OR FLAP DOUGLAS 251(1), Oregon Dunes National Recreation Area ‐ Umpqua Dunes Access Improvements
ID: 69056724B000025Type: Presolicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL HIGHWAY ADMINISTRATION690567 WESTERN FEDERAL LANDS DIVVANCOUVER, WA, 98661, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the OR FLAP Douglas 251(1) project, which focuses on access improvements at the Oregon Dunes National Recreation Area in Winchester Bay, Oregon. The project entails significant construction work over a 1.3-mile access route, including earthwork, aggregate installation, drainage enhancements, precast concrete block wall construction, and guardrail installation, all while adhering to environmental protection measures. This initiative is crucial for improving public access and safety in a popular recreational area, with an estimated contract value between $2 million and $5 million and a tentative completion date set for November 2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    The Oregon Dunes National Recreation Area's Umpqua Dunes Access Improvements project involves significant construction work to enhance a 1.3-mile access route in Douglas County, Oregon. Scheduled for completion in Fall 2025, the project is estimated to cost between $2 million to $5 million. Key activities include earthwork, aggregate installation, drainage improvements, precast concrete block wall construction, and guardrail installation. The project emphasizes environmental protection through measures like soil erosion and sediment control, including temporary stream diversion and various silt control devices. The work is structured into divisions covering project requirements, earthwork, slope reinforcement, aggregate courses, asphalt paving, incidental construction, and traffic control measures. Additionally, safety practices and contractor responsibilities are outlined, underscoring the project's compliance with federal regulations and quality assurance needs. This initiative represents a crucial investment in enhancing public access and safety in a popular recreational area.
    Similar Opportunities
    OR ERFO FS UMPQU 615-2022-2(1), Umpqua ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Umpqua ERFO Repairs 2022 project located in the Umpqua National Forest, Oregon. The project involves the repair of a 0.19-mile aggregate roadway, including ditch regrading, slope stabilization, and the construction of a mechanically stabilized earth wall, with a focus on environmental compliance and infrastructure integrity. This initiative is part of federal efforts to maintain and improve infrastructure in natural areas, ensuring safety and environmental protection while promoting public access. The contract is a total small business set-aside, with an estimated price range between $700,000 and $2,000,000, and is anticipated to be solicited in winter 2024/2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details.
    OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for the Granite Hill Road Reconstruction, Phase II project in Baker City, Oregon, under the OR FLAP Grant 24(2). This project aims to enhance roadway infrastructure by reconstructing approximately 9.32 miles of Granite Hill Road, including the replacement of existing culverts with Aquatic Organism Passage (AOP) structures to improve fish passage and drainage. The initiative is crucial for ensuring safe and efficient transportation while adhering to federal and state regulations, with a contract value estimated between $5 million and $10 million. Interested contractors must submit their bids by December 10, 2024, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the OR FS ERFO 2020(1)-14(1) and WA ERFO FS UMATL614 2020-1(1) projects, which involve extensive repairs in the Walla Walla South and North Umatilla areas. The scope of work includes excavation, grading, aggregate surfacing, drainage improvements, and stream bank stabilization, aimed at enhancing the resilience and safety of critical infrastructure in the Umatilla National Forest. With an estimated project cost between $5 and $10 million and a tentative completion date set for spring/summer 2027, interested bidders are encouraged to prepare for the solicitation process, which will be formally announced in early 2024. For further inquiries, potential contractors can contact the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the Cleetwood Trail and Marina Improvements project at Crater Lake National Park in Oregon. The project involves the rehabilitation of a 1.1-mile trail, rockfall mitigation, replacement of a failed marina bulkhead, and upgrades to restroom facilities, with a focus on enhancing visitor access and safety while adhering to environmental standards. This initiative underscores the federal commitment to maintaining national park infrastructure, with an estimated contract value between $30 million and $40 million, and a tentative completion date set for Fall 2027. Interested vendors can contact the Contracts G. Office at WFL.contracts@dot.gov or by phone at 360-619-7520 for further details, and should monitor SAM.gov for solicitation updates anticipated in winter 2024/2025.
    OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Blue Pool Safety and Access Enhancement Project located in Linn County, Oregon. This project aims to enhance safety and access to the Blue Pool area by constructing a new parking area for up to 100 vehicles, paving an access road, and improving Oregon Route 126 with designated left-turn lanes. The initiative is part of the Federal Lands Access Program, emphasizing the importance of infrastructure improvements in federal lands management while ensuring compliance with environmental standards. Interested small businesses must submit their bids by the specified deadlines, with the project completion targeted for September 27, 2024. For further inquiries, potential bidders can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520.
    OR FS OCHOC607 22(1), Road 22 Repairs MP 0.0 to 8.0
    Active
    Transportation, Department Of
    Presolicitation notice from the Department of Transportation, Federal Highway Administration, for the procurement of road repairs on Road 22 in Oregon. The project, titled OR FS OCHOC607 22(1), Road 22 Repairs MP 0.0 to 8.0, aims to address the maintenance needs of this road section. Interested contractors should refer to the attachments for the full requirement. This opportunity is set aside for small businesses. For more information, contact Contracts G. Office at wfl.contracts@dot.gov or 3606197520.
    ID FLAP BONNER 841(1), Trestle Creek Road, MP 100 to 103.7
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the reconstruction and paving of Trestle Creek Road in Bonner County, Idaho, under project ID FLAP BONNER 841(1). The project aims to enhance a 3.75-mile stretch of roadway by implementing improvements such as riprap placement, roadway aggregates, asphalt concrete pavement, and drainage enhancements, ultimately facilitating year-round access to the Kaniksu National Forest. This initiative is part of the government's commitment to infrastructure improvement and environmental stewardship, with an estimated contract value between $5 million and $10 million. Interested vendors should note that the solicitation is set to be released in Spring 2025, with a completion target of Fall 2025, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR
    Active
    Transportation, Department Of
    Presolicitation notice from the Department of Transportation, Federal Highway Administration, for a project titled "WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR". The project is located 2 miles East of Long Beach, Washington in Pacific County. It involves roadway embankment, paving, and striping. The project is 0.15 miles in length and is expected to be completed by Fall 2025. The contract type is Sealed Bid, Firm-Fixed-Price. The estimated price range for the project is between $700,000 and $2,000,000. This solicitation is offered as a Total Small Business Set-Aside. Interested vendors must register as a SAM user to view the Interested Vendors List. The INVITATION FOR BIDS will be posted on SAM.gov.
    WA ERFO FS MTBKR605 2020-1(1), Mt. Baker Snoqualmie ERFO Repairs 2020 Phase 1 & WA ERFO FS MTBKR605 2022-1(1), Mt. Baker Snoqualmie ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking proposals for emergency repair projects in the Mt. Baker-Snoqualmie National Forest, specifically identified as WA ERFO FS MTBKR605 2020-1(1) and WA ERFO FS MTBKR605 2022-1(1). The projects involve critical infrastructure improvements, including earthwork, roadside development, wall construction, and drainage systems across multiple sites in Washington, covering a total length of 0.4 miles. This initiative is vital for enhancing safety and accessibility in the region's roadways, with an estimated budget ranging from $700,000 to $2,000,000 and a fixed completion target set for Winter 2025. Interested contractors should contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details and to stay updated on the solicitation documents expected to be released in Winter 2024/2025.
    WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the improvement and stabilization of Hawk Creek Road in Lincoln County, Washington, under the project titles WA FLAP LINCOL 57860(1) and WA NPS LARO 208(1). The project encompasses a range of construction activities, including earthwork, grading, paving, drainage improvements, and the installation of soil nail retaining walls and guardrails, aimed at enhancing access to the Lake Roosevelt National Recreation Area while ensuring environmental sustainability. With an estimated project cost between $5 and $10 million and a targeted completion date in Summer/Fall 2025, interested bidders are encouraged to contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details and to monitor the SAM website for solicitation updates.