Y--MALU 293291 Rehabilitate the Visitor Center and
ID: 140P2024R0056Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEDSC CONTRACTING SERVICES DIVISIONDENVER, CO, 80225, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF MISCELLANEOUS BUILDINGS (Y1JZ)

Set Aside

8(a) Set-Aside (FAR 19.8) (8A)
Timeline
    Description

    The Department of the Interior, National Park Service, is soliciting proposals for the rehabilitation of the Visitor Center and Headquarters at the Martin Luther King Jr. National Historical Park in Atlanta, Georgia. The project aims to enhance the facility through comprehensive renovations, including interior remodels, roof repairs, HVAC and electrical updates, and site improvements, all while ensuring compliance with safety and environmental standards. This initiative is crucial for preserving the historical integrity of the site and improving visitor experience. The estimated contract value ranges between $5 million and $10 million, with a performance period from March 1, 2025, to May 31, 2026. Interested contractors must submit their proposals by November 15, 2024, and can contact John Babcock at john_babcock@nps.gov or 303-969-2626 for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    The National Park Service is conducting a Sources Sought Notice to gather information from interested businesses for the rehabilitation of the Visitor Center and Headquarters at Martin Luther King Jr. National Historical Park, with a project cost estimated between $5-10 million. Responses from both large and small businesses are requested to inform an acquisition strategy, with a proposal submission deadline of January 18, 2024. The project will require extensive repairs and upgrades to the facility, while minimizing visitor impact during construction, projected to last 456 days.
    The National Park Service is issuing a pre-solicitation notice for the rehabilitation of the Visitor Center and Headquarters at the Martin Luther King Jr. National Historical Park, with an estimated contract value between $5 and $10 million. The project includes extensive repairs to the building's systems and landscaping while ensuring minimal disruption to park visitors; it will be open for competitive proposals in June 2024. This procurement will utilize an 8a set-aside method to encourage participation from small and disadvantaged businesses.
    The “Rehabilitate Visitor Center and Headquarters” project at the Martin Luther King Jr. National Historic Park focuses on the extensive renovation and selective demolition of building elements, including the removal of hazardous asbestos-containing materials (ACM). The National Park Service outlines the technical specifications for various construction tasks, including selective building demolition, concrete work, plumbing, mechanical systems, and asbestos abatement. Relevant protocols emphasize compliance with local, state, and federal regulations regarding safety and environmental protection. The execution involves preserving existing structures, salvaging items for reuse, and ensuring the removal of ACM adheres to strict guidelines for worker safety and environmental containment. The project aims to enhance the visitor center's infrastructure while maintaining safety standards and historical integrity. Attention is given to coordinated efforts among contractors, the necessity of clear communication regarding utility services, and the application of protective measures for adjacent facilities. This project underscores the government's commitment to restoring and maintaining historic landmarks while ensuring public safety and regulatory compliance.
    The Martin Luther King, Jr. National Historic Park is planning a comprehensive rehabilitation project for its Visitor Center and Headquarters. The project, designed by DHM Design, aims to address existing structural issues while enhancing accessibility and visitor experience. Key components include the demolition of deteriorated elements, installation of new infrastructure, and restoration of landscape features. Contractors will be responsible for familiarizing themselves with project documents, verifying conditions prior to commencing work, and ensuring no damage occurs to existing utilities and natural areas. The scope covers grading plans, utility layouts, landscape improvements, and the installation of updated signage. Specific attention is directed towards protecting existing trees and ensuring minimal site disturbance during the rehabilitation. Procedural guidelines involve coordination with the NPS contracting officer, adherence to federal and local regulations, and tightly managed staging and access protocols for construction activities. The project encapsulates the federal commitment to preserve historical integrity while enhancing functionality and safety for visitors. Overall, this initiative reflects the broader objectives of government RFPs and grants, focusing on infrastructure improvement within national parks for better public engagement and experience.
    This document outlines the General Decision Number GA20240307, effective March 22, 2024, pertaining to wage rates for building construction projects in Fulton County, Georgia, under the Davis-Bacon Act. It stipulates that contractors must comply with specific wage requirements, linked to Executive Orders 14026 and 13658, depending on the contract's effective date. Workers on applicable contracts should receive specific minimum wage rates, with adjustments based on yearly evaluations. The wage determination lists various trades, including electricians, carpenters, and laborers, alongside their respective prevailing wages and fringe benefits. It also highlights worker protection mandates under Executive Order 13706 regarding paid sick leave for federal contractors. Furthermore, the document details the appeals process for wage determinations and classifications not covered by existing wage rates. The information is vital for ensuring fair compensation in federal and related contracts, reinforcing compliance with labor laws and protections for workers in construction environments.
    The document is a Request for Proposal (RFP) for the rehabilitation of the Visitor Center and Headquarters at the Martin Luther King Jr. National Historical Park, issued by the National Park Service's Denver Service Center. The project is a competitive 8(a) set-aside acquisition with an estimated price range of $5,000,000 to $10,000,000. The contractor will be responsible for multiple aspects of construction, including interior and exterior rehabilitation, repairs of structural and utility systems, and improvements to landscaping. Key sections outline specific project requirements, proposal submission guidelines, inspection and quality control measures, and contract clauses regarding payments and responsibilities. Contractors must begin work within 10 days after receiving notice to proceed and complete the project within 456 days, subject to potential liquidated damages for delays. The document emphasizes the importance of performance and payment bonds, inspection records, and affirmative actions for equal employment opportunities. The solicitation encourages participation from qualified small businesses and underscores the expectation that funding will be arranged despite the current unfunded status of the project. This procurement process illustrates the government's initiative to engage small businesses in significant renovation projects while adhering to established regulations and standards.
    The document scrutinizes various federal and state/local Requests for Proposals (RFPs) and grants, directed primarily towards streamlining funding opportunities. It outlines the design and implementation processes required for applicants to access federal funding, underscoring the importance of compliance with specific guidelines such as performance targets, deadlines, and reporting requirements. Central themes include transparency in funding allocations, the evaluation of project proposals based on feasibility and expected outcomes, and fostering partnerships between governmental bodies and service providers. The document also highlights the necessity for a systematic approach to grant management, advocating for the utilization of technology in tracking and reporting processes. It concludes with a call for stakeholders to engage in best practices to enhance grant effectiveness and ensure optimal resource use in addressing community needs. Overall, it serves as a comprehensive guide for entities seeking government funding, ensuring clarity in expectations and enhancing accountability in public expenditure.
    The Past Performance Questionnaire serves as a critical component in the solicitation process (No. 140P2022R0121), designed to evaluate an offeror's previous contract performance. It requires the offeror to provide detailed information about their company, past project experience, and necessary references. The completed questionnaire will be assessed under defined categories, such as Quality, Schedule (Time Management), Cost Control, Management, Small Business Subcontracting (Labor Standards), and Regulatory Compliance, each receiving a rating from Exceptional to Unsatisfactory. The evaluation focuses on the effectiveness and quality of the contractor's work, addressing issues like adherence to schedules, cost management, and relationship management with subcontractors. The document emphasizes that the information is Source Selection Sensitive, meaning it cannot be used for promotional purposes or imply government endorsement. Completeness and clarity in reporting past performance are critical, as this information significantly impacts future contract awards, particularly in federally funded projects. The document concludes by specifying return instructions and a designated contracting officer for submissions, reinforcing the questionnaire's importance in assessing suitability for future contracts with the National Park Service.
    The National Park Service solicits proposals for the rehabilitation of the Visitor Center and Headquarters at the Martin Luther King, Jr. National Historical Park. The solicitation document outlines contract line items for various building rehabilitation tasks, including interior and exterior improvements, site enhancements, and several bid options for additional work. Contractors are instructed to provide unit pricing, extended totals, and a total base price for the specified scope of work. There are also multiple bid options related to exhibit space rehabilitation and restroom facilities. The document emphasizes the importance of adhering to specifications and accurately calculating pricing to ensure acceptance of proposals. This RFP operates within the federal grant framework, ensuring proper allocation of funds for public project improvements, reflecting the government's commitment to maintaining national heritage sites.
    The provided document appears to be a fragmentary text from a government file related to Requests for Proposals (RFPs), grants, and potential funding opportunities at the federal and state/local levels. The main focus seems to be on outlining various requirements, including compliance measures, budget considerations, and project scopes necessary for successful submissions. Key ideas include the importance of adhering to federal standards, the necessity for detailed project plans, and the integration of safety measures during implementation. Supporting details highlight the complexity of projects funded through governmental channels, which require multidisciplinary approaches and coordination among various stakeholders. The text implies an emphasis on transparency, regulatory adherence, and the vital nature of thorough project assessment. Overall, the document serves as a guideline for entities seeking government funding, ensuring they meet specified criteria to enhance their chances of approval for RFPs and grants.
    This document serves as a report on the limitations of subcontracting for a federal contract focused on general construction, specifically for socio-economic set-aside service contracts priced at or above $150,000. It details the participation calculations related to invoicing by the prime contractor and their subcontractors, differentiating between similarly situated subcontractors (SSS) and non-similarly situated subcontractors (NSS). Central to the reporting requirements is the need for compliance with established percentage limits on subcontracting; for general construction, up to 85% may be subcontracted to NSS and certain percentages apply for service and special trade contracts as well. The document necessitates a corrective action plan if the prime contractor's participation percentages do not meet compliance thresholds defined by contract clauses. The report emphasizes the importance of ensuring that a significant portion of contract work is retained by qualifying small businesses as part of federal contracting goals, reflecting broader objectives for economic inclusivity and support for disadvantaged groups in the business sector.
    The document pertains to a Request for Proposal (RFP) issued by the National Park Service (NPS) for the rehabilitation of the Visitor Center and Headquarters at the Denver Service Center. It includes essential provisions for contractors, such as financial agent details for wire transfers, the process for filing protests, and the requirement for a site visit. Notably, protests must be acknowledged in writing and submitted promptly to the designated Contracting Officer and other relevant officials. An organized site visit is scheduled for August 15, 2024, with registration required by August 8, 2024, to facilitate planning. The document also outlines definitions regarding uncompensated overtime for workers, emphasizing the calculations necessary for proposals, which include rate adjustments based on actual hours worked. The overall purpose of this RFP is to solicit bids from contractors for construction services while ensuring compliance with federal procurement regulations and transparency in the bidding process.
    This document outlines a solicitation for bids associated with the rehabilitation of the Visitor Center and Headquarters, identified by project number MALU 293291. The solicitation is competitive and designated as an 8(a) Set Aside, aimed at small businesses. The estimated cost for this project ranges between $5,000,000 and $10,000,000. A pre-proposal site visit is mentioned, along with the requirement for prospective contractors to furnish performance and payment bonds. The contractor is expected to begin work upon award of the contract, which is contingent on the availability of funds. Offers must be submitted sealed and must adhere to the timeline specified, with specific attention to the rejection of late submissions. Additionally, clear guidelines for proposal submission and the evaluation process are provided in the referenced sections of the solicitation. The document emphasizes the anticipation of funding, implying that while the project is currently unfunded, it is expected to proceed once financial resources are secured, reflecting the federal government's commitment to improving its facilities while supporting small business participation.
    The document outlines the requirements and procedures related to Solicitation No. 140P2024R0056 for the National Park Service's project to rehabilitate the Visitor Center and Headquarters. It specifies necessary financial information from the offerors, detailing how to provide pertinent banking details for wire transfers. The document also addresses the protocol for filing protests, indicating that they must be served to the designated Contracting Officer within one day if filed with the Government Accountability Office (GAO). Additionally, it emphasizes the importance of a site visit scheduled for August 15, 2024, and instructs participants to notify the government in advance to facilitate planning. The identity of uncompensated overtime is discussed, defining the adjusted hourly rate and what constitutes uncompensated overtime for exempt employees. Overall, the document serves as a foundational guide for potential contractors regarding the expectations and formalities for the bidding process, ensuring compliance with federal regulations and offering key logistical details pertinent to the project.
    The National Park Service (NPS) has issued Solicitation No. 140P2024R0056 for the rehabilitation of the Visitor Center and Headquarters at the Martin Luther King Jr. National Historical Park. The document, part of a federal request for proposals (RFP), outlines a comprehensive list of attachments relevant to the project. Key attachments include technical specifications, final drawings, construction wage decisions, project experience and past performance questionnaires, a price schedule, and studies related to geotechnical engineering and environmental assessments. These supporting documents, dated from 2021 to 2024, encompass various critical evaluations and requirements, such as mold surveys, hydrant test results, and evaluations of roofing materials. The purpose of this RFP is to solicit proposals from qualified contractors to ensure the effective and compliant rehabilitation of the facilities, adhering to federal standards and local regulations. The organized structure of the document reflects a systematic approach to procurement, ensuring all necessary information is readily available to potential bidders.
    The solicitation document, identified as Solicitation No. 140P2024R0056 by the National Park Service (NPS), pertains to the rehabilitation of the Visitor Center and Headquarters through construction contracts. It details amendments for contractors, including the requirements for financial agents regarding wire transfers and stipulations for serving protests about the bidding process. Key clauses relevant to site conditions, including site visits, are specified, emphasizing the importance of offerors inspecting conditions prior to submitting proposals. A scheduled site visit is set for October 22, 2024, in Atlanta, where interested parties must register in advance. Additionally, the provision addresses uncompensated overtime definitions and calculations, essential for bidders' understanding of labor costing. The document serves to guide contractors through compliance requirements and procedural expectations in the bid process for a federal construction project, reflecting the structured process in government procurement.
    The document is a sign-in sheet for a pre-bid conference regarding the rehabilitation of the Visitor Center and Headquarters (Project MALU 293291). The event was held by the National Park Service on October 22, 2024, with Solicitation Number 140P2024R0056. Participants included various contractors and government personnel, who were required to confirm any oral comments in writing for contractual changes within four days of receiving that information. The sheet lists attendees with their names, companies, contact numbers, and email addresses, signifying the interest from multiple contractors in the proposed project. The emphasis on written confirmation for verbal discussions underscores the importance of clear communication and adherence to formal contract protocols. Overall, the document reflects the procedural steps taken in the bidding process for federal projects, ensuring compliance and accountability among contractors involved.
    The Geotechnical Engineering Report by Schnabel Engineering, LLC details the subsurface exploration for the Visitor Center rehabilitation at the Martin Luther King Jr. National Historical Park in Atlanta, Georgia. Conducted on April 26-27, 2022, the exploration included hand auger borings and dynamic cone penetrometer (DCP) tests to assess soil conditions for stormwater design. The results revealed generally sandy silts with gravel and debris indicating probable fill above a residuum of silt and sand. Infiltration testing showed very low rates (≤0.02 in/hr), with no groundwater encountered. Notably, drainage issues in the building area are attributed to surface water pooling, necessitating the installation of trench drains and grading measures to redirect water away from the structure. The report outlines the methods and findings of the exploration while providing recommendations for mitigating identified drainage concerns. The research underlines the importance of adequate stormwater management in preserving the historic site while ensuring safety and compliance with design standards.
    Wiss, Janney, Elstner Associates, Inc. (WJE) performed an assessment of the canopy roof and window sealants at the Martin Luther King Jr. National Historical Park Visitor Center in Atlanta, Georgia, responding to reported leaks and preparing for extensive renovations. The evaluation revealed significant water intrusion issues primarily due to damaged EPDM membrane gutter liners and structural problems with exterior glulam beams, which are warped and can allow further water damage. Various leaks were noted, including those at the interface of metal roofs and dormers, with missing ridge cap flashings and poorly sealed joints being contributing factors. WJE provided several recommendations, including the structural evaluation and potential replacement of damaged glulam beams, gutter liner replacement, sealing the skylight, and addressing various metal roofing deficiencies. Additionally, the exterior sealants, particularly those in precast concrete and brick sections, were found to be expired and in need of replacement with more durable materials. These measures aim to protect the historical integrity of the building and ensure long-term functional durability while enhancing the visitor experience at the site. This assessment highlights the necessary steps for compliance and preservation concerning the federal guidelines for national parks.
    The document outlines the rehabilitative project for the Visitor Center and Headquarters at Martin Luther King Jr. National Historic Park, focusing on construction specifications administered by the National Park Service. The primary goal is to upgrade and renovate the facility through a comprehensive scope of work that includes interior remodels, roof repairs, HVAC and electrical updates, and site improvements. The renovations aim to enhance visitor experience, restore infrastructure, and ensure compliance with safety and environmental standards. The project will be executed under a single prime contract, with careful coordination across multiple disciplines including architectural, mechanical, and electrical engineering, as indicated by the involvement of licensed professionals. The contractor is responsible for scheduling, reporting, and compliance with regulations throughout the process while minimizing disruption to the public and preserving natural features. The document includes details on contract line items for various aspects of the work, emphasizing a structured approach to payment and progress monitoring. This initiative illustrates the government's commitment to maintaining and improving national historic sites while adhering to systematic project management practices.
    The document outlines the Rehabilitation of the Visitor Center and Headquarters at the Martin Luther King Jr. National Historic Park. The primary aim is to enhance the facility's accessibility and overall functionality, ensuring compliance with federal, state, and local regulations. Key components of the project include site preparation, demolition of damaged structures, installation of new infrastructure, and landscaping improvements. The contractor is responsible for verifying existing field conditions, protecting utilities during construction, and adhering to outlined safety measures to minimize disturbances. Detailed drawings showcase the scope of work, including a staging and access plan, existing condition assessments, grading and utility plans, and landscape designs. Furthermore, the document emphasizes the importance of noise control, erosion, and sediment management, along with maintaining aesthetic qualities in alignment with the park's historic significance. This initiative not only focuses on immediate renovations but also integrates long-term sustainability and preservation considerations, reflecting the government's commitment to enhancing public access and the integrity of historical sites.
    The City of Atlanta, under Mayor Andre Dickens and the Watershed Management Department, conducted fire hydrant and pressure tests on March 24, 2022, at three different locations. The tests were requested by Calibre Engineering, with Jessica Kordziel as the contact. Results from the tests included flow rates and pressure measurements for each site. At 90 Boulevard, the hydrant flow was recorded at 1190 gallons per minute (gpm) with static pressure at 73 psi and residual at 70 psi. At 101 Jackson Street, the flow was lower at 750 gpm, with static pressure at 80 psi and residual at 40 psi. The final location at 460 Auburn Avenue showed similar high flow results to the first site, registering 1190 gpm, static pressure at 71 psi, and residual at 69 psi. Each test utilized a 2.5-inch nozzle from a 6-inch water main, demonstrating the city’s ongoing assessment of firefighting resources and water pressure systems to ensure public safety and reliable service. The reports were compiled by an authorized representative of the City of Atlanta, with contact information provided for any follow-up. This document reflects the city's commitment to maintaining and improving its infrastructural capabilities in emergency services.
    Mabbett & Associates, Inc. conducted a Mold/IAQ and Regulated Building Materials Survey for the rehabilitation of the Martin Luther King Jr. National Historic Park Visitor Center in Atlanta, GA. The objective was to identify asbestos-containing materials (ACM), lead-containing paint (LCP), and assess indoor air quality for mold. The survey, conducted on August 17, 2023, found no asbestos in 69 collected bulk samples. Five lead paint chip samples also revealed no lead concentrations exceeding regulatory thresholds, indicating compliance with HUD guidelines. However, the visual inspection identified indicators of water and mold issues, with one air sample showing higher mold spore concentrations indoors than outdoors, necessitating remediation of affected materials. Conclusions include recommendations for monitoring and potentially sampling inaccessible materials that might contain asbestos and advising proper handling procedures in case of disturbing these materials during renovations. The findings underscore the importance of addressing potential mold and lead hazards to ensure a safe environment for visitors during the Visitor Center's rehabilitation. The survey is essential for regulatory compliance and for guiding remediation efforts prior to construction work.
    The document consists of inspection reports from GPRS for various sewer line segments located in Atlanta, specifically along Auburn Avenue. Each inspection assesses pipe condition based on established classifications ranging from "Excellent" to "Poor," with detailed observations on defects, water levels, and material conditions. Significant findings include various grades of defects, ranging from severe issues requiring immediate attention to minor defects that are unlikely to cause failure soon. The inspections cover multiple pipe segments, noting parameters such as pipe size, shape, sewer category, and joint conditions. Notable observations include significant settling of deposits, water level sags indicating potential blockages, and multiple tap break-ins. The aim is to provide a comprehensive assessment for ongoing sewer management and maintenance, ensuring repair or replacement actions can be prioritized based on severity and potential risk of failure. This documentation is crucial for local government agencies to guide future repairs or upgrades to municipal infrastructure.
    The National Park Service (NPS) is seeking proposals for renovating the Visitors Center and Headquarters at the Martin Luther King, Jr. National Historic Park under solicitation 140P2024R0056. The project encompasses substantial upgrades to various building systems, including HVAC, electrical, and fire safety features, as well as aesthetic updates such as finishes and restrooms. Key components include the rehabilitation of visitor restrooms and common areas, as well as essential upgrades to water, heating, and electrical systems. The renovation plan is divided into multiple Contract Line Item Numbers (CLINs), detailing specific scopes of work such as building rehabilitation, lighting enhancements, exterior improvements, and site drainage upgrades. Unique project elements include the maintenance of existing exhibits during construction and ensuring public safety while the park remains open. The pre-proposal conference's agenda included an overview of the project’s resources, required documentation, and proposal guidelines, emphasizing that all proposals must adhere strictly to the terms outlined in the solicitation. This initiative reflects NPS’s commitment to enhancing visitor experience while preserving historical integrity and operational functionality of the site.
    The document is a sign-in sheet for a project, MALU 293291 Rehab Visitor Center and HQ, associated with the U.S. National Park Service. The meeting took place on August 15, 2024, to discuss the solicitation number 140P2024R0056. It outlines the procedural requirements for contractors regarding communication and modifications to project contracts, emphasizing that all oral comments or changes must be confirmed in writing and any modifications must be officially issued by the Contracting Officer. The sheet includes contact information for various attendees, indicating their companies and roles in the context of the project. This document serves to facilitate communication among stakeholders involved in the federally solicited project, ensuring clarity and accountability throughout the procurement process. The adherence to formal procedures reflects the government's commitment to transparency, compliance, and organizational integrity in federal contracting.
    This document serves as Amendment P0009 to Solicitation 140P2024R0056, issued by the U.S. Department of the Interior, National Park Service. The primary purpose of this amendment is to extend the due date for RFP submissions to November 15, 2024, at 15:00 ET, while all other terms and conditions of the solicitation remain unchanged. The amendment provides guidelines for acknowledging receipt of the amendment and outlines the procedures for submitting modifications to offers already made. Additionally, it highlights that the period of performance for the related contract will be from March 1, 2025, to May 31, 2026. A series of prior amendments were issued in August and September 2024, indicating ongoing revisions to the solicitation. The document emphasizes the importance of adhering to specified guidelines and deadlines for effective contractor participation in the solicitation process, ensuring compliance with federal acquisition regulations and standards.
    The document is an amendment (0010) to a solicitation (140P2024R0056) issued by the U.S. Department of the Interior, National Park Service, detailing updates to an existing contract. The amendment includes instructions for contractors on acknowledging receipt of the amended solicitation, emphasizing that failure to do so before the specified deadline may lead to rejection of their offer. Key changes outlined in the amendment are: an updated Price Schedule, the definition of Contract Line Items, and a Q&A section. Additionally, a site visit is scheduled for October 22 at 9 AM ET. The period of performance for the contract is set from March 1, 2025, to May 31, 2026. Previous amendments, from August to September 2024, are also referenced, with all other terms and conditions from the original solicitation remaining unchanged. This document reflects the standard procedure in government contracting to ensure clarity and compliance among potential bidders.
    The document is an amendment (0010) to solicitation number 140P2024R0056 issued by the Department of the Interior, National Park Service, Denver CO. Its primary purpose is to amend terms of the solicitation to provide updated information, including an amended price schedule, definitions of contract line items, and a Q&A section. The amendment requires contractors to acknowledge receipt of this change before the specified deadline to ensure their offers remain valid. Additionally, a site visit is scheduled for October 22 at 9 AM ET. This amendment does not change other solicited terms and conditions besides those explicitly mentioned. The overall period of performance for the contract spans from March 1, 2025, to May 31, 2026. There have been several previous amendments issued prior to this document, indicating an ongoing process of refinement in the solicitation details. The amendment emphasizes the importance of proper acknowledgment and response from contractors to meet deadline requirements.
    The provided document outlines the Contract Price Schedule Template for the Martin Luther King, Jr. National Historical Park rehabilitation project, managed by the National Park Service (NPS). The solicitation number identifies this as part of the Project Management Information System (PMIS). The project entails various rehabilitation tasks for the Visitor Center and Headquarters, including interior and exterior building rehabilitation, site improvements, and optional bid items such as fountain removal and restroom installation. Contract line items are specified, with instructions for offerors to provide pricing on both base items and additional options. Offerors must ensure their calculations are accurate, with unit prices and extended totals required for unit-priced line items. Incorrect calculations will default to the unit price. The document emphasizes the importance of adhering to submission requirements to maintain proposal acceptability, highlighting the project’s comprehensive scope aimed at enhancing the facility for visitor use. The structure includes a breakdown of specific line items, additional options, and total pricing components which must be clearly reported by potential bidders. Overall, this template serves as essential guidance for contractors engaging with federal contracts, underscoring compliance, precision, and thorough project execution.
    The document outlines the definition and scope of various contract line items associated with a rehabilitation project at a Visitor Center. It specifies the work involved in each item, including both interior and exterior improvements, site enhancements, and optional bid items. Key contract line items include: 1. Interior rehabilitation of the Visitor Center, excluding generator infrastructure. 2. Exterior work involving roof replacement, sealant application, and generator infrastructure installation. 3. Site improvements focused on drainage, paving, and landscaping. 4. Bid options for exhibit space rehabilitation, fountain removal, site signage improvements, and restroom facilities. 5. Detailed descriptions of each item clarify what is included and excluded, as well as the payment conditions based on monthly work completion percentages. The purpose of this document aligns with federal grant and RFP processes by defining work parameters and payment structures, ensuring clarity and compliance in public procurement practices. Each line item is focused on enhancing the Visitor Center’s functionality and appearance while adhering to budgetary controls and project timelines.
    The government file outlines a Request for Proposal (RFP) for the rehabilitation of the Visitor Center and Headquarters, detailing queries from contractors about project specifications. Key topics include the use of materials like fiberglass ladders and scaffolding, roof composition, and requirements for roofing insulation and metal components. Contractors seek clarification on aspects such as staging areas for dumpsters, roofing warranty options (60 mil vs. 80 mil PVC), lightning protection specifications, and BIM coordination requirements. The document emphasizes adherence to contract specifications, which may exceed local codes, and insists on clarity in project execution. It serves as a crucial communication tool to ensure all parties understand technical requirements and protocols necessary for successful project completion, underpinning the overall compliance and safety concerns associated with government projects.
    The government file addresses the rehabilitation of the Visitor Center and Headquarters, specifically concerning mold and asbestos issues identified in a bid. Several inquiries focus on protocols for addressing hazardous materials, including the necessity for testing stucco for asbestos, approaches to ceiling tile replacement, and clarification on HVAC cleaning requirements. It outlines that mold abatement is not included in the contract, although the mold report serves as a reference. Asbestos abatement procedures are specified, while the exterior stucco and ceiling tile assembly removal details will be determined during construction. The contractor is advised to consult contract documents for any conflicting requirements regarding plenum cleaning. This document provides critical guidance for contractors, ensuring compliance with health and safety regulations while preparing for the rehabilitation project. It reflects the government's oversight in managing hazardous materials as part of community infrastructure enhancement.
    The document discusses the Rehabilitate the Visitor Center and Headquarters project, highlighting questions raised by bidders regarding asbestos and mold management, HVAC cleaning, and structural access during construction. Specific inquiries include the lack of protocols for mold and asbestos, the process for ceiling tile replacement, and the need for clarity on cleaning HVAC ducts and replacing structural components like roof decks. Responses indicate that mold abatement is excluded from the contract, whereas asbestos removal protocols are defined in the specifications. The contractor will identify ceiling tile replacements during construction, while certain elements like the bridge will remain undisturbed. Access to the roof is provided from inside the building, and the canopy evaluation will inform project requirements but is categorized as for informational purposes only. This document represents a crucial communication in the context of government RFPs, ensuring clarity and guidance for contractors on project expectations and requirements while addressing safety and regulatory compliance issues.
    The document serves as an amendment to solicitation 140P2024R0056, primarily addressing changes relevant to an upcoming contract proposal. The amendment stipulates updates such as the new location for the Pre-Bid Site Visit, now taking place at Fire Station No. 6 in Atlanta, GA, and revises the issuance date to August 6, 2024. Additional revisions to the solicitation are documented on revised pages included with the amendment. Importantly, all other terms and conditions of the original solicitation remain unchanged. Offerors must acknowledge receipt of the amendment to ensure their proposals are considered, with specific instructions on submission methods outlined. The amendment is typical of federal contract modifications, ensuring clarity and compliance while maintaining existing contractual structures. This adjustment reinforces the government's commitment to facilitating transparent and organized procurement processes.
    The document is an amendment notice for Solicitation No. 140P2024R0056 issued by the DOI, NPS, DSC Contracting Services. Its primary purpose is to communicate changes and updates to the procurement process for a contract. The amendment specifies a revised RSVP date for the Pre-Bid Site Visit, now set for August 13, 2024. A revised page of the solicitation reflecting this change is included as an attachment. Importantly, all other terms and conditions of the solicitation remain unchanged. The amendment outlines the process for contractors to acknowledge receipt of this update to avoid potential rejection of offers if not properly acknowledged by the submission deadline. The document’s structured format includes details on communication methods for acknowledgments and also identifies responsibilities regarding contract modifications. This amendment is part of the larger framework of federal contracting, ensuring adherence to regulations and providing clarity to potential bidders by maintaining a transparent process.
    The document is an amendment (0003) to solicitation number 140P2024R0056, issued by the U.S. Department of the Interior, National Park Service, for construction projects. This amendment outlines updates and attachments that replace previous versions and includes critical documents such as updated specifications, construction drawings, a geotechnical engineering report, and evaluations of materials. Key points include: attaching Division One Specifications, updated drawings, a geotechnical report, and various test results related to materials and structural assessments. The notice specifies that contractors must acknowledge receipt of the amendment to avoid offer rejection and sets procedures for submitting changes to existing offers. Terms and conditions remain unchanged except for the attached updates. This amendment ensures that all parties are informed of necessary changes, maintaining compliance with procurement regulations and project requirements. The amendment illustrates the government's commitment to thorough planning and documentation in federal contracting.
    This document is an amendment to the solicitation 140P2024R0056, primarily focusing on updating details regarding the pre-proposal site visit and associated documentation. The amendment specifies that contractors must acknowledge receipt of the amendment before the deadline to avoid the rejection of their offers. It also includes the attachment of a sign-in sheet and presentation slides from the pre-proposal site visit, with all other terms and conditions of the original solicitation remaining unchanged. The amendment is necessary for keeping potential bidders informed about the site visit, ensuring adherence to the updated instructions and requirements, and streamlining the proposal process for future submissions. The contracting officer is John Babcock, who oversees the modifications outlined in this amendment. This amendment is part of a series of changes issued earlier in August 2024, underscoring the ongoing adjustments made to the solicitation process to enhance clarity and compliance for the bidders involved in the project.
    This document is an amendment to solicitation number 140P2024R0056 issued by the Department of the Interior, National Park Service. The primary purpose of Amendment P0005, dated August 6, 2024, is to address previously submitted Requests for Information (RFIs) with a reference to an attached spreadsheet (B09 MALU 293291_Questions_Responses_Spreadsheet). The amendment emphasizes that all other terms and conditions of the original solicitation remain unchanged. It outlines the procedures for acknowledging receipt of the amendment, stating that failure to do so before the specified deadline may lead to rejection of submitted offers. Additionally, it provides a timeline of prior amendments (P0001 to P0004) issued between August 7 and August 16, 2024. The document also contains instructions for modifications related to contracts/orders, reinforcing the importance of accurate acknowledgment for compliance purposes. Overall, this amendment serves as a critical update for contractors involved in the solicitation, ensuring clarity and transparency in the submission process.
    The government document outlines Amendment P0006 for solicitation number 140P2024R0056, issued by the DOI, NPS, DSC Contracting Services. This amendment emphasizes the requirement for contractors to acknowledge receipt prior to the specified deadline, either by completing copies of the amendment or submitting a separate correspondence. It reiterates that changes to previously submitted offers can be made under specified conditions before the submission deadline. Key points of this amendment include the attachment of Requests for Information (RFIs) relevant to the solicitation, as indicated in the included attachment B09. Furthermore, it states that all other terms and conditions of the original solicitation remain unchanged. The document lists prior amendments (P0001 to P0005) and maintains a clear structure indicating essential information such as modification reasons, effective dates, and requirements for acknowledgment by the contractors. Overall, this document serves to ensure clarity and update interested parties on essential changes while adhering to formal procurement processes in government solicitations.
    The document is an amendment (0007) to solicitation 140P2024R0056, issued by the DOI, NPS, DSC Contracting Services. Its primary purpose is to extend the submission deadline for proposals from the original date to September 16, 2024, at 15:00 ET. The amendment outlines that all other terms and conditions of the original solicitation remain unchanged. Additionally, the document includes instructions on how offerors must acknowledge receipt of the amendment, either by submitting copies with the acknowledgment noted, or via a letter or electronic communication referencing the solicitation and amendment numbers. The amendment refers to a series of prior amendments (P0001 to P0006), indicating a series of adjustments and communications related to this solicitation. The document is structured to include sections detailing the amendment number, modification purpose, contractor information, signing authority, and compliance guidelines, emphasizing the procedural integrity necessary in government contracting processes. Overall, this amendment reinforces the federal framework for ensuring timely and compliant proposals in government RFPs.
    The document pertains to Amendment P0008 for Solicitation No. 140P2024R0056, issued by the Department of the Interior, National Park Service on August 6, 2024. The primary purpose of this amendment is to extend the Request for Proposals (RFP) submission deadline to October 18, 2024, at 15:00 ET. It emphasizes that acknowledgment of receipt of this amendment must be communicated via specified methods, and failure to do so may lead to proposal rejection. The amendment maintains all prior terms and conditions unchanged, signifying no substantial modifications other than the deadline extension. Besides, the document lists previous amendments (P0001 to P0007) issued in August and September 2024, providing a timeline of updates to the solicitation. This amendment is significant for interested contractors, ensuring they are aware of the new deadline and the importance of compliance with the acknowledgment process. It reflects standard practices in federal contracting, emphasizing transparency and clarity in the solicitation process.
    The document outlines Amendment 0001 to Solicitation No. 140P2024R0056, issued by the Department of the Interior, National Park Service in Denver, Colorado. The primary purpose of this amendment is to update certain logistical details related to the solicitation for bids. Key changes include a new pre-bid site visit location at Fire Station No. 6, Atlanta, GA, and the revision of the issuance date to August 6, 2024. The amendment requires that all offers must acknowledge the receipt of this amendment by specified methods to avoid rejection. It clarifies that all other terms and conditions of the original solicitation are unchanged. The amendment emphasizes adherence to submission protocols and establishes the importance of proper acknowledgment to maintain the integrity of the bidding process. This document is significant as it ensures all potential contractors are informed of critical updates before the bidding closes, facilitating a fair and transparent procurement process.
    The document pertains to Amendment 0002 for Solicitation 140P2024R0056, issued by the Department of the Interior's National Park Service. Its primary purpose is to modify the solicitation details, specifically changing the RSVP date for a Pre-Bid Site Visit to August 13, 2024. The amendment requires all offerors to acknowledge receipt of this amendment using specified methods, emphasizing that failure to do so may lead to rejection of their offers. The document confirms that all other terms and conditions of the original solicitation remain unchanged. The administrative process outlined follows federal regulations, ensuring compliance and clarity for potential contractors. Overall, this amendment serves to update the solicitation timeline while maintaining other existing agreements, signifying the government's commitment to a transparent procurement process.
    The document is an amendment (0003) to solicitation number 140P2024R0056, issued by the Department of the Interior, National Park Service, relating to a construction project. The primary purpose of this amendment is to attach various updated documents and reports essential for the proposal process. Specifically, it includes the updated Division One Specifications and Final Construction Documents, new Drawings, a Geotechnical Engineering Report, a Canopy Roof and Window Sealants Evaluation, and several other crucial assessments like the GPRS Video Pipe Classification Report and Hydrant Test Results Report. Contractors are reminded that they must acknowledge receipt of this amendment by a specified method to ensure their offers are considered. Additionally, the document iterates that all previous terms and conditions of solicitation 140P2024R0056, as amended by earlier modifications, remain unchanged. This amendment signifies the commitment to transparency and provides the necessary adjustments to facilitate the bidding process while ensuring compliance with established federal regulations.
    The document is an amendment to solicitation number 140P2024R0056, issued by the DOI, NPS, DSC Contracting Services. The main purpose of this amendment (P0004), dated 06/25/2024, is to facilitate communication regarding the acknowledgment of changes in the solicitation process. Offerors must signify receipt of this amendment to avoid rejection of their submissions. The document outlines the necessity for contractors to respond formally via accepted methods, such as completing specified copies of the amendment or through separate communication referencing pertinent solicitation details. This amendment includes important attachments: a sign-in sheet from the pre-proposal site visit and presentation slides related to the site visit, both aimed at enhancing offerors' understanding of the project scope. It also clarifies that all other terms and conditions of the solicitation remain unchanged. This document exemplifies standard procedure in federal contract management, ensuring transparency and clear communication during the bidding process.
    The document outlines Amendment P0005 to Solicitation 140P2024R0056, issued by the Department of the Interior’s National Park Service. The amendment primarily details required acknowledgments for receipt of the amendment by contractors, essential changes to offers, and instructions for submitting modifications prior to public opening. The amendment’s main purpose includes adding responses to Requests for Information (RFIs) within the attached document, B09 MALU 293291_Questions_Responses_Spreadsheet. All other terms and conditions of the solicitation remain unchanged. The record provides a timeline of prior amendments to the solicitation, reinforcing the dynamic nature of the procurement process. It requires contract signatures for validation, emphasizing administrative accuracy in federal contracting practices. Overall, this amendment demonstrates adherence to regulatory procedures in managing federal solicitation processes and highlights the importance of timely communication in contract modifications.
    This document is an amendment (P0006) to solicitation 140P2024R0056 for a government contract, specifically issued by the Department of the Interior's National Park Service in Denver, CO. The amendment outlines required actions for bidders, such as acknowledging receipt of the amendment before the specified deadline, or risk having their offers rejected. It serves to attach Request for Information (RFI) documents, specifically questions and responses compiled in attachment B09. Additionally, all other terms and conditions from the original solicitation remain unchanged by this amendment. It details the history of previous amendments from August 2024 up to this point, indicating a continued effort to revise and clarify the solicitation process. The document emphasizes the importance of compliance and communication in the procurement process within government contracting procedures.
    The document details an amendment (P0007) to the solicitation numbered 140P2024R0056, issued by the Department of the Interior's National Park Service. Its primary purpose is to extend the due date for proposals to September 16, 2024, at 15:00 ET. The document outlines instructions for acknowledging receipt of this amendment, emphasizing the importance of timely acknowledgment to avoid rejection of offers. It clarifies that all other terms and conditions outlined in the original solicitation remain unchanged. The amendment record includes previous amendments P0001 through P0006, indicating an ongoing process to refine the solicitation details. This amendment process exemplifies standard procedures in government contracting, ensuring transparency and compliance while accommodating necessary changes in submission timelines.
    The document is an amendment (P0008) to solicitation number 140P2024R0056, issued by the DOI, NPS, DSC Contracting Services. Its primary purpose is to extend the due date for offers to October 18, 2024, at 15:00 ET, allowing additional time for potential contractors to respond. The amendment outlines the procedures for acknowledging receipt of this amendment, requiring that offers are properly amended in the submission. Furthermore, it notes that all other terms and conditions within the solicitation remain unchanged. The document also details the amendment’s administrative aspects, including references to previous amendments, ensuring clarity and continuity in the procurement process. This amendment serves as a formal update in the context of federal procurement practices and emphasizes compliance with contractual procedures. It demonstrates a commitment to transparency and the facilitation of responses from vendors within the federal procurement framework.
    The document outlines Amendment P0009 to Solicitation No. 140P2024R0056, issued by the Department of the Interior's National Park Service (NPS) in Denver, CO. The primary purpose of this amendment is to extend the submission deadline for proposals to November 15, 2024, at 15:00 ET. It emphasizes the importance of acknowledging receipt of this amendment to avoid rejection of offers, providing methods for contractors to do so, including acknowledgment on the offer copies or through electronic communication. The amendment makes clear that all other terms and conditions of the original solicitation remain unchanged. A historical overview of previous amendments (P0001 to P0008) is provided, alongside key details such as the period of performance, which is set from March 1, 2025, to May 31, 2026. This amendment signifies an administrative adjustment in the contracting process while maintaining focus on ensuring that prospective contractors are informed and compliant with submission procedures.
    The document concerns Amendment 0010 to Solicitation 140P2024R0056, issued by the Department of the Interior, National Park Service, which outlines modifications and updates to a previously published request for proposals (RFP). The amendment specifically includes an updated Price Schedule, definitions for contract line items, and a question-and-answer section related to the solicitation. Additionally, it announces a scheduled site visit on October 22 at 9 AM ET. It emphasizes that acknowledgment of this amendment is mandatory for contractors to ensure their offers are considered, specifying accepted methods for acknowledgment. The document maintains the existing terms and conditions of the original solicitation and its prior amendments, ensuring continuity in the procurement process. This amendment highlights the federal government's commitment to transparency and responsiveness in its contracting and procurement activities, facilitating contractors' compliance with updated requirements.
    The document outlines Amendment P0011 to solicitation 140P2024R0056, detailing changes and requirements for prospective contractors. It highlights the necessity for bidders to acknowledge receipt of this amendment before the specified deadline to avoid rejection of their offers. The amendment includes an attached sign-in sheet for a pre-proposal site visit and states that all other terms and conditions remain unchanged. Additionally, it provides a timeline of previous amendments issued from August to October 2024, indicating ongoing updates to the solicitation. The period of performance for the related contract is identified as running from March 1, 2025, to May 31, 2026. The document emphasizes compliance with submission protocols, reiterating the importance of accurate documentation in the competitive bidding process. This amendment reflects standard procedures in government Requests for Proposals (RFPs), where transparency and clear communication are critical to maintaining integrity and competition among contractors.
    This solicitation outlines a Request for Proposal (RFP) for the rehabilitation of the Visitor Center and Headquarters under project number MALU 293291. It is designated as a competitive 8(a) Set Aside acquisition, particularly aiming to involve small businesses. The anticipated contract value ranges between $5,000,000 and $10,000,000, and potential bidders are directed to refer to sections for site visits, proposal submissions, and required performance bonds. Currently, the project lacks funding; however, there is an optimistic expectation that funding will materialize, allowing for contract awards. Key procedural points include the requirement for sealed offers, compliance with work specifications as stated across various sections of the solicitation, and obligatory acknowledgment of amendments. The timelines for beginning performance and completeness are negotiable; bidders must ensure their offers are valid for a specified period post submission. This document exemplifies a formal mechanism for securing federal contract services while guiding potential contractors on compliance, submission standards, and timelines.
    Similar Opportunities
    Z--YELL 307127 - Rehabilitate historic Structures
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of historic structures at Fort Yellowstone in Yellowstone National Park, under Solicitation No. 140P2024R0177. The project aims to restore the exteriors of seventeen historic buildings, focusing on preserving their historical integrity while upgrading structural and aesthetic elements, including roof repairs, masonry restoration, and the installation of modern safety features. This initiative is crucial for maintaining the cultural heritage of the park and ensuring the longevity of these significant structures, with an estimated project value exceeding $10 million. Interested contractors must submit their proposals by November 4, 2024, and can direct inquiries to Vicki Freese-supler at vickilfreese-supler@nps.gov or by phone at 720-402-8467.
    Y--Source Sought Notice
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking proposals for the rehabilitation of the Painted Desert Community Complex located within Petrified Forest National Park. The project aims to address structural deficiencies, restore historical features, and upgrade facilities to meet current standards, with an estimated construction cost exceeding $10 million. This initiative reflects the federal government's commitment to preserving national landmarks while enhancing visitor experiences and public engagement. Interested contractors must submit their proposals by November 15, 2024, and can direct inquiries to James Waller at jameswaller@nps.gov or by phone at 303-969-2488.
    Z--NAMA 291052 Repair Lincoln Reflecting Pool
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified contractors for the repair of the Lincoln Reflecting Pool located at the National Mall and Memorial Park in Washington, D.C. This project, estimated to cost between $5 million and $10 million, aims to address significant failures in the water treatment and circulation system, including the installation of new supply and return lines, replacement of deteriorated expansion joints, and upgrades to the ozone system. The project is critical for maintaining the historical integrity and functionality of this iconic site, which will remain open to visitors during construction, necessitating careful planning and protective measures. Interested businesses are encouraged to submit their company information, including size classification and relevant experience, by November 4, 2024, to Kyle Gonynor at kylegonynor@nps.gov.
    Y--REPAIR DRAINAGE/ CONTOUR GRADING
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the repair of drainage and contour grading at the Andersonville National Cemetery in Georgia. The project aims to enhance burial site accessibility and overall site conditions by addressing drainage issues, implementing erosion control measures, and ensuring compliance with safety and environmental regulations. This initiative is part of a broader effort to maintain and restore historical cemeteries while adhering to federal standards for construction and labor. Proposals are due by November 4, 2024, with the contract performance period set from November 18, 2024, to November 17, 2025. Interested contractors can contact Yanick Bard at YanickBard@nps.gov or by phone at 404-507-5743 for further information.
    Y--ROMO 327127 Bridge Preservation
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the "Y--ROMO 327127 Bridge Preservation" project, aimed at preserving multiple bridges within Rocky Mountain National Park. The project encompasses various preservation tasks, including concrete repairs, masonry work, and scour countermeasures, with an estimated contract value between $1,000,000 and $5,000,000. This initiative is critical for maintaining infrastructure integrity and ensuring public safety while adhering to environmental regulations within the park. Interested contractors should submit their proposals by November 8, 2024, at 2 PM MT, and can direct inquiries to Shellie Murphy at shelliemurphy@nps.gov or call 720-610-2690.
    Y--YOSE 196416 Rehabilitate El Portal Wastewater Trea
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of the El Portal Wastewater Treatment Facility and Administrative Camp located in Yosemite National Park, California. The project aims to modernize the 45-year-old wastewater treatment facility, which serves Yosemite Valley and surrounding communities, by upgrading treatment processes, electrical systems, and infrastructure to enhance operational efficiency and environmental compliance. This significant investment, with an estimated construction cost between $150 million and $200 million, underscores the government's commitment to maintaining essential services within national parks while ensuring ecological preservation. Interested contractors must submit their proposals by December 2, 2024, and can direct inquiries to Paula Teague at paulateague@nps.gov.
    Vicksburg National Military Park
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for construction work at the Vicksburg National Military Park in Mississippi, under Solicitation Number 693C73-25-B-000002. The project involves essential slide repairs on Grant Avenue and Union Avenue, including tasks such as roadway excavation, embankment construction, and installation of engineered structures to stabilize the affected areas. This initiative is crucial for maintaining the park's infrastructure and ensuring visitor safety, with an estimated project cost ranging from $5 million to $10 million. Interested contractors should prepare to submit their bids electronically by the specified deadline, with bid documents expected to be available around October 23, 2024. For further inquiries, contact Emily McCleary or C. Shawn Long at EFLHD.Contracts@dot.gov.
    Z--Rehab Storm Damaged HQVC Building
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service, under the Department of the Interior, is seeking contractors for the rehabilitation of the storm-damaged Headquarters/Visitor Center Building at Sandy Point National Wildlife Refuge in the U.S. Virgin Islands. The project involves comprehensive repair services, including electrical and aerial communication replacements, mold remediation, and adherence to safety and environmental regulations. This initiative is crucial for restoring federal facilities impacted by Hurricane Fiona in 2022, ensuring compliance with historical preservation laws and environmental standards. Proposals are due via email by November 14, 2024, with a contract value estimated between $500,000 and $1,000,000, and the performance period extending from November 25, 2024, to November 25, 2025. Interested parties can contact Christina Mann at christinamann@fws.gov or by phone at 571-547-3499 for further details.
    Z--BICR 316236 - Rehabilitate Civil Rights Structures (A.G. Gaston Motel)
    Active
    Interior, Department Of The
    Sources Sought INTERIOR, DEPARTMENT OF THE NATIONAL PARK SERVICE is seeking sources for the procurement of rehabilitating civil rights structures, specifically the A.G. Gaston Motel. This service is typically used for the repair or alteration of restoration of real property, specifically commercial and institutional building construction. For more information, please contact Carlos Garcia at carlosgarcia@nps.gov or 7209006595.
    Renovate the Male Dormitory Building 54, Potomac Job Corps Center in Washington, DC
    Active
    Labor, Department Of
    The Department of Labor is seeking qualified contractors to renovate the Male Dormitory Building 54 at the Potomac Job Corps Center in Washington, DC. The project involves comprehensive design and construction services, including interior renovations, plumbing and electrical system upgrades, HVAC replacements, and fire safety improvements, with an estimated construction cost between $5 million and $10 million. This renovation is crucial for maintaining and enhancing facilities that support job training programs, ensuring compliance with federal standards and sustainability practices. Proposals are due by November 29, 2024, at 2:00 PM Eastern, and interested parties can contact Bernadette L. Hughes at hughes.bernadette.l@dol.gov for further information.