Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
ID: 697DCK-24-R-00596Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL AVIATION ADMINISTRATION697DCK REGIONAL ACQUISITIONS SVCSFORT WORTH, TX, 76177, USA

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

MAINTENANCE OF AIR TRAFFIC CONTROL TOWERS (Z1BA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, Maine. The project involves significant upgrades to the HVAC systems, including the replacement of chillers, boilers, and various mechanical components, as well as enhancements to fire safety systems and the building's roof. This initiative is crucial for maintaining operational efficiency and safety at a key aviation facility, ensuring compliance with federal standards throughout the renovation process. Interested contractors must submit their proposals by January 7, 2025, at 1200 ET, and can direct inquiries to Ms. Joni Haynes at joni.l.haynes@faa.gov or Erin Crabtree at erin.m.crabtree@faa.gov. The estimated budget for this project ranges from $2 million to $4 million, and it is set aside for small businesses under the SBA guidelines.

    Point(s) of Contact
    Files
    Title
    Posted
    This document is an amendment of a federal solicitation issued by the Federal Aviation Administration (FAA) regarding contract changes. Specifically, Amendment 0001 modifies Solicitation Number 697DCK-24-R-00596, effective from September 25, 2024. The key change made by this amendment is the adjustment of the size standard for the solicitation, transitioning from a Small Business set-aside to Full and Open competition. All other terms and conditions of the original contract remain unchanged and in full effect. The amendment requires bidders to acknowledge receipt and respond accordingly before the specified deadline to avoid rejection of their offers. This document exemplifies typical federal procurement processes, ensuring clarity and fairness in competitive bidding while adhering to regulations governing government contracts.
    The document is an amendment to a federal solicitation for the Federal Aviation Administration (FAA), specifically regarding Contract ID 697DCK-24-R-00596. The amendment updates key deadlines pertinent to the proposal process. It includes changes to the timeline for a mandatory site visit, which is now scheduled for October 29, 2024, requiring interested parties to register their attendance by October 25, 2024. Additionally, the deadline for submitting questions has been extended to November 6, 2024, by 1200 ET, while proposals must be submitted no later than November 29, 2024, at 1200 ET. The document stresses that any late proposals would be considered non-responsive and thus ineligible for consideration. All other terms and conditions of the original solicitation remain unchanged and in full effect. This amendment serves to ensure all interested bidders are clear on revised timelines, fostering transparency and compliance in the bidding process for federal grants and contracts.
    This document is an amendment to a government solicitation related to the Federal Aviation Administration (FAA) contract identified as 697DCK-24-R-00596. The primary purpose of Amendment 03 is to extend the deadline for proposal submissions to December 16, 2024, at 1200 ET. It stresses that proposals submitted after this date will be considered non-responsive and will not be evaluated for award. No other terms or conditions of the solicitation are altered; they remain unchanged and in full effect. The document stipulates procedures for acknowledging receipt of the amendment, including methods for altering previously submitted offers if necessary. The amendment is orchestrated by the FAA's Regional Acquisitions office in Fort Worth, Texas, ensuring accurate administration as per the outlined contractual framework. This alteration seeks to provide potential contractors with additional time to prepare their proposals within the competitive bidding process typical of government contracts.
    The document outlines Amendment 04 of a federal solicitation identified as 697DCK-24-R-00596 issued by the Federal Aviation Administration. The primary purpose of this amendment is to extend the deadline for proposal submissions to January 3, 2025, at 1200 ET, ensuring proposals submitted after this deadline will be considered non-responsive. Additionally, the amendment includes the release of key questions and answers alongside several supporting attachments, which are vital for potential contractors. These attachments encompass specifications related to the project and important notes that may affect proposal preparations. This modification emphasizes the necessity for bidders to acknowledge receipt of this amendment to avoid potential rejection of their offers. Overall, the amendment serves to clarify the proposal timeline and provide essential resources to enhance the contractor's understanding of the project's requirements while maintaining all other contractual terms unchanged.
    This document represents Amendment 05 to a solicitation from the Federal Aviation Administration (FAA), specifically concerning Contract ID 697DCK-24-R-00596. The amendment serves to incorporate updated questions and answers from a previous release, now superseded by the revision dated December 16, 2024. Accompanying this update are additional attachments required due to the revised Q&A, which collectively enhance the solicitation's clarity and breadth. The deadline for submitting proposals remains set for January 3, 2025, at 1200 ET, with any late proposals being deemed non-responsive. All other terms of the original solicitation remain unchanged. The document underscores the FAA's efforts to maintain transparency and communication with potential contractors while ensuring that the solicitation process is current and effectively managed. This amendment exemplifies procedural adherence and the importance of timely updates in government contracting.
    The document outlines an amendment to a solicitation or contract from the Federal Aviation Administration (FAA), specifically identified as Amendment No. 06. The primary purpose of this amendment is to extend the deadline for the submission of proposals related to solicitation number 697DCK-24-R-00596. The new due date is set for January 7, 2025, at 1200 ET, emphasizing that any proposals submitted after this deadline will be considered non-responsive and not eligible for award. Additionally, it reassures that all other terms and conditions of the original solicitation remain unchanged and effective. The document also specifies the importance of acknowledging receipt of this amendment to ensure the acceptance of offers. The FAA's contracting officer, Joni L. Haynes, is named, but there are no significant changes to the overall requirements or structure of the contract. This amendment is critical for potential bidders, as meeting the updated deadline will be essential for participation in the bidding process.
    The Federal Aviation Administration (FAA) issued a solicitation for the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower in Portland, MA, designated as solicitation number ES-24-02048. This project is a small business set-aside with a budget estimated between $2 million and $4 million and falls under the NAICS code 238210. Contractors must register in the System for Award Management (SAM) and provide performance and payment bonds. The contractor is expected to start work within 10 calendar days after receiving a notice to proceed and complete the project within 270 days. Key tasks include replacing HVAC equipment, installing new plumbing configurations, and upgrading fire safety systems, notably replacing the existing base building roof and various mechanical systems. A pre-construction site visit is scheduled for October 24, 2024, and proposals must be submitted by November 22, 2024. The solicitation emphasizes adherence to safety and regulatory standards throughout the project. Overall, this initiative reflects the FAA's commitment to enhancing operational safety and efficiency in critical air traffic facilities.
    The document outlines specifications for the HVAC rehabilitation project at the Portland International Jetport's Traffic Control Tower and TRACON facility. This federal construction project includes replacing HVAC components, updating the Building Automation System, and refurbishing fire and life safety systems. Key tasks involve demolishing existing equipment, installing new heating, cooling, and ventilation units, and ensuring compliance with environmental standards and safety regulations. The work is to be managed under a firm fixed-price contract and must adhere to stringent FAA guidelines regarding construction and operational safety, particularly in minimizing disruptions to airport activities. Occupancy requirements allow FAA personnel to use completed areas without interfering with the work schedule. Moreover, the contractor must provide detailed submittals, including a list of subcontractors and necessary safety certifications prior to commencing work. The document emphasizes coordination with FAA practices, including managing site access, managing noise and dust, and maintaining existing utility services. It reinforces the importance of thorough communication with all stakeholders throughout the project to ensure compliance with safety standards and operational efficiency at the airport.
    The document outlines the specifications for the HVAC rehabilitation project at the Portland International Jetport's Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility. It primarily focuses on the replacement of HVAC components, including chillers, boilers, and air handling units, as well as updating the Building Automation System. The project also includes roof replacement, fire and life safety system upgrades, and coordination with existing utility services. Key responsibilities include ensuring timely completion, maintaining minimal disruption to airport operations, and adhering to security protocols. The contractor must conduct a pre-bid site visit, provide a list of subcontractors, and ensure compliance with safety and health regulations. It establishes a single-phase construction plan under a firm fixed-price contract, emphasizing cooperation with other contractors and FAA personnel throughout the project duration. Overall, the document captures critical logistical details, safety requirements, and operational constraints, demonstrating the FAA's commitment to enhancing infrastructure within regulatory and operational frameworks.
    The document appears to be garbled and lacks coherent content, making it impossible to ascertain a clear main topic or purpose. It is formatted akin to technical or procedural documentation likely related to federal or state grants and RFPs, but there are no discernible themes or robust data present. The intended subject matter related to government funding opportunities, requests for proposals, or grant applications cannot be analyzed due to the nonsensical nature of the text. Therefore, a meaningful summary cannot be constructed, as the essential details and foundation for understanding are absent. Further review or a more complete document would be necessary to provide insights or a proper summary related to government initiatives or funding mechanisms.
    The document outlines a comprehensive HVAC Rehabilitation project at the Portland International Jetport (Airport Traffic Control Tower) under the Department of Transportation and the Federal Aviation Administration. The project, designated as number 230041.00, involves critical engineering services aimed at updating the building's heating and cooling systems while ensuring continuous operation during renovations. Key aspects include the installation of temporary heating and cooling systems, removal of existing ceiling structures, and necessary utility connections to maintain functionality. Specific tasks include providing a temporary chiller with a capacity of at least 40 tons and a temporary boiler to sustain systems serving critical areas. Coordination with the FAA is imperative for utility interruptions and equipment operations to avoid disruptions. Safety and regulatory compliance are emphasized throughout this infrastructure project, which aims to enhance operational efficiency and environmental conditions at the facility. The document serves as a reference for contractors, detailing implementation requirements and phasing necessary for project execution without compromising infrastructure integrity.
    This document contains a formal digital signature from Jennifer Lyn Brown, dated August 15, 2024, indicating its official nature. Given the context of federal government Request for Proposals (RFPs) and grants, the signature suggests the completion or approval of a specific process or project related to the RFPs. However, the content of the document does not provide additional context, details, or information regarding the projects or proposals. The brevity and focus on the digital signature imply that the file serves primarily as a procedural record rather than offering substantive discussion about ongoing or upcoming grants and RFPs. The intended purpose is likely to affirm the execution of formalities necessary in governmental operations around funding and proposal processes.
    The document discusses various federal grants, RFPs (Request for Proposals), and state/local funding opportunities aimed at supporting public projects. It outlines the eligibility criteria, application processes, and fundamental requirements necessary for securing these grants and responses. Key sections cover the types of projects that may be funded, including infrastructure development, health services, environmental management, and community initiatives. It emphasizes collaboration between federal and local governments, aiming to enhance community welfare while ensuring compliance with existing regulations. The document further highlights the importance of maintaining transparency in the procurement process, stressing accountability and proper budgeting practices. It emphasizes that potential applicants should prepare comprehensive proposals that detail project objectives, anticipated outcomes, and financial implications to increase chances of funding approval. Overall, the file serves as a guideline for stakeholders looking to leverage federal and state resources for executing impactful projects, reflecting ongoing efforts to promote public welfare through targeted financial support.
    The document outlines engineering services related to the construction and site planning for an Airport Traffic Control Tower (ATCT) at the Portland International Jetport in Portland. It includes references to multiple work revisions and construction drawings, indicating a history of updates and adjustments to the project since as early as 2005. Key components of the utility site plan, such as the underground electric utility feeder, storm drains, and sanitary sewer systems, are detailed graphically through engineering drawings. The document emphasizes compliance with Federal Aviation Administration (FAA) specifications and showcases various utility configurations, including fiber optics and gas services. Additionally, it notes the importance of reviewing previous construction plans for a seamless integration of new systems with existing infrastructure. Overall, this project reflects a commitment to enhancing aviation safety and operational efficiency through meticulous planning and engineering oversight.
    This performance questionnaire is designed to support federal contracting evaluations for the Federal Aviation Administration (FAA). It requires contractors to provide essential contract details, such as name, contract number, initiation and completion dates, total value, and type of contract. The evaluator, representing the assessing organization, must provide their name, position, contact details, and the duration of performance monitoring. The document includes a series of evaluation criteria focused on different aspects of contractor performance, whereby an evaluator rates the contractor on quality of products and services, overall performance, technical capability, adherence to schedules, cost control, customer satisfaction, and overall assessment. Ratings span from "Exceptional" to "Unsatisfactory," alongside the option to provide additional comments for further clarification on the assessment. Overall, the questionnaire is a structured tool for objectively assessing contractor performance, which is critical in the context of federal RFPs and grants, ensuring that contractors meet established standards and can effectively deliver on government projects. Completing this form accurately is essential for maintaining accountability and transparency in government contracting processes.
    The document outlines a breakdown of costs for a project proposal required by federal authorities. It specifies the need for a comprehensive submission from contractors that includes all materials, labor, supervision, and equipment necessary for project execution. Each cost item, such as temporary utilities, field personnel, and HVAC, must be detailed with associated expenditures categorized into materials, labor, and equipment. Additional costs, such as overhead, profit, insurance, and bonding, are also required. The document mandates that proposals must adhere strictly to the requested format, failing which they could be deemed non-responsive. It further emphasizes that any additional information needed during negotiations must be provided to the Contracting Officer to avoid disqualification. Overall, the emphasis is on transparency, thoroughness in financial disclosure, and compliance with federal guidelines for RFPs, ensuring a fair bidding process. This systematic costing approach is crucial in determining the total project budget and facilitates informed decision-making by the government.
    The document outlines a detailed pricing breakdown for a construction project focused on fire safety systems. It includes a list of necessary components, such as rated separation and door details, fire/smoke damper costs, fire alarms, fire stopping, and stair pressurization systems. Each item is designated with corresponding costs for materials, labor, and equipment, leading to a total calculation for each category. Additionally, the document mentions the application of taxes, profit, overhead, general and administrative costs, and insurance tied to the project. It emphasizes that the contractor is responsible for all aspects of the job, including material provision and labor supervision. The overall purpose is to provide a comprehensive financial estimate for government review as part of a Request for Proposal (RFP) process, ensuring all costs related to fire safety are accounted for in compliance with federal and state guidelines.
    The document outlines specifications for a 44' x 12' mobile office provided by WillScot. The mobile office features a 40' box layout with a variety of designs, including options for aluminum or wood siding. Key construction details include an I-Beam frame, standard gutters, paneled walls, and flooring choices of carpet or vinyl tile. Electrical features comprise fluorescent ceiling lights and a breaker panel, alongside heating and cooling options such as central HVAC or thru-wall AC. Security is addressed with options for vision panel doors or steel doors with a lock. The floor plan accommodates private offices and an optional restroom. WillScot also offers additional services such as steps, ramps, furniture, appliances, technology, site services, and loss protection to enhance the workspace. The document serves as a product specification sheet for potential government RFPs and grants, targeting clients in need of mobile office solutions for a productive and safe working environment. It emphasizes the availability of customizable products and services that meet diverse operational needs for mobile workspaces.
    The PWM HVAC Upgrade Project outlines critical adjustments and clarifications regarding the installation and upgrade of heating, ventilation, and air conditioning systems. Key directives include flushing and refilling chilled and hot water systems, reusing control wires provided they meet specifications, and updating labels for various components. Additional instructions specify the alteration of circuit setups for water systems and the installation of new temperature sensors in key locations. The document mandates maintaining minimum operating conditions and emphasizes the importance of accurate component identification throughout the design. These clarifications aim to ensure a successful upgrade while complying with existing technical requirements and enhancing the HVAC infrastructure's efficiency and safety. The document serves an essential role in guiding contractors to meet federal, state, and local standards within government-funded projects.
    The document serves as a comprehensive catalog for Satellite Suites' range of portable restroom trailers and sanitation solutions, emphasizing their diverse offerings tailored for various events and needs. It details various models including the Selfie, Millennium Ultra, Flex, and ADA-compliant trailers, outlining their dimensions, station capacities, freshwater and wastewater tank specifications, and interior designs. The trailers are designed for ease of transport, setup, and use, targeting both high-traffic events and intimate gatherings. Key features include elegant interiors with amenities like air conditioning, flushing toilets, and stainless-steel sinks, designed to provide users with a comfortable experience. The catalog highlights the importance of functionality for operators, offering lightweight, durable options for diverse applications, from weddings to fieldwork. Additionally, the document identifies unique offerings like laundry trailers and handwash units, addressing emerging needs in portable sanitation markets. This information is particularly relevant in the context of government RFPs and grants, as it highlights the products’ compliance with ADA standards and their potential utility in community events or disaster relief scenarios, thereby positioning Satellite Suites strategically within the sanitation supply chain for governmental and municipal contracts.
    The project at the PWM Portland Maine ATCT focuses on mechanical and roofing upgrades with a due date for proposals set for November 6, 2024. The FAA confirmed that no abatement is required, although an independent Quality Control organization is essential, adding to project costs. The contractor must follow specific protocols regarding HVAC and BAS, with a preference for specified brands, while still allowing for approved equal substitutions. Taxes apply at the contractor level as the FAA is tax-exempt. Meetings are mandatory, preferably using Teams for coordination, and all submissions need FAA approval. No additional site visits will be allowed prior to bid submission. The project emphasizes compliance with specifications for quality control, safety, and environmental considerations, such as indoor air quality testing. Requirements for temporary facilities, contractor responsibilities for metering installations, and command over utility interactions were elaborated upon, with clarification provided on project timelines and bidding procedures. Overall, the document underscores thorough governance in the bidding and execution phases to ensure safety, adherence to FAA standards, and effective project management.
    The document outlines the Q&A for the PWM Portland Maine ATCT Mechanical & Roofing project, addressing inquiries related to project specifications, contractor responsibilities, and FAA requirements. Key topics include clarification on the lack of abatement requirements, acceptable brands for controls, tax responsibilities, and the necessity for an independent quality control organization. Additionally, it specifies that all major mechanical and electrical equipment must be sourced from a single manufacturer, while allowing for alternate manufacturers pending compliance with specified requirements. The FAA emphasizes strict adherence to project specifications regarding submission processes, bonds, scheduling, and on-site operations, including safety protocols. A significant point is the need for the contractor to ensure compliance with FAA standards throughout the project lifecycle and to secure temporary facilities and utilities as stipulated. Overall, this document serves as a foundational guide for contractors bidding on the project, detailing compliance with engineering specifications and FAA guidelines while fostering a transparent communication channel throughout the bidding and execution phases.
    Similar Opportunities
    SOLICITATION: **BIL-FUNDED** REPLACE MULTIPLE HVAC UNITS AND REPAIR THE ROOF AT THE NORWOOD MEMORIAL AIRPORT (OWD) AIR TRAFFIC CONTROL TOWER (ATCT) FACILITY IN NORWOOD, MA
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting bids for the replacement of multiple HVAC units and roof repairs at the Norwood Memorial Airport Air Traffic Control Tower facility in Norwood, Massachusetts. The project aims to enhance operational efficiency and safety by replacing an existing 7.5-ton rooftop HVAC unit, installing a Packaged Terminal Air Conditioner (PTAC), and conducting necessary roof rehabilitation, all while ensuring minimal disruption to air traffic operations. This contract is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses, with an estimated funding amount between $260,000 and $355,000, and proposals are due by January 14, 2025. Interested contractors should direct inquiries to Stephen Branch at stephen.n.branch@faa.gov and are encouraged to attend a site visit scheduled for December 19, 2024.
    Water Intrusion Mitigation Project- Miami Air Traffic Control Tower (ATCT), Miami, FL 33122
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking proposals for the Water Intrusion Mitigation Project at the Miami Air Traffic Control Tower (ATCT) in Miami, Florida. The project requires contractors to provide all necessary labor, materials, and equipment to address water intrusion issues, ensuring the operational integrity of the facility. This initiative is crucial for maintaining the functionality of essential FAA operations and is set aside for small businesses, with an estimated contract value between $50,000 and $100,000. Interested contractors must submit their proposals by January 17, 2025, and are encouraged to attend a mandatory site visit on January 7, 2025. For further inquiries, contact Regina Singleton at regina.singleton@faa.gov or call 404-305-5790.
    Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is soliciting proposals for the construction of a new Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility at Ted Stevens International Airport in Anchorage, Alaska. This project aims to enhance air traffic management capabilities and safety by replacing outdated facilities built in 1977, with a focus on modern engineering standards and compliance with federal regulations. The estimated construction cost ranges from $100 million to $200 million, and interested vendors must submit their proposals by 3:00 PM PT on January 31, 2025, following a pre-proposal Zoom meeting scheduled for January 10, 2025. For further inquiries, vendors can contact Katherine Fogle at katherine.fogle@faa.gov.
    Roof replacement at MFE ATCT (McAllen, TX)
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for a roof replacement project at the McAllen Air Traffic Control Tower (MFE ATCT) in Texas. The project involves extensive civil, mechanical, and architectural work, including the replacement of roof membranes, HVAC units, and lead paint abatement, all to ensure the structural integrity and safety of the facility. This initiative is part of a broader commitment to maintaining critical infrastructure within the National Airspace System, with an estimated contract value between $1 million and $5 million. Interested contractors must be registered in the System for Award Management (SAM) and adhere to the small business size standard, with key deadlines including a mandatory site visit on December 17, 2024, and proposal submissions due by January 27, 2025. For further inquiries, contact Elisha Distler at elisha.distler@faa.gov or call 817-222-4196.
    BIL Fire Life Safety at PHX Base Building and P50 TRACON
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Aviation Administration (FAA), is soliciting proposals for a fire life safety upgrade project at the Phoenix Sky Harbor International Airport (PHX) Base Building and P50 TRACON. The project aims to enhance fire safety systems by replacing the existing automatic sprinkler system, upgrading fire pumps, and modifying fire alarms, ensuring compliance with safety regulations and improving overall fire management infrastructure. This initiative is critical for maintaining high safety standards in airport operations, reflecting the FAA's commitment to enhancing facility safety and operational integrity. Interested contractors must submit their proposals by February 4, 2025, and are encouraged to direct inquiries to Ms. Melina Nguyen at melina.m.nguyen@faa.gov, with a project budget estimated between $4 million and $7 million.
    Fire Life Safety at EVV ATCT in Evansville, Indiana
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is soliciting bids for a total small business set-aside contract to upgrade the fire life safety systems at the Evansville Regional Airport's Air Traffic Control Tower (ATCT) in Indiana. The project involves comprehensive improvements to the architectural, mechanical, electrical, and fire protection systems to ensure compliance with OSHA, FAA, and Fire Code requirements, including the replacement of existing fire detection and alarm components. This initiative is crucial for enhancing safety and operational compliance at aviation facilities, reflecting the federal commitment to maintaining high safety standards. Interested contractors must register in the System for Award Management (SAM) and submit bids by January 21, 2025, with a project cost estimate ranging from $400,000 to $750,000. For further inquiries, contact Elisha Distler at elisha.distler@faa.gov or call 817-222-4196.
    Replacement of Door in Albuquerque, New Mexico
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking qualified contractors to replace the Control Room double doors at the Albuquerque Air Route Traffic Control Center in New Mexico. The project requires contractors to provide all necessary engineering, materials, labor, and supervision to complete the work in compliance with FAA regulations and safety standards, with a budget ranging from $25,000 to $50,000. This initiative is part of the FAA's commitment to maintaining secure and functional aviation control facilities, emphasizing support for small businesses through a 100% Small Business Set-Aside. Interested contractors must RSVP for a mandatory site visit by December 17, 2024, and submit proposals via email by January 13, 2025, with all inquiries directed to Haylee Hildebrand at haylee.p.hildebrand@faa.gov.
    Basic Ordering Agreements (BOA) for Design/Build (D/B) and Bid/Build (B/B) Services
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking to establish Basic Ordering Agreements (BOAs) for Design/Build (D/B) and Bid/Build (B/B) services related to Air Traffic Control (ATC) facilities. The FAA intends to add up to five qualified vendors to support the modernization and management of the National Airspace System (NAS), emphasizing the importance of compliance with the Buy American Act and reporting requirements under the Bipartisan Infrastructure Law (BIL). This procurement is critical for enhancing safety, reliability, and efficiency in air traffic control operations across the United States. Interested vendors must submit proposals by 17:00 ET on February 14, 2025, and direct any inquiries to Katherin Fogle at katherine.fogle@faa.gov.
    MARKET SURVEY TO INSTALL TWO 20 TON HVAC UNITS AND ASSOCIATED DUCTING AND HARDWARE IN SUPPORT OF MAST SYSTEM LOCATED AT THE FAA STT ASR FACILITY IN ST. THOMAS, USVI
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is conducting a market survey to identify qualified contractors for the installation of two 20-ton HVAC units at the FAA STT ASR Facility in St. Thomas, USVI. The project entails the removal of existing air conditioning units, power washing, duct repairs, and the installation of new TRANE/ALLIED units, with all work to be completed within 45 calendar days while ensuring compliance with safety and local regulations. This procurement is critical for maintaining operational efficiency and safety at the facility, emphasizing the importance of adhering to OSHA standards and minimizing disruption to FAA operations. Interested vendors must submit their statements of interest and capability by 4:00 p.m. Central Time on January 6, 2024, to Stephen Branch at stephen.n.branch@faa.gov, with the subject line "MARKET SURVEY RESPONSE: STT ASR HVAC."
    Fire Life Safety Maintenance and Testing at DEN, D01, BJC
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is seeking proposals for Fire Life Safety Maintenance and Testing services at various air traffic control facilities in Denver, Colorado. The contract, which is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), will cover essential maintenance and testing services at the Denver International ATCT, Denver TRACON, and Rocky Mountain Metropolitan ATCT, with a performance period from April 1, 2025, to March 31, 2030. Interested contractors must submit their proposals by January 30, 2025, and are encouraged to attend a site visit on January 9, 2025, to familiarize themselves with the requirements outlined in the Performance Work Statement. For further inquiries, potential bidders should contact Jennifer J. Davis at jennifer.j.davis@faa.gov.