Solicitation for Bldg. 168 Boiler, Heat Distribution, and Ventilation Replacement on Spangdahlem AB
ID: FA560625B0001Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE AIR FORCEFA5606 52 CONS DA LGCAPO, AE, 09126-3910, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

REPAIR OR ALTERATION OF MAINTENANCE BUILDINGS (Z2EB)

Set Aside

No Set aside used (NONE)
Timeline
    Description

    The Department of Defense, through the U.S. Air Force, is soliciting bids for the replacement of the boiler and HVAC system in Building 168 at Spangdahlem Air Base, Germany. The project involves installing an air-to-water heat pump system, upgrading fan coils, radiators, and heating distribution, as well as implementing a new ventilation system for the facility. This initiative is crucial for enhancing energy efficiency and ensuring compliance with safety and environmental standards. Interested contractors should note that bids are due by August 29, 2025, at 15:00 CEST, and must be submitted via email, with a project value estimated between $500,000 and $1,000,000. For further inquiries, contact James C. Sulhoff at James.Sulhoff@us.af.mil or Philip T. at Philip.Miu.1@us.af.mil.

    Files
    Title
    Posted
    The Multiple Award Construction Contract (MACC) Statement of Work, Revision No. 2, outlines the VYHK 17-1145 project to replace the outdated heating boiler in Building 168 at Spangdahlem Air Base, Germany. The project includes replacing the boiler with an air-to-water heat pump system, upgrading all fan coils, radiators, and heating distribution, and installing a new ventilation system for the changing area. Key tasks involve electrical connections to Transformer Station 138, hydraulic balancing of heating circuits, and installing a new air handler with heat recovery for the locker room. The project also covers decommissioning an underground heating oil tank, implementing an emergency ventilation shutoff, and ensuring fire protection compliance. Strict security regulations, occupational safety, and environmental guidelines are mandatory. The contractor must provide extensive documentation, including as-built drawings and maintenance data, and adhere to specific site rules and utility outage procedures. Work stoppages due to military exercises are anticipated.
    The project, "VYHK 17-1145 REPLACE OUTDATED HEATING BOILER B 168," located at Building 168, Spangdahlem Air Base, Germany, involves replacing the outdated boiler with an air-to-water heat pump system, replacing all fan coils, radiators, and heating distribution, and installing a new ventilation system for the changing area. Key tasks include installing a new 90 kW heat pump, upgrading electrical connections from transformer station 138, replacing heating distribution, radiators, and fan coil units compatible with low temperatures, and installing a new air handler for the locker room with heat recovery. The project also covers system filling with desalinated water, decommissioning an underground heating oil tank, installing an emergency ventilation shutoff, and adhering to fire protection standards. Special conditions include strict security regulations, occupational safety and health plan requirements, precise construction site management, airfield construction precautions, restricted area access protocols, military escort procedures, utility outage coordination, and strict adherence to material and work quality standards. The contractor is responsible for providing detailed as-built drawings and maintenance data in both German and English.
    The "Schedule of Material Submittals" for Project VYHK 17-1145, "Replace Outdated Heating Boiler B 168," outlines the required material submissions for the project. This document, likely part of a federal government RFP or contract, details specific items such as heat pumps, FCUs and radiators, AHU for the locker room, and the control concept. For each item, it specifies the number of copies required for various submittal types including certificates of compliance, shop drawings, samples, color selection, manufacturer's recommendations, warranties, catalog data, operating instructions, equipment used, technical descriptions, and certifications. All materials are required "Before installation." The form also includes sections for tracking submission dates, receipt dates, routing to civil engineering, return suspense dates, submittal numbers, and approval status, including provisions for resubmittals. This structured approach ensures all necessary documentation for the heating boiler replacement project is provided and approved in a timely manner, maintaining compliance and quality standards.
    The "CONTRACTOR MATERIAL USAGE DATA SHEET (MUDS)" is a bilingual (English/German) form designed for contractors to report their usage of hazardous materials. This document is crucial for federal, state, and local government RFPs and grants, as it ensures compliance and accountability regarding hazardous substance management. The form requires detailed information such as contractor details, contract number, estimated start and end dates, location of activity, and a description of the task. For each hazardous material used, the form mandates the material's name, manufacturer, NSN#, quantity used, unit of measurement (e.g., g, kg, liter), and the type of container (e.g., Box, Bottle, Can, Drum, Bag, Cartridge), along with units per container. The document also provides contact information for the HAZMART Office for any questions and includes fields for location, date, and signature. This standardized form streamlines the tracking and oversight of hazardous material usage in government-funded projects, ensuring safety and environmental compliance.
    The document appears to be a legend or key for a mapping or engineering diagram, likely related to infrastructure within a government project. It lists various types of lines, systems, and installations, categorized by their function or material. Key categories include "T-KOM" (telecommunications), "CSegmentedCable_L", "CServiceLoop_L", "EConduitSystem_L" (electrical conduits), "ECounterpoiseSystem_L GROUNDING", "EUGPrimary_L" and "EUGSecondary_L" (underground primary and secondary electrical), "OInstallationPipeline_L", "SCasing_L (Dosing Pipe)", "SPressurizedMain_L", "SGravityMain_L", "SwCulvert_L", "SwGravityLine_L main", "SwOpenDrainage_L", "TCasing_L", and "TConventionalHighTempWSupply_L". It also includes "Pump Pressure Distribution Main" and "Commercial" which might indicate usage. The presence of locations like "FAIRCHILD", "HOLLOMAN LN", and "ARNOLD BLVD" suggests a specific geographic area, possibly a military base or government facility. The scale is indicated in meters. This document serves as a crucial reference for understanding the components of an infrastructure project, essential for planning, construction, or maintenance in federal, state, or local government RFPs or grants.
    The provided government file details heating load calculations for various rooms and areas within a project, likely for a federal or state RFP related to building infrastructure or energy efficiency. The document specifies design temperatures, heat loads in Watts, and heat loads per square meter for spaces such as 'Bay 1/2 + 0.5Hall,' 'Bay 3 + 0.5Hall,' 'Classroom 1st floor,' 'Admin Area,' and 'Instructor 2nd Floor.' It meticulously breaks down heating requirements based on different building components, including air exchange, floor/basement to ground, wall to outside air, ceiling/roof to outside air, and windows/doors. The file also includes U-values for various construction materials (e.g., concrete, wood beam ceilings, hollow block ceilings, and different types of insulation) and details on specific factors like exhaust ventilation and additional heating capacity. The recurring project number '168' and consistent design temperatures indicate a standardized approach to calculating heating demands for this facility.
    The document addresses a series of questions and answers related to the "Replace Heating Boiler Building 168 project # VYHK 17-1145." Key points include clarity on the responsibility for electrical lines up to the transformer station (CE will operate, but lines must be complete), the decommissioning and gravel-filling of the old oil tank, and the absence of existing conduits under the road between buildings 138 and 168, necessitating road excavation for new cables. The control units for heat pumps will be manufacturer-made, and technical documentation for installed fan coil units (GEA M421S.PE2 and GEA M422S.PE2 from 2001) is provided. Heat calculations are attached to the revised SOW. The construction time has been extended from 120 to 150 calendar days, with the heating system required to be functional from late September to late May. New drawings are necessary due to the replacement of heat and ventilation pipes.
    The VYHK 17-1145 project involves replacing the outdated heating boiler at Building 168 of Spangdahlem Air Base, Germany, with an air-to-water heat pump system. The project scope includes the removal of the existing boiler and heating components, installation of new fan coils and radiators compliant with low-temperature heating, and an upgraded ventilation system for the locker room area. All work must adhere to military security regulations, safety protocols, and construction standards. Key tasks include laying new electrical connections, conducting hydraulic balancing for heating circuits, decommissioning the existing heating oil tank, and ensuring fire protection measures are implemented throughout. The new system will be controlled via standard controllers, with a focus on energy efficiency and reliability. Comprehensive documentation, including as-built drawings and maintenance schedules, is required post-project completion. The contract emphasizes environmental regulations, proper waste disposal, and adhering to specific timeframes for utility outages and construction access. This initiative demonstrates the government’s commitment to modernizing infrastructure while maintaining stringent safety, environmental, and operational standards within military settings.
    The document outlines the Schedule of Material Submittals for the project titled "Replace Outdated Heating Boiler B 168," designated as Project Number VYHK 17-1145. It is structured to facilitate the submission of various materials and documentation by contractors involved in the project before installation. Key components required include heat pumps, fan coil units, radiators, air handling units, and control systems. For each item, specific types of submittals are indicated, such as certificates of compliance, shop drawings, samples, color selections, and manufacturer's warranties, all necessary for project compliance and quality assurance. The schedule specifies submission and approval timelines, indicates the number of copies needed, and includes sections for contractor resubmissions and final approval statuses. The overarching purpose of this document is to ensure that all materials and equipment proposed by the contractor meet project specifications and standards, supporting effective project implementation and compliance with federal RFP protocols.
    The Contractor Material Usage Data Sheet (MUDS) is a document designed for contractors to report their use of hazardous materials during projects. It includes essential fields such as contractor name, contract numbers, estimated start and end dates, project location, and a description of tasks performed. The document emphasizes the identification and management of hazardous materials, which must be recorded with details such as the hazardous material's name, manufacturer, part number, and quantity used, measured in various units like grams or liters. Additionally, there are provisions for the type of container used for these materials, whether boxes, bottles, cans, or drums, and a section for the contractor's signature and date. The primary purpose of the MUDS is to ensure compliance with safety regulations regarding hazardous substances during federal and state projects, thereby promoting workplace safety and environmental protection. This structured approach helps maintain accurate records essential for monitoring hazardous material usage and safeguarding worker and public health in government contracts.
    The file outlines infrastructure components and utilities for a development project at Fairchild focused on various systems essential for construction and service operations. Key elements include segmented cables, conduit systems, drainage mechanisms, and primary and secondary utility lines, particularly for water supply and wastewater management. It details the specifications for installation pipelines, pressurized mains, stormwater lines, and grounding systems, indicating a systematic approach to ensure reliability and efficiency in utility management. This structured layout suggests compliance with federal and local regulations, guiding contractors in project execution while emphasizing the need for adherence to established engineering standards. The document is integral to the proposal process, helping bidders understand the infrastructure expectations in response to funding opportunities from government grants and Requests for Proposals (RFPs). Overall, it highlights the critical relationship between infrastructure planning and regulatory compliance in public works.
    The Standard Form 1442 (SF 1442) serves as a critical document for federal government solicitations, offers, and awards in construction, alteration, or repair projects. It functions as a comprehensive template for both sealed bid (IFB) and negotiated (RFP) procurements, detailing essential information for potential contractors and the government. The form outlines requirements such as project identification numbers, addresses for offer submission, and specifies the scope of work. It also sets forth critical timelines for performance commencement and completion, as well as the necessity for performance and payment bonds. The SF 1442 includes sections for offeror information, including contact details and remittance addresses, and mandates acknowledgments of any amendments to the solicitation. The award section, completed by the government, formalizes the contract, integrating the solicitation, the offer, and the award document. This form ensures a structured and compliant process for securing bids and awarding contracts for government construction projects.
    This government solicitation, FA560625B00010002, is an Invitation for Bid (IFB) issued by the US Air Force for a construction project to replace the Boiler/HVAC system in Building 168 (Transport Maintenance Facility) at Spangdahlem Air Base. The project, valued between $500,000 and $1,000,000, involves replacing the outdated boiler with an air-to-water heat pump, upgrading fan coils, radiators, heating distribution, and installing a new ventilation system in the changing area. Key dates include a site visit on August 13, 2025, questions due by August 15, 2025, and bids due by 15:00 European Central Time on August 29, 2025. Bids, limited to two pages, must be submitted via email and include company and payment information. The contract has a 120-day performance period after notice to proceed, and mandates compliance with various FAR and DFARS clauses, including those related to electronic payments (WAWF), domestic construction materials, and antiterrorism measures.
    The solicitation, numbered FA560625B0001, outlines a federal construction project at Spangdahlem Air Base's Transport Maintenance Facility (Bldg. 168). The project involves replacing an outdated boiler with an air-to-water heat pump system, upgrading fan coils, radiators, heating distribution, and installing a new ventilation system for the changing area. Interested contractors must submit their sealed bids electronically by 1500 CET on 25 August 2025, with a bid guarantee required if applicable. The project magnitude is estimated to fall between $500,000 - $1,000,000. A site visit is planned for 8 August 2025, while all questions regarding the solicitation must be submitted by 15 August 2025. The contractor is responsible for all labor, materials, and equipment necessary for successful project completion. Provisions include performance bond requirements, adherence to safety regulations, and a commitment to environmentally friendly practices, such as eliminating ozone-depleting substances. This solicitation emphasizes thorough compliance with federal acquisition regulations and provides detailed instructions for submitting proposals, ensuring effective management of government procurement processes.
    Similar Opportunities
    Replace HVAC Systems, 21 Buildings, 13100 Block FSGA
    Buyer not available
    The Department of Defense, specifically the Department of the Army, is soliciting proposals for the replacement of HVAC systems in 21 buildings at Fort Stewart, Georgia, under Solicitation Number W912JM26QA002. The project entails the removal and replacement of existing HVAC systems in 18 barrack buildings and 3 latrine buildings, with a focus on energy-efficient units and compliance with industry standards. This procurement is crucial for maintaining operational efficiency and comfort within military facilities, emphasizing the importance of modern HVAC systems. Interested small businesses must submit their proposals by December 8, 2025, and can direct inquiries to Gregory Hoffman at gregory.d.hoffman2.civ@army.mil or Melvin F. Reid Jr at melvin.f.reid2.civ@army.mil, with an estimated contract value of $19 million and a performance period from January 5, 2026, to May 4, 2026.
    B101 Boiler replacement
    Buyer not available
    The Department of Defense, specifically the Department of the Army, is soliciting quotes for the replacement of a boiler system in Building 101 at the 180th Fighter Wing in Swanton, Ohio. The contractor will be responsible for removing the existing boiler and installing a new system that meets specific performance criteria, including a minimum input of 285,000 BTU/hr and at least 96% thermal efficiency, along with all necessary electrical, piping, and venting components. This procurement is critical for maintaining operational efficiency and compliance with applicable regulations, and it is set aside exclusively for small businesses. Interested parties must submit their quotes by 10:00 A.M. EST on December 11, 2025, to the designated contracting email, with all necessary documentation as outlined in the solicitation. For further inquiries, contact 2d Lt Adam Krouse at adam.krouse@us.af.mil or TSgt Cody Walker at cody.walker.12@us.af.mil.
    Sollars ES HVAC Upgrades, Misawa Air Base, Japan
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers, Japan District, is conducting market research for the "Sollars ES HVAC Upgrades" project at Misawa Air Base, Japan. This Design-Bid-Build (DBB) requirement aims to upgrade the existing heating system and add full cooling capabilities across five buildings, including extensive mechanical and electrical work, structural modifications, and site improvements. The project is significant for enhancing operational efficiency and comfort within the facilities, with an estimated contract value between ¥2,500,000,000 and ¥10,000,000,000. Interested local firms must respond by December 18, 2025, and are encouraged to contact Ryan Marzetta or Jennifer Knutson for further details.
    183 CES Repair Server HVAC and Electric
    Buyer not available
    The Department of Defense, specifically the Illinois Air National Guard's 183d Wing, is seeking qualified contractors to provide HVAC and electrical repair services for Building 48 in Springfield, Illinois. The project aims to address deficiencies in the communication infrastructure by improving electrical power and installing necessary HVAC systems in the server rooms, ensuring compliance with current codes and Department of the Air Force Instruction requirements. This contract, set aside for small businesses, has an estimated value between $25,000 and $100,000, with a duration of 59 days post-notice to proceed. Interested contractors should contact Alicia C. Braun at Alicia.Braun@us.af.mil or Amanda Brenizer at Amanda.Brenizer@us.af.mil for inquiries, and must register in SAM to access the solicitation, which is expected to be issued in late June 2025.
    B185 Cooling Tower Repairs
    Buyer not available
    The Department of Defense, through the Department of the Air Force, is soliciting proposals for the B185 Cooling Tower Repairs project at Offutt Air Force Base in Nebraska. The project involves procuring and installing two new cooling tower fan transmissions, associated hardware, and a new fan motor for Tower 2, along with necessary maintenance tasks such as rebalancing the fans and ensuring compliance with safety and labor standards. This procurement is crucial for maintaining the operational efficiency of the cooling systems at the base, with an estimated contract value of $19 million and a performance period from January 1, 2026, to March 31, 2026. Interested contractors must submit their offers by December 17, 2025, and can direct inquiries to SSgt Eyvind Boyesen at eyvind.boyesen@us.af.mil or Mr. Daniel Kuchar at daniel.kuchar@us.af.mil.
    Library Refresh
    Buyer not available
    The Department of Defense, specifically the Department of the Air Force, is seeking quotes for a "Library Refresh" project at Spangdahlem Air Base in Germany. This procurement involves the design, furnishing, delivery, and installation of new library furniture, including shelving, circulation desks, and various seating areas, as part of an initiative to enhance the patron experience through a Modern Bookstore Layout remodel. The project is critical for creating an inviting and functional library environment that meets the needs of diverse user groups, including children and young adults. Interested contractors must submit their quotes by January 7, 2025, and are required to attend a mandatory site visit on December 12, 2025, at Building 148. For further inquiries, contact Katrin Arnoldy at katrin.arnoldy.de@us.af.mil or Angie Pequeno at angelica.pequeno.1@us.af.mil.
    Repair Arctic Foundation Bldg 4002 (WWCX 15-1009) Pituffik Space Base, Greenland
    Buyer not available
    The Department of Defense, specifically the Department of the Air Force, is seeking contractors for the repair of the Arctic Foundation Building 4002 at the Pituffik Space Base in Greenland. The project involves plumbing, heating, and air-conditioning services, which are critical for maintaining operational capabilities in the harsh Arctic environment. This procurement is essential for ensuring the functionality and safety of the facility, which supports various military operations. Interested contractors can reach out to Rene Streander at rene.streander.2.dk@spaceforce.mil or Patrick King at patrick.king.23@spaceforce.mil for further details, with the presolicitation notice indicating the importance of timely responses.
    Repair, Install and Replace Ceilings, Walls and Doors within Buildings, USAG Bavaria, Grafenwoehr Military Community (W912PB26BA002)
    Buyer not available
    The Department of Defense, through the Department of the Army, is soliciting bids for the repair, installation, and replacement of ceilings, walls, and doors within buildings at the USAG Bavaria, Grafenwoehr Military Community, under solicitation number W912PB26BA002. This project encompasses a range of construction activities, including the installation of electronic locking systems, and requires compliance with both German and U.S. regulations, emphasizing safety, quality control, and environmental protection. The contract, valued at a maximum of €10,000,000.00, will be awarded to the lowest responsible bidder, with bids due by January 15, 2026, at 14:00 local time. Interested contractors should direct inquiries to Regina Rueckschloss at regina.rueckschloss.ln@army.mil or call 09641-70-526-8702 for further details.
    WPAFB 3rd Air Stream/ B18
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE) Louisville District, is conducting a market survey to identify potential contractors for the construction of a new industrial compressed air plant at Wright-Patterson Air Force Base in Ohio. The project, estimated to cost between $5 million and $10 million, involves the installation of two 4,000 HP centrifugal air compressors, two natural gas-fired air heaters, specialty steel piping, and associated controls, along with the demolition of existing equipment and significant electrical work. This initiative is crucial for enhancing the operational capabilities of the facility, and the procurement may be set aside for small businesses, including HUBZone, 8A, Woman-Owned, and Service-Disabled Veteran Owned firms. Interested parties must submit their responses via the Market Survey Response Form by October 31, 2025, at 1:00 PM Eastern Time, and can contact Thomas Nauert at thomas.s.nauert@usace.army.mil for further information.
    Heat Plant Boiler Tube Repair
    Buyer not available
    The Department of Defense, specifically the Department of the Air Force, is seeking contractors for the repair of Boiler 1 at the heat plant located on Malmstrom Air Force Base in Montana. This procurement is aimed at addressing urgent maintenance needs for critical heating equipment, which is essential for the operational functionality of the base. The repair work is classified under the maintenance, repair, and rebuilding of plumbing, heating, and waste disposal equipment, highlighting its importance in ensuring reliable heating services. Interested contractors can reach out to Alexander D. Luttrell at alexander.luttrell.1@us.af.mil or by phone at 406-731-4001 for further details regarding the Justification and Approval for Unusual and Compelling Urgency associated with this opportunity.