OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II
ID: 69056723B000021Type: Presolicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL HIGHWAY ADMINISTRATION690567 WESTERN FEDERAL LANDS DIVVANCOUVER, WA, 98661, USA

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Granite Hill Road Reconstruction, Phase II project under the OR FLAP Grant 24(2) in Baker City, Oregon. This project aims to enhance roadway infrastructure by reconstructing approximately 0.46 miles of Granite Hill Road, including the replacement of culverts and improvements to drainage and traffic control systems, while ensuring compliance with federal and state engineering standards. The initiative is critical for maintaining safe and efficient transportation routes, particularly in areas affected by environmental considerations such as aquatic organism passage. Interested small business contractors must submit their bids by December 10, 2024, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.

    Point(s) of Contact
    Files
    Title
    Posted
    The document details Amendment A001 to the Granite Hill Road Reconstruction, Phase II project under the OR FLAP GRANT 24(2). Effective from November 18, 2024, it provides significant updates, including the addition of FAR Clause 52.240-1, which prohibits delivering, operating, or using Federal funds for unmanned aircraft systems manufactured or assembled by specific foreign entities as defined by the American Security Drone Act. The amendment outlines the responsibilities of contractors regarding compliance with this prohibition, including a requirement to check a Federal Acquisition Security Council-maintained list for regulated entities before utilizing unmanned aircraft systems in the project. It emphasizes that contractors must adhere to these guidelines to ensure alignment with national security regulations. The amendment indicates that all other terms of the contract remain unchanged, highlighting the federal government’s ongoing commitment to uphold security standards in federal contracts.
    The document is an amendment to the solicitation for the Granite Hill Road Reconstruction, Phase II project (OR FLAP GRANT 24(2)), issued by the Federal Highway Administration on November 27, 2024. The amendment modifies contractual obligations regarding traffic management during construction operations. Key revisions include requirements for the contractor to provide a traffic control supervisor certified by the Oregon Department of Transportation. Specific road closures are stipulated for several dates in July and August 2025, and the contractor is mandated to ensure immediate access for emergency vehicles. Furthermore, updated conditions restrict construction operations during holiday weekends, emphasizing the need for effective communication among traffic management personnel. Overall, this amendment reinforces safety protocols and traffic considerations critical to maintaining public safety and minimizing disruptions during construction activities, reflecting the government's commitment to efficient infrastructure development.
    This document serves as an amendment to the solicitation for the Granite Hill Road Reconstruction, Phase II project under FLAP Grant 24(2). Issued by the Department of Transportation's Federal Highway Administration, Amendment A003, effective from December 4, 2024, specifically revises the project plans. It updates plan sheets D-6 and D-8 to include information regarding existing utilities that must be relocated by others. The solicitation's deadline for offers remains unchanged, and all other contract terms continue to apply as previously established. The document ensures compliance with federal guidelines pertaining to amendments and invites contractors to acknowledge these changes in their submissions. This process underscores the structured approach required in federal contracting, highlighting the importance of updates for maintaining project integrity and regulatory adherence.
    The Boundary Creek Fish Passage Improvements report details the final recommendations for reconstructing the Granite Hill Road in Grant County, Oregon. The project involves rehabilitating a 9.32-mile stretch of road, replacing existing culverts with aquatic organism passage (AOP) culverts to enhance fish movement, particularly for endangered species such as bull trout and steelhead. The report emphasizes using design criteria that mimic natural stream conditions, ensuring appropriate culvert dimensions and materials for effective fish passage. Site conditions, including the presence of a beaver dam and placer mine tailings, influence construction strategies. Recommendations include installing a precast concrete culvert, constructing an outlet channel to connect with Bull Run Creek, and implementing erosion control measures. The construction phase is restricted to specific months to minimize ecological impact, and monitoring for turbidity is mandated. This project reflects federal and state efforts to uphold environmental standards while improving infrastructure.
    The document presents a tabulation of bids for the Granite Hill Road Reconstruction, Phase II, project under the OR FLAP GRANT 24(2). It outlines the bids received from various contractors for both Alternate Schedule B and Base Schedule A, including their responsiveness and respective amounts. The engineer's estimate for Schedule B is noted as $7,378,500, while the bids ranged from approximately $5.97 million to over $9.11 million, with Cascade Civil CORP submitting the lowest bid for Alternate Schedule B at $5,973,031.70. Notably, all contractors listed are deemed responsive, indicating compliance with solicitation requirements. The document includes detailed pricing for numerous line items related to construction activities, including mobilization, erosion control, and traffic control measures, to ensure comprehensive evaluation of contractor proposals. Its structure reflects standard practices in government contracts, emphasizing transparency in the bidding process, compliance with federal regulations, and attention to cost-effectiveness. Overall, this bid tabulation illustrates the competitive nature of public works projects and the federal commitment to responsible fiscal management in infrastructure development.
    The bid opening summary for Solicitation No. 69056723B000021 details the proposals received for the Granite Hill Road Reconstruction, Phase II project, under the OR FLAP GRANT program. The bid opening occurred on December 10, 2024, with multiple contractors submitting offers. The bids range from Marcum & Sons LLC's low bid of $4,929,458.74 to West Coast Contractors' high bid of $9,114,442.42, significantly surpassing the engineer's estimate of $5,653,130.00 for Schedule A. Attendance for the event included 12 participants online and 10 in person, facilitated by Bid Opening Officer Marino Chea and assistant Robert Kolln. The low bidder's phone number was provided for further inquiries. The document emphasizes the competitive nature of the contracting process and the importance of transparency in federal grant-funded projects.
    The BULL RUN CREEK NO. 1 FISH PASSAGE IMPROVEMENTS AOP HYDRAULICS REPORT, prepared by the Western Federal Lands Highway Division, outlines the reconstruction of 9.32 miles of Granite Hill Road, Oregon. The project includes replacing a deteriorating 60-inch by 90-inch CMP arch culvert on Bull Run Creek with a 66-foot long precast concrete box culvert designed to enhance aquatic organism passage (AOP) while adhering to regulatory requirements, including the Endangered Species Act and Oregon statutes. Key design criteria focus on mimicking natural stream conditions to support both adult and juvenile fish migration effectively. The culvert design integrates features to maintain water depth and velocity similar to the natural stream and encourages sediment and debris transport. Structural recommendations include specific dimensions for the culvert and its alignment in relation to the existing road. The construction phase has strict timing constraints, with construction permitted only between July 15 and August 15 to minimize impacts on fish habitats. The report provides essential engineering assessments, estimates of peak discharges for the site, and emphasizes the importance of thorough monitoring and maintenance post-construction, illustrating a commitment to ecological responsibility while upgrading infrastructure.
    The memorandum from the Western Federal Lands Highway Division outlines plans for the Bull Run Creek No. 2 fish passage improvements associated with the Granite Hill Road Reconstruction in Grant County, Oregon. The project focuses on replacing an outdated culvert with a precast concrete AOP culvert designed to facilitate the passage of endangered fish species. Compliance with Oregon and federal environmental laws, including the Endangered Species Act and the Magnuson-Stevens Act, is emphasized throughout the document. Key features of the culvert design include specific dimensions to mimic natural stream processes, adequate channel width and height for fish passage, and sediment transport functionalities. Construction activities are constrained to the period from July 15 to August 15 to minimize impacts on water flow and aquatic life. The plan includes definitive measurements, construction techniques, and required materials to enhance habitat restoration. The document serves as a technical report for a federal grant project aimed at improving infrastructure while safeguarding fish populations, aligning environmental stewardship with road management practices in the national forest. This initiative exemplifies the government's focus on sustainable development and compliance in public works projects.
    The memorandum from the Western Federal Lands Highway Division outlines the hydraulics report for the Bull Run Creek Crossings No. 3 Bridge as part of the Granite Hill Road Reconstruction project in Grant County, Oregon. The project involves reconstructing 9.32 miles of road, incorporating new drainage structures, replacing culverts with Aquatic Organism Passage (AOP) features, and installing bridges at specified crossings. Key recommendations include establishing specific minimum elevations for bridge features, using spill-through abutments to minimize excavation, and ensuring proper channel configuration to enhance aquatic habitats. Construction operations are scheduled for a limited window between July 15 and August 15, accommodating stream flow management and turbidity control as per agency regulations. Hydrologic analyses have estimated peak discharges and potential scour risks associated with flood events, necessitating careful monitoring and maintenance protocols for installed riprap erosion controls. The proposed improvements aim to restore natural stream processes and enhance fish passage, reflecting the project's commitment to environmental stewardship and safety compliance. Overall, the memorandum serves as a comprehensive guide for effective management and execution of the road upgrade project and its hydrological implications.
    The memorandum from the Western Federal Lands Highway Division outlines the proposed improvements for the Bull Run Creek Crossings No. 4 Bridge as part of the Granite Hill Road Reconstruction project in Grant County, Oregon. The project involves reconstructing 9.32 miles of road, including the replacement of culverts and bridges to enhance drainage and facilitate aquatic organism passage. Key recommendations include specific bridge design parameters such as minimum elevation, channel alignment, abutment type, and erosion control measures. Construction activities are restricted to specific dates to minimize impacts on stream flow, with requirements for temporary flow deflections and turbidity control outlined. The report also provides a detailed hydrologic analysis using HECRAS modeling to estimate peak flow scenarios and scour impacts, promoting a sustainable approach to manage stream flow and sediment transport post-construction. In summary, this document serves as a design and engineering guideline that ensures the project aligns with environmental regulations and enhances road safety and ecological integrity while actively engaging with associated federal and state agencies.
    This memorandum outlines the final foundation recommendations for the Granite Hill Road Reconstruction Project Phase Two in Grant County, Oregon. The project focuses on replacing five culverts, with specific details on new concrete box culverts and bridges designed to replace existing corrugated metal pipes. Upon completion of Phase One, geotechnical investigations revealed complex subsurface conditions, necessitating consideration of both shallow and deep foundation options. The preferred deep foundation method involves driven piles based on site conditions and load requirements. Site assessments indicate varying geological formations and potential hazards, but no significant risks were identified during site evaluations. Recommendations include detailed parameters for constructing wing walls and performing excavation and pile driving amidst various soil types and potential groundwater challenges. The overall goal of this report is to inform engineering practices for the project's successful execution while ensuring structural integrity and compliance with design standards. This memorandum plays a crucial role in aligning federal funding efforts with practical engineering solutions to enhance infrastructure resilience.
    The Granite Hill Road Reconstruction project aims to address roadway and pavement issues along a vital access road in Grant County, Oregon. A detailed geotechnical report outlines the findings from subsurface investigations, including site conditions, soil composition, and recommendations for remedial actions. The project encompasses the evaluation of local geology, climate, and specific roadway conditions, revealing poor drainage contributing to pavement distress. Key recommendations involve ditch reconditioning to enhance drainage and subexcavation repairs in areas exhibiting weakened subgrade conditions. The report emphasizes the need for specific rehabilitation techniques, such as full depth reclamation and deep patching in particularly distressed sections, to ensure roadway stability. The use of Boundary Creek dredge mine tailing materials is also considered for potential aggregate sourcing, subject to further testing. This geotechnical guidance supports bid preparation and future construction efforts, aiming for a sustainable and structurally sound roadway network.
    The document serves as an Invitation for Bids (IFB) for the reconstruction of Granite Hill Road, Phase II, under Project No. OR FLAP GRANT 24(2), issued by the U.S. Department of Transportation's Federal Highway Administration. It outlines the project specifications, bidding process, and requirements for eligible bidders, which are exclusively small businesses, per federal standards. Key elements include instructions for bid submission, the need for bid guarantees, and adherence to the Standard Specifications for Construction of Roads and Bridges. The project is located in Grant County, Oregon, with an approximate length of 0.46 miles and a total estimated cost between $5,000,000 and $10,000,000. Bidders must provide detailed bid schedules and complete all required certifications and representations. The document includes various appendices detailing required contract clauses, wage decisions, and special contract requirements, ensuring compliance with federal regulations. The bid opening is scheduled for December 10, 2024, with additional information and amendments posted on the designated government website. The solicitation emphasizes the importance of accurate bid submission and the verification of all data prior to submission to avoid rejection.
    The document is a Volumes Report for the Earthwork Review related to the Granite Hill Road reconstruction project under the FLAP Grant 24(2). Created on May 9, 2023, the report details various measurements and volumes concerning the project’s earthwork components, measured in feet, square feet, and cubic yards. It includes data on pavement and shoulder layers, indicating specific volumes for cuts and fills, which are essential for assessing the earthwork needed for the roadway. The report specifies that the total volume cut is 333.259 cubic yards, while the total volume fill amounts to 846.614 cubic yards. It also includes details about the pavement and shoulder layers but indicates that many associated components have zero volumes, suggesting either no work is required or not yet measured. The report serves as a critical component of the project management process and financial planning related to the federal grant funding, ensuring compliance and accurate estimation of earthwork necessary for the road reconstruction project.
    The Horizontal Alignment Review Report for the Granite Hill Road reconstruction project (Phase II) provides a detailed assessment of the roadway's horizontal alignment parameters as part of the federal FLAP Grant 24(2). Created on June 21, 2024, the report outlines various alignment elements, including linear and circular sections, with specific measurements presented in feet. Critical alignment points are specified, from the starting point to the endpoint, detailing tangential directions, lengths, and curvature characteristics for each segment. The document emphasizes the importance of precise engineering computations to ensure road safety and efficacy in design, aligning with federal and state regulations for infrastructure projects. The findings support the ongoing efforts to secure funding and strategically plan the revitalization of this roadway, highlighting its significance in local transportation infrastructure development.
    The Vertical Alignment Review Report for the Boundary Creek project examines the proposed reconstruction of Granite Hill Road under the FLAP Grant 24(2). Created on June 21, 2024, the report details the vertical and horizontal alignments of the project, outlining key measurements and geometric parameters, including station elevations, tangent grades, and parabola specifications. The document is meticulously structured, presenting various alignment elements with their respective coordinates, lengths, grades, and curvature calculations. Key findings include specific grades and lengths for different segments, emphasizing the design's compliance with engineering standards. The report provides essential data for federal and state project funding and highlights critical considerations for the project's technical execution. This analysis ensures that infrastructure improvements meet safety and operational benchmarks while securing necessary funding from government programs.
    The Horizontal Alignment Review Report assesses the alignment for the Bull Run Creek Crossing #1 project, part of the OR FLAP GRANT 24(2) concerning the reconstruction of Granite Hill Road, Phase II. Created on June 21, 2024, this report details the horizontal alignment processes and parameters for the project's design, documenting geographical coordinates and technical specifications for linear and circular elements along the route. The report contains calculated values for each alignment segment, including station marking, tangential directions, length, and curvature metrics. Key elements include specific radii of curvature, angles of deviation, and tangent lengths which are instrumental for engineering and design purposes. The document is structured to present data segment-by-segment, allowing clarity on the progression of horizontal alignment from start to finish. This review is crucial in ensuring compliance with federal and local standards as it provides essential data for planning and executing road construction projects. By detailing precise technical information, it aids in evaluating the project's feasibility and safety, reflecting the government's commitment to infrastructure improvement through accurate documentation in support of federally funded grants and local development initiatives.
    The Vertical Alignment Review Report for the Bull Run Creek Crossing project details the technical specifications of the roadway design, funded under the OR FLAP Grant 24(2) for the Granite Hill Road reconstruction, phase II. Created on June 21, 2024, the report outlines various alignment elements, including linear and parabolic segments, providing specific elevation and grade data at various stations along the project path. Key metrics include tangent grades, lengths, entrance and exit grades, and parameters like radius and middle ordinate, which are critical for conforming to engineering standards. The document serves to evaluate the project’s compliance with necessary design criteria for safe and efficient roadway construction. The comprehensive nature of this review indicates its importance in the overall planning and execution of federally supported infrastructure projects, ensuring alignment with both federal and local guidelines.
    The document is a Horizontal Alignment Review Report for the Bull Run Creek Crossing #2, part of the OR FLAP GRANT 24(2) concerning the Phase II reconstruction of Granite Hill Road. Created on June 21, 2024, it details the geometric alignment components of the project, including linear and circular elements with specified measurements in feet. The report contains precise data on alignment names, stationing, coordinates (Northing and Easting), and directional tangents for various points, encapsulating critical parameters like radius, delta angle, degree of curvature, and tangent lengths for both straight and curved elements. This technical evaluation is essential for ensuring the project adheres to established engineering standards and facilitates safe roadway design. The document exemplifies the thorough documentation associated with federal and state proposals and grants, underlining its significance for regulatory compliance and project planning in infrastructure development.
    The Vertical Alignment Review Report, prepared for the Bull Run Creek Crossing #2 project as part of the OR FLAP grant 24(2) for Granite Hill Road reconstruction, details the vertical alignment parameters essential for road design. Created on June 21, 2024, the report presents critical data on the project’s elevation and gradient metrics, providing baseline measurements necessary for construction planning. Key elements include start and end stations with corresponding elevations, tangent grades, and lengths for various sections, including linear and symmetrical parabola elements. The document emphasizes the importance of maintaining the specified grades and lengths to ensure alignment stability and vehicle safety. Overall, the report serves as a technically detailed guide for engineers and planners involved in the reconstruction, ensuring compliance with design standards in alignment with federal and local requirements.
    The document is an earthwork volume report for the Bull Run Creek Crossing #3 associated with a federal grant (OR FLAP GRANT 24(2)) for the reconstruction of Granite Hill Road, phase II. Created on May 9, 2023, the report outlines the various layers of pavement and shoulder involved in the project, categorized by type and associated volume measurements in cubic yards and square feet. Key figures include a total cut volume of 307.070 cubic yards and a total fill volume of 1,068.214 cubic yards. Notably, the report indicates specific volumes for multiple pavement and shoulder layers, which will assist in managing the project's sitework accurately. All units are consistent, and certain items have been marked as included in the mass ordinate calculations. This report serves the purpose of documenting intended earthwork quantities to facilitate project planning and execution while ensuring compliance with grant requirements for the road reconstruction initiative.
    The Vertical Alignment Review Report for the Bull Run Creek Crossing #3 project, associated with OR FLAP Grant 24(2) for Granite Hill Road reconstruction (Phase II), provides a detailed analysis of the vertical and horizontal alignment of the roadway. Generated on June 21, 2024, the report includes specific elevation measurements, grades, lengths, and geometrical parameters for various alignment elements. Key elements include linear sections and symmetrical parabolas, detailing start and end station locations, tangent grades, and middle ordinates. The purpose of this report is to ensure that the roadway design complies with engineering standards, facilitating safe and effective transportation infrastructure. It reflects the project's alignment design process, contributing to the overall objectives of federal and state grant initiatives aimed at improving local road systems and infrastructure.
    The Horizontal Alignment Review Report details the specifications for the Bull Run Creek Crossing #4 project under the Granite Hill Road reconstruction, Phase II, funded by the OR FLAP Grant 24(2). Created on June 21, 2024, the report outlines the precise geographical coordinates, elevations, and alignment elements necessary for this civil engineering project. It includes detailed measurements of linear and circular elements that comprise the road alignment, specifying tangential directions, radii, curvature, and other critical geometric parameters. The alignment starts with a linear element, transitions into various circular segments, and concludes with an additional linear portion that captures the project's overall scope. The report's focus on technical specifications is essential for compliance with federal and state guidelines, facilitating accurate construction and ensuring safety standards. Given the context of government grants and RFPs, this report is significant for informing stakeholders about the project's requirements and providing a framework for project execution.
    The Vertical Alignment Review Report for the Bull Run Creek Crossing #4 project outlines the technical specifications and grading details associated with the Granite Hill Road reconstruction, Phase II, under Federal Land Access Program (FLAP) Grant 24(2). Created on June 21, 2024, the report meticulously documents the vertical and horizontal alignments, including start and end stations, elevations, grades, lengths, and elements of alignment such as linear and symmetrical parabolas. Key calculations provided include tangent grades, entrance and exit grades, radius, K values, and middle ordinates. The report delivers precise data necessary for the engineering and design phases of the project while adhering to the standards and requirements applicable to federal grants and state/local RFPs. The detailed metrics and alignment strategies are essential for maintaining the road's safety and accessibility, showcasing the government's commitment to infrastructure improvement and adherence to regulatory guidelines in project planning and execution.
    The document provides an Earthwork Volumes Report for the Bull Run Creek Crossing #1 project under the OR FLAP GRANT 24(2) for Granite Hill Road reconstruction, phase II. Created on May 9, 2023, the report includes detailed calculations of earthwork volumes relevant to various pavement and shoulder layers involved in the project. The report outlines specific volume metrics, detailing areas and adjusted volumes for different layers, such as pavement layers and shoulder layers, although many entries indicate no volume changes. Notable figures include total cut volumes of 225.606 cubic yards and total fill volumes of 143.255 cubic yards, both of which are included in mass ordinate considerations. The document serves to support the grant application and project planning by providing quantifiable data essential for understanding the required earthwork and material needs. This report reflects compliance with federal and local regulations for construction projects and aids in resource allocation for the planned reconstruction efforts.
    The report provides a detailed analysis of the earthwork volumes associated with the Granite Hill Road reconstruction, specifically focusing on Bull Run Creek Crossing #2, under the OR FLAP Grant 24(2). Generated on May 9, 2023, the document outlines various pavement and shoulder layers, highlighting calculated area and adjusted volumes for each component in cubic feet. It indicates volumes of fill as 74.805 cubic yards and cut as 327.367 cubic yards, both of which are included in mass ordinate considerations. The report emphasizes measurement accuracy by reiterating that all units are in feet, square feet, and cubic yards, while noting that several categories display zero values, suggesting no work is required or anticipated. This report serves as an essential tool for project planners and contractors to determine the scope of earthwork necessary for compliance with federal grant requirements, ensuring efficient resource allocation during the road reconstruction project. Overall, it underscores the project's commitment to transparency and precision in earthmoving operations relevant to federal and local infrastructure improvement initiatives.
    The Earthwork Review Report for the Bull Run Creek Crossing #4 project, under OR FLAP GRANT 24(2), provides a detailed analysis of earthwork volumes related to the reconstruction of Granite Hill Road, phase II. Prepared on May 9, 2023, it includes calculations of cut and fill volumes necessary for the project, with all measurements in feet, square feet, and cubic yards. The report outlines the data across different pavement and shoulder layers, noting specific volumes of cut (137.655 cubic yards) and fill (610.194 cubic yards) required for sustaining the roadway alignment. Additionally, it includes information on various layers of pavement and shoulders, with values indicating that many components do not contribute directly to mass ordination. The report emphasizes the importance of these calculations in ensuring compliance with regulatory standards and effective project management for environmental stability and infrastructure safety. Overall, this document serves as a technical resource to guide the reconstruction work while also adhering to funding stipulations associated with federal grants and local project requirements.
    The document presents a Volumes Report for Earthwork related to the Bull Run Creek Crossing #4 project associated with the OR FLAP Grant 24(2) for the Granite Hill Road reconstruction, phase II. Created on May 9, 2023, it details the earthwork calculations for the site, specifically from station 495+00 to 498+75. The report quantifies various layers of pavement and shoulder, providing area and volume measurements in cubic yards, along with classifications for cut and fill volumes. The analysis indicates a total cut volume of 82.548 cubic yards and a fill volume of 546.015 cubic yards, while other metrics, such as pavement and shoulder layers, also break down in detail. Importantly, the document highlights that additional volumes for other parameters are recorded as zero, signifying that they are not applicable for this phase of the project. This report is integral for evaluating the earthwork requirements of the road reconstruction project, ensuring compliance with grant specifications and local regulations, aiding in the efficient planning and execution of the construction activities.
    The document outlines the Survey Control point list for the Granite Hill Phase 2 project in Oregon, associated with FLAP GRANT 24(2). It provides essential details regarding project specifications, including state, project description, date of fieldwork, measurement units, coordinate systems, and vertical datum. The points are recorded with precise state plane and geocoordinates, elevation data, and descriptions of each surveying marker, all formatted for transfer to an Excel plan sheet. The purpose of this file is to ensure the accurate collection and representation of survey control data, which is crucial for infrastructure projects funded by federal and state grants. It details a systematic approach for inputting, checking, and managing survey data for various geographic points, ensuring adherence to standards such as NAD83 and NAVD88. Key instructions include guidelines for inserting new tabs, organizing data, handling multiple project entries, and maintaining formatting for ease of use. The document emphasizes the significance of careful data management in civil engineering projects, reflecting the commitment to precision necessary for public works initiatives funded through government support mechanisms.
    The document outlines procedures and requirements for the Federal Highway Administration (FHWA) Western Federal Lands Highway Division regarding construction site inspections and stormwater pollution prevention. Key components include the delegation of authority, amendment log, inspection reports, and corrective action logs, which help ensure compliance with the Storm Water Pollution Prevention Plan (SWPPP) and relevant regulations. Inspections document the construction phase, weather conditions, and any best management practices (BMPs) implemented to mitigate environmental impact. Report sections require inspectors to note deficiencies and propose corrective actions with timelines for completion, reinforcing a systematic approach to addressing compliance issues. Also emphasized are training logs for personnel in sediment and erosion control, ensuring that staff understands BMPs and inspection protocols. The document affirms the necessity for quality assurance checks to keep projects aligned with established water quality standards. Overall, it serves as a comprehensive guide for ensuring construction activities comply with federal regulations and environmental protection standards, highlighting the government's commitment to responsible land use and oversight in highway projects.
    This RFP from the Federal Highway Administration (FHWA) outlines a road reconstruction project in Grant County, Oregon, as part of the Federal Lands Access Program (FLAP). The project aims to reconstruct a 5-mile stretch of the Granite Hill Road, which is located within the Wallowa-Whitman National Forest. The scope of work includes paving, bridge construction, and roadway excavation. The project will also involve the installation of guardrails, pavement markings, and erosion control measures, such as silt fences and fiber rolls. The technical specifications and requirements are detailed in the provided standard drawings and specifications from the FHWA. The contract type and value are not explicitly mentioned. The key dates include various milestones related to the construction phases, with the latest being the completion of the entire project by July 9, 2024. The evaluation criteria for vendor proposals are not provided in this file.
    The Superelevation Report details the design specifications for the Granite Hill Road reconstruction project, specifically phase II, under the FLAP grant 24(2). Prepared on June 17, 2024, the report outlines superelevation data for various road sections, adhering to AASHTO 2018 standards. Key sections, including BR01, BR02, BR03, and BR04, focus on transitions influenced by a design speed of 35-55 feet and criteria such as pivot methods and relative gradient selections. Each section's data presents a detailed table of station points, indicating cross slopes, point types, and transition types ranging from normal crown to full super and reverse crown configurations. These specifics are crucial in road design to enhance vehicle stability during turns, directly supporting safety and performance objectives. Consequently, this report serves as an essential technical document for ensuring accurate compliance with roadway construction standards and ensuring the structural integrity of the road project. The project demonstrates the government’s commitment to infrastructure development that prioritizes safety and efficiency.
    The Granite Hill Road Reconstruction Project, Phase II, is supported by the OR FLAP Grant 24(2) and managed by the Federal Highway Administration's Office of Federal Lands Highway. The documentation provides detailed cross-section data and elevation measurements for various locations along Granite Hill Road, indicating the depths of subgrade and original ground levels. Significant emphasis is placed on ensuring proper alignment and grades to facilitate reconstruction work, which is critical for road stability and durability. The project includes multiple segments, each with recorded slope percentages and specific measurements that guide construction efforts. The document’s structure presents survey data through station markers, showcasing the progressive alterations needed to meet engineering standards and enhance road infrastructure. This initiative underlines the federal commitment towards improving transportation infrastructure while adhering to safety and regulatory requirements throughout the reconstruction process.
    The Horizontal Alignment Review Report for the Bull Run Creek Crossing #3 outlines the technical specifications and measurements of a road reconstruction project funded by the FLAP Grant. Created on June 21, 2024, the report details the alignment metrics and geometric parameters for the project at Granite Hill Road. It includes a series of alignment elements, specifically linear and circular segments, detailing coordinates, tangential directions, lengths, and curvature characteristics. The report emphasizes the importance of precise engineering in road design to ensure safety and compliance with federal standards. The document is essential for informing stakeholders about project specifications, aiding in project management, and ensuring that construction adheres to prescribed engineering guidelines. Overall, this report illustrates the technical groundwork necessary for the effective execution of the phase II reconstruction project.
    The document addresses inquiries related to the "OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II" project. It responds to potential bidders seeking the prospective bidder list and the bid holders list. The government clarifies that such lists are not provided directly; instead, interested parties can access the registered vendors list via sam.gov, contingent on linking their entity to their registration. Bidders must ensure they have the Contract Opportunities Administrator role in SAM.gov to view the Interested Vendors List. For further assistance, the document cites the Federal Service Desk contact information. This reflects standard procedures in government procurement processes, emphasizing self-reliance for accessing bid-related information and the importance of proper registration within federal systems.
    The document pertains to the "OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II" project, addressing inquiries from prospective bidders about the bidding process and project details. It indicates that the federal government does not provide a list of prospective bidders directly; instead, interested parties can access the registered vendors list via SAM.gov if they have linked their registered entities. Several technical questions regarding project specifications were raised, such as the absence of a bid item for structural excavation and traffic accommodation during work interruptions. The document advises bidders to follow solicitation documents for submission guidelines and clarifications. The responses emphasize that no detour will be required and bidders must ensure proper traffic management without obstructing emergency vehicles. The content reflects the government's efforts to maintain organized communication and compliance in the bidding process while facilitating clarity for contractors involved in the infrastructure project.
    The document pertains to the "OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II," which outlines responses to technical questions from prospective bidders. Key inquiries include the availability of bidder lists and details regarding structural excavation work. The government emphasizes that bidder information can be accessed via SAM.gov, where registrants must ensure appropriate roles for visibility. Clarifications are provided on specific project sections, such as the absence of bid items for structural excavation and the management of local traffic during construction, indicating that road closure will not necessitate a detour. The document serves to assist bidders in understanding project requirements and navigating registration processes while reiterating the importance of proper communication channels for further assistance.
    The document pertains to the "OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II" project, addressing inquiries from prospective bidders and clarifying aspects of the bidding and construction process. Key discussions include the unavailability of a bidder list, which interested parties can access via sam.gov, and specific construction-related questions regarding structural excavation, traffic management, power line relocations, aggregate sourcing, in-water construction restrictions, and holiday work guidelines. Responses emphasize adherence to solicitation documents for bidding. Additionally, they clarify that traffic will not require detours and that the project's timeline indicates certain work restrictions. This document serves to streamline the bidding process by providing essential clarifications to contractors, ensuring they operate within the established regulations and guidelines during the project.
    The document pertains to the OR FLAP Grant 24(2) for the Granite Hill Road Reconstruction, Phase II project. It primarily addresses inquiries from prospective bidders about the project and provides them with essential guidance regarding the bidding process. Key discussions include the unavailability of a bidder list, which must be obtained through SAM.gov, and requirements for submitting bids and accommodating traffic during construction. The document clarifies specific issues, such as structural excavation responsibilities, detour requirements, and road closures for emergency vehicles. It also details in-water restrictions for construction timelines and addresses inquiries about temporary bridge specifications and aggregate sources. Furthermore, it emphasizes the need for bidders to adhere strictly to solicitation documents while also offering contact information for assistance. Overall, the document serves as a reference for contractors looking to understand project requirements and ensure compliance during the bidding process.
    The document pertains to the OR FLAP Grant 24(2) for the Granite Hill Road Reconstruction, Phase II project, detailing responses to technical inquiries from prospective bidders. It highlights various questions regarding bid lists, project specifications, construction procedures, and traffic accommodations. Common themes include the requirement for bidders to access the vendors list via SAM.gov and clarification on construction-related stipulations, such as in-water restrictions, traffic management, and materials sourcing. The government emphasizes that bidders must adhere to the solicitation documents for bid submissions. Additionally, several questions regarding construction timelines and traffic accommodations are answered, providing direction on required procedures. Overall, the document serves to clarify procedural details related to the grant and reconstruction project, aimed at facilitating the bidding process and ensuring compliance with regulations.
    The document outlines the specifications and estimates for a civil engineering project funded by the FLAP Grant 24(2) in Oregon. It includes detailed quantities and descriptions across multiple categories such as erosion control, drainage, traffic control, and structural work for bridges and culverts. The bid schedule lists items like soil erosion control methods, construction equipment, various types of concrete, and traffic management measures associated with the project, all divided into schedules A and B. Key components include measures for soil erosion control, like silt fences and fiber rolls, as well as the installation of precast reinforced concrete box culverts and temporary traffic control setups. The project complies with state and federal guidelines, emphasizing construction quality, safety, and environmental impacts. Detailed quantities for materials indicate significant construction scope, reflecting the project's comprehensive design aimed at infrastructure enhancement while adhering to rigorous standards. Overall, the document serves as a critical resource for contractors and public agencies to ensure project alignment with grant requirements, technical specifications, and best practices in construction and environmental management.
    The Granite Hill Road Reconstruction project in Oregon's Wallowa-Whitman National Forest aims to improve infrastructure and transportation in the region. The primary objective is the installation of three precast concrete box culverts and two bridges, with associated earthwork, slope reinforcement, and roadwork. The project is detailed across various divisions, encompassing tasks like mobilization, construction staking, quality control, and erosion control. Division 200 covers earthwork, including clearing, grubbing, and excavation for roadwork and structure foundations. Division 250 addresses slope reinforcement and retaining walls, with riprap and boulder installation. Division 300 focuses on aggregate and base courses, while Division 400 involves asphalt pavement and surface treatments. Division 550 is critical, encompassing bridge construction, driven piles, structural concrete, prestressed concrete slabs, reinforcing steel, bridge railing, and minor bridge work. Temporary bridges and traffic control are essential during construction. Divisions 600 and 647 include incidental construction and environmental mitigation, such as culverts, drains, guardrails, pavement markings, and the relocation of plants and trees. The estimated price range for this project is $5 million to $10 million, with a tentative solicitation date in the winter of 2024/2025 and a fixed completion date in the winter of 2025. The project specifications are detailed, covering quantities and quality standards for all divisions of work, ensuring a comprehensive road reconstruction and bridge installation project.
    The Western Federal Lands Highway Division is preparing to launch a road reconstruction project in Grant County, Oregon, through the OR FLAP Grant 24(2). With the solicitation number 69056723B000021, the project focuses on Granite Hill Road and the stretch between Bull Run and Baker Road. The primary objective is to install three precast concrete box culverts and construct two bridges, addressing drainage and connectivity in the area. The box culverts vary in length from 34 to 66 feet and in span from 13 to 22 feet. The bridges are designed as single-span structures: one at 54 feet using a prestressed concrete voided slab beam and the other at 105 feet with a prestressed concrete deck bulb tee girder, both supported by steel H-piles. To facilitate construction, temporary bridges and effective traffic control measures will be essential. The division encourages prospective bidders to view the project site during the fall due to potential snow obstruction in the advertising period. Technical questions can be directed to wfl.plans-spec@dot.gov, while general inquiries can be made through wfl.contracts@dot.gov or by phone. Solicitation documents will be available in fall/winter 2024, with the release date to be posted on the SAM website (www.sam.gov). Interested parties are advised to monitor the SAM site and utilize the "Follow" feature for automatic updates.
    The file outlines the Federal Highway Administration's (FHWA) procedures for definitizing equitable adjustments related to change orders in construction contracts, as required by FAR 36.211. It provides data on change order proposals definitized over the past three fiscal years (FY 2021-2023), reflecting the time taken to reach definitive agreements. The report categorizes these adjustments based on the duration post-receipt of adequate proposals, illustrating a variety of outcomes from zero days to over a year. Notably, the data show fluctuations in the number of adjustments definitized within specified time frames across the fiscal years, with certain categories, like those taking over 180 days, having recorded proposals. Importantly, the report indicates there are currently no additional agency-specific policies regarding these adjustments. This comprehensive overview demonstrates the FHWA's adherence to federal standards in managing construction-related change orders, serving as both a performance record and a procedural guideline within the context of federal and state-local RFP processes.
    Similar Opportunities
    OR ERFO FS UMPQU 615-2022-2(1), Umpqua ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Umpqua ERFO Repairs 2022 project located in the Umpqua National Forest, Oregon. The project involves the repair of a 0.19-mile aggregate roadway, including ditch regrading, slope stabilization, and the construction of a mechanically stabilized earth wall, with a focus on environmental compliance and infrastructure integrity. This initiative is part of federal efforts to maintain and improve infrastructure in natural areas, ensuring safety and environmental protection while promoting public access. The contract is a total small business set-aside, with an estimated price range between $700,000 and $2,000,000, and is anticipated to be solicited in winter 2024/2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details.
    OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Walla Walla South and North – Umatilla Repairs 2020, Phase 1, under the Emergency Relief for Federally Owned Roads (ERFO) program. The project involves critical repairs to approximately 0.71 miles of roadway in the Umatilla National Forest, addressing damage caused by severe flooding and erosion, with a focus on enhancing infrastructure safety and resilience. This total small business set-aside opportunity has an estimated contract value between $5 million and $10 million, with bids due to be submitted physically as electronic submissions are not permitted. Interested contractors can reach out to the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details.
    ID FLAP BONNER 841(1), Trestle Creek Road, MP 100 to 103.7
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the reconstruction and paving of Trestle Creek Road in Bonner County, Idaho, under project ID FLAP BONNER 841(1). The project aims to enhance a 3.75-mile stretch of roadway by implementing improvements such as riprap placement, roadway aggregates, asphalt concrete pavement, and drainage enhancements, ultimately facilitating year-round access to the Kaniksu National Forest. This initiative is part of the government's commitment to infrastructure improvement and environmental stewardship, with an estimated contract value between $5 million and $10 million. Interested vendors should note that the solicitation is set to be released in Spring 2025, with a completion target of Fall 2025, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    WA ERFO FS MTBKR605 2020-1(1), Mt. Baker Snoqualmie ERFO Repairs 2020 Phase 1 & WA ERFO FS MTBKR605 2022-1(1), Mt. Baker Snoqualmie ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking proposals for emergency repair projects in the Mt. Baker-Snoqualmie National Forest, specifically identified as WA ERFO FS MTBKR605 2020-1(1) and WA ERFO FS MTBKR605 2022-1(1). The projects involve critical infrastructure improvements, including earthwork, roadside development, wall construction, and drainage systems across multiple sites in Washington, covering a total length of 0.4 miles. This initiative is vital for enhancing safety and accessibility in the region's roadways, with an estimated budget ranging from $700,000 to $2,000,000 and a fixed completion target set for Winter 2025. Interested contractors should contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details and to stay updated on the solicitation documents expected to be released in Winter 2024/2025.
    OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the Cleetwood Trail and Marina Improvements project at Crater Lake National Park in Oregon. The project involves the rehabilitation of a 1.1-mile trail, rockfall mitigation, replacement of a failed marina bulkhead, and upgrades to restroom facilities, with a focus on enhancing visitor access and safety while adhering to environmental standards. This initiative underscores the federal commitment to maintaining national park infrastructure, with an estimated contract value between $30 million and $40 million, and a tentative completion date set for Fall 2027. Interested vendors can contact the Contracts G. Office at WFL.contracts@dot.gov or by phone at 360-619-7520 for further details, and should monitor SAM.gov for solicitation updates anticipated in winter 2024/2025.
    WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the improvement and stabilization of Hawk Creek Road in Lincoln County, Washington, under the project titles WA FLAP LINCOL 57860(1) and WA NPS LARO 208(1). The project encompasses a range of construction activities, including earthwork, grading, paving, drainage improvements, and the installation of soil nail retaining walls and guardrails, aimed at enhancing access to the Lake Roosevelt National Recreation Area while ensuring environmental sustainability. With an estimated project cost between $5 and $10 million and a targeted completion date in Summer/Fall 2025, interested bidders are encouraged to contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details and to monitor the SAM website for solicitation updates.
    ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
    Active
    Transportation, Department Of
    The Department of Transportation's Federal Highway Administration seeks contractors for the Crown Point Trail project in Idaho, involving extensive trail construction and repairs. This small business set-aside project, valued between $700,000 and $2 million, requires expertise in highway construction and will be awarded through a sealed bid process. The upcoming procurement, anticipated in early 2025, aims to enhance a 2.7-mile trail stretch with resurfacing, slope repairs, and new construction, accessible for physical inspection now before snow sets in.
    WA ERFO FS GIFPN603 2020-1(1), Gifford Pinchot Repairs 2020, Phase 1
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking bids for the Gifford Pinchot Repairs 2020, Phase 1 project, aimed at restoring roads within the Gifford Pinchot National Forest in Washington. This project, part of the Emergency Relief for Federally Owned Roads (ERFO) program, includes essential construction activities such as earthwork, subgrade reconstruction, drainage improvements, and the installation of culverts, with an estimated contract value between $2 million and $5 million. The initiative is crucial for maintaining and enhancing infrastructure safety and accessibility in national forest areas, reflecting the government's commitment to public safety following emergency events. Interested vendors should contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520, with the project scheduled for completion by Summer 2025 and solicitation documents expected to be available in winter 2024/2025.
    Sweet Creek Trail Bridge # 2
    Active
    Agriculture, Department Of
    The USDA Forest Service is announcing a competitive Blanket Purchase Agreement (BPA) Call Order for road and bridge construction services within the Siuslaw National Forest, specifically for the Sweet Creek Trail Bridge 2 project. This procurement involves activities such as clearing, excavation, and the construction of prefabricated timber bridges, along with various related tasks, aimed at enhancing infrastructure within the national forest. Interested small businesses are encouraged to submit their organizational details and tailored capability statements by January 7, 2025, as the government will evaluate submissions based on the capacity to perform the required services, including project management and risk mitigation. For further inquiries, interested parties may contact DeForest Watson at deforest.watson@usda.gov.
    George Washington & Jefferson National Forests - Project VA ERFO FS GWJEF808 2020-2(1)
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration (FHWA), is seeking qualified contractors for a construction project in the George Washington and Jefferson National Forests, aimed at addressing infrastructure repairs due to environmental damage. The project involves multiple construction tasks, including slide repairs, soil nail wall construction, drainage replacements, and culvert installations across various roads in Virginia, with road closures anticipated during the work. This initiative is critical for restoring the affected areas and ensuring safe access for the public. Interested contractors must submit their qualifications and relevant information by January 17, 2025, with an estimated project cost between $5 million and $10 million, and an anticipated contract award date no earlier than September 2025. For inquiries, contact Mr. Michael Sun at eflhd.contracts@dot.gov.