Z--HOSP 318915 Rehabilitate Park Bathhouses
ID: 140P2025R0004Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEDSC CONTRACTING SERVICES DIVISIONDENVER, CO, 80225, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

REPAIR OR ALTERATION OF FAMILY HOUSING FACILITIES (Z2FA)
Timeline
    Description

    The Department of the Interior, through the National Park Service, is soliciting bids for the rehabilitation of park bathhouses at Hot Springs National Park, specifically focusing on the Maurice, Libby, Fordyce, and Buckstaff bathhouses. The project aims to restore critical building systems, replace roofs, and enhance accessibility while preserving the historical integrity of these structures. This initiative is vital for maintaining the park's facilities and improving visitor experiences, with an estimated construction magnitude exceeding $10 million. Interested contractors must submit their proposals by February 7, 2025, and can direct inquiries to Edwin Berry at edwin_berry@contractor.nps.gov or by phone at 303-969-2288.

    Point(s) of Contact
    Files
    Title
    Posted
    The National Park Service (NPS) is initiating a pre-solicitation for the rehabilitation of the historic Maurice and Libbey bathhouses at Hot Springs National Park, AR (Pre-solicitation Number: 140P2025R0004). The project will focus on restoring critical building systems and features, including roof replacements, with an estimated budget of over $10 million. The goal is to enhance visitor experiences and reduce future operational costs by preparing these facilities for adaptive reuse, potentially generating lease revenue. The solicitation will be issued on or after October 15, 2024, and interested vendors must have an active registration in the System for Awards Management (SAM). This procurement will utilize a Full and Open contracting method, allowing all responsible businesses to submit proposals. Emphasis is placed on maximizing participation opportunities for small and disadvantaged businesses. A pre-proposal meeting may be arranged, with further details provided in the solicitation. The anticipated project duration is 365 calendar days.
    The solicitation document 140P2025R0004 pertains to the rehabilitation of bathhouses at Hot Springs National Park in Arkansas. The project aims to restore critical building systems, replace roofs of the Maurice and Buckstaff bathhouses, and prepare facilities for future commercial lease opportunities. It includes specifications for the construction process, a detailed bid schedule covering base and optional line items, and clauses addressing contract clauses, quality control, inspection, and invoicing requirements. Contractors must adhere to regulations like the Prohibition on Contracting for Certain Telecommunications and the minimum wages for contractor workers under Executive Order 14026. The bid is structured to emphasize quality and compliance, with specific provisions for the evaluation of offers, including preferences for HUBZone small businesses. Overall, this document serves as a comprehensive guide for contractors to submit proposals for a project that aims to enhance both the historical preservation and visitor experience in the national park.
    The Hot Springs National Park project focuses on rehabilitating the Libbey Bathhouse to stabilize its exterior and replace critical systems and utilities. The project is governed by a comprehensive set of specifications that outline requirements for work, safety, and environmental protection. The contractor will manage site operations with minimal disruption, adhering to strict regulations to protect natural features and comply with safety standards. All construction must be coordinated to optimize efficiency and minimize conflicts, with an emphasis on preserving historical aspects of the structure. The document details the processes for modification proposals and outlines necessary permits, communication procedures, and site management strategies. It also includes specifications on handling hazardous materials, conducting environmental management, and implementing a robust project schedule to facilitate oversight and ensure compliance throughout rehabilitation efforts. The overall goal is to ensure a meticulous restoration while maintaining public safety and environmental integrity.
    The document is a Bid Bond form, Standard Form 24 (Revised 10/2023), required when a bid guarantee is needed in federal contracts. It binds the Principal and Surety(ies) to the United States in a penal sum equivalent to the bid price percentage specified. The Principal must execute further contractual documents within specified timelines upon bid acceptance, failing which they are liable for any excess costs incurred by the Government in obtaining the work. The Surety agrees that its obligation remains in effect even if the Government extends the bid acceptance period, provided such extensions do not exceed 60 days. The form dictates specific instructions for completion, including requirements for individual or corporate sureties, which must be documented properly with the appropriate legal signatures and seals. The aim of the Bid Bond is to ensure financial accountability and commitment from the Principal and Surety in government contracts, addressing potential risks associated with bid acceptance and fulfillment.
    The document outlines the requirements set forth by the Federal Acquisition Regulation (FAR) 36.211(b) regarding the administration of construction contracts, specifically focusing on the definitization of equitable adjustments for change orders. Agencies are mandated to provide a clear description of the policies and procedures related to these adjustments, alongside data that delineates the time frame needed to finalize these contracts effectively. For further details and guidance, references are provided to an official Department of the Interior web page on construction contract policies. This ensures accountability and efficiency in managing changes within government-funded construction projects, underscoring the necessity of timely and proper adjustments to maintain budgetary and project integrity. The document serves as a critical resource for federal, state, and local agencies involved in construction-related contracting and project management.
    The Small Business Subcontracting Plan outlines requirements for large business offerors submitting proposals exceeding $750,000, focusing on achieving specific subcontracting goals for various small business categories. The National Park Service (NPS) aims for 42% of procurement to be from small businesses, broken down into sub-goals for small disadvantaged, HUBZone, Indian small businesses, service-disabled veteran-owned, and women-owned concerns. The plan mandates a detailed goal-setting approach, necessitating the prime contractor to provide estimated dollar values and percentages for each category, and to list subcontracted products and services. It emphasizes the need to maintain extensive records and ensures equitable opportunity for these small businesses by detailing outreach, internal guiding efforts, and monitoring compliance with contract requirements. Additionally, the document specifies provisions for timely payments to small subcontractors, recording interactions with federal agencies, and compliance measures for future audits. The purpose of this plan aligns with federal mandates to promote local and diverse businesses, ensuring broad participation in government contracting efforts.
    The project at the Maurice Bathhouse in Hot Springs National Park focuses on its rehabilitation, with the goal of restoring historic elements and updating facilities for universal access. Key components include selective demolition, utility installation, and exterior repairs such as stucco, windows, and roofing. Enhanced mechanical, electrical, plumbing, and fire protection systems will support future leasing and tenant customization. The work is structured into a single prime contract and requires coordination with simultaneous projects at nearby bathhouses. It encompasses various construction divisions, addressing general requirements, existing conditions, site work, and interior improvements, including restrooms and structural repairs. Compliance with environmental and historical preservation standards is essential throughout, ensuring minimal disturbance to the surroundings. Public access will be limited during construction, with strict operational controls to maintain safety and order. The document serves as a comprehensive guideline for contractors, detailing procedures for modifications, project management, and specific work phases aligned with federal rules and historic preservation goals.
    The document outlines the final construction specifications for rehabilitating the Buckstaff and Fordyce Bathhouses in Hot Springs National Park, Arkansas. The project involves the removal and replacement of roofs, gutters, downspouts, and masonry repairs, ensuring adherence to safety and historical preservation standards. It is structured in multiple divisions, detailing general requirements, existing conditions, and trade-specific sections such as concrete, masonry, and HVAC systems. Noteworthily, there are laid-out protocols for contractor site usage, public interaction during construction, and strict compliance with National Park Service regulations. The contractor must manage environmental concerns, including asbestos and lead inspection reports. The document also highlights the necessity of maintaining government operations during construction and includes requirements for schedule submissions, contract modifications, and project management coordination. This project is an essential component of maintaining historical sites within the National Park System while respecting both environmental compliance and public safety. It underscores the government's commitment to preserving historical structures while enhancing infrastructure and visitor engagement.
    The document outlines the rehabilitation project for the Maurice Bathhouse at Hot Springs National Park, primarily focused on the renovation and upgrade of electrical and mechanical systems. This extensive project is being developed by Strata Architecture and IMEG Corp., emphasizing the importance of adhering to safety standards and regulatory compliance. Key aspects include the installation of new power, fire alarm, and security systems, with detailed plans for the distribution of electrical loads across multiple floors and areas within the facility. It also addresses coordination requirements for various contractor trades, along with the maintenance of existing infrastructures, such as elevators and mechanical equipment. The project aims to enhance the overall functionality and safety of the bathhouse while preserving its historical integrity, reflecting the government’s commitment to improving national park facilities. Overall, the document serves as a technical guide for contractors involved in the bidding process, ensuring all parties understand the specifications and expectations for this vital restoration effort.
    The Buckstaff Bathhouse HVAC project at Hot Springs National Park aims to modernize the building's heating and cooling systems. Currently lacking air conditioning and utilizing outdated heating systems, the project will implement a new HVAC system that prioritizes thermal water use and maximum energy efficiency, while preserving the historic integrity of the structure, which dates back to 1912. This entails protective measures during construction to maintain existing features and materials. Key components of the project include relocating the main electrical service above the flood plain, installing an emergency generator, and ensuring new mechanical, electrical, and plumbing installations adhere to safety and operational standards. The comprehensive scope of the work is defined, including timelines, site protection, utility management, and environmental considerations. Contractors must comply with stringent guidelines for preserving historic resources, ensuring safety protocols, and documenting progress, with all tasks expected to be completed within 365 days from the Notice to Proceed. Critical to the project's success are ongoing safety meetings, utility protection measures, and thorough documentation throughout the construction process, promoting compliance with federal regulations for such historically significant sites. The outlined structural changes and improvements reflect an effort to enhance visitor experiences while respecting the National Park Service's cultural heritage mission.
    The document outlines specifications for rough carpentry, finish carpentry, firestopping, smoke seals, and acoustic treatments within a construction project, specifically for health facilities. It includes quality assurance protocols, sustainability requirements, and compliance with regulatory standards throughout the construction process. Key sections detail the materials and methods for installation, including moisture-resistant and fire-rated gypsum board, and joint treatments. The document emphasizes the need for coordination among various trades to ensure proper installation of components like metal doors and frames, finish hardware, and acoustical treatments, while adhering to standards set by the Steel Door Institute, ASTM, and others. Overall, it serves as a comprehensive guide for contractors and subcontractors to execute work following federal guidelines and best practices for safety and quality in construction.
    The document outlines the comprehensive design and construction plans for the Buckstaff Bathhouse HVAC project located in Hot Springs National Park, Arkansas. It details the architectural, mechanical, electrical, and structural engineering components associated with upgrading the facility. The prime architect firm is Kenneth Hahn Architects based in Omaha, NE, with mechanical and electrical engineering support from Alvine Engineering, also in Omaha. Key schedules address general and specific work details across multiple plans, including demolition, floor plans for various levels, HVAC, and structural notes. The project emphasizes compliance with local codes, preservation of historical integrity, and proper protective measures to avoid damage to existing site materials, given the property’s status on the National Register of Historic Places. Essential specifications are highlighted throughout, including the adaptation of mechanical equipment placements, the handling of existing conditions, and required repairs to ensure the successful installation of new systems. This endeavor showcases the federal government's commitment to enhancing historical sites while ensuring modern operational standards.
    The document outlines the wage determination for construction projects in Garland County, Arkansas, applicable under the Davis-Bacon Act. It specifies that contracts awarded or extended post-January 30, 2022, must comply with Executive Order 14026, mandating a minimum wage of $17.20 per hour, while contracts before this date can follow the prior Executive Order 13658, with a minimum wage of $12.90 per hour. The file lists various skilled trades and their corresponding wage rates, emphasizing the need for contractors to submit conformance requests if necessary classifications are absent from the provided rates. Additionally, it highlights the inclusion of Executive Order 13706 regarding paid sick leave for federal contractors and outlines the process for appealing wage determinations. This document serves to ensure fair compensation in building construction projects funded or supported by federal and state governments, reflecting regulatory changes affecting worker rights and protections.
    The Project Experience Questionnaire outlines the requirements for contractors responding to a government solicitation (140P2019XXXX). It emphasizes the submission of relevant project information, including project title, location, description, and contractor details. The questionnaire requests detailed responses regarding the project work undertaken by various contractors, price changes, schedule modifications, encountered problems, and effective construction methods applied. Additionally, the document includes a Past Performance Questionnaire that requires potential contractors to self-assess and provide references for previous work, including project ratings based on quality, schedule adherence, cost control, and regulatory compliance. The purpose of these questionnaires is to evaluate contractors' experience and performance for future projects, ensuring that they meet the necessary federal standards and requirements. The structure is methodical, requiring comprehensive information to facilitate informed decision-making in the contracting process.
    This document serves as a reference form for offerors participating in government RFPs, federal grants, and state and local proposals. It requires offerors to provide comprehensive information about their contractors, banks, insurance companies, subcontractors, and material suppliers. Specifically, the form requests details such as names, addresses, and contact information for each entity, as well as the area of specialized work or types of materials provided. Additionally, it stresses the importance of transparency, urging offerors to disclose any past unsatisfactory relationships with references and explain corrective actions taken to address deficiencies. Failure to provide this information may lead to negative assessments regarding the offeror's past performance. Consequently, the form aims to promote honesty and ensure a thorough evaluation process of potential contractors in government projects.
    The document outlines the plans for the rehabilitation of the Maurice Bathhouse within Hot Springs National Park, Arkansas. Managed by the National Park Service, the project aims to restore the building's historic features while enhancing accessibility and updating essential systems such as electrical, mechanical, and plumbing. Strata Architecture oversees the architectural design, with civil engineering by Crafton Tull and structural input from Silman Engineers, among others. The project includes extensive restoration of interior spaces and infrastructure updates to prepare the building for future leasing. The rehabilitation adheres to the Secretary of the Interior’s standards for historic property treatment. Specific plans include landscape improvements, utility upgrades, and detailed construction documentation to ensure effective management of safety and environmental regulations. The work intends to create a partially finished space for potential tenants, offering them a foundation for further customization to suit operational needs. This initiative reflects the government's commitment to preserving historical assets while ensuring they remain functional for modern use, thereby enhancing visitor experiences in a historically significant area of the National Park.
    This document presents a series of questions and responses related to a government Request for Proposals (RFP) dated December 12, 2024. Key topics include clarifications on project documentation and timelines. Notably, it addresses the absence of 'Part I' drawings for the 'Reduced Drawings' set, confirming only ‘full-size’ drawings exist. It discusses the potential rescheduling of a job walk and a bid date extension, acknowledging challenges posed by the holiday season that may hinder subcontractor participation. The document clarifies that projects do not need to be fully completed for submission under the Project Experience factor, and that no endangered species are known to impact the construction. Overall, the document serves to enhance communication among bidders by providing necessary clarifications, thereby ensuring competitive and informed bidding processes aligned with government standards.
    This document outlines responses to contractor inquiries regarding a solicitation for rehabilitation and construction tasks at the National Park Service's Bathhouses. Key clarifications include that the proposal submission will follow Mountain Time and a two-week extension was granted to accommodate holiday schedules. Detailed management approaches include submission formats for organizational charts and the requirement for "General References." Clarifications on project specifics cover aspects like compliance with safety and accessibility codes, management of existing building materials, and the acceptable methods for HVAC installation. The document emphasizes adherence to historic preservation standards, particularly during rehabilitation, and allows contractors to propose efficient solutions where applicable. It notes ongoing compliance with federal regulations, such as Davis-Bacon wage requirements, and details procedures for construction risks and change orders. The aim is to ensure efficient project execution while maintaining the historical integrity of the structures, effectively guiding potential bidders through the expectations and requirements of the RFP process.
    This document serves as an amendment to the solicitation numbered 140P2025R0004, specifically detailing changes for the project titled "Rehabilitate Bathhouses" at several sites including Maurice, Libby, Fordyce, and Buckstaff. Key modifications include the requirement for bidders to acknowledge receipt of this amendment through specified methods before a set deadline to avoid rejection of their offers. A pre-bid site visit for potential contractors is scheduled for December 17, 2024, at Hot Springs National Park, providing an opportunity to inspect the work site. The document reaffirms existing terms while emphasizing that participants should comply with specific conditions and clauses related to site investigations and differing conditions affecting the work. The amendment reflects the federal procurement process, underscoring the importance of adherence to solicitation amendments and site evaluations in the bidding process. All remaining terms from the original solicitation remain in effect.
    This document is an amendment to solicitation 140P2025R0004, specifically discussing changes related to the project for rehabilitating bathhouses at Maurice, Libby, Fordyce, and Buckstaff. The primary purpose of this amendment is twofold: to provide responses to questions raised during the solicitation phase and to extend the deadline for submission from January 7, 2025, to January 23, 2025, at 3:00 PM MS. Offers must acknowledge receipt of this amendment in one of three specified ways: by including acknowledgment with each submitted offer, through a separate letter or electronic communication, or by amending an already submitted offer before the new deadline. The document emphasizes that failure to acknowledge receipt could result in rejection of offers. All other terms and conditions from the initial solicitation remain unchanged. This amendment is a critical procedural step within the framework of government Request for Proposals (RFPs), ensuring clarity, compliance, and extended opportunity for contractors to respond comprehensively to the solicitation.
    This file pertains to the amendment of solicitation number 140P2025R0004, which involves procedures and requirements regarding the acknowledgment of amendments by contractors. Offers must be submitted with acknowledgment of this amendment prior to the specified deadline to avoid rejection. The document outlines methods for responding to the amendment, including acknowledgment on offer copies or via separate correspondence. The amendment encompasses provisions related to the pre-bid site visit and confirms that all terms and conditions in the original solicitation remain unchanged except as specified. It is issued under the authority of FAR 43.103(b), emphasizing compliance in modifications of contracts or orders. The contracting officer's details are included to finalize the amendment process, ensuring all parties are informed of the changes made. This procedural document is essential for maintaining clarity and adherence to regulations within the context of federal procurement processes.
    This document is an amendment to solicitation number 140P2025R0004, issued by the United States federal government. Its primary purpose is to inform contractors of necessary changes regarding the solicitation, notably the provision of missing plans for the Maurice bathhouse. The document outlines the requirements for contractors to acknowledge receipt of the amendment, including methods of acknowledgment and the consequences of failing to meet the specified deadlines. It emphasizes that all other terms and conditions remain unchanged. The amendment provides essential administrative updates related to contract modifications, reflecting compliance with relevant regulations. Overall, this document ensures clarity in communication between the government and contractors, facilitating the smooth continuation of associated projects.
    The document outlines an amendment to solicitation number 140P2025R0004, detailing changes relevant to the bidding process for the Rehabilitate Bathhouses project at Hot Springs National Park. It instructs contractors on how to acknowledge receipt of the amendment, emphasizing the need to submit acknowledgment by various means including letter or electronic communication prior to the specified deadline. Notably, the amendment provides essential information for a second Pre-Bid Site Visit scheduled for January 16, 2025, at Hot Springs National Park. Participants are instructed to RSVP by January 13, 2025, and to meet at the Admin Building's parking lot. The document also confirms that relevant clauses about site conditions and investigations will apply to any resulting contracts. It stresses the importance of inspecting the work site before bidding, reminding potential contractors of their responsibilities under the applicable federal regulations. Overall, this amendment serves as a crucial guide for contractors interested in submitting bids while promoting compliance with federal procurement protocols.
    The document is an amendment to a solicitation, specifically referring to solicitation number 140P2025R0004. Its primary purpose is to inform contractors of changes to the original solicitation, including the extension of the submission deadline from January 23, 2025, to February 7, 2025. Additionally, the amendment provides answers to previously asked questions and introduces a general reference form labeled B08_Solit_PSP_Vol_II_GenRefs. Contractors must acknowledge receipt of this amendment through specific methods outlined, ensuring compliance by the specified date to avoid rejection of their offers. The amendment specifies that all other terms and conditions remain unchanged, emphasizing the importance of adhering to new directives while maintaining prior obligations. The document illustrates the bureaucratic process of updating and communicating changes within federal procurement and contracting, which is critical for ensuring transparency and efficiency in government operations. Overall, this amendment is essential for guiding prospective contractors in their submission process and ensuring they are informed of all relevant updates.
    The document serves as an amendment to a specific federal solicitation, identified by the number 140P2025R0004, which outlines requirements for acknowledging this amendment during the bids submission process. It states that contractors must confirm receipt of the amendment through various methods before the specified deadline to avoid rejection of their offers. The amendment includes provisions related to an administrative change, reflecting updates necessary from a recent pre-bid site visit, scheduled for January 16, 2025. The terms and conditions from the original solicitation remain unchanged. The document features a structured format, including sections for modification details, contractor information, and the contracting officer's signature. The purpose of this amendment highlights the importance of compliance with procedural requirements in federal contracting, ensuring that all parties are informed of necessary updates and administrative changes throughout the solicitation process. Overall, it underscores the rigorous protocols in place within government procurement to uphold clarity and adherence to regulations.
    The government solicitation for the rehabilitation of the park bathhouses at Hot Springs National Park (Project No. HOSP 318915) is seeking bids under an Unrestricted Full and Open Competition format. The North American Industrial Classification System (NAICS) code is provided, clarifying the small business size standards applicable. The estimated construction magnitude exceeds $10 million, with all proposals required to adhere to various requirements outlined in the solicitation documents. A mandatory performance period, initially unspecified, will begin following contract award and notice to proceed. Offerors must ensure proposals are submitted in sealed format, detailing their capacity and financial stability, including performance and payment bonds. The project is currently unfunded but carries high expectations for future funding. This invitation encourages potential bidders to ask questions and submit proposals by the stated deadline, ensuring all federal, state, and local taxes are considered as the project is not tax-exempt. The document outlines procedural requirements for submission, evaluation, and bonding, ensuring compliance with construction standards and project completion timelines.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Z--Craters of the Moon National Preserve: Rehabilitate Visitor Center Bathroom
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified contractors to rehabilitate the visitor center bathrooms at Craters of the Moon National Monument and Preserve in Arco, Idaho. The project entails comprehensive repairs and upgrades, including the removal and replacement of existing epoxy flooring, countertops, restroom stalls, and the installation of high-efficiency fixtures to enhance durability, aesthetic appeal, and compliance with ABA/ADA accessibility standards. This initiative is crucial for improving visitor experience and ensuring the facilities meet modern standards. The estimated project cost ranges from $100,000 to $175,000, with the solicitation expected to be posted on or around January 22, 2025. Interested contractors must maintain an active registration in the System for Award Management (SAM) and can direct inquiries to Geraldine Larsen at geraldinelarsen@nps.gov.
    ROMO 326235 Kawuneeche VC
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified contractors for the rehabilitation of the Kawuneeche Visitor Center located in Rocky Mountain National Park, Colorado. The project aims to enhance accessibility, replace outdated systems, and ensure compliance with historic preservation standards, as the center is eligible for the National Register of Historic Places. This initiative is crucial for improving visitor experiences while maintaining the integrity of the historic site. The estimated project cost ranges from $5 million to $10 million, with a performance period of approximately one year, and interested businesses must submit their qualifications by January 29, 2025, ahead of the anticipated Request for Proposals in Spring 2025. For further inquiries, contact Bruce Beck at brucebeck@nps.gov or call 303-969-2318.
    Z--NEZ PERCE NATIONAL HISTORICAL PARK VC RESTROOM REHAB.
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is issuing a pre-solicitation notice for a project aimed at rehabilitating the restroom facilities at the Spalding Visitor Center within the Nez Perce National Historical Park. The project involves replacing existing restroom fixtures and partitions to meet federal accessibility standards, including the installation of modern, energy-efficient fixtures and a reconfiguration of the restroom layout to ensure full wheelchair accessibility in compliance with the Architectural Barriers Act Accessibility Standards (ABAAS). This initiative is crucial for enhancing public facilities, promoting sustainability, and ensuring compliance with accessibility regulations. Interested contractors must register in the System for Award Management (SAM) and qualify as small businesses under NAICS code 238990, with an estimated project budget ranging from $100,000 to $325,000. Proposals will be accepted starting January 22, 2025, with work expected to commence in November and be completed within 65 days.
    Sources Sought Notice No. 140P2025R0049
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service (NPS), has issued a Sources Sought Notice (SSN) for contractors to participate in the preservation of the Federal Hall structure and its exterior envelope located in New York, NY. This project aims to address significant deterioration in the 180-year-old building through extensive masonry repairs, façade cleaning, and restoration of historical features to ensure safety and preserve the landmark's integrity. The anticipated contract value exceeds $10 million, with a projected period of performance of 18 months, and a Request for Proposals (RFP) is expected by mid-2025. Interested contractors must submit their qualifications, including company details and relevant experience, by February 24, 2025, to the primary contact, Marc Nguyen, at marcnguyen@nps.gov or by phone at 720-448-1166.
    HAMP 326087 -
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is soliciting proposals for the preservation of historic structures at the Hampton National Historic Site under project number HAMP 326087. The project aims to ensure the maintenance and restoration of significant historical properties, with an estimated contract value ranging between $5,000,000 and $10,000,000. This initiative is crucial for preserving cultural heritage and enhancing visitor experiences at the site. Interested contractors should note that proposals must be submitted in sealed formats, adhering to specific guidelines outlined in the solicitation document, and can contact Linda Melnick at lindamelnick@nps.gov for further information.
    Z--THRO NU Campground Water Renovations
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting bids for the renovation of the water distribution system at the THRO NU Campground in Theodore Roosevelt National Park, North Dakota. The project involves replacing existing underground water lines with a new 4” HDPE line, removing an in-ground water tank, and installing a new above-ground water storage tank, all while ensuring compliance with environmental regulations and maintaining public access. This initiative underscores the government's commitment to enhancing infrastructure within national parks, thereby improving visitor services and environmental stewardship. Interested contractors must submit their bids by January 23, 2025, and can direct inquiries to Joan Brzezinski at joanbrzezinski@nps.gov or call 605-574-0515 for further information.
    Z--CHIR - REHAB QUARTERS 5
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is seeking proposals for a firm fixed-price contract to rehabilitate Quarters 5 (Erickson House) at Chiricahua National Monument in Arizona, under Solicitation 140P1525Q0014. The project involves significant repairs, including lead abatement, installation of a new HVAC system, and various structural improvements, with a project magnitude estimated between $25,000 and $100,000, categorized under NAICS code 236118. This initiative is crucial for maintaining the safety and functionality of residential facilities within national parks, ensuring compliance with federal and state regulations. Interested small businesses must submit their proposals by January 24, 2025, and can direct inquiries to Donald Tremble at donaldtremble@nps.gov or by phone at 720-450-1198.
    Z--FRRI 253825 Rehabilitate Civil Rights Structures
    Interior, Department Of The
    The National Park Service (NPS) is seeking qualified contractors for the rehabilitation of two historically significant structures—the Greyhound Bus Depot and the Mural Building—located within the Freedom Riders National Monument in Anniston, Alabama. The project aims to enhance visitor access and educate the public about the Civil Rights Movement, with an anticipated budget ranging from $1 million to $5 million, focusing on improving thermal performance, structural integrity, and compliance with preservation standards. Interested businesses are encouraged to respond to the Sources Sought Notice by submitting their qualifications, bonding capacity, and relevant experience by December 13, 2024, as the NPS plans to issue a formal Request for Proposals (RFP) in Spring 2025. For further inquiries, interested parties may contact Carlos Garcia at carlosgarcia@nps.gov or call 720-900-6595.
    45--CAVO Rehabilitate VC and Wellhouse
    Interior, Department Of The
    The National Park Service (NPS) is seeking qualified contractors for the rehabilitation of the Visitor Center Building and Wellhouse at Capulin Volcano National Monument in New Mexico. The project involves comprehensive work including the installation of heating and ventilation systems, removal of biohazardous materials, and upgrades to electrical systems, requiring expertise in mechanical and electrical engineering, fire safety, and environmental health. This initiative is crucial for ensuring the safety and functionality of the facilities, with an estimated construction cost between $500,000 and $1 million. Interested small businesses must submit their qualifications, bonding capabilities, and socio-economic status certifications by January 23, 2025, to justinerdley@nps.gov, referencing the number 140P1225R0004 in the subject line.
    Z-- HAMP 326087: Preserve Historic Structures
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is preparing to issue a competitive 8(a) Request for Proposal (RFP) for the construction and rehabilitation of historic structures at the Hampton National Historic Site in Towson, Maryland. The project aims to preserve the historical integrity of various buildings, including historic enslaved quarters, overseer’s house, and mule barn, while improving accessibility and modernizing building systems. This initiative is significant for maintaining the cultural heritage of the site and is expected to have a contract duration of 18 months with a performance magnitude exceeding $10 million. Interested parties must register in the System for Award Management (SAM) to participate, and they are encouraged to engage as subcontractors, particularly small and disadvantaged businesses. For further inquiries, interested vendors can contact Linda Melnick at lindamelnick@nps.gov.