NV FLAP 400(1), Logandale Trails Access Road
ID: 6982AF24B000020Type: Presolicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL HIGHWAY ADMINISTRATION6982AF CENTRAL FEDERAL LANDS DIVISILAKEWOOD, CO, 80228, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)
Timeline
    Description

    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the NV FLAP 400(1) Logandale Trails Access Road project located in Logandale, Nevada. This project involves the construction of approximately 3 miles of roadway, including grading, widening, asphalt paving, and drainage improvements, aimed at enhancing access to the Logandale Trails, a part of Nevada State Parks. The initiative is crucial for improving infrastructure and accessibility to federal lands while adhering to federal safety and environmental standards. Bids are due by 2:00 p.m. on September 19, 2024, with an estimated project cost ranging from $10 million to $20 million. Interested contractors can reach out to cflacquisitions@dot.gov for further information.

    Point(s) of Contact
    cflacquisitions@dot.gov
    cflacquisitions@dot.gov
    Files
    Title
    Posted
    The U.S. Department of Transportation is soliciting bids for the Logandale Trails Access Road project (Solicitation Number: 6982AF24B000020) in Clark County, Nevada. This project involves grading, widening, asphalt paving, and drainage improvements over a length of approximately 2.95 miles. Bids are due by 2:00 p.m. on September 19, 2024, and must be submitted in printed form, as electronic submissions are not accepted. Key requirements include submission of the SF-1442 form, evidence of SAM registration, completed Authority to Bind certificates, and adherence to the Buy American Act. Bidders must provide bid guarantees and comply with specific regulations such as the FAR clauses and Construction Wage Rate Requirements. The contract will be awarded based on a fixed price, and special considerations for small businesses are highlighted, including a price evaluation preference for HUBZone small business concerns. Bidders are encouraged to establish partnering relationships to ensure project success and adherence to contract goals. The project reflects the federal commitment to improving infrastructure while providing opportunities for small and disadvantaged businesses. Compliance with various regulations, submission requirements, and project specifications are fundamental throughout this designation.
    This document is an amendment to solicitation number 6982AF24B000020 issued by the Federal Highway Administration, Central Federal Lands Highway Division, concerning a roadway construction project. It outlines required procedures for acknowledgment of receipt of the amendment by potential contractors before the submission deadline, noting that failure to do so may lead to bid rejection. The amendment includes changes to the solicitation documentation and extends the offer submission deadline to September 19, 2024, at 2:00 p.m. local time. Contractors must submit their sealed bids to the designated address and may include modifications through electronic communication, provided references to the solicitation and amendment are clear. The document also specifies that performance bonds must be provided by the contractor within ten calendar days post-award. Furthermore, it details the work requirements and necessary adherence to construction regulations, labor wage rates, and specifications integral to federal highway projects. This amendment serves to clarify conditions and requirements essential for contractors participating in the federal bidding process, emphasizing compliance and adherence to revised timelines and procedures.
    This document outlines the amendment process for federal solicitation offers under the Federal Highway Administration. Offers must acknowledge receipt of this amendment before the specified date and time to avoid rejection. Acknowledgment can occur via completing designated sections on the form, returning copies, or through electronic communication that references the relevant solicitation and amendment numbers. The document also details procedures for modifying existing offers, emphasizing the need for clear reference to the solicitation. Additionally, it specifies that the previously stated due date for proposals has been extended. The amendment includes a clear directive about the document's integrity, reiterating that unchanged terms remain in effect unless explicitly stated otherwise in the amendment. The overall purpose is to ensure compliance and clarity in the contracting process, particularly for contractors involved with federal or state-funded projects under the highway division, while maintaining project timelines and procedural adherence.
    The Bid Opening Summary pertains to the NV FLAP 400(1) project for the Logandale Trails Access Road, with the bid opening held on October 3, 2024, in Lakewood, CO, presided over by Officer Laura Vallejos. Six bids were submitted, with the lowest bid from Las Vegas Paving Corp totaling $8,629,000.00, while the highest was from Michel’s Road & Stone, Inc at $15,336,644.00. The engineer’s estimate for the project was $10,946,250.00. It should be noted that all bids are subject to verification and that there were two amendments to the original bid documents dated September 9 and September 26, 2024. This summary highlights the competitive nature of the bidding process associated with federal RFPs concerning infrastructure projects while emphasizing the importance of complying with budgetary guidelines set forth by engineering estimates. The document serves to officially record the bids received for the construction project, establishing transparency within the procurement process of government contracts.
    The Logandale Trails Access Road NV FLAP 400(1) project in Clark County, NV, involves hydrologic and hydraulic analyses to enhance the road’s safety and functionality, addressing thirteen low water crossing locations. Concrete low water crossings are recommended at three sites, using a 25-year flood standard for design, alongside asphalt paving for informal crossings requiring minimal protection. Improved drainage will be achieved through one culvert crossing at station 50+80, designed to accommodate sediment loads. The project requires additional safety features, including road widening, guardrails, and signage, to meet federal highway standards. Key hydrologic evaluations utilized regression equations and rational methods to estimate peak flows for various return periods, concluding with specific recommendations for the road improvements. The report underscores the importance of proper drainage measures in mitigating flood risks, ensuring road safety while fostering compliance with federal guidelines for infrastructure projects.
    The "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects" (FP-14), issued by the U.S. Department of Transportation, outlines regulations and guidelines for contractors involved in federal highway projects. The document serves as a binding component of contracts, asserting that adherence to these specifications is mandatory. It incorporates measurements in both U.S. customary and metric units, ensuring uniformity across diverse projects. Key sections include general requirements, bid processes, construction methods, materials specifications, and project requirements. Specific divisions cover areas such as earthwork, asphalt pavements, bridge construction, and incidental work, detailing necessary practices for safety and environmental protection. Additionally, it establishes criteria for bid preparation, contract execution, project scope, and quality control, emphasizing the collaboration between the contractor and the government. The document reflects the government's commitment to implementing standardized procedures for highway construction, facilitating efficiency, safety, and compliance with federal regulations. Overall, it's a comprehensive resource aimed at ensuring successful project execution while maintaining public safety and regulatory adherence.
    The document serves as an updated solicitation notice, highlighting a list of interested vendors for a federal government contracting opportunity. It provides the latest updates on solicitations, spanning from August to September 2024, with a chronological record of updates. The vendor list includes seven companies, each with essential contact details, such as names, Unique Entity IDs (SAM), CAGE codes, and addresses. Notable vendors listed include Hooker Creek Inc., QC Testing Inc., AE West LLC, and others, along with their representatives' contact information. This solicitation is part of the government’s effort to engage various contractors for upcoming services or projects, showcasing the ongoing procurement processes. The document emphasizes the need for compliance with federal protocols, including concerns about the protection of controlled unclassified information. Overall, the text outlines the landscape of vendors relevant to the contracting opportunity while ensuring adherence to regulations and proper communication channels within federal acquisition processes.
    The Technical Memorandum details evaluations and recommendations for reconstructing the Logandale Trails Access Road in Clark County, Nevada. This project aims to enhance visitor access to recreational facilities, with approximately 3.38 miles of roadway improvements including new pavement, drainage enhancements, and safety features such as guardrails and low water crossings. The area features diverse geology and is subject to seismic activity, necessitating thorough geotechnical analysis. Potential geologic hazards, such as flooding and erosion from high salt concentrations and gypsum deposits, have been identified, alongside risks from earthquakes and soil instability. Specific sites along the road were inspected for slope stability and erosion, with recommendations for construction practices including slope ratios for cut and fill operations and ditch width for improved drainage. The memorandum emphasizes that while no subsurface explorations were conducted for this scope, findings are based on reconnaissance visits and previous investigations. Recommendations include adjusting construction methods to manage the unique geological conditions effectively, ensuring roadway safety and durability, and addressing environmental concerns. The report serves as crucial guidance for federal and local stakeholders in maintaining safe access roads in this ecologically sensitive area.
    The document centers on the "Logandale Trails Access Road" project under federal RFP NV FLAP 400(1), orchestrated by the U.S. Department of Transportation and Federal Highway Administration. It details engineering specifications for the roadway, which will include minor grading, widening, asphalt paving, and drainage improvements. A series of cross-section sheets are outlined, providing precise measurements and elevation grades crucial for construction. Key aspects include intentional omissions of certain sections, adherence to specified construction standards, and a commitment to ensure minimal environmental disruption. The overarching purpose of the project aligns with federal efforts to improve accessibility to federal lands while maintaining rigorous safety and quality standards in construction processes. The document serves as a key reference for contractors and project managers, ensuring clarity in the project's technical requirements and compliance expectations.
    The Logandale Trails Access Road project, identified as NV FLAP 400(1), aims to enhance roadway infrastructure under the jurisdiction of the Central Federal Lands Highway Division, part of the Federal Highway Administration. The detailed planning document outlines essential symbols, standard practices for project execution, and lists various components needed for successful completion, such as drainage systems and traffic control elements. The documentation includes specifications for grading, surfacing, and drainage summaries, which detail required quantities of materials and equipment essential for the construction process. Key items include road excavation, riprap installations, and concrete pavement, critical for ensuring road stability and functionality. The typical section designs provide a framework for the road structure, indicating precise dimensions and materials to be used. Additionally, the document emphasizes the significance of erosion control measures and environmental considerations in compliance with federal and state regulations. Overall, the project seeks to improve access while adhering to safety protocols and construction best practices, demonstrating a commitment to modernization and infrastructure development.
    The Logandale Trails Access Road project aims to pave a 3.25-mile gravel road in southern Nevada, enhancing access to the Logandale Trails trailhead. The report outlines existing road conditions, climate data, and soil investigations, emphasizing the need for pavement recommendations and materials selection based on geotechnical analysis. The region experiences minimal precipitation and features various soil types that require careful assessment to mitigate issues such as salt heave. Key recommendations include the use of asphalt concrete and crushed aggregate base layers to ensure durability over a projected 20-year lifespan, with meticulous design inputs to accommodate estimated traffic volume and vehicle classifications. Materials specifications include a PG 76-22NV asphalt binder and corrugated steel pipes with protective measures against corrosive soil conditions. The report serves as a comprehensive guide for the project's construction, ensuring compliance with federal guidelines and addressing potential environmental impacts, ultimately supporting enhanced public access to recreational areas while maintaining structural integrity.
    The document outlines a series of questions and answers regarding the advertisement for the NV FLAP 400(1) Logandale Trails Access Road project. Key concerns raised include the need for larger plan documents for readability, pre-bid permit procurement issues, and requirements for final stabilization of the project site due to environmental regulations from permitting agencies. Specific queries address details about payment for environmental surveys and construction safety hazards, with recommendations for a complete road closure during certain phases of work. The responses indicate that bidders should follow plans as specified, while permitting and stabilization processes will be managed in line with existing standards. This document reflects the complexities involved in federal and state RFPs, emphasizing the necessity for clarity in project specifications, contractor obligations, and environmental compliance measures to ensure successful bidding and project execution.
    The document addresses queries related to the NV FLAP 400(1) Logandale Trails Access Road project, reflecting contractor concerns during the bidding process. Key points include requests for changes to bid documents, clarifications on construction methodologies, and issues regarding permitting and site safety. Contractors emphasize the necessity for complete permit access prior to bidding and highlight potential construction hazards that could render the access road unsafe during the project. There are also discussions about final stabilization requirements mandated by the Nevada Department of Environmental Protection (NDEP), with specific requests for inclusion in bidding items. Payment mechanisms for specific tasks such as bird surveys and tortoise protections are queried, along with clarification on bid item quantities related to asphalt work. Furthermore, the document delineates Disadvantaged Business Enterprise (DBE) goals within the solicitation framework. The responses mostly reinforce adherence to the original plans, with guidance provided on specific procedures and requirements. This document serves to streamline communication between the contractors and the project administrators, ensuring clarity on project expectations and requirements as part of federal RFP protocols.
    The document is a Q&A session concerning the NV FLAP 400(1) regarding the Logandale Trails Access Road project, addressing various contractor inquiries related to the project specifications. Key points include the necessity for revised drawings to enhance readability, the requirement for pre-bid permit documentation, plans for final stabilization of the project area, and clarifications on payment structures for specific tasks like bird surveys and tortoise surveys. Concerns about public safety and access during construction activities were raised, prompting discussions about potential access restrictions. The document also explores the adequacy of proposed methods for asphalt placement, the accuracy of estimated quantities for construction materials, and the distinction of bid items within the project specifications. Additionally, it clarifies the Disadvantaged Business Enterprise (DBE) goals applicable to the project. Overall, this document emphasizes the need for detailed guidance on project execution, addressing contractor concerns to ensure compliance with regulatory requirements and project standards while maintaining public safety.
    The government file outlines the Q&A from the advertisement for the NV FLAP 400(1) Logandale Trails Access Road project, dated October 2, 2024. It addresses various contractor inquiries regarding project specifications, including permit procurement challenges, final stabilization requirements, and payment clarification for specific tasks such as bird surveys and tortoise monitoring. Key concerns raised involve the safety of the access road during construction, the adequacy of project staging areas, and the contractor's responsibilities for maintaining stabilization and meeting germination rates for native flora. Notably, it mentions the need for clarity on asphalt paving specifications and requests for possible adjustments to established lift requirements due to steep grades. Additionally, issues surrounding contractor pricing for low-carbon concrete materials and compliance with FAR-based DBE goals are discussed. The document emphasizes adherence to existing plans and specifications while addressing the complexities contractors face when bidding under uncertain permit conditions. Overall, the file serves to facilitate clear communication between the contracting authority and potential bidders, ensuring compliance with federal guidelines while addressing real-world construction challenges.
    Lifecycle
    Title
    Type
    Similar Opportunities
    UT FTNP DINO 10(3) 100(2) Green River Road and Quarry Access Road
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the UT FTNP DINO 10(3) 100(2) project, which involves the rehabilitation of Green River Road and Quarry Access Road within Dinosaur National Monument, located in Colorado and Utah. The project aims to address deteriorating road conditions by rehabilitating approximately 2.35 miles of roadway, multiple pullouts, and two parking lots, along with pavement preservation work on an additional 50.4 miles of roads, including various infrastructure improvements such as curb and guardrails. This initiative is critical for maintaining safe access to the national monument and enhancing the overall infrastructure, with an estimated cost range between $10 million and $20 million. Interested bidders must submit their proposals by the specified deadline and can contact Stephanie Navarro or Ryan Phillips at CFLContracts@dot.gov for further information.
    ID FLAP BONNER 841(1), Trestle Creek Road, MP 100 to 103.7
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the reconstruction and paving of Trestle Creek Road in Bonner County, Idaho, under project ID FLAP BONNER 841(1). The project aims to enhance a 3.75-mile stretch of roadway by implementing improvements such as riprap placement, roadway aggregates, asphalt concrete pavement, and drainage enhancements, ultimately facilitating year-round access to the Kaniksu National Forest. This initiative is part of the government's commitment to infrastructure improvement and environmental stewardship, with an estimated contract value between $5 million and $10 million. Interested vendors should note that the solicitation is set to be released in Spring 2025, with a completion target of Fall 2025, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    NM NP MULTI PMS(1), Pavement Preservation New Mexico
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is issuing a Request for Proposals (RFP) for the NM NP MULTI PMS(1) Pavement Preservation Project in New Mexico. This project aims to enhance and preserve roadways and parking areas across multiple national park sites, including Carlsbad Caverns National Park and White Sands National Park, through various techniques such as crack sealing, patching, chip sealing, and micro-surfacing over a total length of 33.49 miles. The initiative underscores the federal government's commitment to maintaining infrastructure in protected areas while ensuring compliance with construction standards and enhancing visitor experiences. Interested vendors should contact the Contracts G. Office at contracts@mail.wfl.fhwa.dot.gov or call 360-619-7520, with an estimated project cost between $5 million and $10 million and a tentative completion date set for Winter 2025.
    CO FLAP LAR 10(1) Horsetooth Res and Carter Lake
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting proposals for the rehabilitation and reconstruction of parking lots and access routes at Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado, under project number CO FLAP LAR 10(1). The project aims to enhance vehicular and pedestrian access while improving safety for over one million annual visitors, involving tasks such as roadway excavation, asphalt pavement placement, and drainage improvements. This initiative is particularly significant as it supports local infrastructure and recreational access, with a total project budget estimated between $10 million and $20 million. Interested vendors must submit their proposals by December 5, 2024, and can direct inquiries to Leslie Karsten at CFLcontracts@dot.gov.
    NM NP MULTI PMS(1), Pavement Preservation New Mexico
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the NM NP MULTI PMS(1) Pavement Preservation project in New Mexico, which involves maintenance work across various national parks and monuments. The project includes tasks such as crack sealing, patching, chip seal application, micro surface treatments, and pavement marking over a total length of 33.49 miles, with an estimated completion date in Winter 2025. This initiative is crucial for maintaining infrastructure and ensuring the safety of public roadways while preserving national heritage sites. Interested vendors can contact the Contracts G. Office at contracts@mail.wfl.fhwa.dot.gov or by phone at 360-619-7520, with the estimated project cost ranging between $5 million and $10 million and anticipated solicitation in Fall 2025.
    OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for the Granite Hill Road Reconstruction, Phase II project in Baker City, Oregon, under the OR FLAP Grant 24(2). This project aims to enhance roadway infrastructure by reconstructing approximately 9.32 miles of Granite Hill Road, including the replacement of existing culverts with Aquatic Organism Passage (AOP) structures to improve fish passage and drainage. The initiative is crucial for ensuring safe and efficient transportation while adhering to federal and state regulations, with a contract value estimated between $5 million and $10 million. Interested contractors must submit their bids by December 10, 2024, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    MS NP NATR 3N18 3H27 ETC - Geotechnical, Pavement Rehabilitation, and Structural Repairs
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the project titled "MS NP NATR 3N18 3H27 ETC," which involves geotechnical, pavement rehabilitation, and structural repairs along the Natchez Trace Parkway in Mississippi. The project aims to address critical maintenance needs, including repairs to slide areas, bridge joints, and delaminated concrete decks, with an estimated contract value between $40 million and $50 million and a construction period of 586 calendar days following the Notice to Proceed. This initiative is vital for ensuring the safety and integrity of transportation infrastructure, supporting both public safety and environmental preservation. Interested contractors must register in the System for Award Management (SAM) and submit their bids in compliance with federal regulations, with all inquiries directed to primary contact Rubrena Johnson at eflhd.contracts@dot.gov.
    ND FTFW WHHI 10(5) WHITE HORSE HILL NGP AUTO TOUR ROUTE
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the improvement of the Auto Tour Route at the White Horse Hill National Game Preserve in North Dakota. The project aims to enhance visitor access, safety, and overall experience by rehabilitating approximately 1.5 miles of roadway, which includes crack filling, asphalt patching, chip sealing, and pavement marking. This initiative is crucial for maintaining the infrastructure of the preserve, ensuring compliance with federal specifications, and promoting environmental considerations. Interested bidders must submit proposals by December 5, 2024, with an estimated project cost ranging between $700,000 and $2,000,000. For further inquiries, contact Jorey Deml at CFLAcquisitions@dot.gov.
    OR FLAP UMATILL 582(1), Mill Creek Road
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for the construction project OR FLAP UMATILL 582(1) on Mill Creek Road in Umatilla County, Oregon. This project involves the replacement of nine deteriorating retaining walls and upgrading the road surface from aggregate to a solid surface to enhance access to the Umatilla National Forest, with a focus on compliance with federal infrastructure standards. The Invitation for Bids (IFB) emphasizes full and open competition, with a Price Evaluation Factor for HUBZone Small Businesses, and includes detailed specifications and requirements for bid submission. Interested contractors can contact the Contracts G. Office at WFL.contracts@dot.gov or by phone at 360-619-7520 for further information, with the bid opening scheduled for a date specified in the solicitation documents.
    OR FLAP DOUGLAS 251(1), Oregon Dunes National Recreation Area ‐ Umpqua Dunes Access Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the OR FLAP Douglas 251(1) project, which focuses on access improvements at the Oregon Dunes National Recreation Area in Winchester Bay, Oregon. The project entails significant construction work over a 1.3-mile access route, including earthwork, aggregate installation, drainage enhancements, precast concrete block wall construction, and guardrail installation, all while adhering to environmental protection measures. This initiative is crucial for improving public access and safety in a popular recreational area, with an estimated contract value between $2 million and $5 million and a tentative completion date set for November 2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further information.