**BIL-FUNDED** SOLICITATION: REPAIR THE PARKING LOT AT THE LAURENCE G. HANSCOM FIELD (BED) AIR TRAFFIC CONTROL TOWER (ATCT) IN BEDFORD, MA.
ID: 6973GH-24-Q-00001Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL AVIATION ADMINISTRATION6973GH FRANCHISE ACQUISITION SVCSOKLAHOMA CITY, OK, 73125, USA

NAICS

All Other Specialty Trade Contractors (238990)

PSC

REPAIR OR ALTERATION OF AIR TRAFFIC CONTROL TOWERS (Z2BA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting bids for the repair of the parking lot at the Laurence G. Hanscom Field (BED) Air Traffic Control Tower (ATCT) in Bedford, Massachusetts. The project involves comprehensive tasks such as the removal of existing asphalt, milling, and installation of new pavement, along with necessary drainage adjustments and erosion control measures. This initiative is crucial for maintaining the operational integrity and safety of the facility, ensuring compliance with applicable FAA, state, and local construction codes. Interested small businesses must submit their proposals by November 1, 2024, with a bid bond of 20% of the proposal amount required, and can direct inquiries to Stephen Branch at stephen.n.branch@faa.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The document serves as an amendment to a federal solicitation regarding contract modifications and clarifications. It outlines updates to bonding requirements and includes an addendum with responses to contractor inquiries. Key changes encompass the Proposal Guarantee, Performance Bond Requirements, and Payment Bond Requirements, specifying that the proposal guarantee must be 20% of the total proposal amount and that both performance and payment bonds must equal 100% of the contract price. These updated clauses align with federal regulations and ensure that contractors are financially responsible and can meet their obligations. The document also stresses the importance of acknowledging receipt of the amendment by contractors to avoid proposal rejection. Additional attachments, such as a Q&A sheet, are included to provide clarity and transparency in the solicitation process. Overall, this amendment is crucial for ensuring compliance and smooth operation within federal contracting standards.
    The document outlines a request for quotes (RFQ) for a competitive construction project by the Federal Aviation Administration (FAA), specifically addressing the replacement of asphalt pavement and curbing for the Bedford Air Traffic Control Tower parking lot. The project has an estimated cost between $135,000 to $185,000, with a performance period of 45 days post-Notice to Proceed. It is a 100% set-aside for small businesses aiming to minimize competition from larger firms. The RFQ includes various mandatory attachments such as a Statement of Work, Wage Determination, and Contractor's Release Form. Additional requirements stipulate that contractors must furnish performance and payment bonds while adhering to specific labor and safety standards. The importance of compliance with affirmative action and environmental regulations is emphasized throughout the RFQ. Contractors are urged to maintain a working environment free from discrimination, with clear guidelines on achieving minority and female participation goals within their workforce. The document highlights the FAA's intent to ensure efficient, safe, and equitable execution of the project while promoting small business engagement.
    The document is a Contractor's Release form issued by the Department of Transportation, which serves as an official acknowledgment by the contractor regarding payments received and obligations discharged under a specific contract with the U.S. Government. It outlines the total amounts paid and payable to the contractor, as well as the legal implications of the release, which absolves the Government of any liability related to the contract, except for specified claims that are explicitly stated. The document details exceptions, including claims for third-party liabilities not known at the time of signing and reimbursement for patent-related costs incurred by the contractor. The contractor must notify the Contracting Officer regarding these exceptions and comply with all relevant contractual provisions. The release must be executed by the contractor and includes spaces for signatures and titles, emphasizing the need for proper corporate compliance where applicable. This form is significant in the context of federal RFPs and grants as it formalizes the conclusion of financial obligations and liability, ensuring both the contractor and the Government recognize the parameters established by the contract.
    The document is a template for submitting offeror information in response to government Requests for Proposals (RFPs), including federal and local grants. It outlines the required details that offerors need to provide, such as company name, address, point of contact, and project specifics like the Contract/Task Order number, dollar value, project status, and description of the project along with responsibilities. Each project submission must include details on the project manager or owner, emphasizing the collaborative relationship with the government entity or company involved. The document also references additional sections that outline criteria for project experience, ensuring that offerors demonstrate their qualifications and relevance for the contract. Thus, it serves as a structured approach for potential contractors to present their capabilities in a format that aligns with government standards for procurement and compliance. This is essential for maintaining accountability and ensuring qualified candidates are selected for governmental projects.
    The document outlines the requirements and conditions for a Bid Bond associated with federal procurement processes, specifically related to contracts managed by the Federal Aviation Administration (FAA). It details the responsibilities of the Principal (bidder) and Surety (guarantor) involved in the bid submission. The Bid Bond ensures that if the Principal fails to execute the contract or provide the necessary bonds upon bid acceptance, they must compensate the government for additional costs incurred in securing the work. The document specifies the format to be followed, including the need for signatures, corporate seals, and the acknowledgment of liability limits. It also establishes the conditions under which the bid bond becomes void and stipulates that any extensions granted to the Principal for bid acceptance do not impair the Surety's obligations. The document emphasizes compliance with the Paperwork Reduction Act, indicating the time burden for respondents, and provides guidance on how to submit comments regarding the information collection process. Overall, this Bid Bond document is a critical component of the federal contracting process, ensuring financial accountability and protecting government interests in contract negotiations.
    This document outlines the structure and required elements of a Performance Bond associated with U.S. government contracts, mandated by regulations including the Miller Act. It specifies that the Principal and Surety(ies) are bound to fulfill contractual obligations, including payment of taxes and compliance with contract terms, with the bond becoming void upon satisfactory performance. Guidelines for completing the bond, such as the necessity for authorized signatures and the inclusion of corporate seals, are detailed. Corporations acting as sureties must be listed on the Treasury's approved list, while individual sureties must submit additional evidence of financial capability. The document also emphasizes the importance of adhering to the authorized form and includes instructions for submitting comments regarding the Paperwork Reduction Act. Overall, the Performance Bond serves as a vital security mechanism to ensure that contractors meet their commitments in federal contracts, reinforcing accountability within government-funded projects.
    The document outlines the requirements for a Payment Bond, particularly in relation to federal contracting under the Act of August 24, 1935. It is a formal agreement binding the Principal (contractor) and Surety(ies) to ensure payment for labor and materials used in the execution of a contract. Key components include the identification of the type of organization (individual, corporation, etc.), state of incorporation, surety details, and the amount of the bond. The bond is void if the Principal fulfills payment obligations to all relevant parties. Specific instructions are included for completing the form and the necessary precautions for signing and sealing the document to maintain its validity. The document also references the Paperwork Reduction Act, including the OMB Control Number, which signifies compliance in information collection. Overall, this document is essential for securing financial protection inherent to federal grants and RFPs, ensuring that contractors meet their obligations to subcontractors and laborers, which is critical in government contracting contexts.
    The Bedford Air Traffic Control Tower (BED ATCT) project involves the comprehensive repair and resurfacing of the parking lot located at Hanscom Field, Bedford, MA. The Federal Aviation Administration outlines the contractor's responsibilities, which include the removal of existing asphalt, milling, and installing new pavement through a specified multi-layer process. Key tasks include draining and grading to ensure proper water flow, adjusting storm drain basins, replacing curbing, and undertaking significant erosion control measures. The contractor must adhere to safety and health standards, secure necessary permits, and coordinate work schedules with relevant authorities. All work should follow applicable FAA, state, and local construction codes, ensuring compliance with environmental regulations. In addition, site personnel must gain proper access credentials due to security at the air force base. The project seeks to enhance the functional integrity of the facility while maintaining operational safety standards.
    The document contains a Q&A sheet related to the RFP for the BED ATCT Parking Lot project (6973GH-25-Q-00001), addressing various contractor inquiries regarding project specifications and requirements. Key details include that onsite inspections will be managed by a Contracting Officer’s Representative (COR), temporary fencing is not required due to project brevity, and proper erosion controls must be implemented to protect catch basins. Pavement markings can be either paint or thermo, though painting is preferred. The project allows for complete closure of impacted lots, with the contractor responsible for any excess pulverized material disposal and ensuring all existing curbing is replaced without disturbing adjacent ADA ramps or sidewalks. There is no requirement for hazardous material testing, and all work must be completed within 45 days of the Notice to Proceed, ideally scheduled for spring 2025 to avoid winter conditions. Emphasis on proper planning, care in executing the work, adherence to the Statement of Work (SOW), and ensuring safety and timely coordination with the FAA and relevant authorities are highlighted throughout the document. Financial aspects are also touched upon, specifying a bid bond of 20% of the proposal amount.
    The Federal Aviation Administration (FAA) provides guidelines for reporting under the Bipartisan Infrastructure Law (BIL). The report comprises five tabs: Contractor Info, Buy American, Environmentally Friendly, Subcontracting, and Jobs Creation. Contractors must supply comprehensive details, including contact information, socio-economic status, contract identifiers, obligated amounts, job control numbers (JCNs), project locations, dollar values for each JCN, and specifics on non-domestic products or technology utilized. Additional tabs require information on energy-saving initiatives and subcontracting expenditures segmented by socio-economic categories, regardless of applicable JCNs. Finally, contractors are tasked with detailing the number of jobs created, expressed in full-time equivalents, for both themselves and first-tier subcontractors. This structured reporting framework emphasizes accountability and compliance with federal guidelines, ensuring transparency in project execution and governmental oversight of funded projects.
    The document is a General Wage Determination for building construction projects in Massachusetts, particularly for contracts subject to the Davis-Bacon Act. It outlines the minimum wage requirements for various worker classifications across multiple counties, including Barnstable, Bristol, Dukes, and others. Executive Orders 14026 and 13658 establish wage rates based on contract dates, dictating that workers must earn at least $17.20 per hour or higher if specified, with adjustments possible for prevailing wage conditions. The document lists detailed wage rates, classifications of workers, and fringe benefits for trades such as insulators, electricians, and laborers. Each classification includes geographic zones, ensuring that wages are competitive and equitable based on local market conditions. Additionally, provisions are made for worker protections, including paid sick leave under EO 13706, enhancing workplace rights. The document serves as a critical resource for contractors and compliance officers when bidding on or executing government-funded projects, ensuring adherence to labor standards and fair compensation practices. Overall, it emphasizes the regulation of wages in public construction, promoting fair labor practices in the state.
    Similar Opportunities
    RDU ATCT Parking Lot Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for the RDU ATCT Parking Lot Improvements project located in Morrisville, North Carolina. The project entails replacing the slide gate at the Raleigh-Durham Air Traffic Control Tower and includes comprehensive improvements to the asphalt parking lots, such as repairing storm drain pipes, replacing curbs and sidewalks, and ensuring compliance with safety and environmental regulations. This initiative is part of the Bipartisan Infrastructure Law funding, with an estimated budget range of $500,000 to $1,000,000 and a performance period of 45 days upon receiving a notice to proceed. Interested contractors must submit their proposals by December 27, 2024, and can direct inquiries to Samantha Pearce at samantha.a.pearce@faa.gov or by phone at 405-954-7739.
    Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, Maine. The project involves significant upgrades to the HVAC systems, including the replacement of chillers, boilers, and various mechanical components, as well as enhancements to fire safety systems and the building's roof. This initiative is crucial for maintaining operational efficiency and safety at a key aviation facility, ensuring compliance with federal standards throughout the renovation process. Interested contractors must submit their proposals by January 7, 2025, at 1200 ET, and can direct inquiries to Ms. Joni Haynes at joni.l.haynes@faa.gov or Erin Crabtree at erin.m.crabtree@faa.gov. The estimated budget for this project ranges from $2 million to $4 million, and it is set aside for small businesses under the SBA guidelines.
    Roof replacement at MFE ATCT (McAllen, TX)
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for a roof replacement project at the McAllen Air Traffic Control Tower (MFE ATCT) in Texas. The project involves extensive civil, mechanical, and architectural work, including the replacement of roof membranes, HVAC units, and lead paint abatement, all to ensure the structural integrity and safety of the facility. This initiative is part of a broader commitment to maintaining critical infrastructure within the National Airspace System, with an estimated contract value between $1 million and $5 million. Interested contractors must be registered in the System for Award Management (SAM) and adhere to the small business size standard, with key deadlines including a mandatory site visit on December 17, 2024, and proposal submissions due by January 27, 2025. For further inquiries, contact Elisha Distler at elisha.distler@faa.gov or call 817-222-4196.
    Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is soliciting proposals for the construction of a new Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility at Ted Stevens International Airport in Anchorage, Alaska. This project aims to enhance air traffic management capabilities and safety by replacing outdated facilities built in 1977, with a focus on modern engineering standards and compliance with federal regulations. The estimated construction cost ranges from $100 million to $200 million, and interested vendors must submit their proposals by 3:00 PM PT on January 31, 2025, following a pre-proposal Zoom meeting scheduled for January 10, 2025. For further inquiries, vendors can contact Katherine Fogle at katherine.fogle@faa.gov.
    REPAIR RUNWAY 32 PAVEMENT PHASE 3
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Air Force, is soliciting bids for the Repair Runway 32 Pavement Phase 3 project at Dover Air Force Base in Delaware. The project entails comprehensive repairs to a portion of Runway 14/32, including rotor milling, repaving with FAA-approved materials, crack sealing, and restriping, with an estimated contract value between $500,000 and $1,000,000 and a performance period of 60 calendar days from the notice to proceed. This initiative is crucial for maintaining airfield infrastructure and ensuring operational efficiency at military installations. Interested contractors must submit their proposals by January 22, 2025, and can direct inquiries to TSgt Joshua Brooks at joshua.brooks.14@us.af.mil or Ms. Omelia Saunders at omelia.saunders.2@us.af.mil for further details.
    Basic Ordering Agreements (BOA) for Design/Build (D/B) and Bid/Build (B/B) Services
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking to establish Basic Ordering Agreements (BOAs) for Design/Build (D/B) and Bid/Build (B/B) services related to Air Traffic Control (ATC) facilities. The FAA intends to add up to five qualified vendors to support the modernization and management of the National Airspace System (NAS), emphasizing the importance of compliance with the Buy American Act and reporting requirements under the Bipartisan Infrastructure Law (BIL). This procurement is critical for enhancing safety, reliability, and efficiency in air traffic control operations across the United States. Interested vendors must submit proposals by 17:00 ET on February 14, 2025, and direct any inquiries to Katherin Fogle at katherine.fogle@faa.gov.
    Water Intrusion Mitigation Project- Miami Air Traffic Control Tower (ATCT), Miami, FL 33122
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking proposals for the Water Intrusion Mitigation Project at the Miami Air Traffic Control Tower (ATCT) in Miami, Florida. The project requires contractors to provide all necessary labor, materials, and equipment to address water intrusion issues, ensuring the operational integrity of the facility. This initiative is crucial for maintaining the functionality of essential FAA operations and is set aside for small businesses, with an estimated contract value between $50,000 and $100,000. Interested contractors must submit their proposals by January 17, 2025, and are encouraged to attend a mandatory site visit on January 7, 2025. For further inquiries, contact Regina Singleton at regina.singleton@faa.gov or call 404-305-5790.
    Market Survey: (BIL) The Federal Aviation Administration (FAA) has an upcoming requirement for Sidewalk Repair, Replacement, and Addition at the Federal Aviation Administration (FAA) ZOB- Oberlin Facility located in 326 E Lorain St, Oberlin, OH 44074.
    Active
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is conducting a market survey for sidewalk repair, replacement, and addition at its ZOB-Oberlin Facility located in Oberlin, Ohio. This project, funded under the 2022 Bipartisan Infrastructure Law, aims to address safety hazards associated with deteriorated sidewalks, ensuring compliance with ADA standards through the removal and replacement of approximately 2,922 square feet of concrete, along with improvements to drainage and accessibility features. Interested vendors are invited to submit their capability statements by January 3, 2025, at 10:00 AM CST, to Bryon Nolan at bryon.r.nolan@faa.gov, including the Market Survey Identifier 6973GH-25-00644 in the email subject line. The FAA will not accept proposals at this stage, and all costs incurred in preparing responses will be the vendor's responsibility.
    Market Survey -- BIL David Wayne Hooks (DWH) ATCT Replacement
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is conducting a market survey to identify potential vendors for the replacement of the Airport Traffic Control Tower (ATCT) at David Wayne Hooks Memorial Airport in Tomball, Texas, funded by the Bipartisan Infrastructure Law (BIL). The procurement aims to gather industry insights and recommendations while assessing vendor capabilities for a project that is critical for enhancing air traffic management infrastructure. The anticipated contract type is a Firm-Fixed Price Design-Build contract, with estimated costs ranging from $10 million to $40 million, and the construction is expected to be completed by 2030. Interested vendors must submit a capability statement by 2:00 p.m. ET on January 6, 2025, and can direct inquiries to Thuylinh TranNguyen at thuylinh.t.trannguyen@faa.gov or David Hull at David.hull@faa.gov.
    Z1DA--NextGen WiFi Upgrades
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for a Firm Fixed Price construction contract to upgrade the WiFi infrastructure at the Bedford Veterans Affairs Medical Center (VAMC) Campus in Massachusetts. The project requires a general contractor to provide all necessary labor, materials, tools, and supervision to enhance the current WiFi system in accordance with the provided Statement of Work and technical specifications. This initiative is crucial for improving connectivity and service delivery to veterans, reflecting the VA's commitment to modernizing its facilities. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) must submit electronic bids by January 3, 2025, with a public bid opening scheduled for the same date. For inquiries, bidders can contact Nicholas Muro via email at Nicholas.Muro@va.gov.