San Juan Bridge Campground Road & Spur Deferred Maintenance (GAOA)
ID: 1240LT24R0021Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA-FS, CSA INTERMOUNTAIN 8Ogden, UT, 844012310, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of Agriculture, specifically the Forest Service, is seeking proposals for the San Juan Bridge Campground Road & Spur Deferred Maintenance project located in Pagosa Springs, Colorado. The contractor will be responsible for providing all necessary materials, labor, and equipment to complete road resurfacing and campground maintenance, with a project budget estimated between $100,000 and $250,000. This initiative is part of the Great American Outdoors Act, aimed at enhancing public recreational spaces while ensuring compliance with environmental regulations. Interested small businesses must submit their proposals by September 20, 2024, and can direct inquiries to Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov.

    Point(s) of Contact
    Elizabeth Ratcliff
    elizabeth.ratcliff@usda.gov
    Files
    Title
    Posted
    The document serves as a guide for the Forest Service, U.S. Department of Agriculture, outlining the regulations and requirements for construction contracts related to National Forest System Roads. Key sections include definitions of terms, scope, work procedures, acceptance criteria, and reporting measures. The document clarifies the roles and responsibilities of contractors, including the appropriate use of materials and legal relations related to public safety. Significant changes implemented involve the deletion of numerous subsections, adjustment of measurement accuracy for payment, and meticulous specifications regarding contractor work practices, including the protection of surrounding natural resources. Essential requirements include conformity with contract specifications and performance assurances backed by testing and inspection protocols. The document aims to standardize construction practices across federal and local government contracts, ensuring compliance with modern regulations and fostering effective management of forest resources. It emphasizes the importance of adherence to exact specifications and the methods for handling non-conforming work. Overall, it represents a comprehensive framework to guide successful contract execution while maintaining ecological integrity.
    The document outlines the prevailing wage determination for heavy construction projects in Colorado for 2024, following the Davis-Bacon Act. It specifies wage rates and fringe benefits for various trades, including electricians, plumbers, and power equipment operators across multiple counties in Colorado. Key points include the applicable minimum wage rates governed by Executive Orders 14026 and 13658, which dictate wage standards depending on contract dates. For contracts starting or renewed after January 30, 2022, a minimum wage of $17.20 per hour is mandated, whereas contracts awarded between January 1, 2015, and January 29, 2022, must adhere to a rate of $12.90. Detailed rates for specific classifications of workers across different counties are also provided, including electricians earning rates from $31.65 to $50.68 per hour depending on the county. Additionally, the document includes guidance for contractors regarding worker protections, paid sick leaves under Executive Order 13706, and the appeals process for wage determinations. This wage determination is essential for compliance in federal contracts, ensuring fair compensation for workers engaged in publicly funded construction projects in Colorado.
    The United States Department of Agriculture's Forest Service has issued a project proposal for the renovation of the San Juan Bridge Campground in the Pagosa Ranger District, Colorado. The project's primary goals include resurfacing the campground road by reconstructing 1.2 miles of roadway, improving campground site amenities such as installing picnic tables and fire rings at designated sites, and removing existing furnishings and debris. The work involves shaping the roadbed, establishing proper drainage, and applying crushed aggregate material with specific grading standards. Additionally, the project includes the reconstruction of connecting roads and walking trails within the campground area. Throughout the contract period, the campground will remain closed to the public, and the contractor will manage site mobilization and traffic control according to safety standards. This investment reflects forestry management's commitment to maintaining public recreational spaces and enhancing visitor experiences while ensuring environmental compliance and safety during construction.
    The USDA Forest Service's Experience Questionnaire is designed for contractors submitting responses to solicitations. It collects essential information regarding a contractor's qualifications, experience, and resources relevant to the proposed project. The questionnaire requests details such as the contractor's name, address, business structure, years of relevant experience, and completed projects in the past three years. It also probes into the contractor's capacity through questions about current contractual obligations, employee availability, equipment specifications, and rates of progress. Additionally, it inquires about any past performance issues, encouraging contractors to disclose any failed completions or instances where work was finished via a performance bond. A certification part requires a verifying signature to affirm the accuracy of all submitted information. This questionnaire serves the purpose of assessing the contractor’s ability to successfully undertake projects commissioned by the Forest Service, ensuring that the agency partners with qualified and capable firms.
    The document is a Request for Proposals (RFP) Question and Answer Document that outlines queries and responses related to a specific RFP. It is structured into two pages, each containing a series of unanswered questions and the corresponding responses from the Division of Medicaid (DOM). There are 16 questions referenced, categorized by their respective RFP sections and page numbers. This format is designed to clarify expectations and provide additional context to potential contractors regarding the proposal requirements. The content indicates a procedural approach to communication between the government and contractors, ensuring transparency and facilitating informed submissions. The main purpose of the document is to assist interested parties by addressing common uncertainties related to the RFP, thereby streamlining the proposal process and promoting compliance with the stipulated guidelines.
    The U.S. Forest Service (USDA) issued a solicitation for the San Juan Bridge Campground Road and Spur Deferred Maintenance project under the Great American Outdoors Act. This project, with an estimated budget of $150,000 to $200,000, aims to rejuvenate the campground with necessary improvements including road resurfacing, picnic table installations, and fire ring setups. Bids are requested from contractors who must meet specific performance and payment bond requirements. The contractor will begin work approximately 60 days after receiving a Notice to Proceed and must complete the project within 60 days thereafter, with a final deadline of April 25, 2025. The solicitation is specifically set aside for small businesses, emphasizing the importance of local economic support. Contractors are encouraged to visit the project site before bidding and must submit questions by August 30, 2024. All proposals must be submitted by September 11, 2024. This solicitation encapsulates the USDA's efforts to enhance public recreational spaces while ensuring compliance with federal regulations and promoting local business engagement.
    The document outlines the solicitation for construction services related to the San Juan Bridge Campground Road & Spur Deferred Maintenance, issued by the U.S. Forest Service under the Great American Outdoors Act. It is a negotiated request for proposals (RFP), with a solicitation number of 1240LT24R0021, published on August 21, 2024. The total budget for the project ranges from $100,000 to $250,000. Contractors must provide materials, labor, and equipment for various tasks, including road resurfacing and campground maintenance, with a completion deadline set for April 25, 2025. The project site is located near Pagosa Springs, Colorado, with specific geographical coordinates provided. The contractor selection criteria prioritize small businesses. A site visit is encouraged but not mandatory prior to bidding. The timeline specifies that work should commence within 60 days after a Notice to Proceed is issued. Bidders must submit proposals by September 20, 2024, with questions due 10 days prior. The document emphasizes compliance with various federal regulations and requirements concerning licensing, performance bonds, insurance, and environmentally responsible practices during the project execution. Key personnel must be identified, and no work can start until all conditions are met. Overall, this solicitation facilitates necessary campground infrastructure improvements within regulatory guidelines.
    The document is an amendment to the solicitation identified as "RFP 1240LT24R0021," issued by the US Forest Service under the USDA, amending contract and offer submission protocols. The amendment extends the solicitation closing date to September 20, 2024, at 12:00 PM MDT, and replaces the original RFP document with a newly amended version. Offerors must acknowledge receipt of this amendment through specified methods to avoid rejection of their offers. The amendment also delineates administrative changes and confirms that all terms and conditions, except those modified, remain in effect. The signing authority for this amendment is Brian Wharton, representing the United States government. This process exemplifies the procedural rigor applied in federal contracting and the importance of compliance with amendment protocols in government RFP management.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Blue Lakes Trailhead Reconstruction
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is soliciting proposals for the reconstruction of the Blue Lakes Trailhead located in the Grand Mesa, Uncompahgre, and Gunnison National Forests in Colorado. The project aims to enhance accessibility and safety by reconditioning the parking area, replacing old restroom facilities with new vault toilets, and implementing erosion and sediment control measures. This initiative is crucial for improving public infrastructure and promoting sustainable outdoor recreation while ensuring compliance with environmental standards. Interested contractors should contact Brenda Simmons at brenda.simmons@usda.gov, with a project budget estimated between $250,000 and $500,000, and a completion timeline of 210 days following the notice to proceed.
    GMUG NF Mechanical Site Prep
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking proposals for the "GMUG NF Mechanical Site Prep" project, which involves site preparation and rehabilitation across the Grand Mesa, Uncompahgre, and Gunnison National Forests in Colorado. The project encompasses the rehabilitation of 109 sites across three timber sales, focusing on ecological restoration through activities such as soil ripping and debris management, with a total performance period of 21 days. This initiative is part of broader federal efforts to manage and restore public lands sustainably, emphasizing the importance of small business participation in federal contracting. Interested contractors must submit their proposals by September 23, 2024, and can direct inquiries to Rebecca Schowalter at rebecca.l.schowalter@usda.gov.
    Bayfield Office Complex Tree Removal & Parking Improvements
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, is soliciting proposals for the Bayfield Office Complex Tree Removal & Parking Improvements project located in Bayfield, Colorado. The project entails the removal of four Siberian Elm trees and enhancements to the parking area, requiring the contractor to provide all necessary materials, labor, and equipment to complete the work. This initiative is part of the Forest Service's commitment to sustainable land management and improving public access to forest resources, with a project cost anticipated to be less than $25,000. Interested small businesses must submit their proposals via email by September 20, 2024, and can direct inquiries to Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov.
    South Fork Bunk House Well
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is soliciting proposals for the South Fork Bunkhouse Well project located in South Fork, Colorado. The project entails drilling a new potable water well, conducting water quality tests, and ensuring compliance with public water system regulations, with an estimated cost between $25,000 and $100,000. This initiative is crucial for maintaining a reliable water supply in the Rio Grande National Forest while adhering to state and federal regulations. Interested contractors must submit their proposals via email by September 20, 2024, and are encouraged to conduct a site visit prior to bidding; for further inquiries, they can contact Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov.
    UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The United States Forest Service (USFS) seeks contractors for an IDIQ MATOC to provide road and bridge construction services across its Rocky Mountain Region. Services include road construction, culvert installation, and retaining walls. The total small business set-aside contract offers a base of two years, with three one-year extensions, and a shared ceiling limit of $50 million for all orders. USFS aims to award a minimum of ten contracts, each consisting of task orders up to $3 million. Interested parties should attend upcoming informational meetings for more details and must be registered on SAM.gov to qualify. Contract questions should be directed to Contracting Officer Paul Larsen.
    Veterans Point Trail Rehabilitation
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is soliciting proposals for the Veterans Point Trail Rehabilitation project located in the Black Hills National Forest, South Dakota. This project aims to restore a trail along Highway 385 near Pactola Lake Dam, ensuring safety and structural integrity while adhering to federal and state regulations. The contract, with a budget range between $250,000 and $500,000, requires contractors to submit sealed offers that meet specified technical, performance, and insurance requirements, with a proposal submission deadline set for October 7, 2024, by 5:00 P.M. EST. Interested contractors can contact Brenda Simmons at brenda.simmons@usda.gov for further information.
    Upland Raptor Survey San Juan National Forest
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is soliciting proposals for the Upland Raptor Survey project within the Dolores Ranger District of the San Juan National Forest in Colorado. The objective of this procurement is to conduct Broadcast Acoustical Surveys to identify forest raptor species and their nests across approximately 1,927 acres, adhering to established monitoring protocols and quality control measures. This project is crucial for wildlife management and conservation efforts, ensuring the protection of raptor populations and their habitats in national forests. Interested small businesses must submit their proposals by September 26, 2024, with the contract expected to run from September 30, 2024, to August 31, 2025. For further inquiries, potential bidders can contact Paula Sales at paula.sales@usda.gov or Isabel Wimbish at isabel.wimbish@usda.gov.
    FY24 Grave Creek Road Maintenance
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking qualified small businesses to provide road maintenance services for approximately 36 miles of roads within the Kootenai National Forest as part of the FY24 Grave Creek Road Maintenance project. The procurement involves a range of tasks including grading, shaping, roller compaction, heavy brushing, and ditch reconditioning, all aimed at ensuring safe and accessible roadways while adhering to environmental standards. This contract, scheduled for performance from October 1, 2024, to September 30, 2025, emphasizes the importance of maintaining infrastructure within national forest lands and requires contractors to submit comprehensive technical proposals that include equipment and timelines. Interested parties can contact Shawn Trout at shawn.trout@usda.gov or by phone at 802-613-7644 for further details.
    Canjilon Campground Vault Toilet Install
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is soliciting proposals for the installation of new vault toilet facilities at the Canjilon Lakes Campground in Carson National Forest, New Mexico. The project involves the removal of nine existing vault toilets and their replacement with pre-manufactured units, ensuring compliance with federal accessibility and environmental standards. This initiative is crucial for enhancing visitor amenities and maintaining the campground's operational integrity. Proposals are due electronically by September 16, 2024, with an estimated project value between $500,000 and $1,000,000, and interested contractors should contact Troy A. McCullough at troy.mccullough@usda.gov for further information.
    Baker Draw Designated Shooting Area Shade Structure Installation
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is soliciting proposals for the installation of a shade structure at the Baker Draw Designated Shooting Area in Ault, Colorado. The contractor will be responsible for providing all necessary materials, labor, equipment, and supervision to complete the project, which is budgeted between $25,000 and $100,000 and must be finished within 60 days of receiving the Notice to Proceed. This initiative aims to enhance public safety and recreational use of the shooting area, ensuring compliance with federal standards and regulations throughout the construction process. Interested small businesses must submit their proposals electronically by September 20, 2024, and direct any questions to Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov by August 23, 2024.