Little Bear Campground Reconstruction
ID: 1282B124R0046Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA FOREST SERVICE-SPOC IMWashington, DC, 202500001, USA

NAICS

RV (Recreational Vehicle) Parks and Campgrounds (721211)

PSC

CONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING) (Y1PA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Agriculture, specifically the USDA Forest Service, is soliciting bids for the reconstruction of the Little Bear Campground located in Delta, Colorado. This project involves comprehensive demolition and construction activities, including site preparation, utility improvements (water, sewer, and electrical), and the installation of new amenities such as pre-cast concrete toilets, picnic tables, and fire rings. The reconstruction aims to enhance recreational facilities, ensuring they meet modern standards and improve visitor experiences. Interested contractors should note that the project has a budget between $1 million and $5 million, with a performance period extending from September 30, 2024, to November 14, 2025. A mandatory site visit is scheduled for August 23, 2024, and proposals must be submitted by September 17, 2024, at 12:00 p.m. CDT. For further inquiries, contact Crystal Amos at crystal.amos@usda.gov or call 618-467-8347.

    Point(s) of Contact
    Files
    Title
    Posted
    The USDA Forest Service seeks bids for the Little Bear Campground Reconstruction project, encompassing demolition, construction, and utility improvements. With a budget between $1 million and $5 million, the project involves reconstructing campsites, improving day-use areas, and enhancing utilities, including water distribution, electrical systems, and as-built drawings. The work is to be completed within a specified period, with potential contract extensions. Offerors must submit comprehensive proposals, including technical details, past performance summaries, and pricing schedules, adhering to strict formatting guidelines. The government encourages attendees at a mandatory site visit and reserves the right to clarify or negotiate selected proposals. Evaluations will consider past performance and technical merit, with price being a secondary determinant. Offerors should propose their best terms upfront, as minimal negotiations are anticipated.
    The document is an amendment to a solicitation issued by the USDA Forest Service concerning a Request for Proposals (RFP) identified as 1282B124R0046. The effective date of this amendment is September 2, 2024, and it changes the RFP submission date to September 11, 2024, at 4:00 PM CDT. All other terms and conditions of the original solicitation remain unchanged. The amendment outlines that offers must acknowledge receipt of this amendment to be considered valid, and the acknowledgment can be made by various methods such as returning copies or providing a separate communication. This document reflects the standard practices associated with federal RFP processes, ensuring clarity and compliance among potential contractors for the specified project under the Great American Outdoors Act (GAOA). The document maintains the formal tone and structure typical in government procurement communications, emphasizing the importance of adhering to specified deadlines and requirements.
    The document is an amendment to a solicitation issued by the USDA Forest Service, specifically modifying contract number 1282B124R0046. The amendment extends the submission date for offers to September 17, 2024, at 12:00 p.m. CDT. Key changes include the removal of Alternative 3 from the specifications, the addition of demolition work for existing site furnishings in Campground areas, and the alteration of a related task from demolishing existing vault toilets to a quantity of five units. An additional attachment outlining electrical requirements has also been added, along with new stipulations concerning primary wire and conduit costs. The overall period of performance for the project will be from September 30, 2024, to November 14, 2025. All other terms of the solicitation remain unchanged. This document reflects ongoing efforts by the government to manage public land projects efficiently and transparently while ensuring compliance and proper contractor engagement.
    This document is an amendment to the solicitation for the Little Bear Campground Reconstruction project, under solicitation number 1282B124R0046. It details modifications to the original solicitation, including a project period extending from September 30, 2024, to November 14, 2025, and provides a comprehensive schedule of items outlining various construction and demolition tasks. Key work components involve general requirements, construction surveying and staking, clearing, demolition of existing infrastructure, tree removal, and road improvements. Additionally, it details improvements to the campground's water distribution systems and electrical services, encompassing site grading and the installation of amenities like picnic tables and fire rings. The amendment incorporates changes from a previous amendment, ensuring contractors understand what they need to acknowledge upon submission. The document emphasizes that all terms remain unchanged except as specified. Overall, it reflects the government's efforts to enhance recreational facilities while clearly laying out required projects to potential contractors.
    The government seeks bids for a comprehensive upgrade and renovation of the Little Bear Campground and its facilities. The project entails mobilization, construction surveying, site preparation, and significant demolition work to remove existing infrastructure and trees. New additions include road improvements, a water distribution system, electrical service enhancements, and campground enhancements like toilets, signage, and pathways. The plan also outlines detailed campground improvements, such as retaining walls, stairs, and amenities for different campsite types. As-built drawings are also required. Contractors can also bid on several alternates, including further electrical service upgrades, accessible fishing platform improvements, and enhancements to the day-use area. The project is expected to be lucrative, with a substantial grand total.
    The document outlines the electrical requirements for the reconstruction of Little Bear Campground under RFP 1282B124R0046. It specifies bid items, including the installation of various electrical components such as service pedestals, a main distribution panel, meter equipment, and associated trenching and concrete work. Key points include coordination with the electrical utility provider, DMEA, to ensure adherence to their specifications and successful state inspections. Specific tasks involve furnishing and installing necessary wiring, conduit, and excavation for primary power as per the DMEA Work Order (#26584), which covers a range of equipment and services planned for the campground. Additionally, alternative bid options are presented for providing electrical service to multiple campground units, detailing the required materials and installation processes. The document serves as a guide for contractors bidding on the project, ensuring compliance with technical standards and operational requirements vital for the campground's electrical infrastructure. Overall, this file is integral to the federal procurement procedure, ensuring clarity on project demands for prospective contractors.
    The document outlines the schedule of items for a construction project at Little Bear Campground (CG), detailing various tasks associated with site improvements. It includes mobilization, surveying, demolition, road grading, water system replacement, electrical services, and campground enhancements. Key components involve clearing, grubbing, removing existing infrastructures such as vault toilets and site furnishings, and implementing water and electrical systems. The scope covers significant upgrades in campground common areas, campsites improvements, and day-use areas, emphasizing accessibility and sustainability. Additionally, various alternates for enhancing electrical services are included, suggesting options for further electrical infrastructure upgrades. Each section specifies quantity, unit measures, and project totals, indicating that the project aims to modernize and improve facilities while maintaining compliance with safety and operational standards. The overall mission is to revitalize the campground to better serve the public and enhance visitor experience.
    The USDA Forest Service's RFP #1282B124R0046 for the Little Bear Campground Reconstruction project includes a solicitation Q&A log to address contractor inquiries. It clarifies multiple points: survey drawing files are not available; the Contracting Officer Representative (C.O.R.) can facilitate field fit adjustments, but the authority ultimately rests with the Contracting Officer (C.O.); tree removal responsibilities and specifications have been detailed, including that no chips will remain on the roadway; and the number of toilets designated for demolition has been updated from four to five based on onsite discussions. Furthermore, guidance is provided regarding the waterline trenching, which cannot involve shutting down watercourses, and the bid item clarifications for campground and parking area specifications. The update emphasizes the importance of accurate bidding and compliance with the revised specifications, ensuring that all changes and requirements are documented for potential contractors. This process illustrates the government's structured approach in facilitating communication and clarifying details critical for successful project bidding and execution.
    Lifecycle
    Title
    Type
    Solicitation
    Similar Opportunities
    Blue Lakes Trailhead Reconstruction
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is soliciting proposals for the reconstruction of the Blue Lakes Trailhead located in the Grand Mesa, Uncompahgre, and Gunnison National Forests in Colorado. The project aims to enhance accessibility and safety by reconditioning the parking area, replacing old restroom facilities with new vault toilets, and implementing erosion and sediment control measures. This initiative is crucial for improving public infrastructure and promoting sustainable outdoor recreation while ensuring compliance with environmental standards. Interested contractors should contact Brenda Simmons at brenda.simmons@usda.gov, with a project budget estimated between $250,000 and $500,000, and a completion timeline of 210 days following the notice to proceed.
    San Juan Bridge Campground Road & Spur Deferred Maintenance (GAOA)
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking proposals for the San Juan Bridge Campground Road & Spur Deferred Maintenance project located in Pagosa Springs, Colorado. The contractor will be responsible for providing all necessary materials, labor, and equipment to complete road resurfacing and campground maintenance, with a project budget estimated between $100,000 and $250,000. This initiative is part of the Great American Outdoors Act, aimed at enhancing public recreational spaces while ensuring compliance with environmental regulations. Interested small businesses must submit their proposals by September 20, 2024, and can direct inquiries to Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov.
    GMUG NF Mechanical Site Prep
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking proposals for the "GMUG NF Mechanical Site Prep" project, which involves site preparation and rehabilitation across the Grand Mesa, Uncompahgre, and Gunnison National Forests in Colorado. The project encompasses the rehabilitation of 109 sites across three timber sales, focusing on ecological restoration through activities such as soil ripping and debris management, with a total performance period of 21 days. This initiative is part of broader federal efforts to manage and restore public lands sustainably, emphasizing the importance of small business participation in federal contracting. Interested contractors must submit their proposals by September 23, 2024, and can direct inquiries to Rebecca Schowalter at rebecca.l.schowalter@usda.gov.
    USACE SPK DBB Construction – USFS Campground – Lake Isabella, CA
    Active
    Dept Of Defense
    The Department of Defense, through the United States Army Corps of Engineers (USACE) Sacramento District, is seeking qualified contractors for a design-bid-build (DBB) construction project at the Lake Isabella Campground in California. The project involves the construction of new campsites and associated facilities for the United States Forest Service (USFS), including drainage systems, group campsites, vault-toilet buildings, and road improvements, with an estimated construction timeline of 365 days from the Notice to Proceed. This opportunity is significant for enhancing recreational facilities and ensuring proper drainage and access, with a projected contract value between $1,000,000 and $5,000,000. Interested contractors are invited to submit capability statements to Gilbert Coyle at gilbert.coyle@usace.army.mil by 8:00 a.m. Pacific Time on September 25, 2024.
    Canjilon Campground Vault Toilet Install
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is soliciting proposals for the installation of new vault toilet facilities at the Canjilon Lakes Campground in Carson National Forest, New Mexico. The project involves the removal of nine existing vault toilets and their replacement with pre-manufactured units, ensuring compliance with federal accessibility and environmental standards. This initiative is crucial for enhancing visitor amenities and maintaining the campground's operational integrity. Proposals are due electronically by September 16, 2024, with an estimated project value between $500,000 and $1,000,000, and interested contractors should contact Troy A. McCullough at troy.mccullough@usda.gov for further information.
    Y--03 - CON - Disaster, Grizzly Flats Guard Station R
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the USDA Forest Service, is seeking proposals for the design and construction of the Grizzly Flats Guard Station Rebuild project, which aims to enhance firefighting capabilities in the Eldorado National Forest. The project includes constructing an engine garage, four barracks, and essential utility infrastructure, with a strong emphasis on sustainable building practices and backup power solutions due to the area's vulnerability to power outages. This initiative is critical for supporting local firefighting operations and improving community safety, with an estimated construction cost exceeding $10 million. Interested small business contractors must submit their proposals by October 30, 2024, and can direct inquiries to Christopher Keck at christopher.keck@usda.gov or call 402-657-3092.
    South Fork Bunk House Well
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is soliciting proposals for the South Fork Bunkhouse Well project located in South Fork, Colorado. The project entails drilling a new potable water well, conducting water quality tests, and ensuring compliance with public water system regulations, with an estimated cost between $25,000 and $100,000. This initiative is crucial for maintaining a reliable water supply in the Rio Grande National Forest while adhering to state and federal regulations. Interested contractors must submit their proposals via email by September 20, 2024, and are encouraged to conduct a site visit prior to bidding; for further inquiries, they can contact Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov.
    Baker Draw Designated Shooting Area Shade Structure Installation
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is soliciting proposals for the installation of a shade structure at the Baker Draw Designated Shooting Area in Ault, Colorado. The contractor will be responsible for providing all necessary materials, labor, equipment, and supervision to complete the project, which is budgeted between $25,000 and $100,000 and must be finished within 60 days of receiving the Notice to Proceed. This initiative aims to enhance public safety and recreational use of the shooting area, ensuring compliance with federal standards and regulations throughout the construction process. Interested small businesses must submit their proposals electronically by September 20, 2024, and direct any questions to Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov by August 23, 2024.
    Y--Jerseydale Work Center Barracks
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the USDA Forest Service, is seeking proposals from certified 8(a) firms for the construction of the Jerseydale Work Center Barracks in California. This project aims to rebuild and expand facilities at the Batterson and Jerseydale Work Centers, which were damaged by the 2020 Creek Fire, and includes the construction of two 6-person barracks and multiple prefabricated metal buildings. The initiative emphasizes sustainability, compliance with federal and state regulations, and the integration of renewable energy standards, with an estimated construction cost between $5 million and $10 million. Interested contractors must submit their proposals by July 26, 2025, and can direct inquiries to Christopher Keck at christopher.keck@usda.gov or by phone at 402-657-3092.
    Delintment Lake Water System Installation
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, is seeking qualified contractors for the installation of a solar-powered water system at the Delintment Lake Campground in Oregon. The project involves replacing an existing handpump delivery system with a solar pump, including the installation of solar panels, a prefab concrete building, and plumbing for water tanks. This initiative is crucial for enhancing the campground's water supply while promoting sustainable practices. Interested small businesses must submit sealed bids by September 18, 2024, with an estimated contract value between $100,000 and $250,000, and work expected to commence on May 1, 2025. For further inquiries, contact Stevonne Fuller at stevonne.fuller@usda.gov or call 509-293-4187.