Z--Northwest Oregon Roadside Maintenance IDIQ, Salem, Oregon
ID: 140L4325Q0001Type: Presolicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF LAND MANAGEMENTOREGON STATE OFFICEPORTLAND, OR, 97204, USA

NAICS

Site Preparation Contractors (238910)

PSC

MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS (Z1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Bureau of Land Management (BLM) is preparing to release a solicitation for the Northwest Oregon Roadside Maintenance Multiple-Award Indefinite Delivery, Indefinite Quantity (IDIQ) contract, based in Salem, Oregon. This contract will focus on roadside and road maintenance within the Northwest Oregon District, with an anticipated ceiling of $5.0 million and a five-year ordering period. The procurement is set aside exclusively for small businesses under NAICS code 238910, with a size standard of $19.0 million, and is not classified as a construction contract. Interested parties should note that the solicitation is expected to be posted within 15 days, with proposals due 30 days thereafter; for further inquiries, contact Tiffany Eslinger at teslinger@blm.gov or (503) 808-6521.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines key information regarding the Bureau of Land Management's Northwest Oregon District, which includes various field offices located in major Oregon cities such as Portland, Salem, and Eugene. The map provided details the geographical distribution of the BLM and U.S. Forest Service offices across the region, emphasizing the area of responsibility for land management in Northwest Oregon. Geographical coordinates and references to major highways illustrate the logistical framework for access and operational activity. The BLM disclaims any warranty on the data's accuracy, indicating that it is subject to updates without prior notice, and has been compiled from multiple sources. This document serves as a preliminary informational tool that may be utilized for governmental requests for proposals (RFPs) or grants, informing stakeholders about the land management framework and field office locations that play a crucial role in federal and local regulatory compliance and environmental stewardship.
    The document outlines specifications for road maintenance and cleaning of drainage systems, critical in federal and local infrastructural projects. It details the procedures for removing materials, addressing culvert and ditch cleaning, and maintaining road surfaces and slopes. The guidelines emphasize the importance of proper grading techniques, ensuring a crown of 2-3% for road surfaces and 1.3 to 1.2 slopes for ditch cleaning. These measures are to prevent drainage issues and maintain road integrity. Key points include the removal of excess materials to designated waste areas, guidelines for pot hole treatments prior to grading, and the necessity for maintaining a minimum clear width of 12 feet for road accessibility. Additionally, the document details requirements for using water-bars, rolling dips, and ditch renovations to properly manage water flow and road drainage. Overall, this maintenance plan serves as a structural framework aimed at enhancing transportation infrastructure, ensuring safety, and promoting efficient water management while adhering to government RFP procedures and environmental guidelines for public works.
    The Performance Work Statement (PWS) outlines a contract for providing non-personnel road maintenance services in the Northwest Oregon District of the Bureau of Land Management. The contractor is responsible for supplying all necessary personnel, equipment, materials, and supervision to restore and maintain forest roads, ensuring high-quality outcomes according to specified standards. Key tasks include routine road grading, snow plowing, pavement sweeping, bridge maintenance, and the removal of hazards such as fallen trees and roadside vegetation. The work emphasizes restoring road conditions to their original design, ensuring proper drainage, and addressing environmental concerns, including erosion control. Quality control and assurance processes are integral to the contract, ensuring compliance with performance standards through regular inspections and reporting. The contractor must manage a stable workforce and adhere to recognized holidays and defined operational hours to maintain efficient service delivery. The document serves as a framework for soliciting bids and ensuring all contractors meet rigorous performance criteria necessary for maintaining public land infrastructure vital to safety and access.
    Similar Opportunities
    BCLH Stewardship IRSC Phase 2
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the BCLH Stewardship Integrated Resource Service Contract (IRSC) Phase 2, aimed at hazardous fuel reduction and road maintenance in the Willamette National Forest, specifically following the 2020 Beachie Creek and Lionshead fires. The project encompasses cutting and removing fire-killed trees, maintaining and reconstructing roads, and performing small fuels treatment across a 1,152-acre area, with a total project value estimated between $5 million and $10 million for mandatory items and $500,000 to $1 million for optional items. This initiative is critical for restoring access to affected areas, enhancing public safety, and mitigating future fire hazards while adhering to environmental regulations. Interested contractors must register in the System for Award Management and comply with specified bonding requirements, with the solicitation anticipated to be issued around February 21, 2025, and contract awards planned for approximately April 25, 2025. For further inquiries, contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519.
    BCLH Stewardship IRSC Phase 1
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking contractors for the BCLH Stewardship IRSC Phase 1 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead fires in Oregon's Willamette National Forest. The project encompasses approximately 1,612 acres and includes mandatory activities such as cutting fire-killed timber, managing hazard trees, small fuels treatment, and road maintenance and reconstruction, with an estimated total cost of $5 million to $10 million for mandatory items and $500,000 to $1 million for optional items. This initiative is crucial for enhancing public safety and ecological restoration while adhering to federal regulations and sustainability goals. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, with the final solicitation expected to be issued around January 15, 2025, and contract awards planned for approximately March 21, 2025.
    BCLH Stewardship IRSC Phase 3
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is seeking contractors for the BCLH Stewardship IRSC Phase 3 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead Fires in Oregon's Willamette National Forest. The project encompasses the removal of fire-killed timber, management of hazard trees, and necessary road maintenance and reconstruction across a 1,843-acre area, with both mandatory and optional work activities outlined. This initiative is critical for enhancing forest health, ensuring safe access, and promoting sustainable land management practices in fire-impacted regions. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, with a total estimated project cost between $1 million and $5 million, and the solicitation expected to be issued around March 31, 2025.
    BCLH Stewardship IRSC Phase 3
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is seeking contractors for the BCLH Stewardship IRSC Phase 3 project, aimed at restoring access routes and mitigating hazardous fuels in the Detroit Ranger District of the Willamette National Forest, Oregon. The project encompasses approximately 1,843 acres affected by the Beachie Creek and Lionshead Fires of 2020, with work including the removal of fire-killed trees, road reconstruction, and maintenance activities to enhance forest management and community safety. Interested contractors are encouraged to attend a pre-solicitation site visit on October 5, 2024, with the final solicitation expected to be issued around March 31, 2025, and contract awards planned for June 6, 2025. For further inquiries, contact Karen Ruklic at karen.ruklic@usda.gov or Heidi Andersen at heidi.andersen@usda.gov.
    OR ERFO FS UMPQU 615-2022-2(1), Umpqua ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Umpqua ERFO Repairs 2022 project located in the Umpqua National Forest, Oregon. The project involves the repair of a 0.19-mile aggregate roadway, including ditch regrading, slope stabilization, and the construction of a mechanically stabilized earth wall, with a focus on environmental compliance and infrastructure integrity. This initiative is part of federal efforts to maintain and improve infrastructure in natural areas, ensuring safety and environmental protection while promoting public access. The contract is a total small business set-aside, with an estimated price range between $700,000 and $2,000,000, and is anticipated to be solicited in winter 2024/2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details.
    Region 6 Botany Survey BPA
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking small businesses to provide botanical survey services through a Blanket Purchase Agreement (BPA) for Region 6, covering Oregon, Washington, and parts of California. The procurement aims to conduct comprehensive surveys of vascular and non-vascular plants, as well as fungi, focusing on threatened and endangered species, with an emphasis on standardized data collection and ecological assessments. This initiative is crucial for promoting biodiversity conservation and systematic data collection across federal lands in the Pacific Northwest. Interested vendors must submit their bids by January 10, 2025, at 4 PM PST, and can contact Darnell Williams at Darnell.Williams@usda.gov or 458-212-6091 for further information. The total spending limit for this BPA is set at $7.5 million over a ten-year period.
    Sweet Creek Trail Bridge # 2
    Active
    Agriculture, Department Of
    The USDA Forest Service is announcing a competitive Blanket Purchase Agreement (BPA) Call Order for road and bridge construction services within the Siuslaw National Forest, specifically for the Sweet Creek Trail Bridge 2 project. This procurement involves activities such as clearing, excavation, and the construction of prefabricated timber bridges, along with various related tasks, aimed at enhancing infrastructure within the national forest. Interested small businesses are encouraged to submit their organizational details and tailored capability statements by January 7, 2025, as the government will evaluate submissions based on the capacity to perform the required services, including project management and risk mitigation. For further inquiries, interested parties may contact DeForest Watson at deforest.watson@usda.gov.
    OR FLAP DOUGLAS 251(1), Oregon Dunes National Recreation Area ‐ Umpqua Dunes Access Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the OR FLAP Douglas 251(1) project, which focuses on access improvements at the Oregon Dunes National Recreation Area in Winchester Bay, Oregon. The project entails significant construction work over a 1.3-mile access route, including earthwork, aggregate installation, drainage enhancements, precast concrete block wall construction, and guardrail installation, all while adhering to environmental protection measures. This initiative is crucial for improving public access and safety in a popular recreational area, with an estimated contract value between $2 million and $5 million and a tentative completion date set for November 2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further information.
    HULT DAM TELEMETRY DATA
    Active
    Interior, Department Of The
    The Bureau of Land Management (BLM) is seeking a contractor to provide satellite data services and maintenance for the Hult Dam Telemetry System, located in Springfield, Oregon. The procurement involves a firm fixed-price contract for telemetry data services, including satellite transmission, data hosting, and support for the Contrail® Web system, with a performance period spanning five years from January 1, 2025, to December 31, 2029. This opportunity is particularly significant as it emphasizes the integrity of data services and compliance with environmental regulations, critical for the operational efficiency of the Hult Dam telemetry system. Interested small businesses must submit proposals by December 27, 2024, with an estimated contract value of $84,000 over the five-year term. For further inquiries, potential bidders can contact Destinee Croom at dcroom@blm.gov or by phone at 503-808-6066.
    ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
    Active
    Transportation, Department Of
    The Department of Transportation's Federal Highway Administration seeks contractors for the Crown Point Trail project in Idaho, involving extensive trail construction and repairs. This small business set-aside project, valued between $700,000 and $2 million, requires expertise in highway construction and will be awarded through a sealed bid process. The upcoming procurement, anticipated in early 2025, aims to enhance a 2.7-mile trail stretch with resurfacing, slope repairs, and new construction, accessible for physical inspection now before snow sets in.