CA FTNP SEKI 13(2) Mineral King Road
ID: 6982AF24B000017Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL HIGHWAY ADMINISTRATION6982AF CENTRAL FEDERAL LANDS DIVISILAKEWOOD, CO, 80228, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)
Timeline
    Description

    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the rehabilitation of Mineral King Road, a critical infrastructure project located within Sequoia and Kings Canyon National Park in California. The project encompasses approximately 12.09 miles of roadway, requiring extensive work including asphalt paving, drainage improvements, and stabilization measures to enhance visitor access and ensure environmental compliance. This initiative is vital for maintaining access to the national park while addressing the challenges posed by the remote mountainous terrain and sensitive ecological areas. Interested contractors must submit their bids by 2:00 p.m. local time on November 6, 2024, with an estimated project cost ranging from $25 million to $35 million. For further inquiries, potential bidders can contact Jorey Deml or Ryan Phillips at cflacquisitions@dot.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    This document outlines Amendment A001 to Solicitation Number 6982AF24B000017 concerning the Mineral King Road project administered by the Federal Highway Administration. Key components include instructions for acknowledging the amendment, submission procedures, and modifications to contract details, with a focus on construction requirements and standards. Significant revisions involve the management of trees, preservation of vegetation, utility protection, and masonry specifications. Specific procedures for tree removal, utility location, and stone masonry work are detailed, emphasizing quality control and environmental preservation. The contractor must provide documentation of past experience and approvals for all masonry work, aligning with the project's historical context. This amendment underscores compliance with regulatory requirements and outlines changes necessary for bid acceptance while maintaining the overall terms of the initial solicitation. Adherence to the new specifications is critical to avoid bid rejection and ensure project effectiveness and safety.
    This document outlines Amendment A002 to a federal solicitation involving highway construction in Tulare County, California, administered by the Federal Highway Administration. The amendment notifies bidders of updates, including changes to sections B, C, and D of the solicitation, where acknowledgment of the amendment is required. Bids must remain compliant with federal regulations, including adherence to wage determinations under the Davis-Bacon Act, which mandates minimum wage rates for various construction roles, reflective of rates adjusted for inflation. The document details evaluation criteria for contractor performance, incorporating factors such as a preference for domestic construction materials, small business representation, and compliance with affirmative action standards. Additionally, it emphasizes the importance of pre-construction site visits and outlines provisions for subcontractor responsibilities. The document serves as a formal notification to potential contractors about specific requirements and modifications relevant to their bids, aiming to ensure compliance with federal contracting standards and promote equitable employment practices within the project scope.
    The Pavement and Materials Report for the CA FTNP SEKI 13(2) Mineral King Road project provides an analysis of the existing road conditions and outlines rehabilitation recommendations for the 15.3-mile stretch within Sequoia National Park, California. Conducted by the U.S. Department of Transportation, the report identifies challenges due to varied pavement thickness and significant deterioration, necessitating comprehensive reconstruction. Key climate data, soil conditions, and traffic analyses inform the design, which adheres to AASHTO and federal guidelines, aiming for a minimum structural number of 1.69 inches over a projected 20-year lifespan. Three distinct pavement sections are proposed to optimize costs, allowing for significant savings while addressing the variable conditions. Materials recommendations include the use of a PG 64-28 asphalt binder accommodating local climate considerations, and the report stresses the need for improved drainage systems due to inadequate ditches contributing to pavement degradation. Estimated project costs total approximately $10.5 million, underlining the critical nature of maintaining infrastructure while ensuring environmental compliance and access to park facilities.
    The document discusses a series of federal and state RFPs (Requests for Proposals) and grants aimed at enhancing community services. Emphasis is placed on projects that target public wellbeing, infrastructure improvements, and technology upgrades. The key ideas include the necessity for detailed project proposals specifying objectives, methodologies, and expected outcomes to secure funding. Additionally, applicants are encouraged to demonstrate their capacity for innovative solutions and community engagement in service delivery. Compliance with federal and local regulations is paramount, particularly concerning budget adherence and reporting requirements. The document outlines a structured process for evaluating proposals, involving a review committee that assesses projects based on merit, feasibility, and potential impact. This strategic funding initiative reflects the government's commitment to fostering local development through collaborative efforts with various stakeholders for sustainable community enhancements.
    The CA FTNP SEKI 13(2) Mineral King Road Hydraulics Report outlines the drainage basin delineations and assesses current and proposed culvert structures for effective management of water flow and flood risks. The report includes a detailed inventory of existing and suggested culvert sizes, types, configurations, and modifications at specific stations. Each entry specifies proposed adjustments for inlet and outlet treatments, including end treatments and recommendations for erosion control. An addendum details an analysis for proposed drop inlets, focusing on their hydraulic efficiency and ensuring effective drainage within this low-standard roadway context. The report emphasizes the importance of maintaining adequate capture efficiency for inlets, and identifies locations needing specific interventions due to their unique hydrological circumstances. Overall, the document functions as a comprehensive guide for the improvement of drainage functionalities along Mineral King Road, ensuring compliance with federal standards while protecting environmental integrity, particularly concerning sequoia root mitigation. Regular maintenance is advised for all drainage features to ensure long-term efficacy. This report aligns with government objectives for infrastructure improvement, underscoring the necessity of sustainable and efficient water management in federal and state projects.
    The document outlines the Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects, issued by the U.S. Department of Transportation and the Federal Highway Administration. Known as FP-14, these specifications form an integral part of contracts awarded under federal highway authority, applying to construction projects governed by the Federal Acquisition Regulation (FAR) and the Transportation Acquisition Regulation (TAR). The document is organized into multiple divisions detailing various aspects of construction, from general requirements and project management (Division 100 & 150) to specific technical guidelines for earthwork, pavement construction, and bridge building. Each section establishes requirements for material control, quality assurance, construction methods, bid preparation, and contractor responsibilities, ensuring compliance and safety throughout construction activities. Key definitions and terms are provided to clarify roles and responsibilities, such as the Contracting Officer's authority over project compliance and quality. The document emphasizes the importance of clear communication, adherence to specifications, and maintaining public safety during construction. Overall, FP-14 serves as a comprehensive framework for federal highway construction, ensuring that projects meet established standards while promoting effective project execution and accountability among contractors.
    The U.S. Department of Transportation is soliciting bids for the rehabilitation of Mineral King Road in Sequoia National Park, California, under solicitation number 6982AF24B000017. The project encompasses a total length of approximately 12.09 miles and includes tasks such as asphalt pavement repairs, parking lot construction, culvert replacement, and retaining wall construction. Bidders are required to submit their offers in printed form by 2:00 p.m. local time on November 6, 2024. Special emphasis is placed on compliance with federal regulations, including the Buy American Act and small business subcontracting goals. Contractors must submit various documents with their bids, including a bid guarantee and certifications related to veterans' employment and hazardous materials. Additionally, a pre-bid meeting will be held on October 8, 2024, providing an opportunity for bidders to familiarize themselves with the site. The estimated price range for the project is between $25 million and $35 million. Compliance with specific federal wage rates and reporting requirements is also mandated, ensuring equitable labor practices throughout the project's duration.
    The document comprises an "Interested Vendors List" related to a presolicitation notice for a federal government opportunity, updated on October 2, 2024, and visible only to authorized personnel. It features a list of vendors, including their contact information, Unique Entity IDs from the System for Award Management (SAM), and CAGE Codes. Key vendors include Martin Brothers Construction, Drill Tech Drilling & Shoring, Inc., and McCullough Construction Inc., among others, primarily based in California. The list serves to inform interested parties of potential contractors for government projects, aligning with federal procurement procedures. The careful documentation promotes transparency and accessibility in the bidding process, encouraging participation from various businesses while ensuring compliance with government regulations. Each vendor's listing includes crucial details, indicating their legitimacy and capacity to undertake potential projects. This document plays a vital role in facilitating government contracting and fostering a competitive environment for service providers.
    The file outlines the specifications and requirements for the Mineral King Road project (SEKI 13(2)) funded by the Central Federal Lands Highway Division of the Federal Highway Administration. It includes detailed symbols and abbreviations for various project components related to drainage, geological features, vehicular access, and erosion control measures. The document also provides quantities for various construction materials and methods for sections of the roadway, including asphalt pavement and drainage structures. Key aspects include the identification of numerous specific symbols to represent existing and proposed state features, as well as an overview of the typical roadway sections planned for different project options. The summaries of quantities section lists mandatory items for bids such as mobilizations, stormwater management, drainage structures, and labor. This information is critical for contractors intending to propose bids, ensuring they adhere to federal guidelines while facilitating construction to improve the roadway infrastructure in Sequoia National Park. Overall, the document serves as a comprehensive guideline for contractors, emphasizing the importance of precise execution to meet environmental compliance and safety standards during construction.
    The document serves as a notice for a non-mandatory pre-bid site visit organized by the Federal Highway Administration (FHWA) for interested contractors prior to a project bid opening. Scheduled for October 8, 2024, at 10:00 AM, the meeting will include a project overview and a subsequent site tour highlighting specific project elements. Attendance is not required to bid; however, interested parties must RSVP via email by October 3, 2024. Attendees should bring their own transportation and personal protective equipment, with carpooling recommended due to limited parking. The meeting location is the Lookout Point Entrance Area on Mineral King Road, approximately 15 miles from Three Rivers, CA. Post-meeting documents, including an agenda and Q&A details, will be uploaded to the solicitation. The notice underscores the FHWA's effort to engage contractors and ensure project transparency in the federal bidding process.
    The document details a series of questions and answers from a site visit regarding the CA FTNP SEKI 13(2) project along Mineral King Road, scheduled for October 21, 2024. It addresses critical logistical aspects such as bridge weight limits, access provisions for private landowners during construction, and contractor responsibilities for road maintenance. Specific technical inquiries include the handling of fire retardants, the determination of asphalt quantities from survey data, and the sourcing of necessary materials such as backfill and water. Additionally, the contractor's ability to utilize volumetric concrete and permissible site alterations are clarified. Key administrative details, including permitting processes and geotechnical reports, are directed for contractor compliance. The document serves to clarify project expectations, ensure regulatory adherence, and streamline construction planning, reflecting a commitment to thorough preparedness in handling complex infrastructure initiatives.
    The document outlines the questions and answers from a site visit regarding the CA FTNP SEKI 13(2) Mineral King Road project, held on October 21, 2024. It addresses key project details such as bridge weight limits, access for private landowners during road closures, maintenance responsibilities, and the handling of fire retardants. It confirms the absence of a fire retardant containing PFAS and clarifies issues surrounding wall specifications, water sourcing, and tree trimming. Additionally, it discusses coordination with Tulare County concerning potential bridge replacement and work restrictions. The document serves as a comprehensive resource for potential bidders, providing important specifications and clarifications related to project execution and regulatory compliance. This reflects the government's commitment to transparency, ensuring that contractors have the necessary information for planning bids effectively and efficiently within the framework of federal and state standards. Ultimately, the Q&A format supports governmental accountability while encouraging informed stakeholder participation in infrastructure development.
    The document details the Q&A from a site visit for the CA FTNP SEKI 13(2) project on Mineral King Road, conducted on October 21, 2024. It addresses various concerns regarding construction, maintenance, and regulatory compliance related to the project. Key points include that the bridges are rated for legal loads, and no construction restrictions will apply to the county bridge. Contractors will not be responsible for road maintenance outside project limits, and fire retardants will be managed separately. Access for private landowners will be maintained, and the plan permits no in-water work window. The document also clarifies geotechnical data for retaining walls, addressing the placement and backfilling material sourcing and confirming that no blasting will be needed. Notably, concerns about PFAS contamination from fire retardants were addressed, confirming that the observed materials do not contain PFAS. Furthermore, while water quality monitoring will be required, costs associated with this will be determined by the contractors. An amendment is expected to clarify tree trimming regulations. The document emphasizes adherence to environmental guidelines and coordination with local agencies to minimize construction disruptions. This structured Q&A aims to provide clarity and assurance to bidders regarding project expectations and regulations.
    The document pertains to a federal project related to the "CA FTNP SEKI 13(2) Mineral King Road," located in Sequoia National Park. It outlines a site visit scheduled for October 8, 2024, as part of the acquisition process. The purpose of this site visit is likely to assess conditions or requirements necessary for project bidding, which aligns with the government's aim to maintain and improve infrastructure in national parks. Although specific details regarding the project goals and scope are not explicitly noted in the provided text, it suggests careful planning and coordination with relevant stakeholders. Companies may be evaluating this opportunity as part of federal grants and local Requests for Proposals (RFPs) aimed at enhancing public spaces. Overall, the document emphasizes the importance of site evaluations in the planning stages of government-funded environmental projects.
    Lifecycle
    Title
    Type
    Similar Opportunities
    UT FTNP DINO 10(3) 100(2) Green River Road and Quarry Access Road
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the UT FTNP DINO 10(3) 100(2) project, which involves the rehabilitation of Green River Road and Quarry Access Road within Dinosaur National Monument, located in Colorado and Utah. The project aims to address deteriorating road conditions by rehabilitating approximately 2.35 miles of roadway, multiple pullouts, and two parking lots, along with pavement preservation work on an additional 50.4 miles of roads, including various infrastructure improvements such as curb and guardrails. This initiative is critical for maintaining safe access to the national monument and enhancing the overall infrastructure, with an estimated cost range between $10 million and $20 million. Interested bidders must submit their proposals by the specified deadline and can contact Stephanie Navarro or Ryan Phillips at CFLContracts@dot.gov for further information.
    Vicksburg National Military Park
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for construction work at the Vicksburg National Military Park in Mississippi, under Solicitation Number 693C73-25-B-000002. The project involves essential slide repairs on Grant Avenue and Union Avenue, including tasks such as roadway excavation, embankment construction, and installation of engineered structures to stabilize the affected areas. This initiative is crucial for maintaining the park's infrastructure and ensuring visitor safety, with an estimated project cost ranging from $5 million to $10 million. Interested contractors should prepare to submit their bids electronically by the specified deadline, with bid documents expected to be available around October 23, 2024. For further inquiries, contact Emily McCleary or C. Shawn Long at EFLHD.Contracts@dot.gov.
    NM NP MULTI PMS(1), Pavement Preservation New Mexico
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is issuing a Request for Proposals (RFP) for the NM NP MULTI PMS(1) Pavement Preservation Project in New Mexico. This project aims to enhance and preserve roadways and parking areas across multiple national park sites, including Carlsbad Caverns National Park and White Sands National Park, through various techniques such as crack sealing, patching, chip sealing, and micro-surfacing over a total length of 33.49 miles. The initiative underscores the federal government's commitment to maintaining infrastructure in protected areas while ensuring compliance with construction standards and enhancing visitor experiences. Interested vendors should contact the Contracts G. Office at contracts@mail.wfl.fhwa.dot.gov or call 360-619-7520, with an estimated project cost between $5 million and $10 million and a tentative completion date set for Winter 2025.
    OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the Cleetwood Trail and Marina Improvements project at Crater Lake National Park in Oregon. The project involves the rehabilitation of a 1.1-mile trail, rockfall mitigation, replacement of a failed marina bulkhead, and upgrades to restroom facilities, with a focus on enhancing visitor access and safety while adhering to environmental standards. This initiative underscores the federal commitment to maintaining national park infrastructure, with an estimated contract value between $30 million and $40 million, and a tentative completion date set for Fall 2027. Interested vendors can contact the Contracts G. Office at WFL.contracts@dot.gov or by phone at 360-619-7520 for further details, and should monitor SAM.gov for solicitation updates anticipated in winter 2024/2025.
    NM NP MULTI PMS(1), Pavement Preservation New Mexico
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the NM NP MULTI PMS(1) Pavement Preservation project in New Mexico, which involves maintenance work across various national parks and monuments. The project includes tasks such as crack sealing, patching, chip seal application, micro surface treatments, and pavement marking over a total length of 33.49 miles, with an estimated completion date in Winter 2025. This initiative is crucial for maintaining infrastructure and ensuring the safety of public roadways while preserving national heritage sites. Interested vendors can contact the Contracts G. Office at contracts@mail.wfl.fhwa.dot.gov or by phone at 360-619-7520, with the estimated project cost ranging between $5 million and $10 million and anticipated solicitation in Fall 2025.
    CA NPS PP MANZ 2019(1), Pavement Preservation Manzanar
    Active
    Transportation, Department Of
    Presolicitation notice from the Department of Transportation, Federal Highway Administration, for a pavement preservation project at Manzanar National Historic Site and Mojave National Preserve in California. The project includes crack sealing, patching, micro surface treatment, pavement markings, and other small items of work. The project is approximately 5.39 miles long and is expected to be completed by Spring 2020. The estimated price range for the project is between $1 million and $2 million. Interested vendors must register on the FBO website. The project will be solicited to the Western Region Pavement Preservation MATOC. Anticipated solicitation date is Fall 2019.
    MS NP NATR 3N18 3H27 ETC - Geotechnical, Pavement Rehabilitation, and Structural Repairs
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Geotechnical, Pavement Rehabilitation, and Structural Repairs project (MS NP NATR 3N18 3H27 ETC) in Mississippi. This project, which spans between mileposts 121 and 204, involves extensive repairs including addressing slide areas, bridge joints, delaminated concrete decks, and pavement rehabilitation, with an estimated budget of $40 million to $50 million. The work is critical for maintaining the integrity and safety of highway infrastructure in the region. Bid documents will be available starting November 4, 2024, and interested contractors must register on the SAM website to access them. For inquiries, contact Rubrena Johnson or Shirley A. Anderson at eflhd.contracts@dot.gov, and ensure compliance with federal registration and subcontracting requirements.
    WY NPS GRTE 2020(1), Moose Wilson Road Phase 2
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Moose Wilson Road Phase 2 project in Grand Teton National Park, Wyoming. This federal contract involves the reconstruction and realignment of approximately 1.386 miles of roadway, including the installation of Aquatic Organism Passage culverts and the development of new parking areas, aimed at enhancing access and safety within the park's sensitive ecological environment. The project is critical for improving infrastructure while adhering to environmental regulations, ensuring the preservation of natural resources. Interested contractors must submit written bids by the specified deadline, and for further inquiries, they can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520.
    AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the AK PFH 58(1) Neck Lake Road Reconstruction project located in the Tongass National Forest, Alaska. The project involves significant roadway improvements over three potential schedules, with tasks including excavation, grading, drainage installation, rock blasting, and guardrail installation, spanning a total of approximately 6 miles of road reconstruction. This initiative is crucial for enhancing local infrastructure while adhering to federal standards and environmental protections. Interested vendors should prepare for a sealed bid process anticipated to begin in Winter 2024/2025, with an estimated project cost between $10 million and $20 million, and a completion target set for Fall 2026. For inquiries, contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520.
    UT FLAP SLA 10(1) Mill Creek Canyon Road
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the reconstruction and widening of Mill Creek Canyon Road in Salt Lake County, Utah, under project number UT FLAP SLA 10(1). The project aims to enhance safety and access to recreational areas within the Uinta-Wasatch-Cache National Forest while implementing best practices for environmental protection and resource management. Key components of the project include road widening, drainage improvements, and the installation of parking facilities, with an estimated cost range between $20 million and $30 million. Interested contractors must submit their bids by November 5, 2024, and are encouraged to attend a pre-bid site visit on October 8, 2024, for further insights into the project specifications.