Z--Reaches 21 Utility Potholing
ID: 140R4025Q0014Type: Presolicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF RECLAMATIONUPPER COLORADO REGIONAL OFFICESALT LAKE CITY, UT, 84138, USA

NAICS

Site Preparation Contractors (238910)

PSC

REPAIR OR ALTERATION OF OTHER UTILITIES (Z2NZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of the Interior, specifically the Bureau of Reclamation, is seeking qualified contractors for the "Reaches 21 Utility Potholing" project, which involves locating and verifying existing underground utilities as part of the Navajo-Gallup Water Supply Project. The contractor will utilize air or hydro-excavation methods to expose utility tops for survey data collection, ensuring compliance with safety regulations and coordination with utility owners during excavations. This project is crucial for enhancing water supply infrastructure while adhering to environmental and safety standards. Interested small businesses must attend a mandatory site visit on January 2, 2025, and submit their proposals by acknowledging the amendments to the solicitation, with the performance period set from January 15, 2025, to February 15, 2025. For further inquiries, potential bidders can contact Brittney Nielson at bnielson@usbr.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The U.S. Bureau of Reclamation's Upper Colorado Region is preparing to solicit bids for the Navajo-Gallup Water Supply Project, specifically for potholing of underground utilities in Reach 21 along the Cutter Lateral. This initiative is a total small business set-aside under the Federal Acquisition Regulations, reflecting sufficient availability of qualified small businesses to meet project demands. The project includes the San Juan Lateral and Cutter Lateral with notable utility excavation required near the Reach 21 Regulating Tank. The North American Industry Classification System (NAICS) code for this project is 238910, with a small business size standard set at $19 million. The solicitation is expected to be released around December 9, 2024, via the System for Award Management (SAM) website. Interested parties can reach the Contract Specialist, Brittney Nielson, or Contracting Officer, Philoma Singer, for inquiries. This notice serves only as a pre-solicitation announcement and does not constitute a commitment to issue a solicitation or award a contract.
    The U.S. Bureau of Reclamation is issuing a pre-solicitation notice for the Navajo-Gallup Water Supply Project Utilities Potholing, specifically for Reach 21 on the Cutter Lateral. This total small business set-aside solicitation is prepared under Federal Acquisition Regulations (FAR) Part 13, acknowledging the presence of qualified small businesses capable of performing the required tasks. The project entails potholing existing underground utilities to support the design and survey efforts at Reach 21, located near the Reach 21 Regulating Tank 3. The work encompasses two main branches of the project: the San Juan Lateral and the Cutter Lateral, running through different locations in New Mexico. The anticipated solicitation will follow Simplified Acquisition Procedures, and a solicitation copy is expected to be available approximately on December 9, 2024. Interested contractors must be registered in the System for Award Management (SAM). The notice clarifies that this is not a formal request for proposals or quotes, nor does it obligate the government to proceed with the project; rather, it serves to inform potential participants of the contemplated procurement. Questions should be directed to the designated contract specialists via email.
    The document outlines the solicitation amendment for the Navajo-Gallup Water Supply Project's utility potholing, identified as Solicitation Number 140R4025Q0014. This contract requires the contractor to execute potholing tasks for existing underground utilities in Reach 21 and Reach 2 of the project, enabling the collection of survey data for subsequent design. The work will involve utility locate verification followed by air or hydro-excavation techniques to expose utilities, with specific requirements for reporting, backfilling, and disposal of materials. Key activities include notifying utility owners, verifying crossings, and obtaining necessary permits, with a focus on minimizing ground disturbance. The anticipated schedule for completing this work spans 1-3 business days. The document emphasizes safety protocols, requiring a Job Hazard Analysis before commencing work to ensure compliance with standards. Furthermore, performance standards are established based on the successful verification of utility locations and the adequate excavation of potholes for survey purposes. Contractors must submit pricing estimates for these services along with timelines, fostering transparency in the procurement process. Overall, the amendment seeks to facilitate efficient utility management under the framework of federal contracting processes.
    The document outlines an amendment to solicitation number 140R4025Q0014, issued by the Bureau of Reclamation for a project in Farmington, NM. The amendment specifies the requirements for acknowledging receipt of the changes, detailing that offers must be submitted along with acknowledgement of this amendment before the specified deadline to avoid rejection. A key point is the coordination of a mandatory site visit scheduled for January 1, 2024, at the Bureau's location in Farmington, which is crucial for potential contractors to gather information pertaining to the solicitation. The set period for contract performance spans from January 15, 2025, to February 15, 2025. Attendance at the site visit is important for logistical planning, and participants are instructed to confirm their attendance with the designated Contracting Specialist. The amendment maintains all previous terms and conditions unchanged, indicating continuity in the solicitation process while clarifying essential procedural steps for interested bidders.
    The document serves as an amendment to a solicitation for a government contract, specifying changes to the site visit date and the period of performance. Originally scheduled for January 1, 2024, the site visit is now set for January 2, 2025. The performance period is designated from January 15, 2025, to February 15, 2025. The amendment outlines the protocols for acknowledging receipt, including the requirement for responses to be submitted before the specified deadline to avoid rejection. Additionally, it details that contractors can modify their earlier submissions by means of electronic communication if they reference the solicitation and corresponding amendment. The document maintains its contractual integrity by ensuring that all other terms and conditions remain unchanged. This amendment reflects typical procedural adjustments found in federal Requests for Proposals (RFPs) and emphasizes the importance of timely notifications for contractors participating in federal contracts.
    The document details a Request for Proposal (RFP) from the Bureau of Reclamation for utility potholing services related to the Navajo-Gallup Water Supply Project, specifically focusing on Reach 21. The contractor is tasked with locating and verifying existing underground utilities and using air or hydro-excavation methods to expose utility tops for survey data collection. The scope includes utility locate verification, potholing methods, and compliance with safety regulations. The contractor is expected to coordinate with utility owners for on-site presence during excavations and manage unforeseen utility issues as they arise. Performance standards and payment structures are also outlined, emphasizing successful utility location efforts and efficient scheduling. Additionally, the contractor must comply with various safety and administrative clauses from federal regulations. The RFP encourages submissions from small businesses, indicating an unrestricted competitive environment. This project aligns with government efforts to enhance water supply infrastructure while ensuring adherence to environmental and safety standards.
    Lifecycle
    Title
    Type
    Presolicitation
    Similar Opportunities
    Z--SJC AZOTEA PORTAL AND DROP STRUCTURES
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation's Upper Colorado Regional Office, is preparing to solicit proposals for the construction of the SJC Azotea Tunnel Portal and Drop Structures in Rio Arriba County, New Mexico. The project involves critical construction activities such as water diversion, dewatering excavations, and the creation of new reinforced concrete structures, alongside earthwork, riprap removal and replacement, and the installation of drainage systems and safety access ladders. This initiative is vital for the renovation of essential water management infrastructure, with an estimated project value between $1 million and $5 million and a completion timeframe of approximately 15 months. Interested small businesses should note that the Request for Proposals is expected to be released on January 3, 2025, and can contact Mary Maestas at mmaestas@usbr.gov or by phone at 505-462-3581 for further information.
    Y--AVC - Crowley Reach 1
    Active
    Interior, Department Of The
    The U.S. Bureau of Reclamation is seeking small business sources for the Arkansas Valley Conduit (AVC) Crowley Reach 1 construction project, which aims to provide a reliable municipal and industrial water supply from Pueblo Reservoir to 40 communities in southeastern Colorado. The project involves the installation of approximately 5.3 miles of 30-inch water transmission pipe and associated infrastructure, including valves, crossings, and traffic management measures, with an estimated cost between $45 million and $55 million. This initiative is crucial for enhancing water supply capabilities for a projected future population of 50,000 people in the service area, reflecting the government's commitment to infrastructure development and support for small enterprises. Interested businesses must submit their qualifications and bonding capabilities by January 15, 2025, to Monte Baird at mbaird@usbr.gov, with responses clearly marked in the subject line.
    LaBarge Watershed Water Wells
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Land Management, is soliciting bids for the LaBarge Watershed Water Wells construction project in Sublette County, Wyoming. This project involves the development of water supply facilities, with a firm fixed-price contract valued between $250,000 and $500,000, aimed exclusively at small businesses. The successful contractor will be responsible for drilling and constructing eight water wells, adhering to strict safety, environmental, and regulatory standards, with a completion timeline of 300 calendar days from the notice to proceed. Bids are due by January 13, 2025, and interested parties can contact Nathan Roush at nroush@blm.gov or (303) 236-2211 for further information.
    Z--Folsom Right Wing Dam - North Fork Ditch Bypass
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation, is preparing to solicit proposals for a firm fixed-price construction contract for modifications to the Folsom Right Wing Dam’s North Fork Ditch Bypass, with a focus on small business participation. The project involves critical tasks such as site preparation, removal of existing infrastructure, installation of drainage systems, and utility installations, with estimated costs ranging from $5 million to $10 million. This initiative underscores the government's commitment to enhancing infrastructure while supporting small businesses in significant construction projects. The solicitation, identified as 140R2025R0004, is expected to be posted on the Government Point of Entry around January 3, 2025, with proposals due by February 3, 2025; interested contractors must be registered in the System for Award Management (SAM) to qualify for bidding. For inquiries, contractors can contact Ronald Gamo at rgamo@usbr.gov or by phone at 916-978-4304.
    J--BGNDRF Backflow Preventer Replacement
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is soliciting proposals for the replacement of backflow preventers at the Brackish Groundwater National Desalination Research Facility in Alamogordo, New Mexico. The project involves the removal and installation of various backflow preventers and shutoff valves, requiring compliance with local regulations and coordination with utility services to minimize disruptions. This initiative is crucial for maintaining safe and efficient water infrastructure, ensuring adherence to public health standards. Interested small businesses must submit their proposals by January 27, 2024, with a project budget estimated between $100,000 and $250,000. For further inquiries, contact Ronda Lucero at rlucero@usbr.gov or call 505-462-3650.
    Z--THRO NU Campground Water Renovations
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting bids for the renovation of the water distribution system at the THRO NU Campground in Theodore Roosevelt National Park, North Dakota. The project involves replacing underground water lines with a new 4” HDPE line, removing an in-ground water tank, and installing a 20,000-gallon above-ground water storage tank, all while ensuring compliance with environmental regulations and maintaining public access. This initiative underscores the government's commitment to improving infrastructure within national parks, enhancing visitor experience, and preserving natural resources. Interested contractors must submit their bids electronically by January 9, 2025, and are encouraged to attend a site visit on November 22, 2024; for further inquiries, contact Joan Brzezinski at joanbrzezinski@nps.gov or call 605-574-0515.
    Y--GVIC FISH SCREEN REHABILITATION
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is soliciting bids for the rehabilitation of fish screens at the Grand Valley Irrigation Company (GVIC) located in Mesa County, Colorado. This project, estimated to cost between $1,000,000 and $5,000,000, aims to enhance water infrastructure as part of the Upper Colorado River Endangered Fish Recovery Program, focusing on the installation of new concrete structures and fish screens, along with a control and cleaning system. The rehabilitation is crucial for preserving aquatic ecosystems and ensuring compliance with environmental regulations. Interested small businesses must submit their sealed bids by January 29, 2025, with inquiries due by January 10, 2025, and the expected performance period running from April 1, 2025, to May 1, 2026. For further details, potential bidders can contact Ana Fife at afife@usbr.gov or by phone at 801-524-3671.
    Z--Battle Creek - South Diversion Dam and Canal Removal
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is preparing to issue a Request for Proposal (RFP) for a firm fixed-price construction contract focused on the removal of the Battle Creek South Diversion Dam and associated canal. The project involves significant demolition work, including the dismantling of multiple diversion dams and the excavation and filling of the South Canal, with an estimated project cost ranging from $10 million to $15 million. This procurement is crucial for environmental restoration efforts in the region and is open to all responsible sources, with a requirement for 100% performance and payment bonds. Interested contractors must be registered in the System for Award Management (SAM) and can expect the solicitation to be posted on or around January 3, 2025, with proposals due approximately by February 3, 2025. For inquiries, contact Rosana Yousef Goarji at RYousefgoarji@usbr.gov or call 916-978-5004.
    Vault Toilet Pumping
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation's Lower Colorado Regional Office, is seeking qualified contractors for waste collection services near Hoover Dam. The contractor will be responsible for providing all necessary materials, equipment, transportation, and labor to collect and dispose of waste according to a specified schedule, with disposal locations including Memorial Bridge Plaza and its overflow lot. This service is crucial for maintaining sanitation and environmental standards in a high-traffic area frequented by visitors. Interested businesses must submit a capability statement detailing their experience and qualifications by January 2, 2025, to Gilbert Mincey at gmincey@usbr.gov, as no contracts will be awarded based solely on this announcement.
    DREDGING OF SETTLING POND& CHLORINE BASIN
    Active
    Interior, Department Of The
    The U.S. Geological Survey (USGS) is seeking qualified contractors for the dredging of Settling Pond 3 and a chlorine contact tank located in Jefferson County, West Virginia. The project aims to restore the pond's depth and remove leaf debris from the tank, with a total period of performance set for 63 days following the notice to proceed. This procurement is significant for maintaining ecological integrity and supporting ongoing research activities at the Eastern Ecological Science Center. Interested small businesses must submit their quotes by January 17, 2025, with a site visit scheduled for January 7, 2025, and the anticipated award date for the contract is January 23, 2025. For further inquiries, contractors can contact Dayna Parkin at dparkin@usgs.gov or by phone at 703-648-7374.