Door Replacement Project at FAA's Denver Air Route Traffic Control Center (ARTCC) located in Longmont, CO
ID: 697DCK-24-R-00450Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL AVIATION ADMINISTRATION690ED9 NORTHWEST/MOUNTAIN REGRENTON, WA, 98055, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

REPAIR OR ALTERATION OF RADAR AND NAVIGATIONAL FACILITIES (Z2BC)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Federal Aviation Administration (FAA) is soliciting offers for a door replacement project at the Denver Air Route Traffic Control Center (ARTCC) located in Longmont, Colorado. The project involves replacing 75 interior doors, including hardware sets, key cores, and associated equipment, with an estimated contract value between $750,000 and $1 million. This procurement is set aside for small businesses under NAICS code 236220, emphasizing the importance of compliance with federal regulations and safety standards throughout the project. Interested contractors must submit their offers by 5:00 PM Mountain Time on November 7, 2024, and can direct inquiries to Cindi Tjelde at cindi.tjelde@faa.gov or by phone at 206-231-3026.

    Point(s) of Contact
    Files
    Title
    Posted
    The document is an amendment to a solicitation issued by the Federal Aviation Administration (FAA), designed to modify the contract and extend the deadline for receiving offers from contractors. Specifically, Amendment 0001 shifts the submission deadline by two weeks to September 12, 2024, allowing the FAA additional time to finalize responses to questions raised by contractors. The FAA emphasizes that offers must be received by 5:00 PM Mountain Time on the new deadline and outlines methods for contractors to acknowledge receipt of the amendment. This change is critical to ensure that all potential bidders have adequate time to prepare their submissions in light of the FAA's ongoing clarifications. The amendment aims to facilitate a fair and transparent bidding process while maintaining the integrity of the procurement process as outlined in previous solicitations and contracts.
    The document is an amendment to a solicitation issued by the Federal Aviation Administration (FAA) to extend the deadline for submission of offers. Amendment 0002 aims to provide additional time for the FAA to finalize responses to submitted questions and make necessary changes to the scope of the project. The new deadline for offers is set to 5:00 PM Mountain Time on Thursday, October 10, 2024. Consequently, all previous terms and conditions remain unchanged and in full effect unless specified otherwise. The amendment emphasizes the importance of acknowledging receipt of this amendment before the specified deadline, and offers the contractor options for acknowledgment, ensuring compliance with procedural requirements. This document is essential in the context of government requests for proposals (RFPs), highlighting administrative adjustments necessary for clarity and transparency in the contracting process.
    The RFO 697DCK-24-R-00450 addresses the ZDV Door Replacement Project, detailing amendments and clarifications related to contractor responsibilities and project scope. Key aspects include that the project is not tax-exempt, the requirement for complete door hardware replacement, and specifications for reusing existing frames only if they're in good condition. Amendments also clarify the need for site verification of door components and adjustments made to the specifications and drawings based on contractor inquiries. New timelines have been established, with references to the inclusion of Atbestos Containing Materials (ACM) in disposal procedures. Additionally, it specifies the need for security measures during construction, confirming that doors must be replaced within a single shift to maintain operations without risking security or compliance. The document indicates planned site visits for contractors to assess revised drawings. Overall, these amendments and clarifications are integral for contractors to accurately price proposals and meet requirements for the successful execution of the project.
    The document pertains to Amendment 0004 of Request for Offers (RFO) 697DCK-24-R-00450 related to the ZDV Door Replacement Project issued by the Federal Aviation Administration (FAA). The primary purpose of this amendment is to inform bidders of additional questions and answers regarding the project, ensuring clarity in the bidding process. The amendment indicates the question period has closed, but the original offer submission deadline remains as November 7, 2024, at 5:00 PM Mountain Time. Key points include clarifications around the responsibilities for asbestos handling, door hardware specifications, electrical work, and re-keying of existing doors. The contractor is responsible for asbestos door leaves and all door cores, with an emphasis on the project scope encompassing the re-keying of all 340 cores in the facility. It further clarifies specifications for door finishes, site access, and bonding requirements, ensuring that bidders understand the expectations accurately. This summary serves to present essential details necessary for prospective contractors to prepare their bids while adhering to specified technical and procedural requirements set forth by the FAA.
    The document outlines a series of technical drawings and specifications for a building project, focusing on various wings, primarily the Automation, Control, and Administration Wings. Each section includes detailed plans for basement and floor layouts, door schedules, and hardware sets, specifying types, materials, dimensions, and fire ratings for doors. Key elements include the need for signage related to restricted areas and safety measures, as well as specific instructions for door installation, including the reuse of existing hardware and compliance with fire safety standards. The door schedules highlight security features, including PIV card readers and electric strikes, while instructions for handling hazardous materials are detailed for safety during construction. This document serves as a critical component in the context of federal RFPs by ensuring compliance with regulatory standards and enhancing facility safety and security as part of a broader modernization initiative. Overall, the document aims to guide contractors and engineers in executing the project while adhering to strict specifications and regulations.
    This government document provides architectural drawings and a detailed door schedule for the Automation, Control, and Administration Wings of a facility, focusing on renovation and door replacement. Each drawing number corresponds to specific plans, such as floor layouts and door schedules. The document outlines comprehensive requirements for the renovation project, including door specifications like fire ratings, materials (hollow metal), security features, and accessibility compliance. It emphasizes the reuse of existing door frames wherever feasible, coordination with security systems, and the careful handling of hazardous materials, specifically noting doors that may contain asbestos. Moreover, it mandates the installation of signage, the coordination of various contractors, and compliance with industry standards. The intent of this document is to streamline the repair and modification process while adhering to safety and regulatory requirements, reflecting a commitment to improving facility standards in line with federal guidelines for RFPs and grants.
    The document outlines the project specifications for the Facility Door Replacement at the Longmont, Colorado ARTCC, scheduled for May 2024. The project involves replacing a total of 75 door assemblies, including 21 double-door leaves and 53 single-door leaves, while retrofitting them to existing frames. Key details include the replacement of 340 key cores, installation of a new key management system, and ensuring the operation of site-specific hardware. Strict work restrictions apply due to the facility's critical operations, necessitating coordination with the FAA. Construction activities are limited to standard hours, avoiding noise and disruption. The contractor must maintain site security and adhere to safety protocols, including submitting an Accident Prevention Plan and Activity Hazard Analysis. Procedures for project closeout and maintenance manuals are specified to provide comprehensive operational data post-installation. The document serves as a detailed guide to ensure project compliance, safety, and effective coordination amidst sensitive operational environments, reflecting the government’s commitment to facility maintenance and safety assurance.
    The document outlines the specifications for the Facility Door Replacement project at the Longmont, CO Air Route Traffic Control Center (ARTCC), scheduled for completion in September 2024. It details requirements and procedures for replacing 74 door assemblies, including 20 double-door leaves and 54 single-door leaves, along with associated hardware. The project emphasizes compliance with safety regulations, coordination with existing building operations, and management of Asbestos Containing Material (ACM). Contractors are required to follow strict access and work restrictions due to the sensitive nature of the facility, ensuring minimal disruption to operations and maintaining security protocols. Various sections cover submittal procedures, safety requirements, and closeout procedures, highlighting the importance of submitting documentation for approvals in a timely manner. Key responsibilities include providing new key cores, ensuring compatibility with existing security systems, and maintaining clear communication with FAA representatives throughout the project. The comprehensive guidelines reflect the government's commitment to efficient project management, safety, and regulatory adherence, vital in a security-focused environment like the FAA's ARTCC.
    The document outlines a General Wage Decision for building construction projects in Boulder County, Colorado, effective July 5, 2024. It specifies wage rates for various labor classifications based on the Davis-Bacon Act and relevant Executive Orders, namely EO 14026 and EO 13658. Contracts awarded on or after January 30, 2022, must comply with a minimum wage of $17.20 per hour, while those awarded between January 1, 2015, and January 29, 2022, require at least $12.90. The wage determination includes detailed classifications and rates for construction roles, such as electricians, plumbers, carpenters, and operators, alongside fringe benefits. It highlights the importance of contractor compliance with the specified wage standards and worker protections, including provisions for paid sick leave and the appeal process for wage determination disputes. Overall, this document serves as a regulatory guide for federal contracts, ensuring fair labor practices and adherence to minimum wage standards within the construction industry in the specified region.
    The Federal Aviation Administration (FAA) is soliciting past performance evaluations as part of the contractor selection process for a door replacement project at their Air Route Traffic Control Center in Longmont, Colorado. The survey targets contractors and their key personnel listed as references, focusing on various performance criteria, such as cost management, adherence to schedules, compliance with regulations, and overall customer satisfaction. Evaluators are asked to rate past performance on a scale from "Strongly Disagree" to "Strongly Agree," or indicate if they have no knowledge of an element. Additional information requested includes the rater's contact details and specifics about the contractor's project, contract type, and values. The insights gained from this survey will assist in assessing contractor qualifications and ensuring that the selected contractor has a track record of successful project execution while complying with safety and regulatory standards. This information is essential in the context of government Requests for Proposals (RFPs), aiming to establish a reliable and efficient contracting process.
    The document outlines the requirements for contractors and subcontractors within the framework of a prime contract governed by federal regulations, specifically under the jurisdiction of the Federal Aviation Administration (FAA). It includes a Paperwork Reduction Act statement, ensuring compliance and accuracy in the reporting process associated with the OMB Control Number 2120-0595. Key components include the identification details of the prime contract, subcontracting parties, and whether the contract includes the "Contract Work Hours and Safety Standards Act Overtime Compensation." Additionally, it specifies the clauses that must be acknowledged by the subcontractor, which include labor standards and compliance regulations such as the Davis-Bacon Act and Copeland Act. The structure of the document is divided into two main parts: the Statement of Prime Contractor and the Acknowledgment of Subcontractor, each requiring signatures and relevant parties' information. This form is crucial for maintaining federal compliance in government contracts, particularly regarding labor standards and the management of subcontracting processes in public-sector projects. Overall, it emphasizes accountability and adherence to established labor laws during contract execution.
    The U.S. Department of Transportation's Federal Aviation Administration (FAA) has issued a Request for Offers (RFO) for the Denver ARTCC Door Replacement Project, located in Longmont, CO, with the solicitation number 697DCK-24-R-00450. The project seeks competitive proposals for a firm, fixed price contract, with an estimated value between $750,000 and $1 million, specifically set aside for small businesses under the NAICS code 236220. Offers are due by August 29, 2024, with mandatory insurance and performance/payment bond requirements in place. A site visit is encouraged on July 31, 2024, to ensure prospective contractors fully understand project conditions. Questions must be submitted in writing by August 15, 2024, to the designated contracting officer, emphasizing the need for clarity in responses. The scope of work involves replacing doors at the Denver Air Traffic Control Center and complies with federal guidelines, including the Buy American Act. Successful bidders must adhere to established wage determinations and ensure projects are compliant with safety and regulatory standards. The estimated timeline for project completion is around 365 days after notice to proceed, reflecting a commitment to thorough oversight and quality workmanship.
    Similar Opportunities
    Fire Life Safety Maintenance and Testing at DEN, D01, BJC
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is seeking proposals for Fire Life Safety Maintenance and Testing services at various air traffic control facilities in Denver, Colorado. The contract, which is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), will cover essential maintenance and testing services at the Denver International ATCT, Denver TRACON, and Rocky Mountain Metropolitan ATCT, with a performance period from April 1, 2025, to March 31, 2030. Interested contractors must submit their proposals by January 30, 2025, and are encouraged to attend a site visit on January 9, 2025, to familiarize themselves with the requirements outlined in the Performance Work Statement. For further inquiries, potential bidders should contact Jennifer J. Davis at jennifer.j.davis@faa.gov.
    Water Intrusion Mitigation Project- Miami Air Traffic Control Tower (ATCT), Miami, FL 33122
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking proposals for the Water Intrusion Mitigation Project at the Miami Air Traffic Control Tower (ATCT) in Miami, Florida. The project requires contractors to provide all necessary labor, materials, and equipment to address water intrusion issues, ensuring the operational integrity of the facility. This initiative is crucial for maintaining the functionality of essential FAA operations and is set aside for small businesses, with an estimated contract value between $50,000 and $100,000. Interested contractors must submit their proposals by January 17, 2025, and are encouraged to attend a mandatory site visit on January 7, 2025. For further inquiries, contact Regina Singleton at regina.singleton@faa.gov or call 404-305-5790.
    Basic Ordering Agreements (BOA) for Design/Build (D/B) and Bid/Build (B/B) Services
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking to establish Basic Ordering Agreements (BOAs) for Design/Build (D/B) and Bid/Build (B/B) services related to Air Traffic Control (ATC) facilities. The FAA intends to add up to five qualified vendors to support the modernization and management of the National Airspace System (NAS), emphasizing the importance of compliance with the Buy American Act and reporting requirements under the Bipartisan Infrastructure Law (BIL). This procurement is critical for enhancing safety, reliability, and efficiency in air traffic control operations across the United States. Interested vendors must submit proposals by 17:00 ET on February 14, 2025, and direct any inquiries to Katherin Fogle at katherine.fogle@faa.gov.
    Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, Maine. The project involves significant upgrades to the HVAC systems, including the replacement of chillers, boilers, and various mechanical components, as well as enhancements to fire safety systems and the building's roof. This initiative is crucial for maintaining operational efficiency and safety at a key aviation facility, ensuring compliance with federal standards throughout the renovation process. Interested contractors must submit their proposals by January 7, 2025, at 1200 ET, and can direct inquiries to Ms. Joni Haynes at joni.l.haynes@faa.gov or Erin Crabtree at erin.m.crabtree@faa.gov. The estimated budget for this project ranges from $2 million to $4 million, and it is set aside for small businesses under the SBA guidelines.
    Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is soliciting proposals for the construction of a new Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility at Ted Stevens International Airport in Anchorage, Alaska. This project aims to enhance air traffic management capabilities and safety by replacing outdated facilities built in 1977, with a focus on modern engineering standards and compliance with federal regulations. The estimated construction cost ranges from $100 million to $200 million, and interested vendors must submit their proposals by 3:00 PM PT on January 31, 2025, following a pre-proposal Zoom meeting scheduled for January 10, 2025. For further inquiries, vendors can contact Katherine Fogle at katherine.fogle@faa.gov.
    Roof replacement at MFE ATCT (McAllen, TX)
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for a roof replacement project at the McAllen Air Traffic Control Tower (MFE ATCT) in Texas. The project involves extensive civil, mechanical, and architectural work, including the replacement of roof membranes, HVAC units, and lead paint abatement, all to ensure the structural integrity and safety of the facility. This initiative is part of a broader commitment to maintaining critical infrastructure within the National Airspace System, with an estimated contract value between $1 million and $5 million. Interested contractors must be registered in the System for Award Management (SAM) and adhere to the small business size standard, with key deadlines including a mandatory site visit on December 17, 2024, and proposal submissions due by January 27, 2025. For further inquiries, contact Elisha Distler at elisha.distler@faa.gov or call 817-222-4196.
    RDU ATCT Parking Lot Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for the RDU ATCT Parking Lot Improvements project located in Morrisville, North Carolina. The project entails replacing the slide gate at the Raleigh-Durham Air Traffic Control Tower and includes comprehensive improvements to the asphalt parking lots, such as repairing storm drain pipes, replacing curbs and sidewalks, and ensuring compliance with safety and environmental regulations. This initiative is part of the Bipartisan Infrastructure Law funding, with an estimated budget range of $500,000 to $1,000,000 and a performance period of 45 days upon receiving a notice to proceed. Interested contractors must submit their proposals by December 27, 2024, and can direct inquiries to Samantha Pearce at samantha.a.pearce@faa.gov or by phone at 405-954-7739.
    BIL Fire Life Safety at PHX Base Building and P50 TRACON
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Aviation Administration (FAA), is soliciting proposals for a fire life safety upgrade project at the Phoenix Sky Harbor International Airport (PHX) Base Building and P50 TRACON. The project aims to enhance fire safety systems by replacing the existing automatic sprinkler system, upgrading fire pumps, and modifying fire alarms, ensuring compliance with safety regulations and improving overall fire management infrastructure. This initiative is critical for maintaining high safety standards in airport operations, reflecting the FAA's commitment to enhancing facility safety and operational integrity. Interested contractors must submit their proposals by February 4, 2025, and are encouraged to direct inquiries to Ms. Melina Nguyen at melina.m.nguyen@faa.gov, with a project budget estimated between $4 million and $7 million.
    Fire Life Safety at EVV ATCT in Evansville, Indiana
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is soliciting bids for a total small business set-aside contract to upgrade the fire life safety systems at the Evansville Regional Airport's Air Traffic Control Tower (ATCT) in Indiana. The project involves comprehensive improvements to the architectural, mechanical, electrical, and fire protection systems to ensure compliance with OSHA, FAA, and Fire Code requirements, including the replacement of existing fire detection and alarm components. This initiative is crucial for enhancing safety and operational compliance at aviation facilities, reflecting the federal commitment to maintaining high safety standards. Interested contractors must register in the System for Award Management (SAM) and submit bids by January 21, 2025, with a project cost estimate ranging from $400,000 to $750,000. For further inquiries, contact Elisha Distler at elisha.distler@faa.gov or call 817-222-4196.
    Market Survey: (BIL) The Federal Aviation Administration (FAA) has an upcoming requirement for Replacement of Flow Control Valves at the FAA Potomac Consolidated TRACON in Warrenton, VA 20187.
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is conducting a market survey for the upcoming requirement to replace flow control valves at the Potomac Consolidated TRACON facility in Warrenton, Virginia. This project, funded under the 2022 Bipartisan Infrastructure Law, involves the replacement of 24 flow control valves and associated actuators for both Chilled Water and Condenser Water systems, necessitating careful coordination to minimize disruptions during off-peak hours. Interested vendors are invited to submit their capability statements, detailing their experience and qualifications, by January 13, 2025, at 10:00 AM CST, to Bryon Nolan at bryon.r.nolan@faa.gov. The FAA will use the responses to assess competition and determine the acquisition strategy for this procurement.