The Dalles Campground Improvements
ID: 12048924R0016Type: Combined Synopsis/Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA FOREST SERVICE-SPOC NWWashington, DC, 202500001, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Agriculture, specifically the USDA Forest Service, is seeking contractors for the Dalles Campground Improvements project located in Enumclaw, Washington. The primary objective is to restore degraded asphalt surfacing on campground roads and select sites, enhance safety features by installing gates and signage, and perform tree removal and erosion control measures. This project is crucial for maintaining access and safety within the Mt. Baker-Snoqualmie National Forest, ensuring a better experience for visitors while adhering to environmental protection standards. Interested contractors must submit their proposals by September 12, 2024, with the performance period set from October 1, 2024, to November 1, 2025, and can contact Kevin Flores at Kevin.Flores@usda.gov or Jason Tanamor at Jason.Tanamor@usda.gov for further inquiries.

    Point(s) of Contact
    Files
    Title
    Posted
    The solicitation outlines a project by the USDA Forest Service to restore degraded asphalt and enhance safety features at the Dalles Campground in the Mt. Baker-Snoqualmie National Forest. The contractor is required to undertake various tasks including tree removal, asphalt compaction, installation of gates, signage, and erosion control measures. The project duration spans from October 1, 2024, to November 30, 2025, with a completion window of 120 days from the start of work. Contractors must comply with specific regulations regarding environmental protection and fire safety, including measures to prevent erosion and handle hazardous material responsibly. This contract reflects the government's commitment to improve infrastructure while safeguarding natural resources and ensuring public safety during campground operations. Offers must be submitted by September 12, 2024, with a performance bond requirement. The project emphasizes adherence to federal construction standards, wildlife considerations, and efficient management of both materials and labor to complete the work effectively.
    The document outlines specifications and guidelines for construction contracts under the jurisdiction of the U.S. Department of Agriculture’s Forest Service. It is focused on defining terms, procedures, and responsibilities related to the bid, award, and execution of contracts for works such as excavation, embankment, road construction, and environmental protections. Key sections include definitions of materials and terms, legal responsibilities regarding public safety, environmental protection measures, and ensuring proper workflow and construction quality. Particular emphasis is placed on contractor obligations, the acceptance of work, and adherence to specified materials and methodologies during the construction process. The document mandates strict compliance with environmental regulations, including protocols for managing hazardous materials spills. The overarching aim is to provide a structured framework for contractors to follow, ensuring all construction activities align with federal standards and promote efficient project completion. This specification serves as a critical reference for federal grants and RFP processes, emphasizing the need for responsibility and safety in government-funded projects.
    The document outlines the proposal for the installation of gates within the Mt. Baker-Snoqualmie National Forest under the United States Department of Agriculture Forest Service. It includes project specifications such as locations, construction requirements, and funding allowances for tasks like mobilization, clearing, and gate installation. Key features include providing certified weed-free materials for erosion control, waste management of cleared trees, and proper installation of gates marked by the Forest Service. Attention is given to public safety with measures for traffic control and signage during construction. Detailed drawings illustrate gate installation types and locations, specifying clearing requirements and environmental compliance. The project emphasizes protecting natural resources while enhancing safety and access management along forest roads. This proposal aligns with federal objectives for environmental stewardship and infrastructure improvement within public lands.
    The LRT Campground Paving Project, overseen by the United States Department of Agriculture Forest Service, aims to enhance campground accessibility through asphalt paving and construction improvements at the Dalles and Silver Springs Campgrounds. Key aspects include mobilization of materials, compliance with environmental regulations and erosion control, tree removal, and installation of signage and wheel stops. The project specifies payment items covering mobilization, soil erosion control, tree removal, and asphalt installation, emphasizing safety and public access restrictions during construction. The project also plans for distinct asphalt layout options, such as teardrops, pull-throughs, and new access pads, with detailed construction methodologies. Notably, contractors must adhere to strict protocols, including the use of certified weed-free materials and the submission of project plans for approval. This documentation serves as part of federal RFPs as the Forest Service seeks contractors to execute the project efficiently and in alignment with environmental standards, promoting sustainable recreational use of the national forest. The thorough guidelines ensure both project execution and environmental safeguarding during operations.
    The document outlines the wage determinations for construction contracts in Washington State, specifically for highway projects per the Davis-Bacon Act regulations. Significant provisions include wage rates mandated by Executive Orders 14026 and 13658, stipulating minimum wages for various classifications of workers based on contract dates and renewals. For contracts initiated or renewed after January 30, 2022, the minimum wage is set at $17.20 per hour, while those awarded between January 1, 2015, and January 29, 2022, must pay at least $12.90 per hour. The document provides detailed wage rates and fringe benefits for labor classifications such as carpenters, electricians, and power equipment operators across different counties in Washington. It also specifies zone pay rates based on distance from designated cities and outlines additional pay for hazardous work situations. This comprehensive list supports compliance with federal labor standards to ensure fair compensation for workers engaged in federally funded construction projects across the state.
    This document addresses vendor inquiries related to a government Request for Proposal (RFP) concerning signage and construction work at two campgrounds, including the Dalles campground. The government clarifies that an additional campground included in the site map only requires signage, and pricing should reflect this, as mobilization costs are minimal due to proximity. The performance period is outlined as October 1, 2024, to November 1, 2025, providing ample time for favorable weather work execution. The government confirms that preliminary tasks, like sign installation, can commence before the primary construction window, aiming to avoid disruptions for previous campground guests. Campgrounds typically close a few weeks after Labor Day, but there is potential for extension based on weather conditions. The responses aim to clarify the vendor's scope of work, contract durations, and operational restrictions, ensuring a smooth project flow while maintaining compliance with campground operational norms.
    Lifecycle
    Title
    Type
    Combined Synopsis/Solicitation
    Similar Opportunities
    OLYM - REMOVE HAZARD TREES AT LAKE CRESCENT
    Active
    Interior, Department Of The
    The National Park Service (NPS) is seeking proposals from qualified small businesses for the removal of approximately 222 hazardous trees located adjacent to US 101 at Lake Crescent, Washington. The project requires contractors to provide all necessary personnel, equipment, and materials to safely remove the identified trees, implement traffic control, and manage the disposal of debris, while adhering to environmental preservation standards. This initiative is crucial for maintaining road safety and mitigating hazards within the national park, reflecting the government's commitment to environmental management and public safety. Interested contractors must register in the System for Award Management (SAM) and submit their proposals by the specified deadlines, with the anticipated contract performance period from September 30, 2024, to November 22, 2024. For further inquiries, contact Mickey Chisolm at mickeychisolm@nps.gov or call 360-565-3025.
    San Juan Bridge Campground Road & Spur Deferred Maintenance (GAOA)
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking proposals for the San Juan Bridge Campground Road & Spur Deferred Maintenance project located in Pagosa Springs, Colorado. The contractor will be responsible for providing all necessary materials, labor, and equipment to complete road resurfacing and campground maintenance, with a project budget estimated between $100,000 and $250,000. This initiative is part of the Great American Outdoors Act, aimed at enhancing public recreational spaces while ensuring compliance with environmental regulations. Interested small businesses must submit their proposals by September 20, 2024, and can direct inquiries to Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov.
    Mud Mountain Dam Lower Cascade Creek Water Control Facility
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is seeking qualified small businesses to undertake the Mud Mountain Dam Lower Cascade Creek Water Control Facility project in Enumclaw, Washington. The objective of this procurement is to replace an outdated water control structure that failed during a flood event in 2009, necessitating the full demolition of the existing system and the construction of a modern facility designed to improve flood management capabilities and operational reliability. This project is critical for enhancing the hydrological management of Lower Cascade Creek, ensuring compliance with environmental standards, and minimizing disruption to existing operations, with an estimated construction cost between $10 million and $25 million. Interested parties should note that the solicitation is expected to be issued on or about October 17, 2024, with a closing date around December 3, 2024, and can contact Jeannette Patton at jeanette.k.patton@usace.army.mil for further inquiries.
    Beaverhead Deerlodge National Forest fencing and spring developments
    Active
    Agriculture, Department Of
    The USDA Forest Service is seeking contractors for the Beaverhead Deerlodge National Forest fencing and spring developments project, which involves fenceline clearing, construction of fencing, and spring site development using government-furnished materials. The project is located approximately 50 miles southwest of Butte, Montana, and aims to enhance natural resource conservation and habitat improvement within the forest. The estimated contract value ranges from $25,000 to $100,000, with work expected to commence on June 1, 2025, and conclude by October 15, 2025. Interested contractors must submit their quotes along with a completed experience questionnaire by the bidding deadline of September 23, 2024. For further inquiries, contact John Curry at john.curry@usda.gov or call 605-673-9216.
    Little Bear Campground Reconstruction
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the USDA Forest Service, is soliciting bids for the reconstruction of the Little Bear Campground located in Delta, Colorado. This project involves comprehensive demolition and construction activities, including site preparation, utility improvements (water, sewer, and electrical), and the installation of new amenities such as pre-cast concrete toilets, picnic tables, and fire rings. The reconstruction aims to enhance recreational facilities, ensuring they meet modern standards and improve visitor experiences. Interested contractors should note that the project has a budget between $1 million and $5 million, with a performance period extending from September 30, 2024, to November 14, 2025. A mandatory site visit is scheduled for August 23, 2024, and proposals must be submitted by September 17, 2024, at 12:00 p.m. CDT. For further inquiries, contact Crystal Amos at crystal.amos@usda.gov or call 618-467-8347.
    FY24 Grave Creek Road Maintenance
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking qualified small businesses to provide road maintenance services for approximately 36 miles of roads within the Kootenai National Forest as part of the FY24 Grave Creek Road Maintenance project. The procurement involves a range of tasks including grading, shaping, roller compaction, heavy brushing, and ditch reconditioning, all aimed at ensuring safe and accessible roadways while adhering to environmental standards. This contract, scheduled for performance from October 1, 2024, to September 30, 2025, emphasizes the importance of maintaining infrastructure within national forest lands and requires contractors to submit comprehensive technical proposals that include equipment and timelines. Interested parties can contact Shawn Trout at shawn.trout@usda.gov or by phone at 802-613-7644 for further details.
    Delintment Lake Water System Installation
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, is seeking qualified contractors for the installation of a solar-powered water system at the Delintment Lake Campground in Oregon. The project involves replacing an existing handpump delivery system with a solar pump, including the installation of solar panels, a prefab concrete building, and plumbing for water tanks. This initiative is crucial for enhancing the campground's water supply while promoting sustainable practices. Interested small businesses must submit sealed bids by September 18, 2024, with an estimated contract value between $100,000 and $250,000, and work expected to commence on May 1, 2025. For further inquiries, contact Stevonne Fuller at stevonne.fuller@usda.gov or call 509-293-4187.
    Tree Trimming & Hazard Tree Removal, Modoc National Forest
    Active
    Agriculture, Department Of
    The USDA Forest Service is seeking proposals for tree trimming and hazard tree removal services within the Modoc National Forest, specifically at the Warner Mountain Ranger District and Canby Work Center. The project involves maintenance of approximately 41 trees to enhance safety around administrative sites located in Cedarville, Canby, and Adin, California, requiring contractors to provide materials, labor, and supervision while adhering to industry best practices and safety protocols. This initiative underscores the importance of environmental management and safety within national forest lands, while also promoting participation from small business contractors, as the solicitation is a total small business set-aside. Proposals are due by September 18, 2024, with work expected to be conducted between May 15 and September 30, 2024, and interested parties can contact Margaret Forrest at margaret.forrest@usda.gov or Joshua Kline at joshua.kline@usda.gov for further information.
    Baker Bay Pile Dike Repair
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the Baker Bay Pile Dike Repair project located in Ilwaco, Washington. This federal contract involves the repair and replacement of existing pile dikes at the Mouth of the Columbia River, with a construction estimate ranging from $10 million to $25 million. The project is critical for maintaining navigational safety and environmental integrity in the region, requiring compliance with various federal regulations, including labor standards and environmental protections. Interested contractors must submit their bids electronically by September 19, 2024, and can direct inquiries to Aragon Liebzeit at aragon.n.liebzeit@usace.army.mil or Michael Saldana at Michael.E.Saldana@usace.army.mil.
    OR ERFO FS UMPQU 615-2022-2(1), Umpqua ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Umpqua ERFO Repairs 2022 project located in the Umpqua National Forest, Oregon. The project involves the repair of a 0.19-mile aggregate roadway, including ditch regrading, slope stabilization, and the construction of a mechanically stabilized earth wall, with a focus on environmental compliance and infrastructure integrity. This initiative is part of federal efforts to maintain and improve infrastructure in natural areas, ensuring safety and environmental protection while promoting public access. The contract is a total small business set-aside, with an estimated price range between $700,000 and $2,000,000, and is anticipated to be solicited in winter 2024/2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details.