N--VA-GREAT DISMAL SWAMP-Replace HVAC in bunkhouse.
ID: 140FC225Q0002Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEUS FISH AND WILDLIFE SERVICEFWS, CONSTRUCTION A/E TEAM 2Falls Church, VA, 22041, USA

NAICS

Plumbing, Heating, and Air-Conditioning Contractors (238220)

PSC

INSTALLATION OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT (N045)
Timeline
    Description

    The U.S. Fish and Wildlife Service (USFWS) is soliciting bids for the replacement and installation of two water-source geothermal heat pump units at the Crew Quarters Building located in Suffolk, Virginia. The project aims to replace outdated units that have required frequent repairs due to their age, with the selected contractor responsible for providing compatible new units, thermostats, and related materials while ensuring compliance with applicable regulations and standards. This initiative reflects the USFWS's commitment to sustainability and efficient energy use in its facilities, with a total contract amount estimated to be less than $25,000 and a performance period scheduled from January 20, 2025, to March 20, 2025. Interested contractors must conduct a site visit on December 10, 2024, and submit their quotes by December 27, 2024, with inquiries directed to Contract Specialist Bill Koski at william_koski@fws.gov.

    Point(s) of Contact
    Koski, William
    william_koski@fws.gov
    Files
    Title
    Posted
    The document is an amendment to solicitation FC225Q0002 concerning the replacement of two old geothermal heat pumps in a quarters building, deemed necessary due to multiple repairs and vendor recommendations. The amendment outlines processes for acknowledging receipt of this amendment and modifying existing offers. Contractors must confirm receipt of the amendment through specified methods before the deadline to avoid rejection. The effective period for the project is set from January 20, 2025, to March 20, 2025. The document’s structure includes sections such as solicitation modification details, accounting information, and contractor obligations, highlighting the importance of compliance and administrative changes in government contracting. Overall, this amendment reinforces the government's procedural requirements while addressing energy efficiency and equipment reliability as part of its operational improvements.
    The U.S. Fish & Wildlife Service (USFWS) is soliciting bids for the replacement and installation of two water-source geothermal heat pump units at the Crew Quarters Building in Suffolk, VA. The project aims to replace outdated units that have required frequent repairs due to their age of approximately 12 years. Bidders are encouraged to conduct a site inspection on December 10, 2024, before submitting quotes, which are due by December 27, 2024. The total contract amount is estimated to be less than $25,000, with a performance period spanning from January 20, 2025, to March 20, 2025. The scope of work includes providing compatible new units, thermostats, and related materials, ensuring compliance with applicable regulations and standards. The contractor must consider environmental impact, adhere to OSHA provisions, and follow strict guidelines for waste disposal. The solicitation outlines various certifications, inspection requirements, and compliance with the Buy American statute emphasizing the use of domestic materials. This initiative reflects the USFWS's commitment to sustainability and efficient energy use in its facilities.
    Lifecycle
    Title
    Type
    Similar Opportunities
    CO-ROCKY MTN NWR-REHAB VC GEOTHERMAL SYS
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service is soliciting proposals for a firm fixed-price construction contract to rehabilitate the geothermal heating system at the Visitor Center of the Rocky Mountain Arsenal National Wildlife Refuge in Colorado. The project involves identifying and repairing leaks within the geothermal system, which includes testing 25 vertical wells and associated lines, and requires contractors to provide detailed assessments and cost estimates for necessary repairs. This initiative underscores the government's commitment to maintaining operational efficiency and environmental integrity in its facilities. Interested contractors must submit sealed offers by January 17, 2025, with the project expected to commence within 15 calendar days following the award notice, and can contact Sanford Carson at sanfordcarson@fws.gov for further information.
    Z--OR Sheldon NWR Bunkhouse HVAC
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service is seeking contractors for the design and installation of a central heating and air conditioning system at the Sheldon National Wildlife Refuge bunkhouse in Denio, Nevada. The project, with an estimated cost between $25,000 and $100,000, aims to replace the existing HVAC system while ensuring compliance with federal regulations, including the Davis-Bacon Act and bonding requirements. This procurement is crucial for maintaining the comfort and functionality of the bunkhouse, which accommodates up to eight people. Interested small businesses must submit their proposals by the specified deadlines, with a site visit scheduled for December 12, 2024, and the performance period set from January 14, 2025, to April 21, 2025. For further inquiries, contractors can contact Jessica Tines at jessicatines@fws.gov.
    CA-RED BLUFF FWO-WALK-IN FREEZER REPAIR
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service is soliciting quotes for the repair of a walk-in freezer at the Red Bluff Fish and Wildlife Office in California, specifically focusing on the replacement of a failed compressor. This procurement is critical for maintaining the functionality of the freezer, which is essential for the Hatchery Evaluation Program, with a required completion date for the installation by January 31, 2025. Interested vendors must demonstrate experience in commercial refrigeration repairs and submit their quotes by January 20, 2025, to ensure compliance with Federal Acquisition Regulation guidelines. For further inquiries, vendors can contact Chelsea Devivo at chelseadevivo@fws.gov.
    Z--Detroit River International Wildlife Refuge Visitor Center + Replacement and In
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service intends to award a sole source contract to Spectre Alliance Industries L.L.C. for the replacement and installation of a Daikin VRV outdoor HVAC unit at the Detroit River International Wildlife Refuge Visitor Center. This urgent procurement is necessitated by the failure of the existing HVAC unit, which is critical for maintaining the climate control of the 13,000 square foot facility, particularly as winter temperatures drop, posing a risk of damage to the building. The selected contractor is uniquely qualified due to their exclusive knowledge of the existing Daikin system and its integration with the building's automation controls, making them the only viable option for this replacement. Interested parties may submit a statement of capabilities to Renee Babineau at reneebabineau@fws.gov, but no telephone inquiries will be accepted.
    Bill Williams River NWR Well
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (FWS) is seeking qualified contractors for the Bill Williams River National Wildlife Refuge (BWRNWR) well installation project in La Paz County, Arizona. The project involves the construction of a 6-inch diameter groundwater well, with a depth of at least 100 feet, to support irrigation for newly planted native trees in a 60-acre area affected by a recent wildfire. This initiative is crucial for ecological restoration and aligns with federal efforts to enhance wildlife habitats. Interested vendors must submit their quotations by January 8, 2025, with an estimated project cost ranging from $100,000 to $250,000, and are encouraged to contact Tiffany Breske at TiffanyBreske@fws.gov or 612-713-5187 for further details.
    MA-OFC RFG LE-VEHICLE UPFIT CHEVY TRL BS
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (USFWS) is seeking qualified vendors for the upfitting of law enforcement vehicles as part of its National Wildlife Refuge System Law Enforcement program. This procurement involves equipping emergency vehicles, including full-size SUVs and pickups, with essential safety and operational features such as emergency lighting, sirens, and specialized equipment for Federal Wildlife Officers. The initiative is crucial for maintaining the safety and readiness of the agency's law enforcement fleet, ensuring compliance with federal standards for emergency response and wildlife protection. Interested vendors must submit proposals by the specified deadline, demonstrating their technical experience and capability, with a total contract value of up to $9 million and a performance period from January 9, 2025, to January 8, 2026. For further inquiries, contact Keith Rose at keithrose@fws.gov or call 612-713-5423.
    Roof work - MA
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (FWS) is seeking proposals from qualified contractors for roofing and siding work on Quarters 5 at the Eastern Massachusetts National Wildlife Refuge in Sudbury, MA. The project involves replacing an existing asphalt shingle roof and deteriorated siding, with specific requirements for new roofing materials, flashings, and vent boots, while maintaining existing gutters and fascia boards. This maintenance work is crucial for ensuring the building's functionality and compliance with federal safety and quality standards. Interested small businesses must submit their proposals by January 6, 2025, following a pre-proposal site visit on December 23, 2024, with an estimated project value between $100,000 and $250,000. For further inquiries, contact Christine Beauregard at ChristineBeauregard@fws.gov or call 413-253-8232.
    Y--Lookingglass FH - Egg Incubation Room
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (USFWS) is soliciting bids for a design-build contract to expand the Lookingglass National Fish Hatchery in Oregon by constructing a new egg incubation room. This project aims to increase the hatchery's egg incubation capacity by 10-15%, thereby enhancing operational efficiency and safety through the installation of new infrastructure and utility connections. The selected contractor will be responsible for comprehensive design and construction services, adhering to federal regulations, including environmental and historical preservation laws, while ensuring minimal disruption to existing hatchery operations. Interested contractors should contact Cindy Salazar at CindySalazar@fws.gov or 503-872-2832, with a project budget estimated between $500,000 and $2,000,000, and key deadlines including a Request for Information by January 3, 2025, and proposal submissions due by January 10, 2025.
    Z--AL-EUFAULA NWR-DQ126-REHAB INLET PUMP
    Active
    Interior, Department Of The
    The Department of the Interior, through the U.S. Fish and Wildlife Service, is soliciting proposals for the rehabilitation of the Inlet Pump at the Eufaula National Wildlife Refuge in Alabama. The project aims to refurbish various components of the pump system, ensuring compliance with environmental regulations and operational efficiency, with a construction budget estimated between $250,000 and $500,000. This rehabilitation is critical for maintaining water supply and irrigation systems within the refuge, highlighting the importance of sustainable practices in federal construction projects. Interested contractors must submit their proposals by December 23, 2024, at noon EST, and can direct inquiries to Tiffannie Pannell at tiffanniepannell@fws.gov or by phone at 505-248-6792.
    Y--NV ASH MEADOWS NWR CRY SPRNGS RESTORE
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service, under the Department of the Interior, is soliciting proposals for design/build services aimed at restoring the Crystal Springs outflow and associated infrastructure at the Ash Meadows National Wildlife Refuge in Nevada. The project involves the decommissioning and removal of existing dams, construction of new outflow channels, and enhancements to visitor access, with a focus on ecological restoration and habitat improvement for endangered species. This initiative is critical for restoring natural hydrology and biodiversity in the region, addressing past agricultural impacts, and ensuring compliance with federal environmental regulations. Interested contractors must submit their sealed proposals by January 30, 2025, with the contract performance period running from April 1, 2025, to September 12, 2028. For further inquiries, contact Ian Young at ianayoung@fws.gov or call 612-713-5214.