DREDGING OF SETTLING POND& CHLORINE BASIN
ID: 140G0125Q0017Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEUS GEOLOGICAL SURVEYOFC OF ACQUSITION GRANTS-NATIONALRESTON, VA, 20192, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

ARCHITECT AND ENGINEERING- CONSTRUCTION: DREDGING FACILITIES (C1KF)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Geological Survey (USGS) is seeking qualified contractors for the dredging of Settling Pond 3 and a chlorine contact tank located in Jefferson County, West Virginia. The project aims to restore the pond's depth and remove leaf debris from the tank, with a total period of performance set for 63 days following the notice to proceed. This procurement is significant for maintaining ecological integrity and supporting ongoing research activities at the Eastern Ecological Science Center. Interested small businesses must submit their quotes by January 17, 2025, with a site visit scheduled for January 7, 2025, and the anticipated award date for the contract is January 23, 2025. For further inquiries, contractors can contact Dayna Parkin at dparkin@usgs.gov or by phone at 703-648-7374.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines the General Wage Determination for heavy construction in Jefferson County, West Virginia, identified as WV20240068. It specifies that contracts under the Davis-Bacon Act must adhere to minimum wage standards set forth by Executive Orders 14026 and 13658, with increasing wage rates annually. For contracts initiated or extended after January 30, 2022, the minimum wage is $17.20 per hour. For contracts awarded between January 1, 2015, and January 29, 2022, the minimum wage is $12.90 per hour. The wage determination includes prevailing wage rates and fringe benefits for various construction roles, including carpenters, electricians, ironworkers, laborers, and equipment operators, with detailed rates provided for each classification. The document also emphasizes the requirement for contractors to provide sick leave under Executive Order 13706 and outlines the process for appealing wage determinations. Overall, this wage determination serves as a guide for compliance in federal and state construction projects, ensuring fair labor practices and equitable compensation for workers.
    The Past Performance Questionnaire outlines the required submission process for client references regarding a contractor's previous work. It is aimed at gathering feedback from the client's technical or business managers, or a contracting officer representative. The form requests detailed information about the contractor, including contract specifics, project scope, and any challenges faced during execution. Evaluative factors such as quality of services, personnel management, financial controls, timeliness, and customer satisfaction are assessed using adjectival ratings ranging from Unsatisfactory to Excellent. Respondents are also prompted to comment on their overall experience with the contractor to inform future selection decisions. The structure includes detailed rating guidelines for a coherent evaluation methodology, ensuring that the responses are comprehensive and relevant for the government’s RFP processes.
    This document serves as a payment bond form, mandated for protecting individuals supplying labor and materials per 40 USC Chapter 31, Subchapter III. The bond ensures that the Principal (contractor) and Sureties (bond issuers) are financially responsible for fulfilling payment obligations associated with the identified contract. Key components include the legal name and address of the Principal, the penal sum of the bond, and the names and addresses of the Sureties, which can be individual or corporate entities. Proper execution involves corporate seals and signatures, along with adherence to strict regulations governing Sureties. The document outlines conditions under which the obligation is void, primarily contingent on the Principal's timely payment to those who have provided services or materials. Compliance with the Paperwork Reduction Act of 1995 requires the inclusion of an OMB control number and a time estimate for form completion. The overall purpose of the form is to provide a structured approach to securing financial accountability in government contracts, ultimately ensuring that all labor and material suppliers are compensated, thus facilitating project execution in alignment with government RFPs and grant requirements.
    The document pertains to a Release of Claims form used by the United States Department of the Interior. It outlines the process a contractor must follow after completing work under a federal contract. Prior to receiving final payment, the contractor is required to submit a release confirming that they relinquish any claims against the government related to the contract. The document specifies that this release discharges the United States and its representatives from any claims, debts, or obligations that may have arisen under the terms of the contract. The form includes spaces for the contractor's information, signature, and confirmation that the release was signed on behalf of a corporation, if applicable. This Release of Claims is integral in ensuring that the government is protected from future liabilities once payment has been made, playing a significant role in the administration of federal contracts and grants.
    The document titled "Statement and Acknowledgment" serves as a formal record pertaining to federal contracting, specifically concerning subcontracting agreements under a prime contract. It contains sections for both the prime contractor and subcontractor to document pertinent details such as contract numbers, dates, parties involved, and specific work descriptions. Key clauses from the prime contract, like those relating to compensation and labor standards, must be acknowledged by the subcontractor. The form underscores compliance with the Contract Work Hours and Safety Standards Act and other relevant labor standards, ensuring that all parties involved adhere to federal regulations. It also contains a Paperwork Reduction Act statement, detailing the estimated time required to complete the form and providing a contact for comments or suggestions. The structure of the document is methodical, gathering essential information on contract relationships and requirements, reflecting the government’s rigorous standards for accountability in federal projects.
    The U.S. Department of Labor has issued Form WH-347, a payroll report for contractors and subcontractors engaged in federally financed or assisted construction projects. While its use is optional, completion is mandatory for covered entities as they are required to submit weekly statements detailing wages paid to employees, in compliance with the Copeland Act. The form necessitates the listing of workers' names, hours worked, pay rates, total earnings, and deductions. Additionally, contractors must provide a "Statement of Compliance," affirming payment of at least the Davis-Bacon prevailing wage rate and accurate payroll records. The document outlines obligations concerning wages, fringe benefits, and apprenticeship program registrations. It also emphasizes the consequence of willful falsification of information, which can lead to criminal prosecution. The form aids in ensuring that federally funded projects uphold wage laws and protect workers’ rights while facilitating transparency for federal contracting agencies.
    The Eastern Ecological Science Center (EESC) in Kearneysville, WV seeks a contractor for dredging operations at a settling pond and a chlorine contact tank. The project involves dredging Settling Pond 3, measuring approximately 75’x375’, to restore its original depth of 3-5 feet and removing leaf debris from an 18’x18’x6’ chlorine tank. Completion is mandated by May 30, 2025, with extensive operational guidelines to minimize disruptions to ongoing research. The contractor must obtain state-required permits, manage all materials safely, and submit a detailed breakdown of costs prior to commencement. A pre-construction meeting is required to ensure all stakeholders are informed. The contractor is responsible for maintaining cleanliness on-site, safely disposing of debris, and scheduling inspections with the Facility Manager. Rigorous adherence to local, state, and federal environmental and safety regulations is required, and any changes to the work plan must be documented and approved. Overall, the project reflects a commitment to maintaining ecological integrity while ensuring compliance with regulatory standards during construction activities at EESC.
    The document outlines a government solicitation for construction services, specifically related to dredging a settling pond and chlorine contact tank under a fixed-price contract. The U.S. Geological Survey (USGS) intends to commence the project soon after the award, with a timeline for execution spanning from March 1, 2025, to June 30, 2025. Bids must be submitted by January 17, 2025, and contain original offers along with performance bonds if necessary. Special attention is given to sustainable practices, including compliance with environmental regulations and safety standards throughout the construction phase. The contract emphasizes the requirement for contractors to manage indoor air quality, ensure labor compliance, and adhere to specified wage determinations. Furthermore, it mandates contractors to employ trained personnel with proper security clearances for access to government facilities. This solicitation exemplifies the government's commitment to maintaining environmental integrity while leveraging contracts for necessary infrastructure developments.
    Lifecycle
    Title
    Type
    Solicitation
    Similar Opportunities
    B--BETHNIC MACROINVERTEBRATES SAMPLE ANALYSIS
    Active
    Interior, Department Of The
    The U.S. Geological Survey (USGS), part of the Department of the Interior, is seeking proposals for an Indefinite Delivery Indefinite Quantity (IDIQ) contract focused on taxonomic identification and enumeration analysis services for freshwater benthic macroinvertebrates in Johnson County, Kansas. The objective is to assess stream health by analyzing approximately 28 samples and comparing current data with historical samples collected between 2003 and 2010, with a contract performance period from January 1, 2025, to December 31, 2029. This procurement is critical for environmental monitoring and management, ensuring compliance with quality standards and documentation protocols. Interested small businesses must submit their proposals electronically to Travis Herberholz at therberholz@usgs.gov by the extended deadline of December 20, 2024, with a total contract value not exceeding $499,999.99.
    Emergency Watershed Protection Little Creek Church Site 1, Kanawha County, West Virginia
    Active
    Agriculture, Department Of
    The Department of Agriculture is preparing to solicit bids for the Emergency Watershed Protection project at Little Creek Church Site 1 in Kanawha County, West Virginia. The project aims to implement erosion control measures, including the installation of wire mesh gabions, foundation preparation on shallow bedrock, rebar anchoring, and riprap foundation protection. This initiative is crucial for maintaining the integrity of the watershed and preventing further erosion in the area. The contract, set aside for small businesses, is anticipated to be awarded in February 2025, with an estimated value between $25,000 and $100,000. Interested firms must be registered with the System for Award Management (SAM) and are encouraged to attend a site visit scheduled for January 7, 2025. For further inquiries, contact Tasha Kennedy at natasha.kennedy@usda.gov or Ruben Mindieta at ruben.mindieta@usda.gov.
    Emergency Watershed Protection, Kanawha County, West Virginia
    Active
    Agriculture, Department Of
    The Department of Agriculture, through the Farm Production and Conservation Business Center, is preparing to solicit bids for an Emergency Watershed Protection project in Kanawha County, West Virginia. The project aims to implement streambank stabilization measures at Fields Creek, utilizing grouted riprap and rebar anchoring techniques to mitigate erosion and enhance environmental resilience. This total small business set-aside contract, with an estimated value between $100,000 and $250,000, is anticipated to be awarded in February 2025, following the issuance of the solicitation in January 2025. Interested firms must be registered with the System for Award Management (SAM) and are encouraged to attend a site visit scheduled for January 7, 2025, at 11:30 AM local time. For further inquiries, contact Tasha Kennedy at natasha.kennedy@usda.gov or Ruben Mindieta at ruben.mindieta@usda.gov.
    IDWSC Upper Columbia Idaho Boat Upgrade
    Active
    Interior, Department Of The
    The U.S. Geological Survey (USGS) is seeking qualified vendors to provide upgrades for a 2006 20 ft. aluminum boat used for sediment sampling in the Upper Columbia Idaho region. The procurement involves modifications such as the installation of a 360-degree boom for sampling, center console enhancements for weather protection, additional seating and storage, a diesel heater for winter use, and potential electrical system upgrades, all to ensure the boat meets operational needs. This initiative underscores the importance of maintaining high-quality marine hardware and compliance with federal regulations in government contracting. Interested parties must submit their quotations and technical documentation by January 8, 2025, with questions due by December 30, 2024; the expected completion date for the upgrades is August 31, 2025. For further inquiries, vendors can contact Yangzhi Deng at yangzhideng@usgs.gov or by phone at 916-278-9326.
    Security Guard Services for the USGS National Cent
    Active
    Interior, Department Of The
    The U.S. Geological Survey (USGS) is seeking proposals for Security Guard Services at its National Center in Reston, Virginia, through a Request for Proposal (RFP) designated as 140G0125R0002. The procurement aims to secure comprehensive security services, including facility access control, emergency response, and monitoring of security systems, with a contract duration from April 1, 2025, to March 31, 2030, encompassing a base year and four optional extension periods. This initiative emphasizes the importance of maintaining high security standards within federal facilities while supporting small disadvantaged businesses, as the RFP is set aside for such vendors. Interested parties must submit their proposals electronically by 2:00 PM EST on January 22, 2025, and direct any inquiries to Nicole Demby at ndemby@usgs.gov by December 16, 2024.
    West Coast Hopper Maintenance Dredging 2025
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers Portland District, is seeking bids for the West Coast Hopper Maintenance Dredging project scheduled for 2025. This procurement involves the removal of approximately 3.2 million cubic yards of dredged material from designated areas including Humboldt Bay, the Mouth of the Columbia River, and the Lower Columbia River, with additional optional dredging at Coos Bay. The project is critical for maintaining navigational safety and environmental compliance in these vital waterways, with a contract value anticipated to exceed $10 million. Interested contractors must submit their bids electronically by February 17, 2025, and are encouraged to participate in virtual presolicitation meetings on November 22, 2024, and January 9, 2025, for further project insights. For inquiries, contact Ian Lutjens at ian.k.lutjens@usace.army.mil or Brandon Lasich at brandon.m.lasich@usace.army.mil.
    IDIQ DRILLING SERVICE FOR MASSACHUSETTS AND RHODE
    Active
    Interior, Department Of The
    The Department of the Interior, U.S. Geological Survey (USGS), is seeking qualified contractors to provide drilling services for aquifer sediment core collection and monitoring well installation in coastal southeastern Massachusetts and Rhode Island. The project will utilize direct-push and auger drilling methods to investigate hydrogeology and groundwater resources within sandy glacial aquifers, with a focus on maintaining minimal use of drilling fluids. This Indefinite Delivery-Indefinite Quantity (IDIQ) contract, valued at up to $350,000 over a five-year performance period, is set aside for small businesses, with quotes due on or about January 10, 2025, and an anticipated award date of January 17, 2025. Interested vendors can contact Dayna Parkin at dparkin@usgs.gov or by phone at 703-648-7374 for further information.
    Y--Removal of Perchloric Fume Hood and Waste Disposal
    Active
    Interior, Department Of The
    The U.S. Geological Survey (USGS), part of the Department of the Interior, is seeking qualified contractors for the removal of a perchloric fume hood and associated waste disposal at the Denver Federal Center, specifically within the National Water Quality Laboratory, Building 95. The project entails setting up work areas, removing the fume hood and exhaust systems, and disposing of all related equipment, with the contract period expected to run from February to April 2025. This procurement is crucial for maintaining safety and compliance within laboratory environments that handle hazardous materials. Interested parties should contact Philip Robinson at probinson@usgs.gov for further details, as this opportunity is part of the market research phase for fiscal year 2025.
    DREDGE ENTRANCE CHANNEL (FY25) AT USCG STATION EATONS NECK NORTHPORT, NY (SUFFOLK COUNTY) PSN 19837655
    Active
    Homeland Security, Department Of
    The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking bids for the maintenance dredging of the entrance channel at USCG Station Eaton’s Neck in Northport, New York, for fiscal year 2025. The contractor will be responsible for removing approximately 6,000 cubic yards of dredge material using mechanical methods, ensuring that navigation through the channel remains unobstructed throughout the process, with all work to be completed by March 24, 2025, due to environmental and permitting restrictions. This project is critical for maintaining operational efficiency and safe access to the mooring basin, with an estimated contract value between $500,000 and $1,000,000. Interested small businesses must submit their bids by January 7, 2025, and can contact Cintia Desrosiers-Rivera at Cintia.m.desrosiers-rivera@uscg.mil or Simon W. Leung at simon.w.leung@uscg.mil for further information.
    F--Big River Mine Tailings, (OU2) Sediment Removal
    Active
    Environmental Protection Agency
    Presolicitation ENVIRONMENTAL PROTECTION AGENCY is seeking the services of an experienced firm to provide lead-contaminated sediment removal for the EPA Pilot Study Area located in St. Francois County, Missouri impacted by human transport of mine waste resulting from nearly 2 1/2 centuries of mining in the Old Lead Belt located in Southeast Missouri, Madison County and southern St. Francois County. The work to be performed under this contract consists of excavation and relocation of lead-contaminated materials (mine waste, soil, gravel) from the Big River. This material will be relocated to a soil repository site. Additionally, before relocating the excavated sediment, a 24-inch layer of soil shall be excavated from the repository site. This excavated soil will be used to cap the contaminated sediment. The Period of Performance (POP) for this procurement will be one (1) year. The contractor shall be required to comply with all applicable federal, state and local laws and regulations. Remediation will be conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERECLA) as amended by the Superfund Amendments and Reauthorization Action (SARA), and National Contingency Plan (NCP) requirements. Estimated dollar value for this procurement is between $350k - $450k. This procurement will be a total Small Business set-aside.