Job Corps Pine Ridge Building 511 – Dorm Siding
ID: 12970225R0002Type: Presolicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA FOREST SERVICE-SPOC SWWashington, DC, 20250, USA

NAICS

Site Preparation Contractors (238910)

PSC

REPAIR OR ALTERATION OF OTHER RESIDENTIAL BUILDINGS (Z2FZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Agriculture, specifically the USDA Forest Service, is seeking qualified contractors for the rehabilitation of Building 511 at the Pine Ridge Job Corps Civilian Conservation Center in Chadron, Nebraska. The project involves extensive exterior work, including the installation of siding, sheathing, insulation, roof modifications, and the removal and reinstallation of windows, doors, and gutters, with a focus on enhancing safety and compliance with federal standards. This initiative reflects the government's commitment to maintaining and upgrading its facilities to support operational efficiency and job training environments. Interested small businesses must submit proposals by January 31, 2025, with an anticipated contract value between $500,000 and $1 million, and can direct inquiries to Ma Estrellita Dasmarinas at maestrellita.dasmarinas@usda.gov or by phone at 951-405-3988.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines a request for proposal (RFP) for the rehabilitation project at the Pine Ridge Job Corps Center, specifically targeting Dormitories 2 and 3. It details the necessary base items, including mobilization, bonding premiums, and miscellaneous architectural and site rehabilitation work. Each item is assigned a unit type and quantity, with costs left unspecified. Additionally, optional items such as batt insulation and an optional bonding premium are included, indicating potential upgrades or enhancements to the project's scope. The document emphasizes the structural organization of base versus optional items while highlighting the total estimated costs for both categories. This RFP serves as an invitation for proposals related to the rehabilitation efforts, aligning with federal and state grant initiatives focused on improving community facilities and job training environments.
    The Pine Ridge Job Corps Civilian Conservation Center in Dawes County, Nebraska, is undertaking a rehabilitation project for Building 511. The project involves comprehensive renovations, including siding, sheathing, insulation, and roofing modifications, alongside selective demolition and site work. Key tasks include the removal and reinstallation of windows, doors, and gutters, as well as minor site improvements. Contractors must provide all necessary labor, materials, and equipment while adhering to project schedules and conducting operations to minimize disruption to existing government activities. The document outlines general requirements, including safety protocols, temporary facilities, and submission procedures for project documentation. Specific sections detail demolition, carpentry, insulation installation, and finishes, emphasizing compliance with standards and regulations. Essential points include maintaining existing utilities, waste management procedures, and ensuring environmental protection during construction. The project aims to enhance facility functionality while complying with government guidelines and maintaining safety standards throughout the construction process.
    The document outlines the demolition and rehabilitation plan for the Job Corps National Office Dormitory II/III, Building 511, emphasizing critical structural modifications. Key tasks include the removal and replacement of exterior siding, which must align with the building's lateral system. Contractors are required to submit a phasing plan for demolition to minimize disruptions in occupied spaces. Various existing structures, including concrete stairs, manholes, and retaining walls, will remain. Notable responsibilities include protecting existing finishes during demolition and ensuring weather-tight conditions amid modifications. The exterior wall lateral system involves significant overhauls, including the installation of new Z-R panels. The overall project aims to enhance safety, integrity, and compliance throughout the rehabilitation process, with careful attention to detail and coordination of all demolition efforts. This initiative reflects the federal government's investment in maintaining and upgrading its facilities to support operational efficiency.
    The document revolves around federal and state/local Requests for Proposals (RFPs) and grants, focusing on the essential conditions and requirements for entities seeking funding and partnerships for various projects. It addresses critical compliance issues that organizations must adhere to while preparing their proposals, including federal regulatory standards and local guidelines. Key topics include funding eligibility criteria, application processes, and evaluation metrics used by government agencies to assess proposals. Supportive details elucidate potential restrictions, best practices for proposal writing, and deadlines for submission. The document underscores the importance of aligning project objectives with governmental priorities, demonstrating a clear understanding of community needs, and exhibiting capability and experience. By providing structured guidance, this document serves as a roadmap for applicants, highlighting the necessity for clarity, completeness, and compliance in their proposals. The ultimate purpose is to facilitate better project outcomes that meet public demand and effectively utilize allocated funds, reflecting the government's commitment to transparency, accountability, and community enhancement.
    The document outlines a solicitation for a federal contract related to the JC Pine Ridge Building 511 Dorm Siding project, issued by the USDA Forest Service. The project involves extensive exterior work on the dormitory at the Pine Ridge Job Corps Civilian Conservation Center in Dawes County, Nebraska, including siding replacement, insulation, roof modifications, and other repairs. The solicitation number is 12970225R0002, with a submission deadline on 12/13/2024 and expected performance to begin within 10 calendar days post-award. This project is set aside for small businesses, highlighting opportunities for eligible contractors. Additionally, there are specific solicitation requirements, including the provision of performance and payment bonds. The site is located at 15710 South Highway 385, Chadron, Nebraska. Key contacts for the project include the Contracting Officer Klenise Wallace and Contract Specialist Ma Estrellita Dasmarinas, providing essential communication channels for interested bidders. A site visit and pre-proposal conference are planned, ensuring bidders understand project expectations fully. Overall, this solicitation seeks contractors to participate in a significant rehabilitation effort, underscoring government support for infrastructure improvements through small business engagement.
    The Solicitation No: 12970225R0002 outlines a project for the rehabilitation of Building 511 at the Pine Ridge Job Corps Civilian Conservation Center in Nebraska. The project aims to replace siding, sheathing, insulation, and perform related external work estimated to cost between $500,000 and $1,000,000. Contractors must utilize biobased and recycled products in compliance with federal sustainability guidelines. The document details the scope of construction, project location, and technical specifications, while emphasizing the need for bonding and a complete pricing schedule from the contractor. Specific requirements include established safety plans, adherence to applicable OSHA standards, and the provision of personal protective equipment. The contractor will also be responsible for regular inspections and must submit invoices using the USDA's electronic processing platform. Key personnel contacts within the USDA are identified for administration and oversight. Overall, the document serves as a comprehensive guide for contractors seeking to bid on this project, providing detailed expectations for performance, compliance, and administrative procedures under federal guidelines.
    The document outlines the project schedule for the Pine Ridge Job Corps Center Dormitory 2/3 Rehabilitation, focusing on architectural and site rehabilitation efforts. It includes two base items specified as miscellaneous architectural and site rehabilitation work, both referenced as lump sum jobs. In addition, there is an optional item listed for batt insulation, quantified in square feet, totaling 2069 SF. The document organizes these components into base items and optional items, although totals are not filled out. This RFP-style document indicates the federal government's initiative to rehabilitate facilities within the Job Corps framework, emphasizing project transparency and structured financial planning for appropriated funds. The overall goal is to improve the infrastructure of the Job Corps center, thereby enhancing its operational capacity and service to its intended demographic.
    The USDA Forest Service is initiating a rehabilitation project for Building 511 at the Pine Ridge Job Corps Civilian Conservation Center in Dawes County, Nebraska. The project encompasses various improvements, including siding, insulation, roofing modifications, and window and door replacements. Contractors are expected to provide all necessary labor, materials, equipment, and licenses to execute the tasks outlined in the specifications. Construction will occur during regular business hours while the government occupies the site, necessitating careful coordination and adherence to operational restrictions. Key aspects include selective demolition, rough and finish carpentry, installation of thermal insulation and asphalt shingles, as well as fiber-cement siding. The document outlines precise requirements in divisions from general requirements to specific construction standards, ensuring compliance with various building codes and safety regulations. A detailed schedule of items and submission procedures for contractors is also provided, which includes the handling of hazardous materials if encountered. This project exemplifies the government’s commitment to maintaining and improving public facilities in alignment with operational needs and environmental standards.
    The document outlines the demolition and rehabilitation plans for the Job Corps National Office Dormitory II/III (Building 511) at the Pine Ridge Job Corps Civilian Conservation Center. The key focus is on removing and replacing existing exterior components, including wall siding and rigid insulation, while ensuring structural integrity is maintained throughout the process. Demolition includes specific notes on the retention of existing walls, stairs, and manholes, while a thorough phasing and sequencing plan must be submitted for contractor approval. The contractor is required to mitigate disruptions during construction, protect existing finishes, and ensure weather-tight conditions post-demolition. Additional steps include the careful removal, protection, and reinstallation of exterior fixtures such as lights and cameras. The document emphasizes safety, occupant protection, and adherence to construction standards, underscoring the project’s commitment to sustainable and compliant building practices as part of government funding initiatives. This aligns with federal RFP procedures and local requirements on construction and safety in occupied facilities.
    The government document is a General Decision related to wage determinations for residential construction projects in Custer and Dawson Counties, Nebraska. It emphasizes compliance with the Davis-Bacon Act, stipulating that contractors must pay minimum wage rates as established by Executive Orders 14026 and 13658. These orders set minimum wage requirements based on the contract's award date, with rates of at least $17.20 per hour or $12.90 per hour, applicable to various classifications of workers. Additionally, it outlines worker protections under Executive Order 13706, which mandates paid sick leave for federal contractors. The document provides a detailed wage determination for specific construction classifications and highlights the annual adjustment of minimum wage rates. It also includes a process for appeals regarding wage determinations, summarizing how interested parties can seek review and reconsideration from the Department of Labor. Overall, this file serves to guide contractors on wage compliance and worker rights in federal construction projects, reflecting governmental efforts to ensure fair labor practices.
    Lifecycle
    Similar Opportunities
    Shake Creek Guard Station Siding Replacement
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking contractors for the Shake Creek Guard Station Siding Replacement project in Idaho. The project involves rehabilitating the siding of several historic buildings, which includes cleaning, repairing, and potentially replacing siding while ensuring compliance with safety regulations and maintaining historical integrity. This initiative is crucial for preserving the structures listed on the National Register of Historic Places and involves managing hazardous materials, particularly lead-based paint. The estimated budget for the project ranges between $100,000 and $250,000, with a site visit scheduled for November 5, 2024, and an anticipated solicitation release in February/March 2025. Interested vendors should contact Braidy Richins at Braidy.Richins@usda.gov or 208-423-7545 for further details.
    GAOA Bessey Group Electrical
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is preparing to solicit proposals for the GAOA Bessey Group Electrical project, which involves the removal and replacement of existing RV pedestals and associated electrical systems at two campgrounds in the Nebraska National Forest. The contractor will be tasked with replacing ten RV pedestals in the Group Campground and eleven in the Cedar Loop Campground with new 50-amp pedestals, ensuring improved electrical service for visitors. This project is significant for enhancing the infrastructure of the campgrounds, contributing to the overall visitor experience in the national forest. The anticipated contract, valued between $250,000 and $500,000, is set to be awarded as a Firm Fixed-Price contract, with a projected performance period from March 3, 2025, to May 16, 2025. Interested vendors must ensure they have an active registration in SAM.gov and can contact Heather Cole at Heather.cole@usda.gov for further information.
    South Schells Fence Restoration
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is soliciting bids for the South Schells Fence Restoration project, which involves the removal and replacement of approximately 9.6 miles of existing barbwire fencing and the installation of about 1.98 miles of new fencing within the Duck Creek Basin on the Ely Ranger District in Nevada. The project aims to enhance infrastructure and ecological stewardship by adhering to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) while ensuring public road access is maintained throughout the process. Interested contractors should note that the project has a funding magnitude between $250,000 and $500,000, with bids due by 09:00 local time on February 14, 2025, and a projected start date of May 1, 2025. For further inquiries, contact Derrick Dodson at derrick.dodson@usda.gov or Lisa Kemper at lisa.kemper@usda.gov.
    Deferred Maintenance Projects - Stillwater, OK
    Active
    Agriculture, Department Of
    The United States Department of Agriculture (USDA), through its Agricultural Research Service (ARS), is seeking contractors for deferred maintenance projects in Stillwater, Oklahoma, specifically focusing on repairs and improvements to various facilities, including greenhouses and roofs. The project entails comprehensive renovations across multiple buildings, including demolition and replacement of mechanical, electrical, and structural systems, with an emphasis on compliance with safety regulations and sustainable practices. This initiative is crucial for modernizing USDA facilities to enhance operational efficiency and safety standards. The anticipated Request for Proposal (RFP), 12805B25R0005, is expected to be issued around January 2, 2025, with a contract value estimated between $1 million and $5 million. Interested contractors should monitor sam.gov for updates and are encouraged to contact David Hildebrand at david.hildebrand@usda.gov for further information.
    Greenhouse Rehabilitation
    Active
    Interior, Department Of The
    The National Park Service, under the Department of the Interior, is seeking qualified contractors for the Greenhouse Rehabilitation project at Indiana Dunes National Park in Porter, IN. The project involves the removal and replacement of damaged polycarbonate panels on the roofs and walls of two greenhouses, with an estimated contract value between $100,000 and $250,000. This initiative is crucial for maintaining the park's agricultural infrastructure, which supports environmental sustainability and plant management efforts. Interested small businesses must submit their proposals by the specified deadlines, and the contract is expected to be awarded by late January 2025, with work commencing in February 2025. For further inquiries, contact Jarrod Brown at jarrodbrown@nps.gov or 330-468-2500.
    USDA / NRCS Elsberry Plant Materials Center Greenhouse Renovation Project
    Active
    Agriculture, Department Of
    The United States Department of Agriculture (USDA) is preparing to issue a Request for Quotes (RFQ) for the renovation of the greenhouse at the Elsberry Plant Materials Center in Missouri. The project entails significant upgrades, including the installation of new double-walled acrylic panels, weather seals, walk-in doors, a cooling system, overhead lights, and a concrete floor, as well as ensuring compatibility with the existing control system. This renovation is crucial for enhancing the facility's operational efficiency and supporting the USDA's mission in plant materials conservation. Interested small businesses must be registered in the System for Award Management (SAM) and are encouraged to attend a site showing, with the anticipated contract value between $100,000 and $250,000 and a performance period of 90 days from the Notice to Proceed. For further inquiries, contact Stephen Case at stephen.case@usda.gov.
    Professional Land Surveying - USDA Natural Resources Conservation Service - Nebraska
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Farm Production and Conservation (FPAC) Business Center is soliciting qualifications from licensed land surveyors for professional surveying services in Nebraska. The selected contractor will perform legal boundary surveys and re-surveys of easements under various conservation programs, ensuring compliance with specific land survey specifications. This opportunity is crucial for maintaining accurate and legally established conservation easements on agricultural lands, which supports effective land management practices. Interested firms must submit their qualifications using the Standard Form 330 (SF330) by December 23, 2024, and can contact Amber Maestri at amber.maestri@usda.gov or Laureen Eipp at laureen.eipp@usda.gov for further information. The estimated contract value is up to $9 million over five years, with a base year and four option years.
    Renovations to Garage Building Project C (Adams, OR)
    Active
    Agriculture, Department Of
    The United States Department of Agriculture (USDA), through its Agricultural Research Service (ARS), is seeking contractors for the Renovations to Garage Building Project C at the Columbia Plateau Conservation Research Center in Adams, Oregon. The project involves comprehensive renovations to transform the existing storage facility into two conditioned spaces for sample washing and storage, including the installation of mechanical and plumbing systems, interior partitions, and HVAC systems, while adhering to strict safety and procedural guidelines. This initiative underscores the federal commitment to enhancing agricultural research infrastructure, with a project magnitude estimated between $100,000 and $250,000, and a Firm Fixed Price Construction Contract expected to be issued around January 6, 2025. Interested contractors should monitor the SAM.gov website for the Request for Quotation (RFQ) 12905B25Q0026 and ensure they are registered with the System for Award Management. For further inquiries, contact Spencer Hamilton at spencer.hamilton@usda.gov.
    CHIR - REHAB QUARTERS 5
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is soliciting proposals for a firm fixed-price contract to rehabilitate Quarters 5 at Chiricahua National Monument in Arizona, under Solicitation 140P1525Q0014. The project involves addressing deferred maintenance, including lead abatement, HVAC system installation, and various repairs, with additional options for garage door and wood-burning stove replacements. This initiative is crucial for maintaining the safety and functionality of residential facilities within the national park, ensuring compliance with federal and state regulations. Proposals are due by January 17, 2025, and interested contractors should contact Donald Tremble at donaldtremble@nps.gov or 720-450-1198 for further details.
    Woodrow Wilson Keeble Memorial Health Care Center USP Compliance
    Active
    Health And Human Services, Department Of
    The Department of Health and Human Services, through the Indian Health Service, is soliciting proposals for a construction contract aimed at achieving USP compliance at the Woodrow Wilson Keeble Memorial Health Care Center in Sisseton, South Dakota. The project encompasses a range of renovations, including demolition, mechanical reroutes, carpentry, and system upgrades, with an estimated contract value between $1 million and $5 million. This initiative is crucial for enhancing healthcare facilities and ensuring compliance with safety and operational standards in sensitive health care environments. Interested contractors must submit their proposals by December 23, 2024, and can direct inquiries to Shaukat Syed at shaukat.syed@ihs.gov or call 214-767-3934.