Market Survey - Design/Build Underground Utilities Replacement & Parking Lot Refurbishment Project - Denver Air Route Traffic Control Center (ARTCC) - Longmont, CO - BIL Funded Project
ID: 2024-04ENROUTEType: Sources Sought
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL AVIATION ADMINISTRATION690ED9 NORTHWEST/MOUNTAIN REGRENTON, WA, 98055, USA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

REPAIR OR ALTERATION OF RADAR AND NAVIGATIONAL FACILITIES (Z2BC)
Timeline
    Description

    Sources Sought TRANSPORTATION, DEPARTMENT OF is conducting a Market Survey to gather information for a Design/Build project to replace underground utilities and refurbish the parking lot at the Denver Air Traffic Facility in Longmont, Colorado. The purpose of this survey is to identify capable sources and determine if there is adequate competition to set the requirement aside for a Socially and Economically Disadvantaged Business (SEDB 8(a)), small business, Service Disabled Veteran Owned Small Business (SDVOSB), Woman Owned Small Business, etc. The estimated dollar value of the project is between $5.0 Million and $10.0 Million. The work includes underground utility investigation, site survey, engineering design, subcontractor procurement, and construction. The project also involves refurbishing limited facility parking areas and sidewalks. Contractors with experience in performing successfully at 24-hour critical facilities are encouraged to respond. Interested parties should provide a capability statement with past experience projects, business size status, and unique entity identification number from SAM.gov.

    Point(s) of Contact
    Files
    No associated files provided.
    Similar Opportunities
    Market Survey -- BIL David Wayne Hooks (DWH) ATCT Replacement
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is conducting a market survey to identify potential vendors for the replacement of the Airport Traffic Control Tower (ATCT) at David Wayne Hooks Memorial Airport in Tomball, Texas, funded by the Bipartisan Infrastructure Law (BIL). The procurement aims to gather industry insights and recommendations while assessing vendor capabilities for a project that is critical for enhancing air traffic management infrastructure. The anticipated contract type is a Firm-Fixed Price Design-Build contract, with estimated costs ranging from $10 million to $40 million, and the construction is expected to be completed by 2030. Interested vendors must submit a capability statement by 2:00 p.m. ET on January 6, 2025, and can direct inquiries to Thuylinh TranNguyen at thuylinh.t.trannguyen@faa.gov or David Hull at David.hull@faa.gov.
    PIKES PEAK DISTRICT OFFICE PARKING LOT RECONSTRUCTION
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking qualified contractors for the reconstruction of the parking lot at the Pikes Peak Ranger District Office in Colorado Springs, Colorado. The project involves repaving the existing parking lot, installing a new electronic gate, and erecting security fencing, with a focus on compliance with detailed specifications for construction staking, quality control, and waste material disposal. This initiative is crucial for enhancing the infrastructure of the ranger district office, ensuring safety and accessibility for visitors and staff. Proposals are due by January 9, 2025, with the performance period scheduled from March 1, 2025, to August 1, 2025. Interested contractors can reach out to Janice King at janice.king@usda.gov or Lucas Dahlman at lucas.dahlman@usda.gov for further information.
    SOURCES SOUGHT: SATOC MINOR CONSTRUCTION LOCATED WITHIN THE GEOGRAPHICAL BOUNDARIES OF U.S. ARMY CORPS OF ENGINEERS (USACE) LITTLE ROCK DISTRICT (SWL)
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE) Little Rock District, is conducting a Sources Sought announcement to gather information on potential contractors for minor construction projects within its geographical boundaries. This market survey aims to assess the interest, capabilities, and qualifications of various industry members, particularly encouraging participation from Small Business, Section 8(a), Historically Underutilized Business Zones (HUBZone), Service Disabled Veteran Owned Small Business (SDVOSB), and Woman Owned Small Business (WOSB) entities. The information collected will assist the government in ensuring adequate competition among responsible contractors for future projects. Interested parties are invited to review the attached capabilities survey and respond accordingly, with inquiries directed to Shelby Henson at Shelby.m.henson@usace.army.mil or Sarah Hagood at sarah.n.hagood@usace.army.mil.
    Construct Redundant Electrical Supply, Buckley SFB, CO
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Army, is soliciting proposals for the construction of a redundant electrical supply system at Buckley Space Force Base in Colorado. The project aims to replace aging cable and switchgear, install a new backup commercial power feed, and enhance mission reliability by eliminating single points of failure, thereby adhering to Uptime Institute Tier IV Standards. This construction initiative is critical for ensuring the resiliency and operational continuity of the facility's power supply. Interested small businesses are encouraged to reach out to Scott Dwyer at Scott.Dwyer@usace.army.mil or call 402-995-2584 for further details, as the solicitation is set aside for total small business participation.
    Building 67 Consolidation
    Active
    General Services Administration
    Presolicitation GENERAL SERVICES ADMINISTRATION is planning a consolidation project at Building 67 on the Denver Federal Center. The project aims to remodel the building and house approximately 1,029 federal employees and contractors within 169,785 rentable square feet. The objective is to obtain the services of a qualified Design Build firm to perform architectural and engineering design services. The estimated value of the design-build contract is between $10,000,000 and $15,000,000, with a duration of approximately 24 months. The project will require the relocation of employees into swing space while construction takes place, with minimal impact on tenant mission. The design build scope of work includes all labor, materials, design, engineering, construction, commissioning, and other related services necessary to support the consolidation effort and upgrade the finishes within the tenant spaces. The General Services Administration (GSA) intends to award a firm fixed-price, Design-Build contract for the Building 67 Federal Building Consolidation Project, located in Lakewood, CO. The project will follow the Best Value Design-Build Selection Procedures and will conform to the P-100 Facility Standards for Public Buildings and all other applicable building codes and standards. The DB team will be selected through a best value/tradeoff selection process and will work closely with all stakeholders to deliver an economical and operationally efficient building.
    RDU ATCT Parking Lot Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for the RDU ATCT Parking Lot Improvements project located in Morrisville, North Carolina. The project entails replacing the slide gate at the Raleigh-Durham Air Traffic Control Tower and includes comprehensive improvements to the asphalt parking lots, such as repairing storm drain pipes, replacing curbs and sidewalks, and ensuring compliance with safety and environmental regulations. This initiative is part of the Bipartisan Infrastructure Law funding, with an estimated budget range of $500,000 to $1,000,000 and a performance period of 45 days upon receiving a notice to proceed. Interested contractors must submit their proposals by December 27, 2024, and can direct inquiries to Samantha Pearce at samantha.a.pearce@faa.gov or by phone at 405-954-7739.
    Pavement & Maintenance Facility, Grand Forks AFB, ND
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, Omaha District, is conducting market research for a potential construction project involving a Pavement & Maintenance Facility at Grand Forks Air Force Base, North Dakota. The project aims to construct a 60,000 square foot storage and light maintenance facility for snow removal equipment, including the demolition of existing structures and the installation of supporting facilities such as liquid storage tanks and generators. This opportunity is significant for contractors with experience in similar construction projects, particularly those involving military installations and compliance with DoD design standards. Interested prime contractors with bonding capabilities of at least $65 million must submit their qualifications by 2:00 p.m. CDT on January 7, 2025, to Scott Dwyer at Scott.Dwyer@usace.army.mil, with a courtesy copy to Jessica R. Jackson at jessica.r.jackson@usace.army.mil. The estimated construction contract award is anticipated in the second or third quarter of fiscal year 2026, with a project magnitude between $25 million and $100 million.
    B42 CUP Generator Replacement Design-Build Construction
    Active
    Commerce, Department Of
    The Department of Commerce's National Institute of Standards and Technology (NIST) is seeking qualified prime contractors for the Design-Build construction of a Central Utility Plant Generator Replacement at its Boulder, Colorado site. The project involves replacing three 275kW natural gas generators to ensure continued utility operations, requiring compliance with NIST's operational standards and coordination with various stakeholders to minimize disruptions. This initiative is crucial for enhancing the reliability and functionality of NIST's backup power systems, with an estimated construction cost between $1 million and $5 million. Interested parties must submit a capabilities statement by the specified deadline to Travis Zoellner at travis.zoellner@nist.gov, with further details available in the attached documents.
    Renovation of WPAFB Laboratory Space - Dayton, OH
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is conducting a market survey to identify small business concerns interested in a federal contract for the renovation of laboratory space at Wright-Patterson Air Force Base in Dayton, Ohio. The project entails a Design-Bid-Build reconfiguration of an existing high-bay facility, which includes constructing three additional elevated floors and renovating 9,666 square feet of existing space to create secure laboratory environments for modeling, simulation, and analysis, as well as control and network operations rooms. Interested small businesses, including those certified as HUBZone, 8A, Woman-Owned, or Service-Disabled Veteran-Owned, must respond by December 6, 2024, with documentation of their qualifications and relevant past experience, as the estimated contract value ranges between $10 million and $25 million. For further inquiries, interested parties can contact Morgan Greenwell at morgan.l.greenwell@usace.army.mil.
    Chatfield Irrigation Conduits Repair
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the repair of irrigation conduits at the Chatfield Dam and reservoir in Colorado. The project involves the rehabilitation of a 48-inch pipe and an optional 54-inch pipe, focusing on sealing leaks and ensuring the pipes' functionality for at least another 25 years. This work is critical for maintaining the water supply infrastructure in the region. Interested contractors must submit their quotes by January 10, 2025, and are encouraged to contact Tina L. Keimig or Lee M. McCormick for further details. The estimated budget for the project ranges from $100,000 to $250,000, and compliance with federal regulations, including insurance and material usage guidelines, is mandatory.