The Western Federal Lands Highway Division issued a presolicitation notice on September 3, 2025, for the Crown Point Trail and Parking Area project (Solicitation No. 69056725R000014) in Valley County, Idaho. This project, part of the Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC), involves resurfacing 2.7 miles of trail, constructing 300 feet of new trail, slope stabilization, and building an asphalt parking area. Only proposals from pre-approved prime contractors (ASCORP INC, GRANITE CONSTRUCTION, HAMILTON CONSTRUCTION, M.A. DEATLEY CONSTRUCTION, INC., MJ HUGHES CONSTRUCTION, INC., and THOMPSON CONTRACTING, INC) will be accepted. Preliminary plans are available, and prospective offerors are encouraged to view the site before winter snows. Solicitation documents will be released in winter 2025/2026 on SAM.gov, where interested parties can monitor for updates. Technical questions should be sent to wfl.plans-spec@dot.gov, and general inquiries to wfl.contracts@dot.gov or 360-619-7520.
The Crown Point Trail and Parking Area project, ID BOR SRAO TCROWN(1), outlines preliminary construction plans for trail improvements, parking facilities, and related infrastructure. The project includes detailed typical sections for Crown Point Trail (modeled and non-modeled), Beach Access Trail, and Special Rock Embankment (SRE) at various mile posts (MP 0.00, MP 0.35, MP 0.95, MP 2.40, MP 2.70). It specifies materials like stabilized aggregate surface, roadway aggregate, and unclassified borrow, alongside turf establishment. Detailed plans for drainage chutes, berms, concrete wheelstops, accessible parking layouts, and various gate types (metal frame, timber kissing gate) are provided. The document also includes survey control data, temporary traffic control plans with sign specifications (W20-1, G20-2), and erosion control measures like silt fences and fiber roll check dams. The project emphasizes accessibility standards and environmental protection during construction, adhering to federal highway administration standards.
The ID BOR SRAO TCROWN(1) project in Valley County, Idaho, involves creating a 2.7-mile “firm and stable” trail surface, expanding and paving the existing trailhead, formalizing beach access, repairing slope erosion, and adding a vault toilet. The project, located 69 miles north of Boise, has an estimated price range of $700,000-$2,000,000 and a tentative completion date of Fall 2026. Key work includes construction surveys, quality control, erosion and sediment control (silt fences, earth berms, fiber rolls, check dams), dust control, clearing and grubbing, removal of structures, excavation and embankment, slope reinforcement, aggregate and base courses, asphalt paving, and incidental construction such as drainage chutes, concrete wheelstops, gates, fences, topsoil placement, turf establishment, permanent and temporary traffic control, and roadside development including kiosks and a vault toilet. The project aims to meet Architectural Barriers Act requirements.
The Crown Point Trail and Parking Area project, initially identified as Solicitation 69056724B000021, was canceled. A new presolicitation link is available on SAM.gov. This project is being advertised to holders of the Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract, with an anticipated advertisement in early Spring 2026.