4FL Forest Housing Deferred Maintenance
ID: 1240LT24R0063Type: Presolicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA-FS, CSA INTERMOUNTAIN 8Ogden, UT, 844012310, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS (Z1AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The USDA Forest Service is seeking qualified contractors for the Phase 1 4FL Forest Housing Deferred Maintenance project located in the Payette National Forest, Idaho. The project involves essential construction activities, including the installation of new utilities, demolition of existing structures, and the construction of a new laundry facility, with a focus on maintaining operational safety and environmental compliance. This initiative is part of the government's commitment to improving housing infrastructure for its employees, ensuring adherence to federal regulations and standards throughout the process. Interested small businesses must submit their proposals by September 27, 2024, with a projected contract value between $250,000 and $500,000, and can direct inquiries to Brenda Simmons at brenda.simmons@usda.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The document is an amendment (number 0002) to a solicitation related to a federal contract, issued by the USDA-FS Intermountain. It modifies specific terms of the original solicitation, including updating Attachment 3 with revised maps and drawings. Contractors are required to acknowledge receipt of this amendment by the specified deadline to avoid rejection of their offers. Proposals must be submitted by email to the designated official by September 23, 2024, at 5:00 PM EST, with late submissions not considered. The period of performance for the resulting contract spans from September 30, 2024, to October 30, 2025. This amendment illustrates the procedural updates and compliance necessary for vendors engaging with federal contracts, ensuring all proposals meet the amended requirements for consideration.
    The document outlines Amendment 0003 to Solicitation No. 1240LT24R0063, concerning the Phase 1 Housing Deferred Maintenance project under USDA-Forest Service. This amendment includes responses to contractor inquiries, a complete replacement of the Statement of Work (SOW) attachment, and an extension of the proposal submission deadline to September 27, 2024, at 5:00 PM MT. Key clarifications provided in response to contractor questions address project specifications and requirements, such as structural details, demolition responsibilities, and material specifications. Notably, amendments clarify the intention regarding construction materials, installation methods, and specific omissions in drawings. Additionally, the contractor's responsibilities concerning existing shrub and tree management are detailed. The amendment ensures that all terms and conditions remain in place while addressing logistical concerns raised by potential contractors, reflecting the government’s commitment to transparency and responsiveness in the procurement process for federal projects.
    The document is an amendment to solicitation 1240LT24R0063 related to Phase 1 - Housing Deferred Maintenance. It announces the cancellation of the solicitation due to a received proposal that was approximately 125% higher than the Independent Government Cost Estimate (IGCE), deeming it in the Government's best interest to cancel rather than proceed with the award. The amendment outlines instructions for acknowledgment of the amendment and specifies that offers must be received before the designated date. It emphasizes that the solicitation will be reissued later. The period of performance for this project, if it were to proceed, was indicated to be from September 30, 2024, to October 30, 2025. This cancellation highlights the importance of aligning project costs with budgetary expectations in government contracting processes and the necessity of due diligence in evaluating proposals.
    The USDA Forest Service is soliciting bids for the 4FL Forest Housing Deferred Maintenance project, located in the Payette National Forest, Idaho. This construction initiative, set for 100% Small Business Set-Aside, includes various tasks such as site utility installation, building demolition, and the construction of new facilities like a laundry building at the McCall Administrative site. A pre-bid site visit is scheduled for August 27, 2024. The project anticipates a cost between $250,000 and $500,000 with a performance duration from September 30, 2024, to October 30, 2025. Offers should comply with detailed submission requirements, including providing a technical proposal and price proposal. Evaluation criteria will focus on past performance, technical approach, and overall experience. The contract will be awarded based on a Firm Fixed Price agreement, influencing procurement outcomes. This document emphasizes compliance with federal regulations, mandatory insurance coverage, and the necessity for clear communication throughout the bidding process. It demonstrates the government's commitment to engaging small businesses while outlining specific project requirements, ensuring a structured approach to federal contracting.
    This government document pertains to the amendment of a solicitation identified as 1240LT24R0063, issued by the USDA Forest Service (USDA-FS) Intermountain Region. The primary purpose of Amendment 0001 is to extend the closing date for proposals to September 23, 2024, at 5:00 PM EST and to attach a revised Schedule of Items (SOI). Proposals must be submitted electronically by the specified deadline; late submissions will not be accepted. Additionally, the document notes that further information will be provided in a subsequent amendment and outlines the period of performance for the resulting contract, which is from September 30, 2024, to October 30, 2025. The instructions on how to acknowledge receipt of the amendment are also detailed, stressing that acknowledgment is crucial to avoid rejection of offers. Overall, this document reflects standard procedures in federal procurement processes regarding amendments and proposal submissions.
    The document outlines a Schedule of Items for a federal Request for Proposals (RFP) related to construction and maintenance projects at the 4FL Forest Housing. It details various tasks required for deferred maintenance, including construction staking, mobilization, sewer systems, electrical works, and site preparation. Each item lists the unit of measurement, quantity, and corresponding price, indicating a total cost of $0 for all entries, suggesting this is a preliminary estimate or budgetary draft. The document is structured in two pages, with Page 1 focusing on essential groundwork and utility installations, while Page 2 presents optional bid items such as the construction of a laundry building and electrical feed to future bunkhouses. The optional items allow bidders to propose additional work that may be included if desired. Overall, the purpose of the document is to provide a comprehensive outline of necessary tasks for the improvement and maintenance of the housing facilities, facilitating submissions from contractors for the funding or grant applications. This document serves as a guide for potential bidders to understand the scope of work and associated costs, supporting the federal initiative to enhance housing infrastructure.
    The document outlines the McCall Admin Site Utilities and Housing Demolition Project, detailing necessary construction and renovation activities through a series of line items outlining supplies and services required. Key components include construction staking, pipeline installation (both HDPE and PVC), sewer and electrical systems, and site preparation. The total quantity and unit prices of various items indicate the project's scale, with specific emphasis on utility installation and site demolition for future development. Additionally, the project proposes optional bid items related to a laundry building and electrical feeders for future bunkhouses, allowing for prospective contractors to prepare bids accordingly. The structure focuses on clarity in proposed project phases, delineating core and optional tasks to encourage comprehensive bidding and transparency. Overall, the document serves as a formal Request for Proposal (RFP), which is essential for securing funding and contractor assistance, ensuring compliance with government regulations and standards in public works projects.
    The document outlines the scope of work for the GAOA McCall Area Housing Upgrades Phase 1 project, focusing on the installation of utilities and the construction of a new laundry building on Forest Service property in McCall, Idaho. The project encompasses creating access to the site, laying down buried utilities including waterlines, sewer lines, and electrical lines, and constructing a laundry facility, with various elements such as concrete foundations, plumbing, and electrical systems included in the base bid and options for future work. The contractor is responsible for maintaining safety and limiting public access during construction while ensuring no disruption to existing utility services. The site must be inspected before work begins, and specifics regarding payment, measurement, and regulatory compliance, including erosion control measures, are detailed throughout the document. The schedule indicates a start date in Fall 2024 with a project duration of 365 days. Quality control, inspection, and submittal procedures are specified to ensure that all work meets relevant standards and regulations. Overall, this document serves as a comprehensive guide for contractors interested in bidding for the project, detailing procedures, responsibilities, and specifications vital for compliance and successful project completion.
    The Payette National Forest is initiating a contract for Phase 1 of its Housing Deferred Maintenance project at the McCall Administrative site in Idaho. The project scope involves installing new utilities, demolishing existing buildings, removing trees, and constructing a new laundry facility. Key components include constructing access roads, burying water and sewage lines, and optional demolishing of four bunkhouses. The contractor will be responsible for coordinating logistics, maintaining public safety, and securing utilities during the project. Construction is expected to commence in Fall 2024, with a timeline of 180 calendar days for the base bid and optional work. Additional regulations stipulate environmental protections and the necessity of obtaining approval from the contracting officer for staging and utility considerations. The document outlines specific site limitations, for example, existing facilities must remain operational during construction. This project showcases the federal government's commitment to maintaining infrastructure and ensuring compliance with environmental and safety standards.
    The document outlines the design and planning details for the construction of a family housing laundry building on the Payette National Forest, McCall Area. It includes architectural drawings, foundation plans, floor plans, roof plans, elevations, sections, plumbing, and electrical details. Significant features include a concrete foundation, a metal sheet roof with ice and water shield, and energy-efficient insulation systems. The facility is designed for practicality, featuring an accessible laundry space, non-slip flooring, and a ventilation system for dryers. The document also specifies the installation of utility fixtures and finishes, such as washers and dryers, utility sinks, and wall-mounted light fixtures, and emphasizes compliance with safety regulations and accessibility standards. Additionally, it details electrical installations, including a new switchboard, electricity supply, and backup systems. Ultimately, this project seeks to enhance operational efficiency and living conditions within the national forest by creating essential family housing services while adhering to federal guidelines and safety standards.
    The document details the GAOA McCall Area Housing Phase 1 (Utilities) project managed by the USDA Forest Service, located at 500 North Mission Street, McCall, Idaho, within the Payette National Forest. The primary objective of this project is to install new site utilities to support future barracks buildings, which includes constructing water and sewer lines and demolishing an existing laundry facility. Key components of the base bid involve the construction of access roads and installation of HDPE waterlines, sanitary sewer lines, and electrical lines. Optional work includes constructing a new laundry building, consisting of various building materials and facilities such as plumbing fixtures and electrical systems. The project emphasizes minimizing disruption to existing services, coordinating with local utilities, adhering to environmental regulations, and ensuring proper disposal of materials during demolition. The planned upgrades reflect a broader commitment to improving the housing infrastructure for government employees, balancing operational needs with environmental stewardship and regulatory compliance.
    The document outlines specifications for the construction of the McCall Area Family Housing Laundry Building as part of the USDA Forest Service’s McCall Housing Site Utilities and Demo Project. It details general requirements, reference specifications such as the 2021 International Building Codes, measurement and payment procedures, and related work sections necessary for project completion. Key bid items include construction preparation, utility installation, grading, and building demolition while adhering to quality control standards. The project involves thorough coordination with utility companies and ensuring environmental protection through sediment and erosion control measures. The contractor is responsible for aligning activities with project drawings and specifications, providing necessary labor and materials, and ensuring compliance with relevant codes and regulations. Quality assurance procedures include contractor quality control and ongoing monitoring of construction techniques and environmental impacts. Overall, this document serves as a comprehensive guideline for contractors bidding on or performing work for the USDA Forest Service, emphasizing compliance, safety, and quality throughout the project's lifecycle.
    The document presents the General Decision Number ID20240063 for federal construction contracts in Idaho, specifically focusing on heavy construction projects in Valley County. It outlines wage determinations under the Davis-Bacon Act, which mandates minimum wage rates for construction workers based on various executive orders. For contracts awarded on or after January 30, 2022, the minimum wage is set at $17.20 per hour, whereas for those awarded between January 1, 2015 and January 29, 2022, it is $12.90 per hour. The wage determination includes specific rates for various classifications of workers like electricians, operators, ironworkers, and laborers, along with additional benefits such as zone pay and boom pay for crane operations. Moreover, it details requirements for paid sick leave as stipulated under Executive Order 13706, affecting contracts awarded on or after January 1, 2017. The document also explains the appeal process for wage determinations, including avenues for review and re-evaluation by interested parties through the Wage and Hour Division. Overall, this file serves as a guideline for compliance with wage regulations in federal construction projects, ensuring fair compensation and worker protections in the construction industry.
    The USDA Forest Service is organizing a pre-bid meeting for the Payette National Forest Housing DM Phase 1 contract, scheduled for August 27, 2024, at 12:00 PM. This meeting will take place in person, gathering interested contractors to discuss the project's specifications and requirements. Key attendees noted for the event include representatives from Lewis Structures Inc., various USDA officials, and other relevant contractors. Contact information for the attendees is provided to facilitate communication regarding the bidding process. The purpose of the meeting aligns with the formal procurement procedures often seen in federal RFPs, ensuring transparency and competitive opportunity for potential bidders in the housing initiative linked to federal and state funding mandates.
    Lifecycle
    Title
    Type
    Similar Opportunities
    1240LT25Q0008 Notice of Site Visit Nov 14, 2024 - Stanley Admin Site Housing - Sawtooth NF - Replacement of asphalt shingle roofs, blown insulation into attic and all other work as required. Sawtooth NF - Upper Loop Stanley, ID 83278
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking contractors for a project involving the replacement of asphalt shingle roofs at the Stanley Administrative Site Housing in Sawtooth National Forest, Idaho. The project entails the removal of existing roofs, installation of new asphalt roofs with cold roof ventilation, and the addition of blown insulation into attic spaces, along with any other necessary work. This procurement is crucial for maintaining the integrity and functionality of the housing units, ensuring they are adequately protected against seasonal weather conditions. Interested vendors are invited to a site visit scheduled for November 14, 2024, at 11:00 AM MDT, and must notify the primary contact, Ida Marino, via email at ida.r.marino@usda.gov, to confirm attendance. The estimated construction cost for this project is between $100,000 and $250,000, and it is set aside for small businesses under the SBA guidelines.
    Shake Creek Guard Station Siding Replacement
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking qualified contractors for the Shake Creek Guard Station Siding Replacement project located in Idaho. The project involves rehabilitating the siding of historic buildings, which includes cleaning, preparing, and potentially replacing or repairing siding, as well as managing hazardous lead-based paint. This initiative is crucial for preserving the integrity of these historic structures, particularly as the site will be closed seasonally due to inclement weather. Interested vendors are invited to a site visit on November 5, 2024, at 1:00 PM (MST), and must notify Project Engineer Braidy Richins of their attendance by the previous day. The estimated budget for this project ranges between $100,000 and $250,000, and further inquiries can be directed to Braidy Richins at Braidy.Richins@usda.gov or by phone at 208-423-7545.
    BIG SMOKY ADMIN SITE - SAWTOOTH NF - IDAHO-SITE VISIT NOTICE
    Active
    Agriculture, Department Of
    The Department of Agriculture, through the Forest Service, is seeking qualified contractors for the repair and reconstruction of the sanitary sewer collection system at the Big Smoky Administrative Site within the Sawtooth National Forest in Idaho. The project involves several key tasks, including the removal of sludge from sewage lagoons, installation of new membrane liners, replacement of valves and piping, reconstruction of the RV Dump Station, and the installation of a perimeter fence to secure the lagoon area. This work is critical for maintaining the functionality and safety of the site, which serves as an administrative hub for forest management activities. A site visit for prospective vendors is scheduled for November 12, 2024, and interested parties must notify the designated engineer, Ida Marino, at ida.r.marino@usda.gov, in advance. The estimated project budget ranges from $500,000 to $1,000,000, and this presolicitation notice serves to prepare vendors for the upcoming bidding process.
    127EAW25R0001 - Plumas NF Lookouts Restrooms
    Active
    Agriculture, Department Of
    The United States Department of Agriculture (USDA), through the Forest Service, is issuing a pre-solicitation notice for Request for Proposal (RFP) 127EAW25R0001, aimed at small businesses registered in the System for Award Management (SAM). The project involves decommissioning nine existing restroom facilities and constructing eight new restrooms at various lookout points within Plumas National Forest, located in Plumas and Yuba Counties, California. This initiative is part of the USDA's commitment to enhancing visitor facilities while adhering to environmental standards and historic preservation requirements. The estimated project cost ranges between $500,000 and $1,000,000, with the solicitation expected to be posted on SAM.gov around November 7, 2024. Interested contractors are encouraged to register on the beta SAM website and may contact Gregory Cunningham at gregory.cunningham@usda.gov or (530) 575-7569 for further information.
    Pineview Reservoir Recreation Complex Reconstruction – Port Boat Ramp Ogden Ranger District, Uinta Wasatch, Cache National Forest, Weber, Utah
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking contractors for the reconstruction of the Pineview Reservoir Recreation Complex, focusing on the Port Boat Ramp in the Ogden Ranger District of the Uinta Wasatch-Cache National Forest, Weber, Utah. The project entails comprehensive reconstruction efforts, including the removal of existing structures, road improvements, storm drainage enhancements, and the construction of new facilities such as comfort stations, a dump station, and a parking area. This initiative is vital for enhancing recreational access and facilities while ensuring compliance with environmental regulations and federal guidelines. Interested parties should note that a pre-solicitation site visit is scheduled for November 15, 2024, at 10:00 AM MST, and the project is estimated to exceed $10 million, with a completion timeline of 180 days starting in May 2024. For further inquiries, contact Holly Hlavac at holly.hlavac@usda.gov or Lucas Dahlman at Lucas.Dahlman@usda.gov.
    ID FLAP BONNER 841(1), Trestle Creek Road, MP 100 to 103.7
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the reconstruction and paving of Trestle Creek Road in Bonner County, Idaho, under project ID FLAP BONNER 841(1). The project aims to enhance a 3.75-mile stretch of roadway by implementing improvements such as riprap placement, roadway aggregates, asphalt concrete pavement, and drainage enhancements, ultimately facilitating year-round access to the Kaniksu National Forest. This initiative is part of the government's commitment to infrastructure improvement and environmental stewardship, with an estimated contract value between $5 million and $10 million. Interested vendors should note that the solicitation is set to be released in Spring 2025, with a completion target of Fall 2025, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    Pineview Reservoir Recreation Complex Reconstruction – Port Boat Ramp, Uinta Wasatch, Cache National Forest, Weber Utah
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the reconstruction of the Pineview Reservoir Recreation Complex, specifically the Port Boat Ramp, located in Weber County, Utah. The project entails comprehensive renovations, including the removal of existing structures, construction of new facilities such as comfort stations and storm drainage improvements, and enhancements to parking and access areas, all while adhering to strict environmental and safety regulations. This initiative is crucial for improving public recreational facilities within the Uinta Wasatch-Cache National Forest, with an estimated contract value exceeding $10 million and a performance period from May 1, 2025, to May 1, 2026. Interested parties should submit their Statements of Capability to Contract Specialist Holly Hlavac at Holly.Hlavac@usda.gov within 18 days of this presolicitation notice.
    ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
    Active
    Transportation, Department Of
    The Department of Transportation's Federal Highway Administration seeks contractors for the Crown Point Trail project in Idaho, involving extensive trail construction and repairs. This small business set-aside project, valued between $700,000 and $2 million, requires expertise in highway construction and will be awarded through a sealed bid process. The upcoming procurement, anticipated in early 2025, aims to enhance a 2.7-mile trail stretch with resurfacing, slope repairs, and new construction, accessible for physical inspection now before snow sets in.
    BCLH Stewardship IRSC Phase 1
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, is seeking contractors for the BCLH Stewardship IRSC Phase 1 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead fires in Oregon's Willamette National Forest. The project encompasses approximately 1,612 acres and includes mandatory activities such as cutting fire-killed timber, managing hazard trees, small fuels treatment, and extensive road maintenance and reconstruction. This initiative is critical for enhancing safety and accessibility in the region while adhering to sustainable forest management practices. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, with a projected contract value between $5 million and $10 million for mandatory items and $500,000 to $1 million for optional items, and the solicitation is expected to be issued around January 15, 2025.
    BCLH Stewardship IRSC Phase 3
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is seeking contractors for the BCLH Stewardship IRSC Phase 3 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead Fires in Oregon's Willamette National Forest. The project encompasses cutting and removing fire-killed timber within 100 feet of roads, managing non-commercial hazard trees, and conducting essential road maintenance and reconstruction across a total area of 1,843 acres. This initiative is critical for enhancing forest health and safety while ensuring compliance with federal regulations, with an estimated contract value between $1 million and $5 million. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, and note that the final solicitation is anticipated to be issued around March 31, 2025, with contract awards planned for June 6, 2025.