Trimmer & Auberry Station and Work Center
ID: 12970224R0024Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA FOREST SERVICE-SPOC SWWashington, DC, 20250, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF OTHER RESIDENTIAL BUILDINGS (Y1FZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of Agriculture, Forest Service is seeking qualified contractors for the design and construction of new administrative buildings at the Trimmer & Auberry Work Center in California, following the loss of facilities during the Creek Fire. The project will be executed through a single award Design-Build Contract, requiring the contractor to provide all necessary labor, materials, and services to complete the work, which includes multi-disciplinary design and compliance with various building codes and agency requirements. This initiative is crucial for restoring operational capabilities within the Sierra National Forest, emphasizing sustainable design and infrastructure improvements. Interested parties must submit proposals by January 20, 2025, with inquiries directed to Andre Dickson at andre.dickson@usda.gov or Klenise Wallace at klenise.wallace@usda.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines the details regarding the "Standard Engine Garage and Barracks" project, commissioned by the U.S. Forest Service for the Pacific Southwest Region 5, specifically located in Vallejo, California. Issued on February 15, 2023, it serves as a project manual to support potential bidders or contractors interested in the project. Key details include contact information for the regional office, including essential phone and fax numbers, as well as the website for further inquiries. The document is copyrighted as of 2023, indicating the ownership of content and its importance in guiding the execution of the project. Notably, it reflects the federal government's aim to develop infrastructure that supports forest management and firefighting operations within the region. This project title page is a critical step in the process of issuing requests for proposals (RFPs) and informs stakeholders about the project's scope and administrative details.
    The document titled "Instructions to Bidders" serves as a guideline for prospective contractors regarding the bidding process for a project in the Region 5 Pacific Southwest, specifically related to the Standard Engine Garage and Barracks. It emphasizes that the products mentioned in the specifications set a benchmark for quality, performance, cost, and aesthetics, without restricting competition. While specific equipment, materials, or processes may be referenced by brand or model, these references are intended to establish quality standards rather than to limit the bidding options available to potential bidders. The document underscores the government’s intent to foster a competitive bidding environment while ensuring that submitted proposals meet established quality expectations.
    The document outlines the Indoor Air Quality (IAQ) Management requirements for construction operations at the Region 5 Pacific Southwest Standard Engine Garage and Barracks. It details protocols for managing emissions and moisture during construction to ensure the safety and health of occupants. Key components include the definition of terms associated with IAQ, such as hazardous materials and adequate ventilation, and the necessity of an IAQ Management Plan to be submitted prior to the preconstruction meeting. Quality assurance measures are emphasized, highlighting the importance of inspections, testing for moisture content, and microbial growth. The procedures mandate control of emissions through compliance with ASHRAE standards, employing low-emission materials, and protecting HVAC systems during construction. Moisture control is another critical focus, with guidance on housekeeping, inspections, site drainage, and testing for moisture penetration in materials. Overall, these comprehensive guidelines aim to promote sustainable development and mitigate health hazards associated with poor indoor air quality in new construction, reflecting government commitments to environmental protection and public health in RFP and grant frameworks.
    The document outlines specifications for rough carpentry within the Region 5 Pacific Southwest Standard Engine Garage and Barracks project. It includes various types of wood products, their treatments, and construction standards essential for compliance with competitive bidding and contract requirements. Key elements include definitions of lumber types, sustainable design submissions adhering to California environmental standards, and rigorous quality assurance measures. Proper treatment for wood preservation against moisture and insects is mandated, along with criteria for acceptable moisture content. Installation guidelines emphasize structural integrity and safety, detailing methods for framing, fastening, and protecting treated wood. The document serves as a comprehensive guide for contractors to ensure materials and practices align with federal and local project regulations, ultimately reinforcing the importance of durability, compliance, and sustainability in construction projects. Overall, it establishes clear expectations and standards for contractors involved in the rough carpentry aspects of the specified project, catering to industry protocols and environmental considerations.
    This document outlines specifications for Structural Insulated Panels (SIPs) to be used in the construction of the Standard Engine Garage and Barracks in Region 5 Pacific Southwest. It delineates requirements for SIPs, including their composition of oriented strand board (OSB) and expanded polystyrene insulation, compliance with various standards, and the necessity for pre-installation meetings to confirm project specifications. The document emphasizes quality assurance, recommending that manufacturers be certified members of the Structural Insulated Panel Association and that installers possess specific training qualifications. Furthermore, it details sustainable design submittals, action and informational submittals, and the required handling and storage of SIPs to prevent damage. The panels must meet specified performance and structural integrity standards, including acceptable R-values and U-values for insulation efficiency. It also outlines installation processes for wall and roof constructions, ensuring adherence to the SIP manufacturer's instructions. Warranty parameters include a 20-year warranty against material failure. This document serves as a critical reference in government procurement processes, ensuring compliance with industry standards while enhancing the sustainability and efficiency of building practices within federal projects.
    This document outlines the specifications for solid surface vertical wall panels as part of the construction requirements for a project within Region 5 Pacific Southwest. It delineates the necessary materials, specifically Formica Everform Solid Surface, and emphasizes sustainable design practices, including VOC content limits and compliance with California standards for adhesives used. The document specifies required actions for submittals, including product data, samples, and shop drawings, and mandates the submission of environmental certifications for materials used. Qualifications for installers and fabricators are outlined, ensuring that all parties have expertise in solid surfacing work. Key installation instructions emphasize environmental conditions, stating solid surfaces should only be installed when the building is sealed and indoor environments are regulated. Fire safety is addressed through strict adherence to flame spread requirements. Finally, the document stipulates processes for delivery, handling, and cleaning of materials post-installation to maintain quality and ensure compliance with specified standards. Overall, the document serves as comprehensive guidance aimed at ensuring that all solid surface applications meet both aesthetic and regulatory criteria for the project, aligning with government standards for federal, state, and local contracts and grants.
    This document outlines the specifications for thermal insulation materials, specifically focusing on cotton fiber blanket insulation and extruded polystyrene foam-plastic board insulation. It includes details on necessary action submittals, sustainable design certifications, and installation guidelines. Key requirements emphasize compliance with various environmental and performance standards, including GREENGUARD certification and ENERGY STAR qualification. The document specifies performance requirements, labeling, and fire safety for the insulation materials, detailing installation procedures to ensure proper fitting and adherence to manufacturer instructions. Protecting the insulation from damage during storage and installation is also highlighted. Overall, this section serves as a guideline for contractors and builders on acceptable insulation products and standards necessary for the construction of the Standard Engine Garage and Barracks in the Pacific Southwest region, reinforcing the commitment to energy efficiency and compliance with safety regulations.
    The document outlines specifications for weather barriers, specifically focusing on the installation and performance criteria for building wrap as part of a construction project. It includes details on required product data, including air and water-vapor permeance testing results, and structural details related to building wrap terminations and penetrations. Key compliance standards such as UL 2818 for chemical emissions, California Department of Public Health regulations, and certification of Environmental Product Declarations are highlighted for sustainable design considerations. The building wrap must adhere to ASTM E1677 and demonstrate flame-spread and smoke-developed indexes, with strict tolerances for air permeability, water vapor permeance, ultraviolet exposure, and compliance with fire safety protocols. Additionally, installation guidelines emphasize the importance of sealing seams and penetrations in accordance with manufacturer instructions. This document serves as a critical reference for contractors and developers involved in federal and state construction projects, ensuring adherence to safety, environmental, and performance standards. It exemplifies the government's commitment to sustainable building practices in infrastructure projects across various regions.
    This document outlines the specifications for formed metal roof panels, specifically for the Standard Engine Garage and Barracks project in the Pacific Southwest region. It details submittal requirements, quality assurance measures, and installation guidelines for the roofing system to ensure compliance with performance standards. Key points include the need for sustainable materials with specified recycled content, detailed product data for roofing panels, and maintenance data submissions. Additionally, the document emphasizes the necessity of performance testing for wind resistance, water penetration, and air infiltration, alongside the importance of proper delivery and installation procedures to prevent damage to the roof panels. It mandates warranties for both materials and finishes over a 30-year period, providing assurance against structural failures and deterioration. Overall, the document serves to guide contractors and suppliers in delivering a high-quality metal roofing system that meets government regulations and performs optimally within specified environmental conditions. Its purpose aligns with government RFPs demanding adherence to building standards and sustainability practices in public infrastructure projects.
    The document outlines specifications for the installation of formed metal wall panels, focusing on products featuring concealed-fastener and lap-seam designs. Key submittals include product data, sustainable material requirements—including a minimum of 10% recycled content—and detailed shop drawings. Performance testing and quality assurance measures are specified to ensure compliance with the Standard Building Code and industry standards, addressing water resistance, air infiltration, and structural integrity. Logical coordination of installation with adjacent work is emphasized to achieve a leakproof and durable construction. The warranty provisions are extensive, covering materials and finishes for a period of 30 years after completion. The panel system is expected to consist of premium materials such as 24-gauge steel with specified coatings ensuring longevity and minimal maintenance. The document presents a structured approach, adhering to relevant ASTM standards and health guidelines, indicative of a comprehensive response to government RFP requirements. It underscores the importance of quality, safety, and environmental sustainability in construction projects across the Pacific Southwest region, specifically for the Standard Engine Garage and barracks.
    This document outlines the specifications for metal soffit panels as part of a federal project, emphasizing sustainable design, quality assurance, and installation standards. Key components include the requirement for product data submittals such as construction details and recycled content documentation, with a minimum of 10% post-industrial and post-consumer recycled materials specified. Quality assurance involves installer qualifications and closeout submittals, including maintenance data. The document details the handling, delivery, and storage processes to prevent damage during transit and installation, alongside warranty terms spanning 20 years for both structural integrity and finishes. Performance requirements specify that the panels must withstand wind loads and air infiltration rates while allowing for thermal movement. The fabrication section indicates compliance with several standards, and installation techniques are designed to ensure weather-tightness and structural alignment. The guidelines also cover cleaning and protection measures post-installation. Overall, this document serves as a comprehensive guide to ensure the successful implementation of metal soffit panels in a government-funded construction project, aligning with environmental standards and structural integrity.
    This document outlines specifications for hollow metal doors and frames as part of the construction requirements for the Standard Engine Garage and Barracks in Region 5, Pacific Southwest. It details the types of doors and frames included, definitions for minimum thickness, and various coordination requirements for installation, including door hardware and access control systems. Key aspects involve sustainable design compliance with specific environmental standards, including VOC content, and submission guidelines for product data, shop drawings, and qualification documentation for inspectors. Quality assurance is emphasized, with requirements for thermally rated doors, sound transmission control, and adherence to relevant standards for materials and fabrications. The section also specifies delivery, storage, handling, and installation procedures, ensuring doors and frames are installed properly and securely. Finally, it outlines procedures for field quality control and repair of installations that do not meet specified standards. This document serves as a crucial guideline for ensuring compliance and quality in the construction process, aligning with the objectives of federal RFPs and local grants to ensure durability, sustainability, and safety in building projects.
    This document outlines the specifications for hollow metal doors and frames as part of a federal construction project, focusing on both interior and exterior standard steel doors and frames, including pocket door frames. Key topics include construction details, material requirements, hardware installation coordination, and sustainable design standards. Compliance with various performance metrics such as thermal ratings and sound transmission control is emphasized, alongside adherence to regulations set by entities like the California Air Resources Board and the Department of Public Health. Submittal categories cover product data, sustainable design compliance, shop drawings, qualifications for inspectors, and product testing reports. Detailed guidelines for delivery, storage, installation, and quality assurance are included, ensuring proper handling and alignment of door frames. Factory pre-fabrication preparation for hardware is mandated, alongside specific requirements for insulated glass and frame anchors. The overall purpose of these specifications is to establish a precise framework for manufacturing, installing, and inspecting hollow metal doors and frames, ensuring they meet necessary safety and performance standards within a government project context.
    This document outlines the specifications for access doors and frames as part of construction for the Region 5 Pacific Southwest Standard Engine Garage and Barracks. It includes requirements for materials, installation, and sustainable design considerations. Key elements include minimum thickness standards, coordination for hardware and security systems, and criteria for sustainable materials that comply with California regulations on VOCs and chemical emissions. The section specifies the types of access doors, detailing requirements for flush access doors, including size, material, and optional features. It emphasizes the need for smooth finishes, appropriate fabrication techniques, and adherence to specific ASTM standards during production. Installation procedures necessitate examination of substrates, compliance with manufacturer instructions, and quality control measures post-installation. Adjustments after installation for optimal function are also mandated. Overall, this document serves as a guideline for contractors to ensure quality, compliance with environmental regulations, and proper functionality of access doors and frames in government construction projects.
    The document outlines specifications for overhead sectional panel doors, including construction, installation, and performance requirements for a project noted as Region 5 Pacific Southwest Standard Engine Garage and Barracks. It details action and informational submittals required from contractors, including product data, shop drawings, and samples for verification. Quality assurance guidelines mandate that installers must be trained and approved by the manufacturer, with warranties covering material failures. The doors must comply with accessibility standards, structural performance under wind loads, and seismic requirements. Key product specifications include insulated steel construction, operability standards, and motorized operation capability. The section emphasizes comprehensive testing, installation procedures, and maintenance guidelines. This document serves as a crucial element in the procurement processes for federal, state, and local projects, ensuring that the products meet established safety and performance standards vital for governmental infrastructure.
    This document outlines the specifications for aluminum-clad wood windows as part of the construction for the Standard Engine Garage and Barracks in the Pacific Southwest region. It details submission requirements including product data, shop drawings, and sustainable design compliance, emphasizing the use of sustainably harvested wood and VOC regulations in paint and coatings. Quality assurance standards stipulate compliance with industry benchmarks and require installers to have substantial experience. The warranty covers manufacturers’ commitments to address defects in materials or workmanship for a decade post-completion. The specifications for the windows encompass performance criteria including thermal transmission and air infiltration rates consistent with established standards, listing Andersen E-Series as the approved product. Other materials and construction elements, such as hardware installations and insect screens, are specified to ensure durability and aesthetic alignment. The document culminates in installation procedures, ensuring proper alignment, weather-tightness, and compliance with testing agency requirements for air and water infiltration. This thorough specification serves not only as a guide for construction but also as assurance of environmental and operational standards aligning with government initiatives for sustainability and efficient building practices.
    The document outlines specifications for door hardware as part of the federal RFP for the construction of the Standard Engine Garage and Barracks in the Pacific Southwest, detailing both mechanical hardware for swinging and pocket doors. It emphasizes the need for coordination among installation templates, security, and electrical system integration. The analysis mandates comprehensive product submittals, including data, samples, and a door hardware schedule, which must align with the construction plans. Each installation must adhere to specific accessibility and performance standards, ensuring compliance with relevant building codes and federal agency requirements. The document highlights quality assurance, necessitating qualified installers and consultants in door hardware. Additional sections address delivery, storage, maintenance, warranty obligations, and execution details like installation heights and adjusting mechanisms for optimal performance. This specification ensures that all door hardware is functional, secure, and meets aesthetic standards. Overall, it serves as a critical reference for fulfilling the hardware requirements of the construction project.
    This document, Section 092216, outlines specifications for non-structural metal framing intended for use in interior gypsum board ceilings as part of the Standard Engine Garage and Barracks project in Region 5 Pacific Southwest. It details requirements for sustainable materials, including minimum recycled content and compliance with various environmental standards. The document emphasizes the qualifications of installers, the quality assurance of framing members, and the correct handling, delivery, and storage of materials. Performance requirements cover load limitations and deflection criteria, while ensuring compliance with relevant design codes, including AISI S220 and ASTM standards. Installation guidelines outline procedures for verifying site conditions before installation, ensuring proper alignment and securing connections. It specifies methods for installing framing and ceiling systems when accommodating building movement and load requirements, detailing the placement of studs, tracks, and suspension systems. The section serves to ensure that all framing work meets stringent performance, safety, and environmental standards, essential for government-led construction projects under RFPs and grants aimed at sustainable and compliant building practices.
    The document outlines specifications for gypsum board installation, integral to the construction of the Standard Engine Garage and Barracks. It details various types of gypsum boards, including standard and water-resistant options, as well as required action submittals such as product data and environmental considerations like recycled content and local sourcing. The guidelines emphasize compliance with ASTM standards, proper storage, field conditions, and installation methods tailored to minimize joints and ensure durability. Key elements include instructions on joint treatment materials, installation techniques for both interior wall and ceiling applications, and finishing levels for surface preparation prior to decoration. Additional focus is placed on protecting installed products and the environment during and after construction. This summary highlights the government's commitment to quality standards and sustainability in construction practices while facilitating compliance with federal and local regulations for RFPs and grants related to the project.
    This document outlines specifications for the installation of resilient base and accessories, primarily using thermoset rubber products in construction. It includes requirements for product selection, testing for harmful substances, and adherence to local and state regulations regarding chemical emissions. Key stipulations include the necessity for sustainable design materials, proof of low VOC (volatile organic compounds) compliance, and adherence to specified temperature ranges during installation. The document emphasizes the preparation and examination of substrates before installation, ensuring they meet cumulative moisture and finish requirements. Installation protocols are detailed, specifying methods for applying resilient bases and moldings, including the need for job-formed corners and adherence characteristics. Cleaning and protection measures for the installed materials are also emphasized to prevent damage during ongoing construction. Overall, this section serves as a technical guideline for contractors bidding on government projects in Region 5, aiming for high-quality, compliant installations.
    The document outlines specifications for resilient flooring installation, focusing on interlocking rubber floor tiles and sheet vinyl flooring in a gymnasium context. It details requirements for product data submissions, including sustainable design documentation that addresses VOC content, recycled materials, and compliance with health and safety standards. Installation protocols emphasize coordination with gym equipment, adherence to temperature conditions, and proper substrate preparation to ensure flooring performance. Quality assurance standards are prescribed for both the installer and the materials, ensuring that all products meet specified environmental certifications. The document also specifies the execution process for flooring installation, including installation methods, seam preparation, and cleaning procedures post-installation. The comprehensive regulations aim to foster sustainable practices while ensuring the durability and safety of the flooring in athletic environments, highlighting the importance of compliance with local and state regulations, particularly within the context of government RFPs and grants related to infrastructure improvements.
    The document outlines specifications for the installation of resilient flooring at the Region 5 Pacific Southwest Standard Engine Garage and Barracks. It includes detailed requirements for interlocking rubber floor tiles and vinyl plank flooring, emphasizing sustainable practices. Key aspects include adherence to eco-friendly certifications like GREENGUARD and CDPH standards, as well as compliance with VOC content regulations. Coordination for the layout concerning gymnasium equipment and submission of product data, maintenance manuals, and extra materials are essential. Installation procedures must ensure proper temperature control, moisture testing, and substrate preparation, focusing on adherence and safety. The document stipulates detailed installation methods for both floor tile and vinyl planks, with requirements for maintenance and protection post-installation. Overall, the document serves to guide contractors in delivering high-quality, environmentally-sustainable flooring solutions in accordance with government standards and specifications.
    The document outlines specifications for painting within the Region 5 Pacific Southwest Standard Engine Garage and Barracks project. It includes details on primers, water-based finish coatings, and floor sealers, and emphasizes compliance with sustainable design practices, including low-VOC and low-odor products. Action submittals require product data, sustainable design certifications, and sample submissions. The document mandates specific manufacturer requirements, with a focus on Sherwin Williams products. Key product specifications include interior latex paints for walls and ceilings, along with specialized primers for various substrates. The installation section details preparation, application, and expected conditions, promoting strict adherence to manufacturer guidelines and environmental compliance. Quality control measures, such as dry-film thickness testing, are outlined to ensure the quality and uniformity of painted surfaces. Additionally, there are cleaning and protection protocols aimed at safeguarding the work of other trades and required maintenance materials for touch-ups. Overall, the document serves as a comprehensive guide for contractors to adhere to painting standards and environmental regulations during the project execution, ensuring both aesthetic and compliance integrity.
    The document outlines the specifications for painting work at the Standard Engine Garage and Barracks in the Pacific Southwest region. It details the materials to be used, including primers, water-based finish coatings, and floor sealers, while emphasizing sustainability and compliance with California's stringent air quality regulations. The guidelines include submission requirements for product data, VOC content, and sustainable testing certifications. Application conditions stipulate proper temperature and humidity levels, and procedures for substrate preparation, cleaning, and application techniques. The document also specifies product sources, including Sherwin Williams and H & C Products Group, mandating material compatibility and outlining a precise painting schedule for different substrates. Finally, it emphasizes quality control through dry-film thickness testing and proper waste disposal practices following local regulations, reflecting a structured approach to ensure high-quality workmanship and environmental compliance. Overall, this document serves as a critical reference for contractors bidding on the project, ensuring adherence to regulatory standards and optimal painting practices.
    This document outlines specifications for installing toilet, bath, and laundry accessories as part of a federal RFP for public-use facilities at a Standard Engine Garage and Barracks in the Pacific Southwest. It includes details about various components like washroom and shower accessories, under lavatory guards, and custodial accessories. Key requirements emphasize compliance with accessibility standards and structural performance, specifically that grab bars and shower seats must withstand 250 pounds of concentrated load. The document lists product approval procedures, including action and informational submittals, maintenance data, and warranty information. The use of stainless steel and specific models from the manufacturer Bobrick is mandated. Installation guidelines require adherence to manufacturer instructions and accessibility laws, aiming for durability and safety in public settings. Overall, the document seeks to ensure high quality and functional standards in the provision of essential bathroom equipment within government projects.
    This document outlines the specifications for fire protection cabinets intended for portable fire extinguishers as part of the Region 5 Pacific Southwest Standard Engine Garage and Barracks project. It details action submittals required from contractors, including product data, shop drawings, and maintenance data. Emphasis is placed on product performance requirements, stating that cabinets must comply with ASTM E814 for fire-resistance rating, with a specific model (Larsen Vista Series) indicated for use. Materials must consist of stainless steel with clear acrylic doors, highlighting the importance of durability and accessibility. Installation guidelines stress proper mounting heights and secure fastenings to ensure safety and functionality. Coordination with surrounding constructions regarding dimensions and functionality is crucial. This document reinforces the need for standardization across fire protection equipment procurement to ensure compatibility and reliability. Overall, the specifications aim to ensure the safety and effectiveness of fire protection systems within the facility, reflecting government standards in emergency preparedness and building safety.
    The document outlines specifications for portable, hand-carried fire extinguishers and their mounting brackets as per Section 104416. It emphasizes the need for compliance with NFPA 10 standards, requiring detailed product data, including ratings, classifications, and dimensions of the extinguishers and their relevant accessories. A notable feature is the six-year warranty period from the manufacturer against material or workmanship failures, including hydrostatic testing issues and faulty operations. The fire extinguishers specified are a multi-purpose dry chemical type with a 10 lbs capacity, approved and labeled by an independent testing agency. The installation must be conducted in compliance with jurisdiction regulations, ensuring that all extinguishers are examined for proper functionality before installation. This document serves as a guideline within federal RFPs and grants, highlighting the government's commitment to safety and regulatory compliance in fire protection systems across various facilities.
    The document outlines the specifications for knocked-down athletic lockers as part of a government project in the Pacific Southwest region. It includes product data requirements, emphasizing sustainable design through the use of materials with at least 25% post-industrial and post-consumer content. The document stipulates compliance with various environmental and safety standards, including VOC limits and GREENGUARD Certification. Details on construction materials and methods are provided, such as specifications for expanded-metal doors, body framework, and locking mechanisms. Maintenance requirements are highlighted, including warranty information, with an assurance to repair components that fail within a two-year period due to manufacturing defects. The section also includes installation directives, ensuring proper alignment and support for the lockers. Key accessories and attributes, such as identification plates and hooks, are specified to enhance functionality. This information is crucial for potential contractors in preparing bids and ensuring compliance with government standards, particularly concerning environmental sustainability and safety in public spaces.
    The Trimmer & Auberry New Construction project in the Sierra National Forest aims to design and construct new administrative buildings to replace those lost in the Creek Fire. This undertaking will utilize a single Design-Build Contract, obligating the contractor to deliver labor, materials, and services necessary to complete the project per specified guidelines. Key deliverables include project definition documents, design compliance with codes, and a complete set of construction drawings. The project is located at the Trimmer Work Center and Auberry Station and is estimated to exceed $10 million, reflecting its significant scope. It encompasses phases such as design development, construction documentation, and various construction aspects, including site preparation, utilities installation, and building construction. Special requirements include adherence to safety and environmental regulations, integrated design collaboration, and usage of domestic materials in compliance with the Buy American Act. The successful contractor must demonstrate compliance with labor safety standards and ensure that health and safety plans are in place prior to construction. The project signifies a broader federal investment into infrastructure for the Sierra National Forest, emphasizing efficient and sustainable building practices.
    This document details specifications for the procurement and installation of horizontal louver blinds featuring polymer slats, targeted for the Standard Engine Garage and Barracks in Region 5 Pacific Southwest. It encompasses a comprehensive outline of requirements, including submittals for product data, shop drawings, samples, and maintenance information. It mandates testing compliance with NFPA 701 for fire resistance and details sustainable design submissions, such as VOC content and GREENGUARD certification. The file emphasizes the need for uniform procurement from a single manufacturer, identifying American Blinds and Shades Graber Lake Forest as an acceptable source. Key features of the blinds include lead-free, UV-stabilized polymers, and robust manual lift and tilt mechanisms enclosed in durable headrails. The installation procedures assert the importance of adhering to specific dimensional tolerances, ensuring operational performance, and maintaining cleanliness and protection during and after installation. The document's structure is methodical, covering general requirements, product specifications, and execution guidelines, in line with federal RFPs and standards. Overall, the specification aims at guaranteeing safety, durability, and sustainability in the deployment of window treatments in a government facility.
    This document outlines the specifications for plastic-laminate-clad countertops in a federal project, focusing on requirements for materials, installation, and compliance with sustainability standards. The section includes product data submissions, sustainable design requirements adhering to California’s environmental standards, and quality assurance protocols for fabricators and installers. Key points include the necessity for VOC compliance, certification of materials for low chemical emissions, and the AWI Quality Certification for workmanship. The countertops must feature high-pressure decorative laminate and specific core materials, with detailed instructions on fabrication, installation, and environmental conditions necessary for ensuring product longevity and performance. Emphasis is placed on quality control throughout the project, from preparation to final installation and maintenance. This section exemplifies a commitment to environmental responsibility while maintaining high construction standards in government procurement practices.
    The document outlines specifications for commercial showers, primarily focused on installation and maintenance requirements within federal and local projects, specifically for the Standard Engine Garage and Barracks in the Pacific Southwest region. It includes sections on materials, action and closeout submittals, and pipe connections, emphasizing compliance with safety standards such as the U.S. Safe Drinking Water Act and various plumbing standards. Key components detailed include shower bases made of polymethyl methacrylate (PMMA), various types of shower heads and valves, and specifications for maximum flow rates to meet environmental standards. The document further specifies the need for maintenance materials and proper installation procedures to ensure functionality and safety. The structured approach of the document aids in clear communication of the expected project requirements, helping contractors deliver compliant and safe installations for government facilities.
    The document outlines specifications for the installation and maintenance of emergency plumbing fixtures, specifically eyewash units, under Section 224500. It defines various terms, including accessible and plumbed emergency fixtures, and lays out detailed action and informational submittals required for compliance. Key performance requirements demand adherence to established standards such as ANSI/ISEA Z358.1 and ASSE 1071, ensuring fixtures are certified and suitable for use. The document also includes precise product specifications for wall-mounted eyewash units, emphasizing features like stainless steel construction, integrated filters, and compliant signage. Installation guidelines stress the importance of verifying water and waste line placements and mandate the proper assembly and testing of fixtures to confirm functionality and safety. Quality control measures entail rigorous testing for leaks and operational checks, ensuring fixtures meet established capacities. Overall, the document reflects a commitment to providing safe and accessible emergency plumbing solutions in government facilities, supporting compliance with federal regulations and ensuring the health and safety of users during emergencies.
    This document outlines the Supplemental Requirements for Electrical Work related to the construction of the Standard Engine Garage and Barracks in the Pacific Southwest Region. It specifies standards for electrical installations, referring to related sections for seismic and wind-load guidelines. Key components include a glossary of electrical terms and abbreviations, design specifications, and performance requirements for emergencies and essential services. The document emphasizes the coordination of electrical service interruptions with the owner and the need for preinstallation meetings focusing on installation schedules and energy efficiency. It underscores the importance of qualified professionals for various roles, including electrical and lighting engineers, ensuring that all activities comply with quality assurance standards. Additionally, it establishes a facility Electrical Preventive Maintenance (EPM) program to enhance safety and operational reliability post-installation. This thorough set of guidelines aims to promote efficient and compliant electrical work while addressing safety concerns in facility operations and maintenance.
    The document outlines the specifications and requirements for wiring devices in the Standard Engine Garage and Barracks project under Section 262726. It includes a variety of components such as general-use switches, receptacles (both general and hospital-grade), dimmers, and connectors. Key subsections detail the prerequisites for installation, including compliance with applicable standards and the necessity for pre-installation meetings involving project stakeholders. Product qualifications, action submittals, and maintenance materials like extra stock and special tools are addressed, emphasizing the need for proper warranties and field quality control measures. Furthermore, the document stresses adherence to regulatory requirements as outlined by the National Fire Protection Association (NFPA) and Underwriters Laboratories (UL), ensuring safety and functionality. The installation process is regulated, with instructions for testing, inspections, and adjustments to guarantee performance. This document serves as a crucial guideline for contractors and manufacturers involved in fulfilling government RFPs and federal grants related to infrastructure and electrical standards within government facilities. The comprehensive outline ensures that all parties are aware of and adhere to required specifications and standards throughout the project lifecycle.
    This document outlines the requirements for lighting systems in a construction project located in the Pacific Southwest Region, specifically for a Standard Engine Garage. It includes specifications for luminaires, fittings, electric-discharge lamp control equipment, and lamps. It emphasizes compliance with relevant regulations such as NFPA 70 and UL standards, detailing action and informational submittals necessary for product approval. Key definitions, such as Correlated Color Temperature (CCT) and Color Rendering Index (CRI), are provided to clarify lighting quality metrics. The section establishes performance criteria, including energy efficiency standards and sustainable design data submissions. Installation guidelines are described, requiring due consideration of various construction techniques and coordination with other trades to ensure compliance and functionality. The document also addresses quality control through structured testing and field inspections, ensuring that products meet specified operational standards. Overall, the document serves as a comprehensive guideline ensuring that all lighting components are functional, efficient, and compliant with safety regulations, reflecting the project’s commitment to maintaining high construction and operational quality standards in line with government regulations.
    The Trimmer & Auberry New Construction project in Sierra National Forest aims to replace and expand facilities lost in the 2020 Creek Fire. This includes the construction of new buildings at the Trimmer Work Center and Auberry Station, enhancing operational capacity. The Trimmer Work Center will feature a Forest Service Full Engine Bay with associated barracks, upgraded water systems, and parking areas. The Auberry Station will entail a pre-fabricated metal building for storage and office space, also including proper drainage and a retaining wall. Environmental assessments have been completed, with measures to protect hydrology and cultural resources, alongside strategies to control invasive species. Designs must adhere to sustainable construction standards, including renewable energy requirements, while ensuring strong coordination with local utility providers. Security, parking, and necessary amenities will be integrated, following detailed site plans. The project not only stresses aesthetics in line with Forest Service standards but also includes functional facilities for employee use within a controlled environment. This construction initiative reflects a strategic approach to recovery and management of forest service operations post-disaster.
    The Sierra National Forest's Trimmer and Auberry New Construction project involves creating new facilities with a focus on sustainability, efficiency, and adherence to federal and state guidelines. The design must reflect Region 5 aesthetics, emphasizing harmony with the natural environment and incorporating energy-efficient standards. Key objectives include meeting space utilization mandates, achieving at least 30% energy savings over baseline standards, and using native vegetation for landscaping to minimize environmental impact. The project requires adherence to accessibility standards, a minimum 50-year life expectancy for materials and structures, and integration of modern technologies to facilitate communication and operations. Moreover, considerations for stormwater management, utilities, and a strong focus on creating a welcoming outdoor space are mandated. The document outlines a comprehensive structural and engineering plan, ensuring compliance with local and international building codes, including detailed requirements for plumbing, electrical systems, and sustainable architectural practices. Overall, the initiative underscores the Forest Service's commitment to environmental stewardship while enhancing operational efficiency within a durable infrastructure.
    The Trimmer & Auberry New Construction project in Sierra National Forest outlines comprehensive guidelines for project management, payment procedures, administrative requirements, quality control, and temporary facilities. The document emphasizes the preparation of a Schedule of Values for progress payments and mandates electronic submissions for applications and change orders. It details protocols for construction management, including a Project Management Information System (PMIS) for document tracking and collaboration among stakeholders. The Quality Requirements section specifies standards for construction quality assurance and necessitates the submission of test reports and quality control plans. Safety measures, including the provision of temporary facilities and security controls on site, are crucial to ensuring compliance with regulations. The structured format of the document, including clearly designated sections, highlights the expected roles and responsibilities of contractors (DBC) in maintaining quality and project timelines. Overall, the document serves as a critical framework guiding the execution of construction activities, emphasizing efficient operations, safety, and adherence to government standards.
    The document pertains to the design and construction plans for the Trimmer Work Center in the Sierra National Forest, overseen by the U.S. Department of Agriculture, Forest Service. It includes detailed drawings and specifications, indicating compliance with various architectural and safety codes, such as the Americans with Disabilities Act and the International Building Code. The project encompasses multiple facets, including structural, mechanical, electrical, and plumbing plans, highlighting the total gross square footage allocated for different occupancy levels and amenities. Notably, it lists the required vs. provided egress widths and occupancy load details, ensuring adherence to safety regulations. This file serves as an integral component within the framework of federal grants and RFPs, indicating the government's commitment to developing functional facilities while ensuring safety, accessibility, and compliance with current codes and standards.
    The document outlines the designs and specifications for the Standard Engine Garage project overseen by the United States Department of Agriculture's Forest Service, specifically in Region 5, located in Vallejo, California. The project includes detailed architectural, mechanical, electrical, and plumbing plans, along with a schedule of equipment and materials required. Key features of the design include adherence to applicable building codes, a construction type of VB that is fully sprinkled, and an occupant load estimation based on safety codes. The document provides a comprehensive list of drawings, including floor plans, elevations, and mechanical details, while also highlighting compliance with various state and national standards. It emphasizes the importance of safety in design and construction, ensuring all electrical work meets current codes and all plumbing systems are properly documented. The extensive details provided are essential for contractors responding to this RFP, ensuring that all aspects of construction meet regulatory standards and project specifications. The overall aim is to equip the facility with adequate systems to serve operational needs effectively while maintaining safety and compliance.
    The US Forest Service Region 5 in the Pacific Southwest outlines its Design Standard Finishes and Materials for construction projects. The document specifies exterior materials like standing seam snap lock metal roofing, Western reveal and wave panels, Andersen E series windows, and particular door models. For interior finishes, it includes guidelines for paint, sheet vinyl flooring, carpet tiles, and countertops. Notable brands mentioned are Sherwin Williams for paint, Tarkett for flooring and wall base, and Formica for counters. The structure of the document categorizes materials into exterior and interior, focusing on aesthetics and functionality while adhering to sustainability standards, which is crucial for government-funded projects. This file serves to standardize material selection for efficiency and uniformity in construction across the Pacific Southwest forests, aligning with federal RFPs that dictate specifications for public service infrastructures.
    The document outlines General Decision Number CA20240018 pertaining to wage determinations for various construction projects in California, specifically covering building, heavy (dredging), and highway construction across multiple counties. It provides key details regarding wage rates mandated under the Davis-Bacon Act and relevant Executive Orders (14026 and 13658), ensuring that contractors pay workers at least the specified minimum wage rates based on the contract’s award date. Separate wage rates are listed for various job classifications, including asbestos removal workers, electricians, and carpenters, categorized by geographic areas within the state. The document emphasizes that wage rates differ by area and type of work, detailing fringe benefits as well. This information serves as a guideline for contractors engaged in federally funded projects, highlighting the importance of compliance with labor laws in an effort to protect worker rights and ensure fair compensation. The document reflects the government's commitment to maintaining oversight in project funding while ensuring adherence to wage regulations.
    The document outlines the design specifications and project details for the United States Department of Agriculture's Forest Service's Standard Barracks, located in Region 5, Pacific Southwest. The project includes detailed architectural, structural, mechanical, electrical, and plumbing plans for barracks meant to accommodate six individuals. Key aspects discussed include compliance with various building codes, including those related to energy efficiency and safety, as well as specific construction types and materials to be used. The barracks will feature a layout that accommodates bedrooms, bathrooms, a kitchen, and living areas, adhering to standards for accessibility and occupant safety, such as egress width and management of hazardous materials. Additional provisions for interior finishes and exterior aesthetics are highlighted. The document serves as a guideline for contractors and architects involved in the bidding process, ensuring that all designs meet federal standards and local regulatory requirements while efficiently planning for construction details and project execution timelines.
    The Trimmer & Auberry New Construction project is aimed at repairing and upgrading facilities in the Sierra National Forest devastated by the 2020 Creek Fire. The plan includes constructing new buildings at the Trimmer Work Center and Auberry Station, featuring essential amenities and upgraded infrastructures such as an engine bay, barracks, and necessary utilities. The project emphasizes sustainable design, adhering to USDA and Forest Service regulations, with a focus on renewable energy and ecological considerations. The scope includes the design and construction of insulated metal buildings, restroom facilities, septic systems, and reinforced access roads, ensuring adequate parking for vehicles and equipment. A critical aspect of the project is the engagement in environmental protection, with strategies for preventing invasive species spread and safeguarding cultural resources during construction. The finalized designs must comply with established construction standards and include features that enhance operational capabilities, like rolling bays and specific areas for equipment storage. Cooperation with local authorities will also play a role in access and resource management throughout the construction phase, reflecting the project’s alignment with government funding strategies aimed at restoring public service facilities in affected regions.
    The document outlines the design specifications and plans for a Standard Engine Garage to be constructed by the United States Department of Agriculture Forest Service, located in Vallejo, CA. It includes detailed architectural, structural, mechanical, electrical, and plumbing plans. The facility aims to provide a fully sprinkled, code-compliant construction that accommodates various operational needs within the Pacific Southwest Region. Key elements covered include the project's compliance with applicable building codes, occupancy regulations, and design parameters, such as a gross square footage of 3,600 and an occupant load of 24, with extensively detailed drawings of floor plans, sections, elevations, and wall types. The document emphasizes the integration of energy-efficient systems, including HVAC, plumbing layouts, and electrical schematics. Furthermore, it stresses the need to follow safety guidelines, including adherence to the Architectural Barriers Act and National Electrical Code. The well-structured plans and extensive notes indicate a thorough approach to ensuring safety and functionality, crucial for potential contract bidders participating in the RFP or grant processes associated with government projects. This project demonstrates a proactive commitment to sustainability while enhancing operational effectiveness for forest service activities.
    The document outlines the schedule of values for a construction project by Trimmer & Auberry, designated for the Sierra National Forest High Sierra Ranger District in Fresno County. The file is structured into several key phases, including Conceptual Design, Design Development, Construction Documents, Administration, and Construction. Each phase is subdivided into base bid items encompassing various activities such as design verification, construction administration, site preparation, and the construction of multiple facilities like barracks and an engine garage. Utilities installation and enhancements, including a water system distribution redesign, are also specified. The total project encompasses comprehensive planning, design, and construction efforts aimed at developing facilities essential for the ranger district's operations. This document serves as a framework for contracting processes related to federal grants and state-local RFPs, highlighting the commitment to improving infrastructure within protected areas while deploying federal resources efficiently.
    This document outlines Amendment 0002 to solicitation number 12970224R0024 regarding the design and construction project for the Trimmer & Auberry area in the Sierra National Forest, under the jurisdiction of the USDA Forest Service. The amendment targets only the two offerors moving to Phase 2 of the project. Key updates include revisions to the Project Program, Schedule of Items, Standard Barracks Set, and Standard Engine Garage specifications. Additionally, it establishes a Phase 2 site visit scheduled for December 19, 2024, along with the rally location and the point of contact for inquiries. The amendment also sets crucial deadlines: requests for information (RFI) must be submitted by December 31, 2024, while proposal submissions are due by January 20, 2025. The project's scope involves commercial and institutional building construction, with a magnitude exceeding $10 million. Contact details are provided for key personnel involved in the project, emphasizing coordination among stakeholders. This amendment ensures that all parties adhere to updated specifications and timelines, facilitating a structured approach to the construction process.
    The document outlines the plumbing requirements for the construction of the Standard Engine Garage and Barracks in Region 5 Pacific Southwest. It details the scope of work, including the installation of domestic hot and cold water piping, drain, waste, and vent systems, and plumbing fixtures, under California's regulatory guidelines. The work must comply with multiple codes, such as the International Plumbing Code and American National Standards, and be executed by licensed plumbing contractors. Key aspects covered include the materials specifications for plumbing fixtures and piping, outlining acceptable types, sizes, and installation methods. Emphasis is placed on the need for plumbing fixtures to meet accessibility standards and the proper insulation of piping. Additionally, the document includes requirements for cleanouts, valves, and testing protocols for the entire plumbing system to ensure functionality and compliance upon completion. This file serves to inform contractors participating in government RFPs and grants about the specific plumbing systems to be installed, indicating criteria for quality, safety, and adherence to established plumbing codes, essential for the successful execution of the project within outlined parameters.
    The document outlines the basic plumbing requirements for a project in the Pacific Southwest Region 5, specifically for the Standard Engine Garage and Barracks. It details the scope of work, including the installation of a domestic hot and cold water piping system, plumbing fixtures, and disinfection of water systems. All work must comply with various codes and standards such as ANSI, NSF, AWWA, and local regulations, ensuring strict adherence to safety and structural integrity. Licensed California plumbing contractors are mandated for the work, and submittals must be made for any equipment or fixture substitutions, including technical specifications of materials used. The document specifies material requirements for plumbing and piping, including types of pipes and valves, insulation standards, and fixture specifications, ensuring accessibility and compliance with federal standards. It emphasizes the importance of proper installation, testing, and disinfection of the plumbing systems to prevent contamination and maintain functionality. The document serves as a comprehensive guideline to ensure that all plumbing aspects meet regulatory requirements, emphasizing quality and safety in the construction process. This information is pertinent for RFPs and grants aimed at improving federal and local infrastructures.
    The document is an amendment for a Request for Proposal (RFP) related to construction projects under the USDA Forest Service. Specifically, it modifies an existing solicitation regarding the construction of the Trimmer Work Center Barracks by updating the RFP reference number and responding to requests for information (RFIs) received. The amendment extends the RFP response deadline to August 26, 2025. It specifies that acknowledgment of the amendment must be made either on the offer copies, through separate correspondence, or electronically before the designated deadline to prevent rejection of the offer. The RFP involves commercial and institutional building construction, with an estimated value exceeding $10 million. The document also confirms that all other terms and conditions remain unchanged. This amendment elucidates the administration's efforts to streamline the procurement process while ensuring compliance with federal regulations.
    The document outlines responses to a series of Requests for Information (RFIs) related to the Trimmer & Auberry New Construction RFQ. Key clarifications include amendments to the submission requirements, such as adjusting the page limit for Volume 1A from 10 to 20 pages, encompassing all deliverables within that volume. The due date for proposals has been extended to August 26, 2024, at 5:00 PM EDT. Moreover, the submission can occur electronically to designated email addresses. Regarding joint ventures, it's clarified that while submitting a joint venture agreement is optional, the prime contractor can be either the construction contractor or the design firm. Experience requirements are also detailed; firms can submit a combination of experience from contractors and designers, though preference will be given to documented design-build project experience. Lastly, the solicitation does not require submissions in the SF330 format, although a narrative is needed to describe the relationships and roles between primary construction and design firms, and the involvement of any significant subcontractors. These clarifications ensure applicants are aligned with submission criteria and evaluation processes for the project proposal.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Bumble Stewardship IRSC, Region 5, Stanislaus National Forest, Summit RD
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, through the Forest Service, is seeking contractors for the Bumblebee Stewardship Integrated Resource Service Contract (IRSC) in the Stanislaus National Forest, California. This project aims to achieve land management goals by facilitating mechanical cutting, biomass removal, and ecological restoration across approximately 2,796 acres, with a completion deadline set for November 1, 2028. The initiative is significant for enhancing forest health and infrastructure while addressing local community needs, with an estimated construction cost ranging from $100,000 to $250,000, and performance and payment bonds required for contracts exceeding $150,000. Interested contractors are encouraged to participate in a field visit on December 17, 2024, to discuss project requirements and can direct inquiries to Jason Dierberg at jason.dierberg@usda.gov or by phone at 209-916-5366.
    BCLH Stewardship IRSC Phase 2
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the BCLH Stewardship Integrated Resource Service Contract (IRSC) Phase 2, aimed at hazardous fuel reduction and road maintenance in the Willamette National Forest, specifically following the 2020 Beachie Creek and Lionshead fires. The project encompasses cutting and removing fire-killed trees, maintaining and reconstructing roads, and performing small fuels treatment across a 1,152-acre area, with a total project value estimated between $5 million and $10 million for mandatory items and $500,000 to $1 million for optional items. This initiative is critical for restoring access to affected areas, enhancing public safety, and mitigating future fire hazards while adhering to environmental regulations. Interested contractors must register in the System for Award Management and comply with specified bonding requirements, with the solicitation anticipated to be issued around February 21, 2025, and contract awards planned for approximately April 25, 2025. For further inquiries, contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519.
    USACE SPK DBB Construction ? USFS Campground ? Lake Isabella, CA
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE), is soliciting bids for construction services related to the USFS Campground at Lake Isabella, California. This project falls under the NAICS code 236220, which pertains to Commercial and Institutional Building Construction, and involves the construction of administrative facilities and service buildings. The successful contractor will be responsible for providing the necessary construction services as outlined in the solicitation documents. Interested parties can reach out to Gilbert Coyle at gilbert.coyle@usace.army.mil or by phone at 961-557-6986, or contact Barton Kirkpatrick at barton.t.kirkpatrick@usace.army.mil or 916-557-7692 for further information.
    BCLH Stewardship IRSC Phase 1
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking contractors for the BCLH Stewardship IRSC Phase 1 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead fires in Oregon's Willamette National Forest. The project encompasses approximately 1,612 acres and includes mandatory activities such as cutting fire-killed timber, managing hazard trees, small fuels treatment, and road maintenance and reconstruction, with an estimated total cost of $5 million to $10 million for mandatory items and $500,000 to $1 million for optional items. This initiative is crucial for enhancing public safety and ecological restoration while adhering to federal regulations and sustainability goals. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, with the final solicitation expected to be issued around January 15, 2025, and contract awards planned for approximately March 21, 2025.
    Carolyn Creek Trail Bridge Project (GAOA)
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, is soliciting proposals for the Carolyn Creek Trail Bridge Project, which involves the design, fabrication, and installation of a 27-foot span glulam timber trail bridge in Spring Creek, Nevada. The project requires contractors to manage all aspects of construction, including the removal of an existing bridge and the potential use of helicopter transport due to challenging site access. This initiative is part of the Great American Outdoors Act (GAOA) and aims to enhance recreational access while adhering to environmental protection standards. Interested small businesses must submit their proposals electronically by January 2, 2025, with a project budget estimated between $100,000 and $250,000, and a performance timeline from July 14, 2025, to September 12, 2025. For further inquiries, contractors should contact Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov.
    Sweet Creek Trail Bridge # 2
    Active
    Agriculture, Department Of
    The USDA Forest Service is announcing a competitive Blanket Purchase Agreement (BPA) Call Order for road and bridge construction services within the Siuslaw National Forest, specifically for the Sweet Creek Trail Bridge 2 project. This procurement involves activities such as clearing, excavation, and the construction of prefabricated timber bridges, along with various related tasks, aimed at enhancing infrastructure within the national forest. Interested small businesses are encouraged to submit their organizational details and tailored capability statements by January 7, 2025, as the government will evaluate submissions based on the capacity to perform the required services, including project management and risk mitigation. For further inquiries, interested parties may contact DeForest Watson at deforest.watson@usda.gov.
    Shake Creek Guard Station Siding Replacement
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking contractors for the Shake Creek Guard Station Siding Replacement project in Idaho. The project involves rehabilitating the siding of several historic buildings, which includes cleaning, repairing, and potentially replacing siding while ensuring compliance with safety regulations and maintaining historical integrity. This initiative is crucial for preserving the structures listed on the National Register of Historic Places and involves managing hazardous materials, particularly lead-based paint. The estimated budget for the project ranges between $100,000 and $250,000, with a site visit scheduled for November 5, 2024, and an anticipated solicitation release in February/March 2025. Interested vendors should contact Braidy Richins at Braidy.Richins@usda.gov or 208-423-7545 for further details.
    USFS Region 5 Reforestation Services IDIQ
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, Region 5 is seeking expressions of interest from qualified vendors for a multi-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract focused on reforestation services aimed at improving forest health across various national forests in California. The contract will cover three distinct service areas—Northern, Central, and Southern California—requiring contractors to provide all necessary resources, including labor and equipment, while adhering to strict safety protocols and environmental preservation practices. This initiative is critical for enhancing the resilience of forest ecosystems and ensuring compliance with regulations regarding endangered species and historical resources. Interested vendors should submit their capabilities and service locations to Kelly Ollivant at kelly.ollivant@usda.gov by November 27, 2024, as this notice serves as market research and does not constitute a formal solicitation.
    BCLH Stewardship IRSC Phase 3
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is seeking contractors for the BCLH Stewardship IRSC Phase 3 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead Fires in Oregon's Willamette National Forest. The project encompasses the removal of fire-killed timber, management of hazard trees, and necessary road maintenance and reconstruction across a 1,843-acre area, with both mandatory and optional work activities outlined. This initiative is critical for enhancing forest health, ensuring safe access, and promoting sustainable land management practices in fire-impacted regions. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, with a total estimated project cost between $1 million and $5 million, and the solicitation expected to be issued around March 31, 2025.
    Trinity River Fish Hatchery Modernization
    Active
    Interior, Department Of The
    The Department of the Interior's Bureau of Reclamation is seeking qualified contractors for the modernization of the Trinity River Fish Hatchery located in Lewiston, California. This project, estimated to cost between $40 million and $80 million, aims to enhance the aging infrastructure of the hatchery, originally built between 1960 and 1963, to meet contemporary aquaculture needs and regulatory requirements for the next 50 years. The procurement will utilize a design-build approach, encompassing phases such as pre-design data collection, design preparation, construction execution, and post-construction support. Interested businesses must submit their capabilities and qualifications by January 10, 2025, to the designated contract specialist, Abelardo Lopez, at aclopez@usbr.gov or by phone at 916-978-5398.