O'Neil Creek Bridge Repairs
ID: 127EAW24R0074Type: Presolicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA-FS, CSA SOUTHWEST 6Albuquerque, NM, 871023498, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Agriculture, specifically the Forest Service, is seeking qualified contractors for the O'Neil Creek Bridge Repairs project located in Klamath National Forest, California. The project involves the removal and replacement of damaged concrete deck slabs and steel railings, with a total small business set-aside contract valued between $250,000 and $500,000. This initiative is crucial for restoring infrastructure following damage from the 2022 McKinney Fire, ensuring compliance with safety and environmental standards throughout the repair process. Interested parties must submit sealed bids electronically to the designated Contract Specialist, Tanya Torres, by the deadline, with all Requests for Information due by August 30, 2024.

    Point(s) of Contact
    Files
    Title
    Posted
    The USDA's Statement of Work outlines the project for repairing the O’Neil Creek Bridge in Siskiyou County, California, following damage from the 2022 McKinney Fire. The scope includes replacing damaged concrete deck slabs and bridge components while adhering to traffic control standards. Work is scheduled to commence in spring 2025, with a performance period of 60 days post Notice to Proceed. The document details the project location within the Klamath National Forest and emphasizes compliance with federal, state, and local regulations. Strict work restrictions include designated hours, archaeological monitoring, and secure disposal of waste. Contractors must submit a comprehensive Safety Plan and various certifications while managing site clean-up and securing necessary permits. The contractor is responsible for maintaining site safety, protecting existing infrastructure, and ensuring environmental compliance through proper waste management. This document is a pertinent example of government procurement practices for infrastructure repair, ensuring adherence to safety and environmental standards while facilitating recreational access and timber management.
    The document outlines a federal government Request for Proposals (RFP) aimed at securing partnerships for various federal grants and funding opportunities at both state and local levels. The primary focus is on soliciting innovative solutions and projects that address community needs, enhance service delivery, and improve infrastructure. Key points include eligibility criteria, application procedures, and deadlines that applicants must adhere to. The RFP emphasizes the importance of measurable outcomes, accountability, and sustainability in proposed projects. It also encourages collaboration among organizations to leverage resources and expertise effectively. The structure includes a comprehensive overview of program goals, priority areas, and evaluation criteria to guide applicants in crafting competitive proposals. Ultimately, the document serves as a critical framework to stimulate local economies, foster innovation, and meet federal initiatives through targeted funding and support.
    The document appears to be a compilation of various federal and state/local RFPs and grant identifiers, possibly related to environmental or infrastructure projects, as suggested by the recurring references to locations and specific codes. The codes likely represent project categories, geographic areas, or specific funding allocations, hinting at a broader initiative to address local needs or environmental challenges. Key ideas involve multiple code entries that may indicate project proposals, environmental management activities, or community development funds. There are several references to natural features like mountains, rivers, and creeks, indicating a focus on ecological or geographical concerns associated with these projects. The structure of the document is predominantly numeric with a substantial amount of entries related to the land or resources, implying the documentation’s purpose in tracking or categorizing funding applications or proposals within the governmental framework. Overall, the content underscores a meticulous tracking of various federally funded projects aimed at community betterment and environmental sustainability.
    The document outlines the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, designated as FP-14 by the U.S. Department of Transportation. It serves as a comprehensive guide for contractors engaged in federal highway construction, detailing regulatory frameworks, definitions, and various requirements for project execution. Key sections include general requirements, bidding processes, contractor responsibilities, quality control measures, and compliance with environmental regulations. The specifications encompass both U.S. Customary and Metric units, ensuring clarity in measurements. Various divisions cover the specifics of construction materials and techniques, including earthwork, pavement types, bridge construction, and incidental activities. The intent is to establish standard practices that guarantee the safety, quality, and efficiency of federal highway construction projects while adhering to federal regulations. These specifications are critical for contractors submitting proposals for federal projects, ensuring consistent quality across diverse construction sites. Overall, FP-14 reflects the government's commitment to safe and effective infrastructure development.
    The document outlines the specifications and construction requirements for prestressed concrete under Section 553. It mandates the use of high-strength non-shrink grout and Class P concrete, with particular design criteria detailed for prestressed members. Prior to fabrication, contractors must notify the contracting officer (CO) at least ten days in advance and provide stringent quality-control documentation from certified inspection bodies. Specifics on fabrication, such as material certifications, prestressing methods, and detailed shop drawings, are elaborated. It stipulates that pretensioned members must be cast in PCI-certified plants and outlines protocols for storing, transporting, and erecting the concrete. The document also emphasizes proper temperature controls during preparation and placement of grout, along with strict guidelines for field welding. Overall, this regulatory framework ensures compliance with engineering standards, safety measures, and quality control in the construction of prestressed concrete structures, aimed at maintaining structural integrity and performance in government-funded projects.
    The document outlines a comprehensive Fire Plan for construction and service contracts, focusing on fire prevention and suppression measures within a designated contract area. Key responsibilities are assigned to contractors, including adherence to fire safety protocols, designating a qualified fire supervisor, and maintaining required fire tools and equipment, particularly during California's Fire Precautionary Period (April 1 to December 1). The Fire Plan specifies various definitions related to logging and mechanical operations and emphasizes compliance with California Public Resource Code regulations. Contractors must equip their operations with appropriate firefighting tools, including fire extinguishers and spark arresters, and must report any fires promptly. Specific operational limitations based on Project Activity Levels (PALs) are defined, restricting certain activities during heightened fire danger. The document serves as a guideline ensuring contractors prioritize fire safety and are accountable for prevention and response initiatives, reflecting the government's commitment to maintaining safety standards in contract operations. This Fire Plan is essential for understanding the requirements and responsibilities of contractors involved in forestry-related activities.
    The document outlines wage determinations under the Davis-Bacon Act for construction projects in various California counties, applicable as of July 26, 2024. It identifies minimum wage requirements for workers in building, heavy, dredging, and highway construction types. Workers are to be compensated according to Executive Orders 14026 or 13658 based on contract dates and renewal conditions. Wage rates vary by classification and area, with detailed rates for different worker categories including electricians, carpenters, laborers, and specific trades related to asbestos removal and diving operations. Notably, the document specifies scale rates for unionized labor, fringe benefits, and adjustments for special work conditions, such as working with raw sewage or in elevated positions. It underscores compliance with federal guidelines to ensure fair labor practices across contracted work. Overall, it serves as a comprehensive reference for contractors regarding labor costs and obligations for federally funded construction projects, reflecting the government's commitment to enforce fair wages and worker protection in public works.
    The document outlines a Request for Information (RFI) for bridge repairs at O'Neil Creek in Klamath National Forest, designated as RFI form 127EAW24R0074. Interested parties are instructed to submit inquiries in writing only to the designated Contract Specialist, Tanya Torres, via email. Telephone inquiries are explicitly prohibited. The RFI form allows respondents to detail their questions, distinguishing between those related to solicitation evaluation factors and technical data. The process aims to streamline communication and ensure that all questions are documented and addressed appropriately through amendments posted on beta.SAM.gov. This formalized approach emphasizes adherence to protocol in responding to RFI submissions, indicative of typical practices in federal contracting and procurement for public projects, ensuring transparency and efficient information dissemination.
    The upcoming USDA Forest Service RFP aims to repair the O'Neil Creek Bridge in California's Klamath National Forest. The primary work involves removing and replacing damaged bridge components, including precast concrete slabs, steel railings, and traffic markers. The contractor will also perform surveying, staking, and traffic control services. Expected to be a small business set-aside construction project, the solicitation will specify a firm-fixed-price contract with an estimated value between $250,000 and $500,000. Tentatively planned for an August 2024 posting, the RFP will outline the scope, requirements, and evaluation criteria. The project emphasizes the repair of the O'Neil Creek Bridge, with key tasks, specifications, and contract details to be provided in the formal solicitation.
    The document outlines the Request for Proposal (RFP) for the O'Neil Creek Bridge Repairs project at the Klamath National Forest in California. It is a total small business set-aside contract with an estimated value between $250,000 and $500,000. Interested contractors are required to submit sealed bids by the specified deadline and follow strict guidelines, including electronic submission to the designated contract specialist, Tanya Torres. The scope includes removing and replacing damaged concrete deck slabs, steel railings, and traffic control in compliance with standards. Contractors must provide detailed technical and business proposals, demonstrating relevant experience and capabilities. A key performance schedule should be included, explaining how the project will be executed within 60 calendar days after the notice to proceed. The document emphasizes the necessity of bonding and performance guarantees, particularly for proposals over $150,000. It outlines the evaluation criteria for proposals, including technical capability, past performance, and compliance with federal acquisition regulations. Adherence to regulations such as the Buy American Act is mandatory, emphasizing the requirement for domestic materials unless otherwise justified. This RFP reflects the government’s ongoing commitment to infrastructure improvement through engagement with small businesses.
    Lifecycle
    Title
    Type
    Presolicitation
    Similar Opportunities
    LOLO NATIONAL FORES T - Upper West Fork Fish Creek Trail Bridge Replacement
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the Upper West Fork Fish Creek Trail Bridge Replacement project located in the Lolo National Forest, Montana. The project involves the removal and replacement of an existing trail bridge along Trail 101 at milepost 3.1, including structural excavation and the installation of a new bridge, while adhering to specific Resource Protection Measures due to its location in a proposed wilderness area. This initiative is crucial for maintaining infrastructure within the national forest and ensuring safe access for visitors, with an estimated construction cost between $500,000 and $1,000,000. Interested vendors are encouraged to attend a formal site visit on October 17, 2024, and must notify the primary contact, Alisha Knaub, at alisha.knaub@usda.gov by October 15, 2024, to confirm attendance.
    BCLH Stewardship IRSC Phase 3
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is seeking contractors for the BCLH Stewardship IRSC Phase 3 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead Fires in Oregon's Willamette National Forest. The project encompasses cutting and removing fire-killed timber within 100 feet of roads, managing non-commercial hazard trees, and conducting essential road maintenance and reconstruction across a total area of 1,843 acres. This initiative is critical for enhancing forest health and safety while ensuring compliance with federal regulations, with an estimated contract value between $1 million and $5 million. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, and note that the final solicitation is anticipated to be issued around March 31, 2025, with contract awards planned for June 6, 2025.
    BCLH Stewardship IRSC Phase 1
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, is seeking contractors for the BCLH Stewardship IRSC Phase 1 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead fires in Oregon's Willamette National Forest. The project encompasses approximately 1,612 acres and includes mandatory activities such as cutting fire-killed timber, managing hazard trees, small fuels treatment, and extensive road maintenance and reconstruction. This initiative is critical for enhancing safety and accessibility in the region while adhering to sustainable forest management practices. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, with a projected contract value between $5 million and $10 million for mandatory items and $500,000 to $1 million for optional items, and the solicitation is expected to be issued around January 15, 2025.
    BCLH Stewardship IRSC Phase 2
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the BCLH Stewardship Integrated Restoration Silviculture Contract (IRSC) Phase 2, aimed at hazardous fuel reduction and road maintenance in the Willamette National Forest, specifically following the 2020 Beachie Creek and Lionshead fires. The project encompasses a total area of 1,152 acres and includes mandatory and optional work activities such as cutting and removing fire-killed trees, maintaining and reconstructing roads, and performing small fuels treatments to enhance access and mitigate fire risks. This initiative is critical for restoring access to affected areas while ensuring compliance with environmental regulations and sustainable forestry practices. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519 for further details, with the anticipated solicitation issuance around February 21, 2025, and a project value estimated between $5 million and $10 million for mandatory items.
    BCLH Stewardship IRSC Phase 3
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is seeking contractors for the BCLH Stewardship IRSC Phase 3 project, aimed at restoring access routes and mitigating hazardous fuels in the Detroit Ranger District of the Willamette National Forest, Oregon. The project encompasses approximately 1,843 acres affected by the Beachie Creek and Lionshead Fires of 2020, with work including the removal of fire-killed trees, road reconstruction, and maintenance activities to enhance forest management and community safety. Interested contractors are encouraged to attend a pre-solicitation site visit on October 5, 2024, with the final solicitation expected to be issued around March 31, 2025, and contract awards planned for June 6, 2025. For further inquiries, contact Karen Ruklic at karen.ruklic@usda.gov or Heidi Andersen at heidi.andersen@usda.gov.
    OR ERFO FS UMPQU 615-2022-2(1), Umpqua ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Umpqua ERFO Repairs 2022 project located in the Umpqua National Forest, Oregon. The project involves the repair of a 0.19-mile aggregate roadway, including ditch regrading, slope stabilization, and the construction of a mechanically stabilized earth wall, with a focus on environmental compliance and infrastructure integrity. This initiative is part of federal efforts to maintain and improve infrastructure in natural areas, ensuring safety and environmental protection while promoting public access. The contract is a total small business set-aside, with an estimated price range between $700,000 and $2,000,000, and is anticipated to be solicited in winter 2024/2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details.
    OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the Cleetwood Trail and Marina Improvements project at Crater Lake National Park in Oregon. The project involves the rehabilitation of a 1.1-mile trail, rockfall mitigation, replacement of a failed marina bulkhead, and upgrades to restroom facilities, with a focus on enhancing visitor access and safety while adhering to environmental standards. This initiative underscores the federal commitment to maintaining national park infrastructure, with an estimated contract value between $30 million and $40 million, and a tentative completion date set for Fall 2027. Interested vendors can contact the Contracts G. Office at WFL.contracts@dot.gov or by phone at 360-619-7520 for further details, and should monitor SAM.gov for solicitation updates anticipated in winter 2024/2025.
    Kalamazoo Campground Reconstruction
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking contractors for the Kalamazoo Campground Reconstruction project located in the Humboldt-Toiyabe National Forest, Nevada. The project involves significant improvements to the campground, including the removal of existing site furnishings, reconstruction of roads and pathways, and installation of new site features such as fencing, signage, and aggregate pathways. This initiative aims to enhance outdoor recreational facilities and ensure safety and accessibility for visitors in a natural forest setting. Interested vendors are invited to a site visit on November 5, 2024, to assess the project conditions prior to the anticipated solicitation, with an estimated construction value between $250,000 and $500,000. For further inquiries, vendors can contact Kevin Wilmot at Kevin.Wilmot@usda.gov.
    OR FLAP UMATILL 582(1), Mill Creek Road
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for the construction project OR FLAP UMATILL 582(1) on Mill Creek Road in Umatilla County, Oregon. This project involves the replacement of nine deteriorating retaining walls and upgrading the road surface from aggregate to a solid surface to enhance access to the Umatilla National Forest, with a focus on compliance with federal infrastructure standards. The Invitation for Bids (IFB) emphasizes full and open competition, with a Price Evaluation Factor for HUBZone Small Businesses, and includes detailed specifications and requirements for bid submission. Interested contractors can contact the Contracts G. Office at WFL.contracts@dot.gov or by phone at 360-619-7520 for further information, with the bid opening scheduled for a date specified in the solicitation documents.
    OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for the Granite Hill Road Reconstruction, Phase II project in Baker City, Oregon, under the OR FLAP Grant 24(2). This project aims to enhance roadway infrastructure by reconstructing approximately 9.32 miles of Granite Hill Road, including the replacement of existing culverts with Aquatic Organism Passage (AOP) structures to improve fish passage and drainage. The initiative is crucial for ensuring safe and efficient transportation while adhering to federal and state regulations, with a contract value estimated between $5 million and $10 million. Interested contractors must submit their bids by December 10, 2024, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.