SOLICITATION: **BIL-FUNDED** REPLACE MULTIPLE HVAC UNITS AND REPAIR THE ROOF AT THE NORWOOD MEMORIAL AIRPORT (OWD) AIR TRAFFIC CONTROL TOWER (ATCT) FACILITY IN NORWOOD, MA
ID: 6973GH-25-R-00007Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL AVIATION ADMINISTRATION6973GH FRANCHISE ACQUISITION SVCSOKLAHOMA CITY, OK, 73125, USA

NAICS

All Other Specialty Trade Contractors (238990)

PSC

REPAIR OR ALTERATION OF AIR TRAFFIC CONTROL TOWERS (Z2BA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Timeline
    Description

    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting bids for the replacement of multiple HVAC units and roof repairs at the Norwood Memorial Airport Air Traffic Control Tower facility in Norwood, Massachusetts. The project aims to enhance operational efficiency and safety by replacing an existing 7.5-ton rooftop HVAC unit, installing a Packaged Terminal Air Conditioner (PTAC), and conducting necessary roof rehabilitation, all while ensuring minimal disruption to air traffic operations. This contract is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses, with an estimated funding amount between $260,000 and $355,000, and proposals are due by January 14, 2025. Interested contractors should direct inquiries to Stephen Branch at stephen.n.branch@faa.gov and are encouraged to attend a site visit scheduled for December 19, 2024.

    Point(s) of Contact
    Files
    Title
    Posted
    The solicitation seeks bids for a construction project at the Norwood Memorial Airport, specifically the replacement of HVAC units and roof repairs on the Air Traffic Control Tower. This project is funded through the Bipartisan Infrastructure Law, with an estimated cost between $260,000 and $355,000, and is open exclusively to Service-Disabled Veteran-Owned Small Businesses. The selected contractor must commence work within 15 calendar days of receiving the Notice to Proceed and complete the project within 60 days. Proposals must include various required documentation, including performance and payment bonds. The contract stipulates compliance with labor regulations, including the Davis-Bacon Act and provisions for minority and female participation in the workforce. The awarding process favors the lowest bid from responsible offerors, ensuring that all terms and conditions outlined in the solicitation are met, including obligations regarding safety, payment, and performance standards. With a focus on public safety and infrastructure enhancement, this contract embodies the commitment of the Federal Aviation Administration to support small businesses while fulfilling critical construction needs.
    The Department of Transportation's Contractor's Release document serves as a formal agreement between the government and contractors upon the completion of project payments. It outlines the total sum paid and payable to the contractor, along with the release of the government's liability concerning the involved contract. Notably, it specifies exceptions to this release, including any claims not disclosed by the contractor at the time of signing, third-party claims arising from contract performance, and reimbursement claims related to patent-related costs. The contractor is obliged to comply with contract provisions, particularly concerning patent matters and timely notifications to the Contracting Officer. The document emphasizes a structured release process that protects both the government and the contractor while ensuring contractual obligations regarding patents and claims management are met. Overall, it facilitates the closure of contractual agreements while safeguarding future claim potentials, reflective of best practices in government contracting protocols.
    This document outlines a Request for Proposals (RFP) structure aimed at obtaining contractor offerings for various government projects. It requests fundamental information from offerors, including company details, contract numbers, values, project status, descriptions of responsibilities, and contact information for project owners or managers. Each offeror must provide insights into their project experience, referencing specific criteria regarding project value and recency as per the provided Special Instructions Report (SIR). The document is structured to gather both offeror details and project specifications for multiple projects, noted as PROJECT #1 and PROJECT #2, indicating a continuous process for evaluating potential contractors. The intent is to assess and document qualifications accurately while ensuring alignment with government contracting standards and requirements, which are crucial for financial accountability and project execution in government-funded initiatives.
    The document outlines the details for a roofing and HVAC replacement project at Norwood Memorial Airport, managed by the Federal Aviation Administration (FAA) under the Department of Transportation. It includes guidelines for replacing damaged roofing materials, specifically focusing on the application of elastomeric coatings and insulation replacements to ensure the structural integrity and compliance with manufacturer specifications. The main elements include the repair or replacement of existing EPDM, ensuring proper sealing of vapor barriers, and the removal of debris from roof drains. Additional tasks involve the inspection of the roof by a coating representative, installation of new aluminum closures, and cleaning existing drains. Approved materials must be submitted by contractors prior to commencement. Overall, the project emphasizes adherence to safety standards and long-term maintenance of the roofing system, reflecting federal standards and best practices for infrastructure rehabilitation. This summary captures the essence of the plans and procedures outlined in the document, which serves as a directive for contractors involved in these essential upgrades.
    The document from the Federal Aviation Administration outlines the electrical design specifications for an HVAC replacement and roof rehabilitation project at Norwood Memorial Airport. It presents a one-line diagram detailing the main distribution panel, sub-panels, switches, and generator set configurations, all operating at designated voltage levels such as 208/120VAC and 240 VAC. The design includes significant equipment like transfer switches, circuit breakers, and transformers, necessary for effective power distribution and management as per National Electrical Code standards. Various panels are annotated with their specific ratings and connections to ensure appropriate operational capacity. The document indicates a structured approach to the project, emphasizing safety standards and systematic installation requirements. The aim is to modernize the facility’s infrastructure while ensuring compliance with federal regulations, facilitating efficiency in airport operations.
    The Federal Aviation Administration (FAA) has issued a document outlining plans for electrical work related to the HVAC replacement and roof rehabilitation project at Norwood Memorial Airport. The document includes an electrical panel schedule detailing the specifications for various electrical panels, including their connection numbers, amperage, voltage, and service voltage. Key points emphasize the requirement for contractors to supply their own lockout devices, submit a lockout tag-out plan to the Contracting Officer Representative (COR) prior to starting electrical work, and ensure that only FAA personnel operate breakers. Additionally, it specifies the coordination of outages with the COR 48 hours in advance. Important notes include the necessity to match existing electrical requirements for new equipment and reuse conduits and breakers where applicable. The document is structured to provide clear insights into locations, connections, and operational guidelines necessary for compliance and safety during the project's execution. Overall, this project showcases the FAA’s commitment to upgrading airport infrastructure while adhering to safety regulations and procedural standards.
    The document pertains to the HVAC replacement and roof rehabilitation project for the Air Traffic Control Tower (ATCT) at Norwood Memorial Airport in Massachusetts. This file was submitted as a 50% design completion and outlines the necessary construction specifications and drawing index related to the project, which is part of the Federal Aviation Administration's infrastructure improvements. Key documents included are the cover sheet, roof work plans, electrical diagrams, and mechanical schedules. The project aims to enhance operational efficiency and ensure compliance with safety and engineering standards within the Aviation sector. Engineering services are coordinated through the FAA's Eastern Service Area, reflecting a broader federal commitment to maintaining and upgrading critical aviation infrastructure. The involvement of project engineers and adherence to government protocols highlights the structured approach to ensuring successful project execution.
    The document outlines the specifications for the HVAC replacement and roof rehabilitation project at Norwood Memorial Airport, led by the Federal Aviation Administration (FAA). It details the requirements for a rooftop air conditioning unit and associated mechanical systems, including parameters such as capacity (7.5 tons), electrical requirements (208/230 volts), and efficiency standards. Specific components include type and quantity of refrigerants, stages of cooling, and additionally required features like dehumidification coils, low ambient controls, and high-efficiency filters. Installation drawings provide dimensions, duct connections, and service access points necessary for system integration. This project emphasizes the FAA's commitment to maintaining airport infrastructure while adhering to federal standards and efficiency requirements for air conditioning systems. Overall, it presents technical specifications, drawing notes, and service requirements essential for prospective contractors involved in responding to this Request for Proposal (RFP).
    The document outlines plans for the HVAC replacement and roof rehabilitation project at Norwood Memorial Airport, managed by the Federal Aviation Administration (FAA). It includes detailed mechanical ductwork specifications to ensure proper installation and functionality of new HVAC units. Critical components include the reuse of existing ductwork, ensuring compliance with local and federal regulations, and implementing measures to prevent noise interference and condensate drainage issues during construction. Key points emphasize the necessity for a written work plan that details cleaning protocols, power supply management for temporary units, and testing and balancing requirements for air distribution. Contractors must submit detailed plans for approval, ensuring adherence to all operational needs during the construction phase without disrupting air traffic services. The project aims to maintain safety, efficiency, and compliance within the aviation infrastructure while providing necessary temporary solutions throughout the upgrade process.
    The document outlines the specifications and requirements for a construction project related to HVAC replacements and roof rehabilitation at Norwood Memorial Airport, initiated by the Federal Aviation Administration. The project includes the installation of a new packaged terminal air conditioner (PTAC) and an electric unit heater. Key tasks for the contractor involve providing and installing specific HVAC units, ensuring compliance with local and federal regulations regarding refrigerant disposal, and submitting equipment for approval prior to installation. Additionally, the contractor must ensure the installation includes necessary wall penetrations for conduits, proper weather sealing, and adherence to manufacturer specifications for the thermal performance of the units. The document emphasizes the importance of coordinated work to maintain current system effectiveness while ensuring safety and operational efficiency at the airport facility. Overall, this RFP emphasizes detail-oriented work, compliance with established codes, and the necessity for contractor accountability in equipment installation and maintenance practices.
    The document outlines the requirements and conditions for a Bid Bond associated with U.S. government contracts, particularly in reference to the Federal Aviation Administration (FAA). It establishes that both the Principal (the bidder) and Surety (guarantor) must secure the bond to ensure compliance with bid obligations and financial accountability. The Principal must execute the contract upon bid acceptance and fulfill any required bonding within specified timeframes. If the contract is not executed or bonds are not provided, the Principal must cover additional costs incurred by the government. The form collects essential details such as bid identification, amount, and surety information. The signature section includes spaces for the Principal and Surety to affirm their commitment, reinforcing the legal obligation of the parties involved. The document serves to protect the government against potential losses in the bidding process, thereby promoting accountability among bidders in federal projects.
    The document outlines the performance bond requirements for contracts with the U.S. Government. A performance bond is a legal agreement wherein the "Principal" (contractor) and any Sureties (guarantors) commit to fulfilling the contractual obligations, thereby protecting the government against potential non-performance by the contractor. Key elements include the requirement for the bond to be executed no earlier than the contract date, a detailed identification of the parties involved, and stipulations regarding individual or corporate sureties. The bond indicates that the principal must perform all contract terms and pay applicable taxes, including those under the Miller Act. It includes instructions for filling out the bond, such as providing legal names, addresses, and obtaining corporate seals where necessary. The document also emphasizes the necessity for corporate sureties to appear on the Treasury’s approved list and requires additional documentation for individual sureties. The overarching purpose is to secure government interests by ensuring that contractors and their sureties are legally bound to complete the contracted work or face potential financial penalties. Compliance with this form is essential for federal contracts, ensuring accountability and adherence to outlined terms.
    This document outlines the requirements for a payment bond related to government contracts, specifically under the Act of August 24, 1935. It provides a form where the principal (the contractor) and sureties (those guaranteeing the payment) commit to a specified penal sum. The bond protects individuals supplying labor and materials in relation to the contract, ensuring they receive payment. It details the obligations of the principal and sureties, conditions under which the bond may become void, and procedural guidelines for executing the bond. The document instructs on the proper completion of the form, including the need for corporate seals and individual surety affidavits when applicable. Additionally, it references the OMB Control Number 2120-0595 for compliance with the Paperwork Reduction Act, estimating an approximate 25-minute burden for completing the required information. Overall, the document serves as a standardized instrument to ensure financial accountability in federal contracting processes, safeguarding the interests of labor and material suppliers.
    The document outlines a Request for Proposal (RFP) for replacing a Heating, Ventilating, and Air Conditioning (HVAC) unit at the Air Traffic Control Tower in Norwood, MA. The primary objective is to replace an existing 7.5-ton rooftop HVAC unit, install a Packaged Terminal Air Conditioner (PTAC), and implement roof rehabilitation efforts, including elastomeric coating. The contractor is obliged to provide thorough labor, equipment, and materials while ensuring the tower remains operational throughout the project to avoid disruption of air traffic. The scope involves demolishing existing systems, installing new units, and conducting necessary repairs to the roofing. Safety measures are prioritized, particularly due to the facility's critical function in air traffic operations. Meetings with FAA representatives are mandatory for operational risk management, and night work is often required to minimize impact. The contractor must also comply with various safety and quality assurance standards, and all work must be completed within 60 days following the notice to proceed. Warranties for equipment and installations are mandated, ensuring quality and long-term functionality of the HVAC systems and roofing materials.
    The Federal Aviation Administration (FAA) provides instructions for the completion of the Uniform Bipartisan Infrastructure Law (BIL) Data Report, which includes five key tabs: Contractor Info, Buy American, Environmentally Friendly, Subcontracting, and Jobs Creation. Each tab requires specific information relevant to projects funded under the BIL. The Contractor Info tab outlines details about the prime contractor, such as contact information, business name, socio-economic status, and contract specific identifiers. Buy American focuses on reporting non-domestic purchases linked to the contract, detailing their dollar value. The Environmentally Friendly tab seeks to capture energy-saving initiatives, necessitating the identification of products being replaced. Subcontracting demands an account of total dollars awarded to first-tier subcontractors, classified by socio-economic category. Finally, the Jobs Creation section quantifies jobs created under each Job Control Number (JCN) by both contractors and subcontractors. This structured report ensures transparency and accountability for the use of BIL funds, aligning with federal grant and RFP guidelines, ultimately supporting government infrastructure initiatives.
    The document is a federal wage determination for construction projects in Massachusetts, specifically covering building construction contracts affected by the Davis-Bacon Act. It supersedes the previous decision MA20230001 and applies to counties including Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk, and Suffolk, excluding single-family homes and smaller apartments. Key points include wage rates for various construction classifications, including minimum wage requirements set by Executive Orders 14026 and 13658, with stipulations on wages starting from January 30, 2022. For 2024, covered workers must be paid at least $17.20 per hour under Executive Order 14026 or $12.90 per hour under Executive Order 13658, depending on the contract's initiation date. The determination includes hourly wages and fringe benefit rates for diverse job classifications, including insulator workers, electricians, and laborers, with detailed rates provided for each region. The document emphasizes compliance with labor standards that protect worker rights and provides recourse through an appeals process for any disputes related to wage determinations, showcasing the government’s commitment to fair labor practices in federally funded construction projects. This is essential for contractors engaged in federal projects to ensure adherence to wage laws and labor protections.
    Similar Opportunities
    Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, Maine. The project involves significant upgrades to the HVAC systems, including the replacement of chillers, boilers, and various mechanical components, as well as enhancements to fire safety systems and the building's roof. This initiative is crucial for maintaining operational efficiency and safety at a key aviation facility, ensuring compliance with federal standards throughout the renovation process. Interested contractors must submit their proposals by January 7, 2025, at 1200 ET, and can direct inquiries to Ms. Joni Haynes at joni.l.haynes@faa.gov or Erin Crabtree at erin.m.crabtree@faa.gov. The estimated budget for this project ranges from $2 million to $4 million, and it is set aside for small businesses under the SBA guidelines.
    Roof replacement at MFE ATCT (McAllen, TX)
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for a roof replacement project at the McAllen Air Traffic Control Tower (MFE ATCT) in Texas. The project involves extensive civil, mechanical, and architectural work, including the replacement of roof membranes, HVAC units, and lead paint abatement, all to ensure the structural integrity and safety of the facility. This initiative is part of a broader commitment to maintaining critical infrastructure within the National Airspace System, with an estimated contract value between $1 million and $5 million. Interested contractors must be registered in the System for Award Management (SAM) and adhere to the small business size standard, with key deadlines including a mandatory site visit on December 17, 2024, and proposal submissions due by January 27, 2025. For further inquiries, contact Elisha Distler at elisha.distler@faa.gov or call 817-222-4196.
    MARKET SURVEY TO INSTALL TWO 20 TON HVAC UNITS AND ASSOCIATED DUCTING AND HARDWARE IN SUPPORT OF MAST SYSTEM LOCATED AT THE FAA STT ASR FACILITY IN ST. THOMAS, USVI
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is conducting a market survey to identify qualified contractors for the installation of two 20-ton HVAC units at the FAA STT ASR Facility in St. Thomas, USVI. The project entails the removal of existing air conditioning units, power washing, duct repairs, and the installation of new TRANE/ALLIED units, with all work to be completed within 45 calendar days while ensuring compliance with safety and local regulations. This procurement is critical for maintaining operational efficiency and safety at the facility, emphasizing the importance of adhering to OSHA standards and minimizing disruption to FAA operations. Interested vendors must submit their statements of interest and capability by 4:00 p.m. Central Time on January 6, 2024, to Stephen Branch at stephen.n.branch@faa.gov, with the subject line "MARKET SURVEY RESPONSE: STT ASR HVAC."
    Water Intrusion Mitigation Project- Miami Air Traffic Control Tower (ATCT), Miami, FL 33122
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking proposals for the Water Intrusion Mitigation Project at the Miami Air Traffic Control Tower (ATCT) in Miami, Florida. The project requires contractors to provide all necessary labor, materials, and equipment to address water intrusion issues, ensuring the operational integrity of the facility. This initiative is crucial for maintaining the functionality of essential FAA operations and is set aside for small businesses, with an estimated contract value between $50,000 and $100,000. Interested contractors must submit their proposals by January 17, 2025, and are encouraged to attend a mandatory site visit on January 7, 2025. For further inquiries, contact Regina Singleton at regina.singleton@faa.gov or call 404-305-5790.
    Provide New HVAC B159 Station
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Facilities Engineering Command (NAVFAC), is soliciting proposals for the installation of a new HVAC system at B159 Station, Marine Corps Air Station Cherry Point, North Carolina, under Project No. 7434000. This project involves replacing three existing split-system air conditioners with steam heat and requires compliance with strict safety protocols and environmental controls, as the building will remain occupied during construction. The initiative underscores the federal government's commitment to enhancing military infrastructure while adhering to labor standards and sustainability practices. Proposals are due by January 7, 2025, following a mandatory site visit on December 17, 2024, with an estimated project cost between $250,000 and $500,000. Interested contractors should contact Ericka J. Bishop at ericka.j.bishop.civ@us.navy.mil or Linda Clark at linda.b.clark14.civ@us.navy.mil for further details.
    Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is soliciting proposals for the construction of a new Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility at Ted Stevens International Airport in Anchorage, Alaska. This project aims to enhance air traffic management capabilities and safety by replacing outdated facilities built in 1977, with a focus on modern engineering standards and compliance with federal regulations. The estimated construction cost ranges from $100 million to $200 million, and interested vendors must submit their proposals by 3:00 PM PT on January 31, 2025, following a pre-proposal Zoom meeting scheduled for January 10, 2025. For further inquiries, vendors can contact Katherine Fogle at katherine.fogle@faa.gov.
    B1130 HVAC Study Commissioning
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the retro-commissioning of the HVAC system in Building 1130 at Shaw Air Force Base, South Carolina. The project aims to optimize the HVAC system's performance by assessing cooling and airflow needs for the first and second floors, requiring the contractor to provide all necessary management, tools, labor, and compliance with various federal and state regulations. This procurement is part of the government’s initiative to promote opportunities for Women-Owned Small Businesses (WOSB), with a total award amount of $25,500,000. Interested contractors must submit their proposals by January 8, 2025, and can direct inquiries to Kishauna Goodman at kishauna.goodman@us.af.mil or Shaunannette Watson at shaunannette.watson@us.af.mil.
    Repair HVAC Base-wide
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is seeking contractors to undertake a firm fixed-price contract for the repair of HVAC systems at the 164th Airlift Wing, Tennessee Air National Guard Base in Memphis, TN. The project involves replacing failing R-22 compressors and facility boilers across four buildings, including the installation of new fan coil units, copper piping, and associated equipment, as outlined in the Statement of Work. This procurement is critical for maintaining operational efficiency and environmental compliance, with a contract magnitude estimated between $500,000 and $1 million. Interested small businesses are encouraged to attend a pre-bid conference and site visit, and should contact Christopher Rhyne at christopher.rhyne.1@us.af.mil or 901-291-7109 for further details.
    Fire Life Safety at EVV ATCT in Evansville, Indiana
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is soliciting bids for a total small business set-aside contract to upgrade the fire life safety systems at the Evansville Regional Airport's Air Traffic Control Tower (ATCT) in Indiana. The project involves comprehensive improvements to the architectural, mechanical, electrical, and fire protection systems to ensure compliance with OSHA, FAA, and Fire Code requirements, including the replacement of existing fire detection and alarm components. This initiative is crucial for enhancing safety and operational compliance at aviation facilities, reflecting the federal commitment to maintaining high safety standards. Interested contractors must register in the System for Award Management (SAM) and submit bids by January 21, 2025, with a project cost estimate ranging from $400,000 to $750,000. For further inquiries, contact Elisha Distler at elisha.distler@faa.gov or call 817-222-4196.
    GMF MT. TABOR HVAC
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is soliciting bids for the HVAC replacement project at the Mt. Tabor Crew Quarters in Vermont. The project entails the removal of four propane furnaces, four A/C condensing units, and a water heater, followed by the installation of new systems, with an optional bid item for replacing exhaust fans. This renovation is crucial for maintaining operational efficiency and compliance with safety and environmental standards within government facilities. Interested contractors must submit their proposals by the specified deadline, with an anticipated project cost between $25,000 and $100,000, and a completion timeframe of approximately 60 calendar days post-award. For further inquiries, contact Marquez Weldon at marquez.weldon@usda.gov or Brad Higley at bradley.higley@usda.gov.