Z1DA--Project 550-24-103 (CON) Replace Air Handler Units B98
ID: 36C25225B0003Type: Solicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF252-NETWORK CONTRACT OFFICE 12 (36C252)MILWAUKEE, WI, 53214, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

MAINTENANCE OF HOSPITALS AND INFIRMARIES (Z1DA)
Timeline
    Description

    The Department of Veterans Affairs is soliciting bids for the replacement of Air Handler Units B98 at the VA Illiana Health Care System in Danville, Illinois, under Project Number 550-24-103. This project, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), involves comprehensive construction efforts to upgrade HVAC systems, ensuring compliance with federal, state, and local codes, including safety and environmental standards. The initiative is crucial for enhancing healthcare facility infrastructure, promoting operational efficiency, and ensuring patient safety during the construction process. Interested contractors must submit their sealed bids by December 5, 2024, at 12:00 PM CST, and can direct inquiries to Contract Specialist Thomas E. Stevens at Thomas.Stevens2@va.gov, with a project budget estimated between $1,000,000 and $2,000,000.

    Point(s) of Contact
    Thomas E StevensContract Specialist
    Thomas.Stevens2@va.gov
    Files
    Title
    Posted
    The Pre-Solicitation Notice outlines the upcoming project for replacing Air Handler Units B98 (Project 550-24-103) at the Veterans Affairs Illiana Healthcare System in Illinois. It is designated for Service-Disabled-Veteran-Owned-Small-Businesses (SDVOSBs) and requires contractors to provide all necessary labor, materials, and supervision, while adhering to various safety and regulatory standards. The project has a budget of $1,000,000 to $2,000,000 and must be completed within 365 days from the Notice to Proceed. Interested bidders can find the solicitation, including details about site visits and additional requirements, on SAM.gov, which will be issued around October 21, 2024, with responses due by November 21, 2024. Bidders must demonstrate their SDVOSB eligibility and be registered in SAM.gov to receive a contract, further emphasizing the VA's commitment to supporting veteran-owned businesses.
    Amendment 0001 to solicitation 36C25225B0003, issued by the Department of Veterans Affairs' Great Lakes Acquisition Center, pertains to Project 550-24-103, which involves replacing Air Handler Units B98. This amendment's primary purpose is to extend the bid due date from the original deadline to December 5, 2024, at 12:00 PM CST. Additionally, it includes the publication of an updated Wage Determination related to the project. The extension acknowledges that further updates will be provided as Requests for Information (RFIs) are answered and new supporting attachments are published. The amendment emphasizes compliance with all existing contractual terms, with the new deadline being critical for contractors submitting bids. The contracting officer, Thomas Stevens, oversees this extension and modification, ensuring that all stakeholders are informed of the changes affecting the solicitation process.
    Amendment 0002 to solicitation 36C25225B0003, managed by the Department of Veterans Affairs Great Lakes Acquisition Center, addresses the project titled "Replace Air Handler Units B98." This amendment serves several key purposes: it updates the Wage Determination, provides responses to Pre-Bid Requests for Information (RFIs) along with relevant attachments, and confirms that the bid submission deadline remains unchanged at December 5, 2024, at 12:00 PM Central Time. The document specifies that all terms and conditions remain effective except as modified. Attached documents include sign-in sheets and additional specifications related to the project. This amendment reflects the government's ongoing effort to facilitate a transparent bidding process while ensuring compliance with updated wage standards and clarifying project requirements for potential contractors.
    The "Replace Air Handling Units" project at the VA Illiana Health Care System (Project #550-24-103) focuses on comprehensive construction plans for updating HVAC systems within the facility. Scheduled to begin on July 30, 2024, the project integrates extensive construction specifications under federal requirements, detailing the necessary steps for demolition, equipment replacement, safety protocols, and infection control measures. Key components include adherence to infection control during construction, managing potential environmental hazards, and ensuring minimal disruption to ongoing medical services. The document outlines bid items, including general construction, fire system replacement, and the establishment of strict security and operational guidelines. A special emphasis is placed on maintaining air quality and mitigating dust generation during construction activities. The contractor must engage in various safety practices, including securing areas from unauthorized access and providing temporary roadside utilities as needed. Compliance with VA safety standards and local policies is vital to ensure the welfare of patients and staff throughout the project's duration, highlighting the VA's commitment to modernizing its health care infrastructure while prioritizing safety and operational continuity.
    The document outlines the construction plans for replacing air handling units in Building 98 of the VA facility in Danville, Illinois. The project, assigned project number 550-24-103, is part of the U.S. Department of Veterans Affairs initiatives to improve facility infrastructure. Detailed construction documents include a site plan and life safety plan, all developed by Guidon Design. The project requires replacing existing air handling units and fire suppression systems, ensuring compliance with relevant local, state, and federal codes, including various NFPA standards. The design includes both demolition and installation phases, with particular emphasis on maintaining fire protection systems during construction. The documentation specifies various engineering concepts, important safety protocols, and the involvement of several consultants underlining their shared responsibilities. An outlined key plan indicates areas outside the project scope. This undertaking reflects the VA's commitment to enhancing healthcare facilities, ensuring patient's safety through improved mechanical systems, and complying with operational standards. The construction process will involve significant planning and coordination among different engineering disciplines to minimize disruption and maintain service continuity during the upgrades.
    The solicitation document (36C25225B0003) issued by the Department of Veterans Affairs pertains to the project "Replace Air Handler Units B98" at the VA Illiana Health Care System in Danville, IL. The government is seeking bids from qualified contractors, specifically those identified as Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a project budget ranging from $1,000,000 to $2,000,000. The work must be completed within 365 calendar days of the notice to proceed, requiring contractors to provide all necessary labor, materials, and supervision according to the provided specifications. Bidders must submit their sealed offers by 12:00 PM CST on November 21, 2024, with an organized site visit scheduled for October 28, 2024. The document outlines specific compliance requirements, including performance bonds and acknowledgment of amendments. Additionally, it emphasizes adherence to regulatory standards regarding employment opportunities and materials procurement in alignment with federal policies. Submissions must follow strict guidelines, as non-compliance could lead to bid rejection. The project underlines the VA's commitment to enhancing healthcare facilities while ensuring compliance with federal contracting regulations.
    This document contains a sign-in sheet for a site visit related to Project # 550-24-103, focused on replacing air handler units (B98) at the Department of Veterans Affairs' Great Lakes Acquisition Center in Milwaukee, Wisconsin. The solicitation for this project is identified as # 36C25225B0003, dated October 28, 2024. Contact details of various representatives from different companies, including names, email addresses, and phone numbers, are listed, showcasing the interest from multiple contractors in the bidding process. Companies represented include CAVU C.G., E.C.I., Anderson Electric, Bridger Construction, Myers Constiservices, Ridge Plumbing, and BEC Mechanical. The document's structure efficiently captures essential participant information, reaffirming the collaborative nature of federal RFP processes in engaging multiple contractors for projects aimed at improving facilities for veterans. The purpose of this gathering is to provide potential bidders an opportunity to assess the project site before submitting their proposals, indicating a transparent and competitive procurement procedure by the VA. This initiative underscores the commitment to enhancing infrastructure and services within the Department of Veterans Affairs.
    The document outlines the pre-bid Requests for Information (RFIs) regarding the Project 550-24-103, which involves replacing Air Handling Units at facility B-98. Key inquiries pertain to project logistics, including the removal of temporary structures, security measures, and environmental concerns such as asbestos abatement, which is confirmed as necessary. The document emphasizes coordination with the VA Construction Oversight Representative (COR) regarding job site specifics, including the placement of dumpsters and safety fencing. Clear answers are provided about project tax exemptions, the composition of existing structures, and responsibilities for various tasks, such as re-construction post-demolition. The response clarifies that the anticipated project initiation will occur approximately two weeks after contract award, although a precise date remains unestablished. Additional specifications, particularly regarding roofing and metal panels, will follow in an addendum. This pre-bid communication is vital for conformance with regulations and project timelines, ensuring all contractors are well-informed of requirements and expectations before bidding on this government undertaking. The thoroughness of the responses reflects the initiative's commitment to clarity and adherence to safety standards during the construction process.
    The document outlines a project involving the replacement of air handling units in Building 98 at the VA facility in Danville, IL. It details the construction staging, temporary equipment setups, and specific requirements for contractors to minimize disruptions during the project. Key tasks include the installation of temporary air handlers, demolition of existing units, and the careful coordination of new ductwork connections to maintain uninterrupted chilled water and steam supply. Furthermore, contractors must submit a detailed phasing plan to address various aspects like rental equipment, demolition schedules, and downtime management. The plans emphasize a commitment to restoring any affected pavement and landscaping to original conditions while adhering to safety regulations during construction activities. This project aligns with federal requirements for maintaining and upgrading veteran health facilities, ensuring operational efficiency and improved living conditions for residents.
    The VA Illiana Health Care System has issued Addendum 1 regarding the Replacement of Air Handling Units Project No. 550-24-103, which includes essential modifications to contract documents effective November 21, 2024. Key changes encompass adjustments to site plans and mechanical demolition notes across several drawing views, ensuring compliance with performance specifications and safety standards, particularly concerning fall protection as per OSHA regulations. Furthermore, the document expands the project's specification sections to include critical areas such as Cast-in-Place Concrete, HVAC and Boiler Plant Insulation, and Hydronic Piping, notably permitting copper piping for smaller sizes. The accompanying attachments detail the revised drawings and new specification sections, affirming the structured approach in implementing these updates. This addendum underscores the VA's commitment to maintaining standards in healthcare facility upgrades, promoting enhanced operational efficiency and safety in medical environments.
    The document outlines the construction specifications for replacing the Air Handling Units B-98 at the VA Illiana Health Care System in Danville, Illinois. It includes comprehensive details on various construction methods, materials, and regulatory compliance needed for the project. Important sections cover general requirements, existing conditions, concrete work, structural integrity specifications, and testing protocols for concrete mix designs. Specific attention is given to infection control measures during construction, environment protections, temporary controls, and sustainable practices. It emphasizes the quality control and safety standards necessary for the project completion. This file serves as a crucial guide for contractors responding to the RFP, ensuring adherence to VA standards while prioritizing patient safety and construction integrity throughout the replacement of the air handling units.
    The document pertains to a federal request for proposals (RFP) and grants within the context of government contracts and funding initiatives. It discusses various administrative and logistical elements involved in grant distribution and project proposals. Key points include the stipulations for eligibility, submission guidelines, evaluation processes, project requirements, and fund allocation specifics. The structure appears fragmented, presenting a myriad of regulations, compliance mandates, and procedural frameworks necessary for government contracts at both federal and state levels. Throughout, the text underscores the importance of transparency and accountability in managing public funds. Specific sections address the necessity for thorough documentation and justification of expenses associated with the proposed projects. The emphasis on safety, environmental responsibility, and adherence to local regulations highlights a commitment to maintaining public welfare through structured funding practices. Overall, this document serves as a guide for potential applicants seeking government grants, delineating the requirements and expectations for successful submissions in tandem with federal and state oversight.
    The document revolves around federal and state/local government Requests for Proposals (RFPs) and grant opportunities. It outlines the procedural framework for applying to these funding mechanisms, emphasizing the significance of compliance with stringent guidelines. Key topics include the eligibility criteria for applicants, the requirements for proposal submission, and the evaluation criteria that will be used by government agencies to assess the applications. In detail, the text highlights essential components such as the importance of adhering to deadlines, the necessary documentation to accompany proposals, and the assessment of project feasibility, sustainability, and potential community impact. The document also addresses the role of collaboration among various stakeholders and the need for transparency throughout the application process. Ultimately, the purpose of the document is to facilitate informed participation in the funding opportunities provided by governmental entities, ensuring alignment with public policy objectives and fiscal responsibility. This summary reflects the framework within which government entities seek to engage applicants for federal and state/local projects, focusing on maintaining clear communication about expectations and compliance while fostering a competitive and transparent bidding process.
    The document discusses various aspects of federal and state RFPs (Requests for Proposals) and grants, emphasizing the importance of compliance, safety, and regulatory standards. It outlines the processes involved in preparing and submitting proposals, highlighting the need for meticulous documentation and adherence to specific guidelines. Key points include the identification of eligible projects, funding availability, and the requirements for grant applications. The text also notes the significance of addressing potential hazards and environmental issues, particularly in projects involving historic sites or hazardous materials. A thorough assessment and remediation plan are essential to ensure compliance with health and safety regulations. In conclusion, the document underscores the government's commitment to supporting projects that follow rigorous safety and quality standards, aiming to promote effective use of federal and state funding in various sectors while ensuring public welfare and environmental protection.
    Similar Opportunities
    Z2DA--STX Upgrade HVAC ALMD Lab 671-22-190
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs, through Network Contracting Office 17, is preparing to issue an Invitation for Bids (IFB) for the upgrade of HVAC systems at the Audie L. Murphy Memorial Hospital in San Antonio, Texas. The project entails providing construction services, including general construction, alterations, and the removal of existing utilities specifically for the 1st Floor Lab, with a focus on enhancing the healthcare infrastructure. This initiative is set aside for 100% Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238220, with a construction budget estimated between $1 million and $5 million, and a completion period of 180 days following the issuance of a Notice to Proceed. Interested bidders should note that the solicitation is expected to be released on SAM.gov around January 8, 2025, with the bid opening planned for February 26, 2025; for inquiries, contact Cheryl Clark at cheryl.clark4@va.gov or 972-708-0825.
    Z2DA--Amendment 01
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors to update the HVAC system at the Community Living Center (CLC) of the Audie L. Murphy Veterans Affairs Medical Center in San Antonio, Texas, under project number 671-22-198. The project involves renovating the HVAC, steam, and plumbing systems while ensuring minimal disruption to patient care operations, with a construction duration of approximately 26 weeks. This initiative is crucial for enhancing the operational efficiency and safety of healthcare facilities for veterans, reflecting the government's commitment to improving infrastructure standards. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSB) must submit their proposals by January 10, 2025, with a projected construction cost between $1 million and $2 million; for further inquiries, contact Contract Specialist Andres J Garcia at andres.garcia1@va.gov or 254-899-6066.
    Z2DA--657A5-23-110, Renovate 3B for Patient Privacy and Intensive Care Unit, (VA-25-00018450)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for a construction contract to renovate Patient Ward 3B at the Marion VA Medical Center in Illinois, focusing on enhancing patient privacy and establishing an Intensive Care Unit. The project, designated as a Service-Disabled Veteran Owned Small Business set-aside, requires comprehensive renovations including demolition, mechanical system updates, and adherence to safety and quality standards, with an estimated construction cost between $2 million and $5 million. Proposals must be submitted by January 14, 2025, following a mandatory site visit on December 18, 2024, and the performance period is set for 550 calendar days post-award. Interested contractors should contact Contract Specialist Maria G. Hoover at maria.hoover@va.gov for further details.
    Z2DA--Project 671-25-006 Replace HVAC in Hemodialysis
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the presolicitation opportunity titled "Project 671-25-006 Replace HVAC in Hemodialysis" at the Audie Murphy VA Medical Center in San Antonio, Texas. The project involves comprehensive general construction services to replace the HVAC systems serving the Hemodialysis Unit, ensuring that adjacent areas remain accessible and operational throughout the construction process. This initiative is part of the VA's ongoing efforts to enhance healthcare infrastructure while minimizing disruptions to patient care, with the HVAC unit already on-site for installation. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSB) must submit proposals by February 6, 2025, at 10:00 AM Central Time, and can direct inquiries to Contract Specialist Jose Reveles at jose.reveles@va.gov or by phone at 254-899-6066.
    Y1DA--CON - Upgrade A Wing & D Wing Elevators - 583-22-101
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the upgrade of elevators in the A and D Wings of the Richard L. Roudebush VA Medical Center in Indianapolis, IN, under project number 583-22-101. This federal contract, estimated to cost between $2,000,000 and $5,000,000, is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and requires comprehensive construction services, including labor, materials, and equipment, to ensure compliance with current safety codes and standards. The project is critical for enhancing patient safety and operational efficiency within the medical facility, with a completion timeline of 690 calendar days from the notice to proceed. Interested contractors must submit proposals via email by the extended deadline of January 7, 2025, and can direct inquiries to Contract Specialist Tiffany A Rausch at Tiffany.Rausch@va.gov.
    4130--557-25-1-5151-0012, Replacement of Chiller 2, Chiller 4, and Chiller 5 (VA-25-00009689)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to provide and install three new 500-ton York Magnetic Bearing Chillers at the Dublin VA Medical Center, replacing malfunctioning existing units. The procurement emphasizes the need for contractors to ensure minimal disruption to medical center operations while adhering to strict infection control and safety standards during the installation process. This project is critical for maintaining the facility's operational efficiency and enhancing the healthcare infrastructure for veterans. Interested vendors must submit their proposals by December 13, 2024, at 4:00 PM Eastern Time, and can direct inquiries to Contracting Officer Don Grier at Don.Grier@va.gov or by phone at 404-321-6111 x4926.
    Z1DA--556-23-105 Roadway and Sidewalk Improvements (VA-25-00021311)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the Z1DA--556-23-105 Roadway and Sidewalk Improvements project at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project aims to address deficiencies in local streets, sidewalks, and stormwater management infrastructure, requiring the contractor to provide all necessary tools, materials, labor, and supervision. This initiative is particularly significant as it supports the enhancement of facilities for veterans while promoting opportunities for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The estimated project cost ranges from $2 million to $5 million, with a completion timeline of 236 calendar days following the issuance of a Notice to Proceed. Interested bidders must ensure they are verified SDVOSBs and are encouraged to attend a pre-bid conference, with the solicitation expected to be posted on December 17, 2024, and bids due by January 28, 2025. For further inquiries, contact Rebecca Picchi at rebecca.picchi@va.gov or call 414-384-2000 x42026.
    Z2AZ--Project Name: Variable Air Volume (VAV) Box Replacements; Project Number: 317VB3261/28; Station Location: St. Petersburg, Florida, VARO; Project Location: Building 46
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is preparing to solicit bids for the Variable Air Volume (VAV) Box Replacements project at the St. Petersburg Veterans Affairs Regional Office, specifically in Building 46. This project involves the replacement of approximately 117 terminal units to effectively manage the building's temperature, ensuring compatibility with the existing Johnson Controls Metasys system. The contract will be a firm-fixed-price agreement, with an estimated value between $1 million and $2 million, and is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Bids will be accepted starting on October 28, 2024, with a submission deadline of December 3, 2024. Interested parties must verify their SDVOSB status and register with the System for Award Management (SAM) to participate in the bidding process. For further inquiries, contact Dirk Kelley at Dirk.Kelley@va.gov.
    6110--676-22-122 Replace Electrical Switchgear
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the replacement of electrical switchgear at the Tomah VA Medical Center in Wisconsin, under project number 676-22-122. The project involves the demolition and replacement of aging electrical systems, requiring contractors to adhere to strict safety and environmental standards while ensuring minimal disruption to the facility's operations. This initiative is crucial for modernizing the infrastructure that supports veteran care, reflecting the government's commitment to enhancing healthcare environments. Interested contractors, particularly CVE-verified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit their bids by January 14, 2025, and can direct inquiries to Contracting Officer Gregory T Block at Gregory.Block@va.gov. The estimated project budget ranges from $1,000,000 to $2,000,000, with a completion timeline of 270 days from the notice to proceed.
    Z2DA--657A4-21-800, TF - FCA - Remove and Replace End-of-Life HVAC Infrastructure Building 1
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for a project to remove and replace outdated HVAC infrastructure at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. This initiative aims to enhance the facility's heating, ventilation, and air conditioning systems, ensuring compliance with modern standards and improving the quality of care for veterans. The project is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and has an estimated cost between $10 million and $20 million, with a completion timeline of 900 days. Interested vendors must register in the System for Award Management (SAM) and submit proposals by January 16, 2025, at 2:00 PM Central Time; inquiries can be directed to Contract Specialist Lucia Cowsert at lucia.cowsert@va.gov or by phone at 913-758-9912.