Z2AZ--Renovation & Expansion of SPS | NRM 640-23-108
ID: 36C26125R0008Type: Solicitation
AwardedAug 22, 2025
$25.3M$25,347,000
AwardeeOVERWATCH AMOROSO LLC ORANGE 92867
Award #:36C26125C0061
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF261-NETWORK CONTRACT OFFICE 21 (36C261)MATHER, CA, 95655, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS (Z2AZ)
Timeline
    Description

    The Department of Veterans Affairs is seeking proposals for the renovation and expansion of the Sterile Processing Service (SPS) at the VA Palo Alto Healthcare System, designated as Project Number 640-23-108. This project involves approximately 18,000 gross square feet of renovation work, including the construction of temporary facilities to maintain operational continuity during the renovation process. The initiative aims to modernize healthcare infrastructure, enhance service capabilities, and ensure compliance with safety and regulatory standards. Interested contractors, particularly certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit their proposals by July 23, 2025, with a pre-proposal site visit scheduled for June 12, 2025. For further inquiries, potential bidders can contact Charee Harris at charee.harris@va.gov.

    Point(s) of Contact
    Charee HarrisContract Specialist
    charee.harris@va.gov
    Files
    Title
    Posted
    The VA 640-23-108 project entails the renovation and expansion of the SPS at the VAPAHCS in Palo Alto, CA, focusing on the installation of manufactured metal and wood casework, as well as countertops and integral accessories. Key specifications include the design and installation of various casework types, ensuring compliance with relevant quality standards, such as ASTM and ANSI. The documentation outlines the required materials, including stainless steel, cold-rolled steel, plywood, and plastic laminate, for constructing durable and functional cabinetry. Critical aspects involve approvals for manufacturers and installers, warranties for construction, and adherence to detailed assembly and installation procedures. The document mandates coordination with other trades and specifies hardware, fastening methods, and finishing standards to ensure a robust and aesthetically pleasing outcome. The renovation aims to provide high-quality casework installations that meet the functionality and safety standards typical for VA facilities, showcasing the government's emphasis on effective facility management and improvement. This undertaking reflects a commitment to enhancing the operational environment of healthcare settings while ensuring compliance with federal guidelines and regulations.
    The Department of Veterans Affairs (VA) is issuing a presolicitation notice for a Firm-Fixed-Price construction contract aimed at renovating and expanding the Sterile Process Supply (SPS) facility at the VA Palo Alto Healthcare System. The solicitation number for this project is 36C26125R0008, with an expected advertisement date in early November 2024. This project is set-aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), with bids accepted only from qualified SDVOSBs that meet specific criteria outlined in the NAICS code 236220. The estimated construction cost falls between $10 million and $20 million. Interested vendors must have active registration in SAM.gov and be free from federal exclusions. The award will be made to the most advantageous offer to the government based on price and other criteria, and a detailed Statement of Work will accompany the solicitation. Responses will be due no less than 30 days after the issuance of the solicitation, which will be made available as downloadable documents. This notice serves to inform potential bidders and does not constitute a request for proposals at this stage.
    The document outlines a Special Notice for the renovation and expansion project of the SPS, identified by solicitation number 36C26125R0008. Managed by the Department of Veterans Affairs, specifically the VA Sierra Pacific Network (VISN 21), the project aims to enhance facilities at the VA Sierra Nevada Health Care System located in Reno, NV. The response deadline for proposals is set for July 10, 2025, at 10:00 Pacific Time, following its official posting on June 4, 2025. This notice does not utilize Recovery Act funds and falls under the Product Service Code Z2AZ and NAICS Code 236220, which relate to commercial and institutional building construction. Interested parties can reach out to Charee Harris, listed as the point of contact, for further information. The document stresses the urgency for contractors to prepare for the upcoming solicitation and highlights the importance of the project within the context of enhancing healthcare facilities for veterans.
    The Department of Veterans Affairs is seeking proposals for the Renovation and Expansion of the Sterile Process Supply (SPS) Department at the VA Palo Alto Healthcare System. This project involves around 18,000 gross square feet of renovation work, including creating separate areas for SPS and Supply Chain Services and constructing temporary facilities to accommodate ongoing operations during construction. It is set aside exclusively for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and follows a best value tradeoff selection process. Bidders must submit both technical and price proposals, attend a pre-proposal site visit, and provide required performance and payment bonds. The project budget is estimated between $20 million and $50 million, with a construction period of 720 days post-award. Key submission dates include the due date for proposals by July 10, 2025, and a critical site visit on June 5, 2025. The overall goal of these renovations is to enhance the facility's service capabilities while ensuring safety and compliance with existing standards.
    This document serves as an amendment to a solicitation for a construction project issued by the Department of Veterans Affairs, specifically for the VA Sierra Pacific Network. The primary purpose of the amendment is to provide final bid drawings and specifications that replace the originally posted documents and to update several contract clauses to reflect recent deviations. The update includes administrative changes and compliance with obligations related to labor standards and biobased product reporting. The document outlines the acknowledgment procedures for offerors regarding the amendment, stressing the importance of timely receipt of such acknowledgment to avoid offer rejection. Various attached documents, including multiple parts of basement and temporary facility drawings, further detail the project's requirements. Overall, this amendment is significant for potential contractors in ensuring they have the most current information and compliance conditions necessary for submitting bids.
    The document is an amendment to a solicitation for proposals issued by the Department of Veterans Affairs (VA), specifically for the VA Sierra Pacific Network. The main purpose of this amendment is to extend the proposal submission deadline to July 16, 2025, at 10:00 AM Pacific Time. This amendment also includes the introduction of an updated clause (852.219-75) dated January 2023, to be utilized in the price binder, replacing the previous version from 2022. Additionally, the document provides site visit sign-in sheets for a visit that occurred on June 12, 2025. Despite these modifications, all other terms and conditions of the solicitation remain unchanged. The notice emphasizes the importance of acknowledging this amendment by the offerors/bidders to ensure compliance and maintain the validity of their proposals. This amendment reflects standard practices in federal RFP processes, ensuring clarity and adherence to updated guidelines throughout the procurement process.
    This amendment pertains to the Department of Veterans Affairs' solicitation (36C26125R0008) for a project involving sterilization equipment and facilities. The amendment primarily serves to extend the deadline for proposals to July 23, 2025, and to address several Requests for Information (RFIs). It clarifies that there are no Division 11 specifications included for the modular modifications, as no furnishings are involved, while Division 12 specifications will be provided separately for the main hospital sterilization project. The amendment also confirms key points regarding bidding procedures, including that all items under CLINs 0001-0004 are base bids and that cost breakout sheets are only required for the specified project. Bidders are allowed to modify a provided supplemental pricing document to align with standard CSI Divisions. Importantly, the amendment specifies that no further extension requests will be accommodated due to fiscal year end constraints. This document reflects typical processes in federal RFPs by ensuring clarity and transparency for potential bidders while accommodating their inquiries.
    The document pertains to an amendment of a solicitation issued by the Department of Veterans Affairs (VA) related to a project designated as 36C26125R0008, administered by the VA Sierra Pacific Network. The primary purpose of this amendment is to respond to requests for information (RFI) as outlined in an attached document, and to extend the deadline for proposal submissions to July 23, 2025, at 10:00 AM Pacific Time. All other terms and conditions of the original solicitation remain unchanged. The amendment indicates that submission acknowledgment must be done by the specified deadline to avoid rejection of offers. Several attachments accompany the document, providing additional context and requirements for the bidding process, including a geo-technical report and details on necessary systems such as HVAC and public address systems. This amendment represents an essential administrative update important for potential contractors bidding on the project.
    This document is an amendment (Amendment 0005) to a Request for Proposals (RFP) issued by the Department of Veterans Affairs for the contract identified as 36C26125R0008. The amendment specifically addresses responses to previously submitted queries (numbers 106, 129, 136, 137, and 139) related to the RFP, which are highlighted in red in the accompanying documents. The proposal submission deadline remains unchanged, set for July 23, 2025, at 10:00 AM Pacific Time. All other terms and conditions outlined in the original RFP document are maintained without alteration. The amendment is signed by Charee Harris, the Contracting Officer for the VA Sierra Pacific Network. This amendment serves an essential purpose in ensuring transparency and clarity for potential bidders, reflecting the federal government’s commitment to a fair and comprehensive procurement process.
    The document outlines the limitations on subcontracting for service and construction contracts awarded to Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and Veteran-Owned Small Businesses (VOSBs) under U.S. federal law. It specifies that for service contracts, no more than 50% of the government-awarded amount can go to non-VIP-listed firms. For general construction, this limit is 85%, while for special trade construction, it is set at 75%. Any work by similarly situated subcontractors counts towards these limits, but costs for materials are excluded. The document emphasizes the importance of compliance with these requirements, as non-compliance may lead to serious consequences, including potential penalties or prosecution. Offerors must submit a certification confirming their understanding and willingness to comply, along with their bids. Failure to provide necessary documentation may result in remedial actions from the government. The purpose of this document is to ensure that federal contracting opportunities support veteran-owned businesses while adhering to regulations that maintain fairness and compliance in federal procurement processes. The structure methodically delineates requirements, responsibilities, and consequences, reinforcing the government's commitment to supporting veteran entrepreneurship through structured subcontracting limits.
    The VAAR 852.219-75 outlines the compliance requirements for contractors regarding limitations on subcontracting under the authority of 38 U.S.C. 8127. It establishes that contractors awarded contracts for services, general construction, or special trade construction must adhere to specific percentages of work performed by certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) or Veteran-Owned Small Businesses (VOSBs). For service contracts, no more than 50% of the contract amount can be paid to non-certified firms; for general construction, this limit is set at 85%; and for special trade construction, the limit is 75%. Contractors are required to maintain documentation, such as invoices and subcontracts, to demonstrate compliance and cooperate with the VA's compliance verification process. Failure to comply or provide requested documents can lead to penalties, including potential debarment and prosecution under U.S. law. The document emphasizes the importance of accurate certification by the offeror to validate compliance, with non-compliant offers deemed ineligible for contract award. This regulation reflects the government's commitment to supporting veteran-owned businesses in federal contracting opportunities.
    The document is a pre-bid response to RFIs (Requests for Information) regarding the renovation and expansion of the Sterile Processing Services (SPS) at a Veterans Affairs facility in Oklahoma City. The primary objective is to integrate new systems with the existing infrastructure while ensuring compliance with various specifications and standards. Key topics include the integration of Siemens Design CC Network, compatible video surveillance and alarm systems (Avigilon and Notifier), and the requirements for Modular Buildings and Temporary SPS facilities, which necessitate compliance with ICRA standards and seamless operation during construction. Respondents seek clarifications on mechanical, electrical, and fire safety aspects tied to system compatibility and existing infrastructure. The document outlines responses to 114 specific questions, addressing concerns about equipment specifications, integration requirements, construction coordination, and regulatory compliance. It emphasizes that no alternative vendors will be accepted for critical systems, ensuring uniformity within existing operations. Further clarifications include the handling of existing equipment, staging logistics, and site access for modular installations. Overall, the response highlights the detailed planning necessary for a successful execution of the project while maintenance of SPS operations remains uninterrupted during the construction period. This reflects the VA's commitment to providing high-quality service and infrastructure enhancements while adhering to regulatory frameworks.
    The VA Palo Alto Health Care System (VAPAHCS) is undertaking the renovation and expansion of the SPS, which includes the installation of a Direct-Digital Control (DDC) system for HVAC. This project encompasses providing and implementing a comprehensive DDC system that facilitates a high-speed, peer-to-peer network, ensuring that all controllers, workstations, and components are BACnet-compliant. Key responsibilities include engineering, programming, configuration, installation, and training, alongside coordinating with other contractors for elements such as control valves and fire alarms. The system is designed for standalone operation and prioritizes performance, security, and integration with existing systems, promoting efficiency and ease of use. The project emphasizes quality assurance, requiring a single-source control installation contractor with proven experience in building automation systems. With warranties on materials and labor provided for five years post-installation, this renovation demonstrates a commitment to modernizing the facility while adhering to regulatory standards and improving operational capabilities within the healthcare environment.
    The Geotechnical Engineering Report prepared by Terracon Consultants for the Sterile Process Supply Trailer and Modular Building project in Palo Alto, California, details subsurface exploration and provides essential geotechnical recommendations for construction. The site comprises 0 to 2½ feet of well-graded gravel fill overlying medium to very stiff clay and dense sand, with no groundwater encountered during exploration. Key aspects include recommended shallow foundation depths of at least 18 inches, maximum allowable bearing pressures of 2,000 psf for footings, and 800 psf for mat slabs, with expected settlements of 1 inch or less. Earthwork requirements emphasize proper removal of undocumented fill, moisture management, and maintenance of effective drainage to mitigate risks related to soil shrink-swell behavior. Pavement designs are guided by anticipated traffic conditions, specifying thicknesses varying from 3 to 5 inches for asphaltic concrete and recommendations for both chemically treated and geogrid-reinforced sections. The report underscores the importance of following geotechnical guidelines to ensure structural integrity while addressing seismic considerations in this earthquake-prone region. This comprehensive study is crucial for the successful development of a resilient facility, ensuring regulatory compliance and safety in construction practices.
    This document outlines the requirements for the installation of a Public Address and Mass Notification System (PAS) as part of the renovation and expansion project at the VA Palo Alto Health Care System (VAPAHCS). The PAS must comply with rigorous standards set forth by the National Fire Protection Association (NFPA), the Occupational Safety and Health Administration (OSHA), and other federal guidelines. The contractor is responsible for the system's design, engineering, certification, and testing, ensuring it is operationally efficient and compliant with safety codes. Key components include an emergency service PAS capable of receiving and distributing communication signals, equipment warranties, and comprehensive system training. The installation process emphasizes safety, including adherence to existing fire and public safety regulations and clear documentation of changes throughout construction. The contractor must maintain an accurate project schedule and deliver all related equipment and submittals promptly. Additionally, the PAS system should be capable of interfacing with existing communication systems, ensuring the infrastructure is adaptable for future expansions. Overall, this project reflects the VA's commitment to enhancing facility safety and operational communication capacities.
    The document outlines the renovation and expansion project for the Palo Alto Veterans Affairs Medical Center, specifically focusing on water, plumbing, and utility management aspects related to the construction. It includes detailed notes on elevations and specifications for various water valves, the layout of utilities, and connections for both above and below ground installations. Key elements include significant civil engineering considerations, adhering to safety measures in plumbing and electrical work, and maintaining existing utilities during the project. The plan emphasizes collaboration with multiple engineering consultants, such as Spur Design and H2B, ensuring compliance with local regulations and VA standards. Contractors are instructed to take necessary precautions when excavating and coordinating utility installations, demonstrating the government’s commitment to enhancing healthcare infrastructure while addressing public safety and environmental considerations. This summary encapsulates the critical components necessary for executing the project effectively.
    The document outlines the requirements for Offerors responding to a federal Request for Proposal (RFP) related to construction projects. It consists of several sections that include a Construction Experience Project Data Sheet, Past Performance Questionnaire, Offeror Team Composition, and a Safety Data Sheet. Each section mandates detailed information about the Offeror's prior project experiences, team structure, safety records, and performance evaluations. Offerors are instructed to submit information on at least three and no more than five relevant projects, indicating their role (prime contractor, subcontractor, etc.), project specifics, and the nature of their involvement. The Past Performance Questionnaire focuses on assessing the contractor's execution quality, timeliness, customer satisfaction, management capabilities, cost management, safety compliance, and overall project management. Additionally, the document emphasizes the importance of submitting safety performance metrics and narratives. The purpose is to evaluate contractors’ qualifications thoroughly, ensuring those selected can meet the specific demands and standards of the RFP. This structured approach assists government agencies in making informed decisions based on contractors' past performances and expertise.
    The document comprises responses to pre-bid requests for information (RFIs) related to the renovation and expansion of the Sterile Processing Service (SPS) at the VA facility. It clarifies various technical and logistical queries regarding the integration and specifications of existing systems, the requirements for new installations, and construction protocols. Key points include the necessity for compatibility with existing systems (e.g., Siemens HVAC, Avigilon CCTV), adherence to compliance standards such as ICRA Class IV, and the operational necessities ensuring the SPS functions uninterrupted during renovations. Additional details cover temporary infrastructure, equipment handling, and contractor responsibilities for utilities and fire suppression systems. The document outlines that proposed schedules must be developed in coordination with existing operations, emphasizing procedural adherence and safety during the construction process. Overall, it captures essential directives, safety considerations, and structural requirements pertinent to potential bidders engaged in the project while ensuring clarity on scope limitations and operational continuity during the upgrade.
    The document outlines the renovation and expansion of the SPS (Sterile Processing Services) at the Palo Alto Healthcare System. This project focuses on upgrading existing mechanical, plumbing, electrical, and fire protection systems in the facility to comply with safety and operational standards. Plans detail the incorporation of new systems while retrofitting existing structures to minimize disruption. Key components include comprehensive demolition of outdated plumbing and HVAC systems, installation of modern medical gas and waste management systems, and adherence to life safety codes. All aspects of the construction will be executed with careful consideration of existing conditions to ensure a seamless integration of new and retrofit designs aimed at improving overall functionality and safety. The renovation project underscores the commitment of the VA to enhance healthcare infrastructure while maintaining regulatory compliance and promoting patient safety through improved service delivery capabilities.
    The document outlines the final bid documents for the renovation and expansion of the Specialty Care Center at the VA Palo Alto Healthcare System. This project aims to modernize the facility located at 3801 Miranda Avenue, Palo Alto, CA, under project number 640-23-108. Various engineering and architectural firms, including Spur Design, LLC, and Poole Fire Protection, Inc., provide expertise across different aspects, such as structural, mechanical, electrical, and fire protection engineering. The proposal includes comprehensive renovation plans with detailed sheet indexes addressing plumbing, mechanical, electrical, and technology systems, ensuring compliance with federal codes and standards. Key aspects of the renovation focus on enhancing accessibility, safety, and the overall efficiency of healthcare services offered at the facility. Critical requirements include adhering to the Americans with Disabilities Act and specific energy codes. These plans reflect the VA's commitment to improving healthcare infrastructure, prioritizing patient safety and operational effectiveness. Coordination among multiple disciplines is vital to achieving a fully operational facility upon completion. Overall, the documents emphasize a thorough and systematic approach to executing the proposed renovations, guided by established safety and performance standards.
    The document outlines the specifications and requirements for the renovation and expansion of the Sterile Processing Service (SPS) at the VA Palo Alto Healthcare System. It includes various engineering and architectural plans highlighting the physical alterations needed to modernize facilities while maintaining compliance with health and safety regulations. Key details consist of room layouts, fire safety measures, and occupancy load calculations, as well as critical information on design consultants such as SPUR Design, LLC, and Gregory P. Luth & Associates. Fire protection features, including a fully automatic sprinkler system and fire-resistance ratings for construction materials, are emphasized to ensure safety standards. The overall purpose is to facilitate the development of updated healthcare environments that effectively manage sterile processing while prioritizing the welfare of patients and staff. The document serves as an essential reference for stakeholders involved in the project, ensuring adherence to codes and efficient coordination among various engineering disciplines.
    The document outlines the plans for the renovation and expansion of the Palo Alto Healthcare System, specifically focusing on site demolition and subsequent construction phases. It details the demolition of existing structures, the removal of temporary facilities, and the preparation of the site for new modular buildings. Various engineering teams, including architects, structural, civil, mechanical, and fire protection specialists, are involved, ensuring compliance with safety and health regulations. The project requires meticulous planning for demolition, which includes ensuring that existing utilities and structures, such as light poles and fire connections, remain intact or are properly relocated. It emphasizes the need for infection control measures and protective protocols throughout the construction process. The renovation aims to enhance the facility's operational capacity and efficiency while maintaining safety standards, particularly concerning site access and environmental management. Overall, this document serves as critical bid documentation, underpinning the federal government's commitment to improving healthcare infrastructure through organized and compliant construction efforts in line with state and local regulations.
    The document outlines an RFP related to the renovation and expansion of the Palo Alto Healthcare System, specifically targeting the electrical demolition and installation within an operating facility. Key elements include the requirement to minimize disruption to services since the facility operates 24/7. Contractors must coordinate work schedules and electrical shutdowns with the contracting officer’s representative to ensure minimal impact. General notes emphasize the necessity for field verification of existing conditions, adherence to schematic demolition drawings, and coordination among all trades involved. The document features detailed electrical requirements, indicating the removal and proper disposal of existing fixtures and conduits back to panelboards, ensuring compliance with the National Electric Code and VA construction standards. The project involves collaborations with various engineering disciplines, including mechanical, electrical, fire protection, and structural. This RFP reflects the VA's commitment to maintaining high-quality healthcare facilities and its proactive approach to operational excellence within the constraints of ongoing service provision.
    The document outlines the specifications and requirements for a construction project related to the installation and upgrade of mechanical and plumbing systems in a designated building area, referred to as Building 100. This project focuses on integrating a new cart washer system while ensuring compliance with various safety and structural guidelines, including ASTM and ASCE standards. Key points include the installation of different ceiling types and lighting fixtures, the need for adequate clearances around equipment, and adherence to federal and local regulations for fire protection systems and electrical installations. The document emphasizes the importance of precise measurements, proper installation methods, and a coordinated approach to managing existing utilities and installations, highlighting the urgency of compliance in health and safety standards during construction activities. This project is critical for improving facility functionality and safety within the context of government-funded improvements.
    The document outlines the renovation and expansion project for the Superior Patient Services (SPS) facilities at the Palo Alto VA Medical Center, located at 3801 Miranda Avenue, Palo Alto, CA. The project, designated as number 640-23-108, encompasses comprehensive architectural and engineering renovations intended to enhance the operational capacity of the healthcare services. Key consultants involved include Spur Design, LLC for architecture, H2B. Inc. for civil/structural engineering, and several specialized firms for fire protection and healthcare planning. The project incorporates sustainable design elements and adheres to safety regulations, emphasizing a fully sprinklered environment for fire protection. Detailed architectural drawings and specifications are provided to guide the construction and ensure compliance with Veterans Health Administration standards. The project is set to finalize bid documents by May 30, 2025, indicating a scheduled timeline for competitive bidding. Overall, this initiative reflects the government's commitment to upgrading healthcare facilities and improving patient services in line with modern standards, ensuring a safe and efficient environment for veterans.
    The document outlines the renovation and expansion project at the Palo Alto VA Medical Center (Project Number: 640-23-108). It addresses the scope of work involving alterations and additions to existing facilities, emphasizing compliance with pertinent building codes and safety standards. The project includes detailed plans for civil, structural, mechanical, electrical, and fire safety systems, with an emphasis on configuration and accessibility for healthcare services. Key components include the installation of a fully automatic fire sprinkler system, compliance with NFPA life safety regulations, and adherence to the Americans with Disabilities Act (ADA). Additionally, it highlights the importance of coordinating construction to minimize disruption to existing operations, alongside maintaining public safety through proper signage and barricading. Consultants involved in the project come from various engineering disciplines, ensuring comprehensive oversight of the renovation process. The document stresses the requirement to follow federal mandates for safety and efficiency while outlining the contractor's responsibilities for maintaining construction sites and upholding cleanliness. In conclusion, this document serves as a vital reference for the Palo Alto VA Medical Center's renovation, showcasing a structured approach to modernization while prioritizing patient care and safety.
    The document is a Request for Information (RFI) centered on the renovation and expansion of the SPS project, identified as Project No. 640-23-108 under Solicitation No. 36C26125R0008. It outlines an inquiry for specific details related to the project, guiding potential contractors on how to submit information pertinent to the renovation and expansion objectives. Essential elements include the contractor's name, contact information, and submission directive to a designated email address. The RFI emphasizes clarity in responses to enhance project understanding and planning, reflecting the structured protocol typical of government procurement processes. This RFI serves to gather insights from industry experts that could inform the subsequent phases of project execution, aligning with federal requirements for transparency and competitiveness in contracting.
    The document outlines the renovation and expansion of the Sterile Processing Service (SPS) at the VA Palo Alto Healthcare System, detailing the bid requirements for contractors involved in the project. It specifies key components such as the need for site preparation, demolition, construction of modular temporary facilities, and subsequent restoration efforts. The project consists of three main task categories: base renovations within an existing structure, establishment of swing space for continuous operations, and installation of mobile units for service continuity. Contractors are required to adhere strictly to safety and security protocols, manage sensitive information, and maintain uninterrupted utility services throughout the construction period. The document emphasizes the importance of coordination to minimize disruptions to medical operations. It includes technical specifications across various disciplines, necessitating compliance with multiple construction standards. The overall goal is to modernize the SPS facility while ensuring safety, compliance with regulations, and minimal impact on ongoing healthcare services, thus reflecting the VA's commitment to improving quality for veterans.
    The VHA Directive 7715 outlines safety and environmental requirements for contractors bidding on federal projects. To qualify for consideration, contractors must demonstrate compliance with Occupational Safety and Health Administration (OSHA) and Environmental Protection Agency (EPA) standards, specifically having no more than three serious violations, one repeat violation, or one willful violation within the last three years. Moreover, contractors must possess a current Experience Modification Rate (EMR) of 1.0 or lower. Offerors are required to provide a self-certification on company letterhead stating that they meet these criteria. They must also submit their current EMR documentation from their insurance carrier’s letterhead, along with explanations for any EMR above 1.0 and a timeline for achieving compliance. The document specifies the need for reporting any serious, repeat, or willful violations, emphasizing the significance of maintaining a strong safety and environmental track record in relation to federal contracting eligibility. This directive reinforces the federal government's commitment to ensuring that contractors adhere to high safety standards, ultimately aimed at protecting workers and the environment during government-funded projects.
    The document outlines the requirements for evaluating the personnel qualifications of offerors participating in the SPS Renovation project (Contract No. 36C26125R0008). It specifies that offerors must provide detailed resumes for key positions, including Elevator Design Project Manager, Superintendent, Engineer, Safety Officer, and QC Manager. Essential information required includes the individual's proposed role, employment history, educational background, professional registrations, and relevant training. Additionally, candidates must list five completed projects from the last six years, detailing their contract numbers, titles, amounts, timelines, roles, and descriptions of work. The proposal must distinctly indicate the years of experience for project management and superintending roles, avoiding combined experience claims. This evaluation framework ensures that only qualified personnel are considered for the project, aligning with federal and local RFP guidelines focused on safety and compliance in construction.
    This government document outlines requirements for Offerors to submit detailed project data sheets and safety information as part of a Request for Proposals (RFP). Each Offeror must provide supporting data for at least three to five relevant construction projects, detailing their role (e.g., Prime Contractor, Subcontractor), project specifics (location, award dates, completion dates, and financial details), and project relevancy. Additionally, a Past Performance Questionnaire (PPQ) must be completed by clients to assess the Contractor’s performance based on various criteria, such as quality, cost management, safety, and customer satisfaction. The submission also includes a team composition section, ensuring that all members involved are registered and describe how they will contribute to the contract's execution. Safety data sheets must record past safety performance metrics and show a commitment to maintaining a safe working environment. The document emphasizes the importance of verifiable information and proper documentation to evaluate the Offerors thoroughly, reflecting the government's commitment to ensuring quality and safety standards in public construction projects.
    The file outlines the Past Performance Questionnaire instructions for the SPS Renovation project at the VA Palo Alto Healthcare System. This questionnaire aims to evaluate contractors' past performance related to the proposal under RFP number 36C26125R0008. Evaluators must complete all sections, providing essential details about the contractor and their work, along with ratings based on a scale from "Exceptional" to "Unsatisfactory" across various performance elements. Key evaluation areas include quality, timeliness, customer satisfaction, management effectiveness, cost/financial management, safety/security compliance, and overall performance. Organizations are encouraged to include comments for additional context. Completed questionnaires are due by July 10, 2025, to facilitate the government's assessment process, ensuring that contractors are capable of meeting the project's requirements effectively while adhering to safety and quality standards. This initiative reflects the government's commitment to employing capable contractors for federal projects, emphasizing thorough evaluations to enhance project outcomes.
    The document presents a sample authorization letter for clients in response to a Request for Proposal (RFP) issued by the Department of Veterans Affairs Network Contracting Office 21. It outlines the importance of emphasizing past performance for contractors bidding on the RFP, thus enhancing the government's ability to select the best proposals. The letter, meant to be printed on company letterhead, authorizes identified clients to respond to inquiries about the contractor's commercial efforts that are relevant to the RFP process. The template includes space for the client's name, a designated point of contact within the organization, and the contractor's signature, company name, and contact information. This practice facilitates the validation process by the government, ensuring an efficient assessment of past performance to align with procurement goals.
    The document outlines the pricing schedule for the renovation and expansion project at the VA Palo Alto Health Care System (HCS). It details various components involved in the construction process, including general requirements, foundations, superstructures, and specific trades such as plumbing, electrical, and HVAC. Each section lists the proposed costs for labor and materials, although many entries remain undetermined. The document summarizes the overall costs, presenting subtotals for each category, leading to a total estimated expense comprising both overhead and profit margins. The project aims to enhance the facility's infrastructure, closely aligning with federal standards for quality and safety in government-funded constructions, while ensuring compliance with necessary protocols. This pricing schedule serves to outline the financial aspects of the project as part of an RFP for potential contractors interested in bidding for the work.
    The document appears to be a disorganized collection of data that may contain information related to federal and state/local government requests for proposals (RFPs) and grants. However, the text is overwhelmingly garbled and corrupted, making it difficult to extract coherent information or specifics regarding RFPs and grants. Despite the unstructured nature, it potentially addresses various governmental processes and documents associated with funding opportunities, compliance requirements, and legal guidelines often tied to RFP submissions and management of grants. The content may include fragmented references to policies, procedural instructions, or budgetary considerations essential for stakeholders engaging with government funding mechanisms. Given the lack of clarity and comprehensibility of the data, a clear overview or actionable insights cannot be reliably deduced from the document. Further investigation or reevaluation of the source content would be necessary for a meaningful analysis related to governmental RFPs and grants. Ultimately, this document does not provide substantial or usable information due to the extent of corruption in the text.
    The document outlines specifications for flooring and finishing materials in the construction project at the Palo Alto VA Medical Center, focusing on the renovation and expansion of the SPS area. It details various floor finishes such as carpet tiles, epoxy flooring, and porcelain tiles, along with their manufacturers and specific sizes. Each room's finish is noted, including floor, wall, and ceiling treatments, ensuring compliance with the Americans with Disabilities Act (ADA) and local regulations. It also emphasizes the need for coordination between various construction disciplines and specifies that no asbestos-containing materials are to be used. The design includes a detailed room finish schedule and a key plan indicating the layout of temporary modular buildings. Additionally, the document includes important guidelines for prep work and installation processes, ensuring high-quality and compliant construction practices. This proposal highlights the commitment to modernizing healthcare facilities while upholding safety and regulatory standards.
    The VA Palo Alto Health Care System (VAPAHCS) is initiating a project for the renovation and expansion of its Sterile Processing Service (SPS) within Building 100, comprising approximately 16,000 gross square feet. The project includes complete site preparation, demolition of existing structures, and installation of new mechanical, electrical, and plumbing systems. Safety, quality control, and infection control measures will be enforced throughout the construction process. The work scope also involves creating temporary facilities, including two mobile units and modular buildings, while maintaining continuous operations within the medical center. Contractors are required to develop a detailed work plan to minimize service interruptions, coordinate security measures, and ensure compliance with VA regulations. The project aims to modernize medical facilities, enhancing operational efficiency and patient safety, demonstrating the government's commitment to improving veteran care through infrastructure upgrades.
    The document outlines a project proposal for the renovation and expansion of the Palo Alto Healthcare System, specifically under the Veterans Health Administration. It includes detailed pre-project drawings, various engineering disciplines involved, and specifications for the construction process. The project number is 640-23-108, with confirmed consultancy support from Spur Design, LLC, alongside various specialists like structural and MEP engineers. The layout includes a comprehensive sheet index covering plumbing, mechanical, electrical, technology, and fire protection, indicating careful planning for essential systems. Significant attention is directed towards safety measures and compliance with federal standards, highlighting the project’s alignment with federal RFPs and grants aimed at improving Veteran healthcare infrastructure. Overall, this initiative demonstrates the commitment to enhancing healthcare facilities to better serve veterans while ensuring updated safety protocols and technologies. The documentation represents a thorough preparatory step in funding allocations and federal bidding processes vital for project advancement.
    The document outlines specifications and guidelines for a renovation and expansion project at the VA Palo Alto Healthcare System. It emphasizes compliance with various building codes, standards, and safety measures, including the Americans with Disabilities Act (ADA) requirements which dictate fixture heights and clearances for accessibility. Detailed instructions are provided for the installation of wall-mounted fixtures, ensuring structural support with proper blocking and consistent measurements from the finished floor. The document also stipulates requirements for energy efficiency and insulation across the building envelope, referencing specific insulation values and materials. Life safety and fire protection standards based on the National Fire Protection Association (NFPA) and the International Building Code (IBC) are highlighted, ensuring a safe environment for occupants. Contractors are reminded of their obligations regarding existing site conditions, cleanliness, and coordination with other disciplines to complete operational systems effectively. Additionally, precautions against asbestos and other hazardous materials are mandated, reiterating the government’s commitment to health and safety throughout the construction process. Overall, this comprehensive guideline serves as a framework for contractors to execute the project while adhering to federal regulations and ensuring the safety of future users.
    The document outlines Bid Documents for the renovation and expansion of the VA Palo Alto Healthcare System, focusing on the structural adjustments and engineering requirements for various systems. It includes comprehensive project details, specifications for mechanical, electrical, and plumbing (MEP) systems, structural engineering notes, and site demolition plans for installing a fully sprinklered temporary modular building and trailers. Key contributors include multiple engineering firms responsible for architectural designs, structural integrity, and fire safety measures. The document emphasizes adherence to building codes, effective anchorage systems for equipment, and necessary safety precautions related to hazardous materials and construction activities. Coordination among contractors, engineers, and the VA is crucial to ensure compliance with health standards and operational efficiency during the renovation process. Overall, it reflects the VA's commitment to enhancing its facilities to better serve veterans while maintaining regulatory compliance and safety protocols throughout the construction phases.
    The document outlines the renovation and expansion plans for the Sterile Processing Service (SPS) at the VA Palo Alto Healthcare System. The project aims to modernize facilities, including upgrades to mechanical, plumbing, and electrical systems, ensuring compliance with safety standards and regulations. It includes detailed drawings and plans detailing existing layouts of various functional areas, such as sterile storage, clean workrooms, and assembly areas. The primary consultants involved in the project include Spur Design, structural and technical engineers, fire protection specialists, and civil engineers, all coordinating to enhance operational efficiency and safety. Key concerns include installation of new medical equipment, improved sterilization processes, and provisions for infection control. Significantly, the project emphasizes the incorporation of sustainable practices and adherence to Veterans Affairs standards. Through careful planning and execution, the renovations aim to create a more integrated and functional work environment while reducing operational risks. The initiative reflects the VA’s commitment to enhancing healthcare facilities for veterans, illustrating a concerted effort in maintaining high-quality service standards.
    The document is a comprehensive mechanical and structural plan detailing the renovation and expansion of the Palo Alto Healthcare System. It encompasses various technical components, including HVAC, plumbing, and fire protection systems. The plans specify the demolition of existing structures and installations to make way for new equipment, focusing on compliance with VA standards and local regulations. Key notes highlight the removal of outdated air handling units, ductwork, and associated piping, with detailed instructions for capping existing utilities and preparing for new installations. Proper coordination among different engineering disciplines is emphasized to ensure functionality and compliance. Specific demolition guidelines are provided for mechanical systems to maintain safety and efficiency throughout the project. This initiative illustrates the VA's commitment to modernizing healthcare facilities while integrating advanced technology and maintaining regulatory standards.
    The document outlines the renovation and expansion plans for the Sterile Processing Services (SPS) at the VA Palo Alto Healthcare System. It details the project’s requirements, including the construction and installation of various technology and security systems, as well as upgrades to existing infrastructure. The renovation must occur in a facility that operates continuously, necessitating careful phasing and coordination with multiple engineering disciplines, including electrical, mechanical, and fire safety engineering. Key components involve the installation of telecommunications systems, data and security cabling, along with specific technology for mass notification and surveillance systems. The project also emphasizes compliance with VA standards and mandates for equipment planning and structural modifications. Additionally, the architecture firm, Spur Design, and other engineering consultants play crucial roles in executing the plans while minimizing disruption to hospital operations. This initiative showcases the VA's commitment to enhancing their healthcare facilities and maintaining high standards of service delivery and security for veterans.
    The document outlines the renovation and expansion project for the Palo Alto VA Medical Center, specifically focusing on the SPS (Surgical and Procedural Suite). It serves as a cover sheet and preliminary documentation for a federal Request for Proposals (RFP) issued by the Veterans Health Administration. The project, designated as VA Project Number 640-23-108, includes detailed plans that span a total of 72 sheets covering various aspects such as civil, structural, architectural, fire protection, plumbing, mechanical, electrical, and telecommunications systems. Key contributors include multiple consultants such as Spur Design, LLC for architectural aspects, and H2B, Inc. as the civil/structural engineer, among others. The document emphasizes the project’s adherence to safety and regulatory standards, including a focus on fire safety with a fully sprinklered structure. The index lists specific sheet numbers, titles, and design plans critical to the project's successful execution. This initiative illustrates the VA's commitment to enhancing service facilities for veterans while ensuring compliance with federal guidelines and community standards.
    The document outlines the construction guidelines and standards for a renovation and expansion project at the Palo Alto VA Medical Center, specifically relating to the installation of fixtures and adherence to various building codes. Key points include the requirement for metal support blocking for wall-mounted accessories, maximum height specifications for fixtures, and design compliance with several recognized codes such as the International Building Code (IBC) and the NFPA Life Safety Code. The text emphasizes the importance of following the latest codes, including energy conservation and safety standards, and the necessity for thorough coordination among contractors and subcontractors. The emphasis on allowing for public health and safety through the enforcement of these adopted codes underscores the VA's commitment to proper construction practices. Additionally, clear procedures for addressing potential conflicts between codes and established VA requirements are highlighted. This document serves as a guideline for contractors to ensure the project meets federal standards while maximizing safety and efficiency in the renovation efforts at the facility.
    The document outlines a Request for Proposal (RFP) for the renovation and expansion of the Special Projects Services (SPS) facility at Palo Alto Veterans Affairs Medical Center (VAMC). The project, prominently designated as number 640-23-108, involves comprehensive updates including the installation of new modular buildings, trailers, and a renovated layout that enhances operational efficiency. Key phases of construction entail site preparation, installation of temporary structures, and subsequent restoration of the site to its original condition, with attention to utility relocations and maintenance of existing features. This initiative underscores the Veterans Health Administration's commitment to upgrading healthcare infrastructures, aligning with regulatory standards while ensuring the safety and accessibility of healthcare services. Detailed site plans indicate various consultants, including Spur Design, LLC and H2B, Inc., for architectural and civil engineering, respectively. The proposal emphasizes the importance of verifying existing utilities and coordinating with VA representatives for successful project execution, ensuring adherence to state regulations and operational continuity throughout the construction phases. Ultimately, this project aims to create a modern, efficient healthcare environment for veterans, enhancing overall service delivery.
    The document outlines the renovation and expansion project for the Palo Alto VA Medical Center (VA MC), focusing on stormwater management, structural improvements, and site restoration. It includes detailed specifications for various drainage systems, including trench drains, catch basins, and underground utilities, along with elevation measurements and installation guidelines. The project aims to ensure compliance with environmental regulations while enhancing the facility's services for veterans. Significant attention is given to construction methodologies, materials, and safety protocols, emphasizing proper dewatering and the management of existing features. Important engineering details, such as reinforcement specifications and foundational requirements, are highlighted to ensure structural integrity. The document reinforces the commitment to high standards of public health and safety, addressing environmental concerns associated with construction activities. Overall, this initiative reflects the VA's dedication to maintaining and upgrading healthcare infrastructure in alignment with federal regulations and community needs.
    The document outlines the renovation and expansion project for the SPS at the Palo Alto VA Medical Center, focusing on mechanical, plumbing, and fire protection systems in modular structures. It details the requirements for installing a new wet-pipe fire riser to serve modular buildings and includes specifications for fire alarm systems, plumbing fixtures, and service connections. Key engineering firms are identified alongside code compliance mandates such as adherence to VA Fire Protection Design Manual and NFPA standards. The project scope involves coordination among multiple disciplines, including civil, structural, and mechanical engineering, ensuring that installations meet quality and safety standards. Special attention is given to water supply, wastewater management, and emergency systems, with guidelines for contractor responsibilities and testing protocols. The overarching goal is to enhance the facility's infrastructure while ensuring compliance with health and safety regulations, illustrating the VA's commitment to providing appropriate resources for veterans.
    The Department of Veterans Affairs is planning to award a Firm-Fixed-Price construction contract to renovate and expand the Sterile Process Supply (SPS) area at the VA Palo Alto Healthcare System. This pre-solicitation notice (36C26125R0008) indicates the intent to issue the solicitation around early February 2025, with a contract value estimated between $10 million and $20 million. This opportunity is exclusively reserved for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220, which pertains to commercial and institutional building construction. Interested bidders must have an active vendor record in SAM.gov and not face any debarments or financial exclusions. The government is set to evaluate offers based on price and other criteria, intending to award one contract. Hard copy documents will not be made available; all information will be accessible online after the solicitation’s release. This notice serves informational purposes only and does not solicit bids at this time.
    The document outlines details regarding a scheduled site visit for the SPS Renovation project under the solicitation no. 36C26125R0008. The site visit is set for June 12, 2025, at 1:00 PM Pacific time, with proposals due by July 10, 2024, at 10:00 AM Pacific time. The document includes a space for recording visitor information, such as printed names, company names, and contact details, alongside the escort name, which is given as Gutierrez. Additional requirements for the visit include badge procurement, indicating a need for security clearance or identification. This file serves as an essential reference for bidders participating in the proposal process, ensuring they are well-informed about the site visit logistics before submitting their proposals. The overarching purpose aligns with government RFP protocols, guiding contractors in preparation and compliance with federal requirements for the renovation project.
    The document pertains to the renovation and expansion of the Sterile Processing Service (SPS) at the Veterans Affairs Palo Alto Health Care System (VAPAHCS). It outlines Contract Modification P0006, effective May 30, 2025, concerning the preparation of the site, demolition, and construction of temporary facilities while maintaining operational continuity for the Medical Center. The project encompasses approximately 16,000 square feet of SPS/SCS space renovation, demanding coordination with various engineering and architectural disciplines. Specific bid items include the base proposal for expansion, swing space integration, and the provision of two mobile units, all necessitating thorough adherence to safety, security, utility management, and environmental control requirements. Key aspects include mandatory compliance with the VA's security protocols, the necessity of project phasing to minimize disruption, and the handling of hazardous materials such as mold. The contractor must maintain existing utilities and manage temporary services effectively, while a detailed warranty management plan is crucial to ensure accountability and compliance with construction standards. Overall, this project reflects the VA's commitment to improving healthcare facilities for veterans through significant infrastructure enhancements.
    Similar Opportunities
    Z1DA--Renovate Pharmacy for USP800 Compliance Project 540-18-102
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking bids for the "Renovate Pharmacy for USP800 Compliance Project 540-18-102" at the Louis A. Johnson VA Medical Center in Clarksburg, West Virginia. This project involves comprehensive construction services to ensure the pharmacy meets USP 800 compliance standards, requiring the contractor to provide all necessary labor, materials, equipment, permits, and supervision over a performance period of 496 calendar days. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $2,000,000 and $5,000,000. Interested parties must submit questions in writing to Contracting Officer Rebecca Besten at rebecca.besten@va.gov, and the response deadline for bids is January 7, 2026, at 3 PM Eastern Time, with the solicitation anticipated to be issued on or about January 20, 2026.
    36C26126R0007 Replace B530 Gymnasium Floor Solicitation
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is soliciting proposals for the replacement of the gymnasium floor in Building 530 at the VA Palo Alto Healthcare System. The project requires comprehensive construction services, including the removal of existing flooring, mold remediation, and the installation of a new maple wood gymnasium flooring system, ensuring a safe and durable surface for athletic and community use. This procurement is particularly significant as it supports the VA's commitment to providing quality facilities for veterans and the community. The estimated project cost ranges from $500,000 to $1 million, with a performance period of 60 calendar days. Interested contractors must submit their proposals by December 22, 2025, and can direct inquiries to Contract Specialist Christopher Aguon at christopher.aguon@va.gov or (808) 433-0600.
    Y1DA--36C257-26-AP-0163 | NEW CON FY26 | CTX 674-16-016 - Remodel Amphitheater (VA-26-00003450)
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the "Remodel Amphitheater Project 674-16-016" at the Olin E. Teague Veterans Medical Center in Temple, Texas. This project, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), involves extensive renovations, including reconfigurations of electrical, mechanical, and plumbing systems within Building 163, with an estimated construction magnitude between $2,000,000 and $5,000,000. The project is critical for enhancing the facility's functionality and aesthetics, ensuring compliance with strict safety and infection control protocols due to its operation within a 24/7 healthcare environment. Proposals are due by January 6, 2026, following a mandatory site visit on December 3, 2025, at 9:00 AM CST, with all inquiries directed to Contract Specialist Jose P Portalatinrivera at jose.portalatinrivera@va.gov.
    SPS Services
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for SPS Services, as outlined in the attached documentation. The procurement aims to fulfill specific medical service requirements under the jurisdiction of the Veterans Affairs Network Contract Office 17. These services are critical for supporting the healthcare needs of veterans, ensuring they receive timely and effective medical care. Interested vendors can reach out to Dayna Cantu at dayna.cantu@va.gov or call 512-922-0142 for further details regarding the submission process and requirements.
    Z2DA--FY26: NRM (PROJ: 673-21-116) BB - Restoration of Building 1 Envelope
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the restoration of the Building 1 envelope at the James A. Haley VA Hospital in Tampa, Florida, under Project Number 673-21-116. This federal contract, valued between $5 million and $10 million, is specifically set aside for VetCert Certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and encompasses general construction, alterations, abatement, and new building components, to be completed within 550 calendar days after the Notice to Proceed. Key deadlines include a proposal submission date of February 16, 2026, at 2:00 PM EST, with a site visit scheduled for November 12, 2025, and a requirement for bidders to acknowledge receipt of all amendments and addenda. Interested parties should contact Contract Specialist David M. Hernandez at David.Hernandez1@va.gov for further information.
    Z2DA--36C25726R0043 | 594A4-22-221 Renovate Halls and Walls DOM
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is preparing to solicit bids for the renovation of halls and walls at the Sam Rayburn Memorial Veterans Center in Bonham, Texas, under project number 594A4-22-221. This project involves comprehensive construction services to upgrade finishes in domiciliary hallways and patient rooms, covering approximately 61,500 square feet, including the installation of floors, walls, door jamb finishes, and associated interior lighting. The contract is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a project magnitude estimated between $1,000,000 and $5,000,000. Interested contractors should note that a request for proposal (RFP) will be issued around December 16, 2025, and a site visit is scheduled for January 06, 2025, at 10:00 AM (CDT). For further inquiries, contact Contract Specialist Cassandra King at cassandra.king@va.gov or by phone at 254-899-6023.
    504-25-120 Replace Steam Trench Cap Amarillo VAMC
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals from Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) for the "Replace Steam Trench Cap" project at the Amarillo VA Health Care Facility. The project entails the removal and replacement of an old trench cap, requiring contractors to provide all necessary labor, materials, equipment, and supervision while adhering to strict safety and environmental regulations. This procurement is crucial for maintaining the operational integrity of the medical center, ensuring minimal disruption during construction activities. Proposals are due by December 16, 2025, at 1:00 PM CST, following a mandatory site visit on November 20, 2025, with an estimated contract value between $250,000 and $500,000. For further inquiries, interested parties may contact Miguel Gonzalez at miguel.gonzalez4@va.gov or by phone at 915-282-1732.
    Z1DA--632-17-107 RENOVATE DIALYSIS (VA-26-00002956)
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the renovation of the Dialysis Unit at the Northport VA Medical Center, identified as Project Number 632-17-107. This comprehensive project involves the renovation of approximately 5,330 square feet, including abatement, demolition, and extensive construction work across various disciplines such as electrical, mechanical, plumbing, and fire protection, with a completion timeline of 548 calendar days from the Notice to Proceed. The renovation is critical for modernizing healthcare facilities to ensure compliance with stringent safety and accessibility standards while maintaining uninterrupted hospital operations. Interested contractors, particularly those certified as Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit their bids via email by January 14, 2026, at 10:00 AM EST, with a public bid opening scheduled for the same day at 11:00 AM EST. For further inquiries, contact Contract Specialist Lester S. Griffith at Lester.Griffith@va.gov.
    Z1DA--RENOVATE BLDG 143 4J SHOWER FLOORS
    Veterans Affairs, Department Of
    The Department of Veterans Affairs, through the Network Contracting Office 6, is soliciting bids for the renovation of shower floors in Building 143, specifically within the 4J section, at the Salem VA Medical Center. The project, identified as number 658-26-102, aims to enhance safety and prevent water escape in 20 patient bathrooms by performing general construction, plumbing, mechanical, and electrical work, with a total project value estimated between $100,000 and $250,000. This renovation is critical for maintaining operational safety and efficiency within the medical facility, which will remain open during the construction period. Interested contractors must submit their bids by December 23, 2025, with electronic submissions due by December 22, 2025, and can direct inquiries to Contract Specialist Intern Chanel C Johnson at Chanel.Johnson@va.gov.
    Z1DA--Renovate B26 for Mental Health - 538-23-102 Chillicothe VAMC
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking qualified contractors for the renovation of Building 26 for Mental Health at the Chillicothe VA Medical Center, under Project 538-23-102. This project, exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), involves a partial renovation of approximately 19,000 square feet of the existing Sustained Behavioral Treatment Unit (SBTU), including necessary architectural, mechanical, electrical, and plumbing upgrades, as well as the construction of a new basement floor for an Air Handling Unit (AHU). The estimated project duration is 320 calendar days, with a funding range between $2,000,000 and $5,000,000, and a solicitation is anticipated to be issued around November 12, 2025. Interested parties should contact Contract Specialist Jeremy Nee at jeremy.nee@va.gov for further information and ensure they are registered on the appropriate government websites to participate in the procurement process.