Y1NB--PN: 438-22-900, Replace Boiler Plant (SF) 36C26324R0136
ID: 36C26324R0136Type: Solicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OFNETWORK CONTRACT OFFICE 23 (36C263)Saint Paul, MN, 55101, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF HEATING AND COOLING PLANTS (Y1NB)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Timeline
    Description

    The Department of Veterans Affairs is soliciting proposals for the replacement of the Boiler Plant at the Sioux Falls VA Health Care System, identified as project number 438-22-900. This construction project, valued between $20 million and $50 million, is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and aims to enhance the facility's operational efficiency and safety standards. The project encompasses the demolition of the existing boiler plant and the construction of a new facility, which will include advanced heating, ventilation, and air conditioning (HVAC) systems, plumbing, and fire protection measures, ensuring compliance with federal regulations. Interested contractors must submit their proposals by February 20, 2025, and can direct inquiries to Contract Specialist Derek Fore at derek.fore@va.gov or 651-293-3032, or to Gregg R. Sutcliffe at gregg.sutcliffe@va.gov or 402-996-3536.

    Point(s) of Contact
    Derek ForeContract Specialist
    (651) 293-3032
    derek.fore@va.gov
    Files
    Title
    Posted
    The Sioux Falls Boiler Plant project, overseen by the Department of Veterans Affairs, encompasses the construction of a new facility covering approximately 8,121 square feet at the Sioux Falls VA Health Care System. The existing boiler plant, which currently includes three 400 HP Johnston boilers, will be replaced with a new structure accommodating three appropriately sized boilers per Steam Boiler Design Manual guidelines. The chosen site is strategically positioned near existing infrastructure, while necessary relocations of underground utilities and steam lines will be undertaken. Additionally, underground storage tanks for fuel and water will be installed to minimize utility disruptions and meet security requirements defined by PSRDM guidelines. Key players in the project include civil and structural engineers, architects, and mechanical and electrical teams, with expert consultations on fire protection and physical security. The construction adheres to numerous building codes, emphasizing life safety planning, fire protection standards, and occupancy classifications relevant to industrial and storage uses. This project illustrates the commitment to enhancing the operational capacity of VA facilities while ensuring compliance with stringent safety and design standards.
    The document pertains to the construction documentation for the Sioux Falls Boiler Plant project, specifically focused on the PCRA (Project Construction Risk Assessment), ICRA (Infection Control Risk Assessment), and ILSM (Interim Life Safety Measures). It is associated with the U.S. Department of Veterans Affairs (VA) and outlines requirements for the project's safety and compliance protocols during construction. The file includes essential project details such as the project number (438-22-900), location (VAMC-Sioux Falls, SD), and issue dates for construction drawings, indicating that the project is fully sprinklered and designed to meet VA standards. The document serves as a vital resource for architects, engineers, and project stakeholders, providing a framework for maintaining safety and regulatory compliance during project implementation. The emphasis is on evaluating risks related to construction activities in a healthcare setting, ensuring minimal disruption to ongoing services and safeguarding patient care. This project is part of the larger initiative to modernize and improve VA facilities, enhancing the infrastructure for veterans' healthcare services.
    The document outlines the construction project details for the Sioux Falls Boiler Plant, managed by the U.S. Department of Veterans Affairs. It includes vital information such as project and building numbers, drawing numbers, issue dates, and contact information for the architect/engineer of record. The project is classified under the fully sprinklered category and consists of detailed construction documents set for completion by September 12, 2024. The project is designed to enhance the facilities at the Veterans Affairs Medical Center in Sioux Falls, South Dakota, focusing on safety and regulatory compliance through modern construction practices. The involvement of experts in architecture and engineering reflects a commitment to high standards in facility management and performance enhancement. Overall, the document serves to organize significant project details for prospective contractors and stakeholders involved in the bidding process and execution of the construction work.
    The document outlines the construction plans for the Sioux Falls Boiler Plant, detailing demolition, utility installation, and site preparation requirements for a project backed by the U.S. Department of Veterans Affairs. Key provisions include a comprehensive civil legend and abbreviations, alongside procedural guidelines for ensuring compliance with federal, state, and local regulations. Major tasks involve verifying existing conditions, protecting utilities and surrounding structures during demolition, and managing erosion control measures. Specific notes emphasize the contractor's responsibilities to manage dust, coordinate work timings with the Contracting Officer's Representative (COR), and comply with safety regulations throughout the project. The contractor is also expected to oversee the removal of demolition materials, manage erosion control inspections, and address any discrepancies in field conditions through a Request for Information (RFI) process. Safety regulations highlight that certain construction operations—such as using gas or diesel equipment—must be conducted with caution, particularly near building air intakes. Additionally, the document stipulates the need for effective waste management practices, including concrete washout procedures, to ensure environmental compliance. Overall, it underlines the project's complexity, necessitating strict adherence to detailed construction and safety protocols to support the facility's modernization efforts.
    The document pertains to the U.S. Department of Veterans Affairs' Office of Construction and Facilities Management, detailing the essential elements of a construction project, including project number, building specifications, and design phases. It outlines the roles of key personnel such as the architect/engineer of record and project director, emphasizing the design-build paradigm. The drawing forms are standardized under VA FORM 08 - 6231, which records revisions, architect checks, and approvals. It also specifies various construction elements, including first-floor and roof dimensions, highlighting attention to mechanical and structural components. The document reiterates the importance of compliance with federal standards and safety protocols in construction. Overall, the purpose of this document is to initiate the procurement process for a construction project, ensuring all relevant stakeholders are informed about requirements and procedural norms while maintaining federal guidelines. The document serves as an official record to streamline the project development and keep track of revisions and approvals throughout the design and construction phases.
    The document outlines construction plans and specifications for the Sioux Falls Boiler Plant project, managed by the U.S. Department of Veterans Affairs. It includes critical architectural and engineering details, emphasizing compliance with safety standards and local regulations. Key features include comprehensive site plans, elevation drawings, and material schedules, detailing components such as wall types, window specifications, and mechanical systems necessary to achieve a fully sprinklered facility. The project focuses on modernizing infrastructure to ensure a safe and efficient environment while meeting the unique requirements of the Department of Veterans Affairs. Various sections cover everything from door specifications to ceiling designs, indicating meticulous attention to detail and adherence to established guidelines. This initiative demonstrates a commitment to enhancing facility functionality and safety for staff and veterans alike, while also fulfilling federal grant requirements. Compliance with safety measures, including moisture resistance in materials and accessibility design, is prominently featured throughout the detailed drawings and plans.
    The document outlines the construction details for the Sioux Falls Boiler Plant project (VA Project Number 438-22-900), as part of the U.S. Department of Veterans Affairs' renovations. It includes comprehensive specifications for stair, railing, door, and window features essential for the facility’s operations. Notably, 1 ½" diameter painted steel pipe rails, high-performance coatings, and specific dimensions for stair treads are emphasized throughout the structural design. Accessibility regulations are highlighted, detailing minimum clearances required for door installations, ensuring compliance with safety standards. The document also lists modifications and specifications for glazing in doors and windows, emphasizing blast resistance, insulation, and weatherproofing finishes. Key aspects include constructing a fully sprinklered building, strategic layout plans for furniture and signage, and adherence to federal safety and architectural guidelines. These plans demonstrate an overall commitment to modernization, safety, and regulatory compliance within the context of government RFPs and federal grants aimed at enhancing veterans' amenities at the Sioux Falls facility.
    The document outlines specifications and designs related to fire protection systems for the Sioux Falls Boiler Plant, as part of a construction project under the U.S. Department of Veterans Affairs. It details the installation of fire sprinkler systems, including piping configurations, backflow preventers, and hanger details, all essential for maintaining safety standards and compliance with regulations such as NFPA (National Fire Protection Association) guidelines. The project involves the installation of various components like side beam brackets, nuts, washers, and all-thread rods, emphasizing the appropriate spacing and methods for securing pipes. The plans are intended for construction management and facility improvement, ensuring fully sprinklered coverage for safety against fire hazards. Notes included within the document instruct on material specifications and installation practices, which must adhere to standards set by U.L. (Underwriters Laboratories) or F.M. (Factory Mutual). The overall goal is to enhance the site’s fire protection capabilities while aligning with federal compliance measures within the scope of government grants and requests for proposals. This construction initiative reflects the federal commitment to upgrading healthcare facilities, particularly in the Veterans Affairs sector, ensuring robust fire safety infrastructure.
    The document outlines detailed plumbing plans for the Sioux Falls Boiler Plant, a project under the U.S. Department of Veterans Affairs. It includes plumbing fixture symbols, general notes, and installation guidelines focusing on constructing an efficient plumbing system compliant with local codes. Key components highlighted are various plumbing fixtures, pipe types, and connections, emphasizing accessibility for maintenance and adherence to safety protocols. The drawings detail the layout for floor drains, sanitary sewage, domestic water systems, and venting requirements alongside specifications for components like backflow preventers and isolation valves. The contractor is required to manage interactions with other construction trades while ensuring accessibility and system performance. This comprehensive documentation is pivotal for executing the project, meeting quality standards, and maintaining compliance with federal regulations concerning healthcare facilities. Overall, the document serves as a crucial reference for contractors, ensuring the successful installation and operation of plumbing systems within the facility.
    The document outlines the mechanical heating, ventilation, and air conditioning (HVAC) plans for the Sioux Falls Boiler Plant, emphasizing the need for compliance with standards, accessibility for maintenance, and safety regulations. The plans incorporate detailed schematics, abbreviations, and manufacturer specifications for various HVAC components, including fans, air handling units, exhaust systems, and controls. Key points include requirements for clear access to equipment, coordination of mechanical installations with other building systems, and verification of dimensions prior to installation. The HVAC design focuses on energy efficiency and incorporates variable frequency drives (VFDs), temperature controls, and air filtration systems to optimize indoor air quality. The document also sets forth maintenance requirements, emphasizing that all accessible components must be operable from a standing position without ladders, reflecting the commitment to operational safety and efficiency. This comprehensive planning aims to ensure a functional HVAC system that serves the specific needs of the Department of Veterans Affairs, underscoring the government's investment in modernizing facilities to enhance environmental quality and service delivery.
    The document details the 100% construction documents for the Sioux Falls Boiler Plant project, overseen by the U.S. Department of Veterans Affairs (VA) Office of Construction and Facilities Management. The project, numbered 438-22-900, is scheduled for issue on June 25, 2024, with subsequent approval expected by September 12, 2024. The construction design aims to ensure that the facility is fully sprinklered, in compliance with safety regulations. The project is categorized under Architecture, Engineering, and Design-Build phases, reflecting a structured approach to development and construction oversight. Various stakeholders, including the architect/engineer of record from Paradigm and a consultant, are involved in the process, emphasizing collaboration and thorough checks during construction. The location of the project is specified as the VAMC-Sioux Falls, located at 2501 W 22nd St, Sioux Falls, SD. The initiative demonstrates the VA's commitment to enhancing infrastructure and delivering facilities that meet both safety and operational standards for veterans' services.
    The document outlines the full construction documents for the Sioux Falls Boiler Plant project, overseen by the U.S. Department of Veterans Affairs' Office of Construction and Facilities Management. Titled "VAMC-Sioux Falls," the project focuses on enhancing facility structures, confirming they are fully sprinklered to meet safety standards. Located at 2501 W 22nd St, Sioux Falls, SD, the documentation includes detailed architectural and engineering plans, with the issue date set for September 12, 2024. Key elements feature basic designs for various types of light fixtures. The project is led by the engineering firm Paradigm and emphasizes the design-build approach. Original documents are standardized under VA FORM 08-6231 and highlight significant construction phases and revisions, confirming compliance with federal guidelines. Overall, the project aims to modernize facilities, ensuring safety and operational efficiency while adhering to regulations and best practices in construction management.
    The document details the construction project for the Sioux Falls Boiler Plant, managed by the U.S. Department of Veterans Affairs (VA). Project number 438-22-900 specifies that the facility is located at the Veterans Affairs Medical Center in Sioux Falls, South Dakota, with project initiation planned for June 25, 2024, and completion by September 12, 2024. This design-build project has been categorized under 100% construction documents, indicating that all necessary design elements have been finalized. The project involves significant enhancements, including a fully sprinklered fire suppression system to ensure safety compliance during operations. The document outlines various phases of project development, including approvals and checks by relevant authorities and the role of the architect/engineer of record. By prioritizing safety and modern facility standards, this initiative reflects the VA's commitment to improving healthcare infrastructure for veterans while adhering to governmental regulations.
    The document outlines the fully sprinklered construction project at the Sioux Falls VAMC Boiler Plant, designated as project number 438-22-900. It falls under the purview of the U.S. Department of Veterans Affairs, specifically the Office of Construction and Facilities Management, highlighting its commitment to enhancing the safety and functionality of veteran services. The construction documents are marked as 100% complete as of June 25, 2024, with an official issue date of September 12, 2024. The project location is specified as 2501 W 22nd St, Sioux Falls, SD 57105, indicating a focus on modernizing essential facilities to meet enhanced safety standards. The document emphasizes the critical role of architecture and engineering in the design-build process, ensuring comprehensive oversight and compliance with applicable regulations and safety protocols. As part of government RFP and grant processes, this construction initiative illustrates the VA's ongoing efforts to maintain and improve facilities dedicated to veteran care, reflecting its strategic priorities in facility management and public safety.
    This document outlines the specifications and requirements for steam and condensate heating piping, as part of a federal government Request for Proposals (RFP). It includes comprehensive details regarding installation, materials, components, and quality control, ensuring compliance with various ASME, ASTM, and AWS standards. Key topics covered include the types of piping and fittings to be used, welding qualifications, as-built documentation, and testing procedures for pressure and temperature. The addendum emphasizes the importance of maintaining cleanliness during installation, the proper configuration of piping systems, and adherence to installation specifications to facilitate maintenance and operation. Furthermore, it mandates stringent documentation and training measures to ensure effective system commissioning and maintenance. This document is crucial for contractors and stakeholders involved in the project, highlighting their responsibilities for delivering a compliant and functional steam piping system. Overall, its detailed structure and thoroughness demonstrate a commitment to safety, efficiency, and regulatory compliance in infrastructure development.
    The Presolicitation Notice outlines an upcoming project managed by the Department of Veterans Affairs to replace the boiler plant at the Sioux Falls VA Medical Center in South Dakota. The notice indicates that a solicitation for a Firm-Fixed-Price Construction Contract will be issued around November 19, 2024, with a proposal submission deadline of January 3, 2025. This project is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), necessitating bidders to be registered and certified in the Veteran Small Business Certification system. The scope of work includes constructing a new boiler plant and associated infrastructure, including utilities, underground storage, and necessary mechanical, plumbing, and electrical systems. The anticipated construction period spans 915 calendar days. Contractors must possess a Unique Entity Identifier and be registered in the System for Award Management (SAM). This notice serves as a precursor to the solicitation process, informing potential bidders of the opportunity while setting parameters that emphasize the inclusion of service-disabled veterans in federal contracting, thereby supporting public law and VA guidelines.
    The document outlines a Request for Proposal (RFP) for a construction project to replace the Boiler Plant at the Sioux Falls VA Health Care System, issued by the Department of Veterans Affairs. The project, valued between $20 million and $50 million, is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) certified vendors. The RFP specifies that offerors must submit complete technical and price proposals according to detailed guidelines, including information on past performance, key personnel, and compliance with various regulations. Proposals will be evaluated based on multiple factors, such as technical approach, relevant experience, and price, with non-price factors holding greater importance. A pre-proposal site visit is scheduled, and all submissions must adhere to specified requirements, including the inclusion of a bid guarantee. The document emphasizes the importance of following guidelines for proposal preparation and encourages potential offerors to verify their eligibility and registration in federal databases. This solicitation represents the VA's commitment to ensuring quality construction services while promoting veteran-owned small businesses.
    This document is an amendment regarding the solicitation for Project 438-22-900, which involves the replacement of a boiler plant by the Department of Veterans Affairs. The amendment primarily alters the cut-off date and time for technical questions, changing it to January 3, 2025, at 10:00 AM CT. The document outlines the procedures for acknowledging this amendment, stipulating that offers must confirm receipt before the designated deadline to be considered valid. It emphasizes that failure to acknowledge receipt may lead to rejection of offers and provides options for offerors to communicate their acknowledgment. The document maintains formalities as per federal contracting standards and underscores the ongoing nature of the solicitation process. Overall, this amendment serves to ensure clarity and compliance among bidders, illustrating the structured and procedural nature of government RFP processes.
    The document outlines an amendment to the solicitation for the Department of Veterans Affairs project 438-22-900, which involves the replacement of a boiler plant. Key updates include scheduling an additional site visit on December 30, 2024, at 1:00 PM CT—whereno questions will be entertained in-person, with inquiries to be submitted via email instead. Additionally, it announces the publication of revised specification 23 22 13 and includes a sign-in sheet from the previous site visit as attachments. The contracting officer for this amendment is Gregg Sutcliffe, and the agency’s address is provided for further correspondence. This document reflects standard practices in government requests for proposals (RFPs), emphasizing clarity in communication with potential bidders and maintaining compliance with established procedures for public project modifications.
    The document is an amendment to a solicitation related to the Department of Veterans Affairs project 438-22-900, which involves replacing a Boiler Plant. The primary purpose of this amendment is to extend the proposal submission deadline to February 5, 2025, at 12:00 PM CST. Additionally, it extends the due date for technical questions to January 13, 2025, at 10:00 AM CST. The amendment outlines the required acknowledgment methods for offerors, emphasizing the importance of timely receipt of submissions to avoid potential rejection. The contracting officer overseeing the amendment is Gregg Sutcliffe, based at the VA Network 23 Contracting Office in St. Paul, MN. Overall, this document is part of the government's procurement process, specifically addressing changes in timelines pertinent to contractor proposals and technical inquiries for an essential infrastructure project within the Department of Veterans Affairs.
    The document is an amendment to a solicitation for the Department of Veterans Affairs regarding the project to replace a boiler plant (Project Number 438-22-900). The primary purpose of this amendment is to extend the proposal deadline to February 20, 2025, at 12:00 PM CST. Additionally, it includes the release of a sign-in sheet from an additional site visit and an updated wage determination. The amendment highlights critical administrative changes while ensuring all other terms and conditions remain in effect. The contracting officer, Gregg Sutcliffe, manages the amendment process to facilitate communication and compliance with interested contractors and bidders. The amendment serves to keep potential offerors informed and engaged in the bidding process for this federally funded project, ensuring transparency and adherence to regulatory requirements.
    The document pertains to a Request for Proposal (RFP) regarding the replacement of a boiler plant, identified by the code 438-22-900 and RFP number 36C26324R0136. It includes details for a site visit scheduled for December 30, 2024, at 1:00 PM Central Time. The purpose of this RFP is to invite contractors to submit proposals for the project, which likely aims to enhance operational efficiency and safety within the facility's heating systems. The document outlines the procedural aspects, including participant identification and contact information requirements for potential bidders. By facilitating a site visit, the agency enables interested parties to assess the project scope and conditions, fostering an informed proposal process. Overall, this RFP represents a formal solicitation for manufacturing or construction services associated with the extensive upgrade of heating infrastructure, reflecting the government's commitment to maintaining facility standards and improving energy efficiency.
    The document details a Request for Proposal (RFP) identified as 438-22-900 aimed at replacing a boiler plant, referenced by RFP number 36C26324R0136. A site visit is scheduled for December 17, 2024, at 10:00 AM CT, indicating a step in the procurement process. The RFP outlines the federal government's intention to engage with contractors to fulfill a specific project requirement. Further details regarding bid specifications, evaluation criteria, and project timelines appear essential for interested parties. The scheduling of a site visit underscores the importance of evaluating conditions firsthand, which is a common practice in government contracting to ensure precise bids and project alignment. The document serves as part of the structured process for federal grants and local RFPs to enhance government facilities and services. This initiative reflects the government's commitment to maintaining its infrastructure while adhering to regulations and standards.
    The project specification for the "Replace Boiler Plant" at the Sioux Falls VA Medical Center outlines a comprehensive scope of work for contractors. The project involves the demolition and new construction of a boiler plant, including building utilities, excavation, site protection measures, and an extension of the existing steam tunnel. Contractors must ensure minimal disruption to hospital operations, requiring advance notice for utility outages and maintaining essential services. The sensitivity of project information is emphasized, requiring official use only protocols. Contractors are encouraged to conduct a site visit to identify existing conditions and report discrepancies to the Contracting Officer. The overall timeline anticipates substantial completion within 915 calendar days post-Notice to Proceed, with an estimated cost between $20,000,000.00 and $50,000,000.00. This document highlights the VA's commitment to maintaining operational integrity during significant construction efforts while following stringent regulatory guidelines.
    GeoTek Engineering & Testing Services, Inc. prepared a geotechnical exploration report for a proposed boiler plant at the VA Hospital in Sioux Falls, South Dakota. Conducted with the authorization of Paradigm Engineering and Consulting, the study involved drilling four test borings, analyzing subsurface conditions, and providing recommendations for site preparation and foundation support. The report identified existing fill, loess, and glacial till soils at varying depths, concluding that the existing fill is unsuitable for the new structure, necessitating overexcavation or advanced foundation techniques like rammed aggregate piers or helical piers. Recommendations for site preparation include specific removal depths, drainage solutions, and frost protection. The report also advises observing the excavation process to ensure the suitability of exposed soils and highlights construction precautions related to soil disturbance and groundwater management. Overall, it underscores the importance of tailored engineering solutions to ensure the stability and safety of the new boiler plant within the context of federal and state regulations.
    The document is a Performance Questionnaire for a United States Department of Veterans Affairs (VA) contract related to the replacement of a boiler plant (Project 438-22-900). Contractors are instructed to fill out their information, including contact details and past performance references, before sending the forms to the designated references for completion. The questionnaire assesses contractor performance on various parameters, such as management capability, quality control, problem-solving effectiveness, and overall project performance. It employs a rating scale from 1 (Unsatisfactory) to 5 (Exceptional) to evaluate aspects like personnel qualifications, adherence to schedules, resolution of project discrepancies, and the contractor's responsiveness to changes. Additionally, references must provide feedback on whether they would award another contract to the contractor and disclose any history of cure or show cause notices. The document underscores the importance of past performance evaluations in the procurement process, ensuring that contractors can effectively meet VA requirements. It serves as a crucial tool for gauging contractor reliability and capability, informing future award decisions in the context of federal contracts.
    The document outlines the construction project specifications for a new Central Boiler Plant at the VA Medical Center in Sioux Falls, South Dakota (Project Number 438-22-900), detailing requirements, safety protocols, and operational guidelines. The project covers the construction of an 8,155 square-foot building with advanced HVAC systems, plumbing, electrical, IT, security, and fire protection integrated into the existing campus infrastructure. Key sections include general requirements, existing conditions, HVAC specifications, electrical systems, and site utilities. Contractors must adhere to strict safety requirements, undergo coordination with the Department of Veterans Affairs for security, and ensure minimal disruption to ongoing Medical Center operations. Multiple vendors and subcontractors will collaborate under the oversight of engineering firm Paradigm Engineers and Constructors, ensuring compliance with federal regulations. The document emphasizes the necessity for scheduled site visits, security plans, and the maintenance of utility services throughout construction, reiterating accountability for preserving existing structures and vegetation. Overall, the specifications aim to ensure a secure, efficient, and compliant construction process while upgrading essential services for the VA community.
    The document outlines wage determinations and requirements for building construction projects in Minnehaha County, South Dakota, under the Davis-Bacon Act, affected by Executive Orders 14026 and 13658. It specifies wages that contractors must pay, starting at $17.20 per hour for contracts entered into after January 30, 2022, escalating to higher rates based on job classifications and provisions under these Orders. Wage rates for various construction trades such as bricklayers, electricians, carpenters, and more are detailed, including fringe benefits. The document sets forth procedures for contractors regarding worker protections, appeals process for wage determinations, and classification for work not specified, emphasizing compliance with federal contractual obligations. It also outlines the structure for union rates, survey rates, and state-adopted rates, and how annual adjustments may be made to these wages. The information is crucial for ensuring fair compensation and adherence to labor standards in federally funded construction projects.
    The document primarily addresses a range of government Requests for Proposals (RFPs) and grants, possibly related to infrastructure or environmental projects. It suggests an extensive cataloging of RFPs and grants granted at federal, state, and local levels. Key topics likely include project scopes, compliance standards, funding opportunities, and specific eligibility criteria for applicants. The content reflects various administrative guidelines and procedural expectations concerning submissions, requirements, deadlines, and evaluation criteria for proposals. The document serves as a vital resource for organizations seeking federal and local funding, as it provides insights into regulatory frameworks and procedural nuances essential for successful proposal submissions. Through its structured layout, encompassing multiple sections dedicated to specific RFPs and guidelines, the document highlights the strategic importance of aligning project proposals with governmental priorities and standards. Its emphasis on compliance and detail reflects the rigorous review process involved in governmental funding applications, underscoring the competitive nature of securing such grants. Overall, this document acts as a crucial tool for stakeholders to navigate complex government funding opportunities effectively.
    Similar Opportunities
    Z1NB--Project 621-22-107 - Modernize Building-108 Boiler Plant and Systems
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the modernization of the Boiler Plant and Systems in Building 108 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. This project aims to enhance safety and operational efficiency through extensive renovations, including the installation of new boilers and supporting systems, while ensuring compliance with Veterans Affairs standards. The procurement is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), reflecting the government's commitment to supporting veteran-owned enterprises. Interested contractors must submit their proposals by January 27, 2025, and are encouraged to contact Contract Specialist Diana K. Grube at diana.grube@va.gov or 615-225-6510 for further details.
    Z1DA--PN: 438-25-601, MV Loop 1 Repair (SF) IFB-Set-Aside- SDVOSB
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking bids for the repair of MV Loop 1 at the VA Medical Center in Sioux Falls, South Dakota, under a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The project involves providing all necessary labor, materials, tools, and equipment to address a medium voltage sectionalizing cabinet failure, including the replacement of 15kV wires and installation labor, with a completion timeframe of three calendar days from the issuance of the Notice to Proceed. This procurement is crucial for maintaining the operational integrity of the medical facility's electrical systems, with an estimated contract value between $100,000 and $250,000. Interested bidders must be registered and certified as SDVOSBs in the VetCert database and are encouraged to monitor the Contract Opportunities website for the solicitation, which is expected to be issued around January 29, 2025. For further inquiries, contact Contracting Officer Michael W. Freeman at Michael.Freeman3@va.gov or by phone at 402-996-3538.
    Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the replacement of the boiler plant at the Oscar G. Johnson VA Medical Center located at 325 East "H" Street, Iron Mountain, MI. The project aims to modernize the facility's heating systems, ensuring compliance with federal, state, and local regulations, particularly concerning hazardous materials like asbestos during demolition and installation phases. This initiative is critical for enhancing operational efficiency and safety within the facility, reflecting the VA's commitment to providing high-quality services to veterans. Interested contractors must submit their proposals by January 27, 2025, at 11:59 p.m. CST, and can direct inquiries to Contract Officer Kristi Kluck at Kristi.Kluck3@va.gov.
    Z1DZ--Project No. 619-20-103: Correct FCA Deficiencies in Boiler Building 14
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for a Firm Fixed Price construction project aimed at correcting deficiencies in the Boiler Plant (Building 14) at the Central Alabama Veterans Health Care System in Montgomery, Alabama. The project, valued between $10 million and $20 million, involves the complete replacement of outdated boiler systems, renovation of the building's infrastructure, and installation of fire protection and electrical systems, all in compliance with various building codes and standards. This initiative is critical for ensuring the facility meets safety and operational standards as identified in multiple Facility Conditions Assessments. Interested small businesses, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and Veteran-Owned Small Businesses (VOSB), must express their interest by providing detailed qualifications and relevant experience to the Contracting Officer, Margaret Yeaton, at margaret.yeaton@va.gov by 4:00 PM EST on January 31, 2024.
    Z2DA--Replace Boiler #2 and Correct Deficiencies at Boiler Plant
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the replacement of Boiler 2 and the correction of deficiencies at the VA Caribbean Healthcare System in San Juan, Puerto Rico. The project involves a firm-fixed-price contract specifically designated for small businesses, requiring the contractor to replace an existing boiler with a new 350 HP firetube boiler while ensuring compliance with safety protocols and maintaining operational functionality throughout the construction process. This initiative is crucial for modernizing the facility's infrastructure, thereby enhancing service quality for veterans and ensuring compliance with safety and operational standards. Proposals are due by January 29, 2025, and interested parties should contact Contracting Officer Ana G. Alvarado at ana.alvarado@va.gov for further information.
    Z1DA--36C26125R0019 | 36C261-24-AP-5056 | NRM 640-25-900 | Palo Alto Boiler Plant Retrofit | CH | 640
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the retrofit of three boilers at the Palo Alto Health Care System's boiler plant, identified as project number 36C26125R0019. The objective of this procurement is to ensure compliance with safety standards as outlined in a recent report by the Boiler Efficiency Institute, addressing critical deficiencies in the current boiler systems. This project is vital for maintaining operational integrity and safety within the healthcare facility, with an estimated contract value between $300,000 and $500,000. Proposals are due by February 6, 2025, following a mandatory site visit on January 6, 2025, and interested contractors should direct inquiries to Contract Specialist Nicole Y Renfrew at nicole.renfrew@va.gov.
    J044--Boiler Plant Safety Devices
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the procurement of Boiler Plant Safety Devices for the Veterans Affairs Medical Center in Manchester, New Hampshire. This solicitation is specifically aimed at Service-Disabled Veteran-Owned Small Businesses (SDVOSBC) and involves the installation, testing, tuning, servicing, and certification of three existing boilers, ensuring compliance with updated safety standards and operational efficiency. The project is critical for maintaining safety measures in facilities that support veteran care, with a focus on adhering to strict safety codes and operational standards. Interested parties must submit their quotes by January 24, 2025, at 3:00 PM EST, and direct any inquiries to David Valenzuela at david.valenzuela2@va.gov.
    Z1DZ--619-20-103 | Correct FCA Deficiencies in Boiler Plant, Building #14
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors to address deficiencies in the boiler plant at the CAVHCS - West Campus in Montgomery, Alabama, under Project No. 619-20-103. This construction project, which is exclusively set aside for Certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), involves significant upgrades including the replacement of boilers, associated piping, and equipment, with an estimated construction cost ranging from $10 million to $20 million. The work is critical for ensuring the operational efficiency and safety of the facility's heating systems, and the contract is expected to be completed within 915 days following the issuance of the Notice to Proceed. Interested contractors must be certified and registered in the SBA and SAM databases to be eligible for bidding, with the formal solicitation anticipated to be posted on or around February 27, 2025. For further inquiries, potential bidders can contact Contract Specialist Ryan Crispin at ryan.crispin@va.gov or (706) 231-7600.
    Z1DA--556-23-104 Chilled Water Piping From Bldg.188 to Bldg.3
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the installation of chilled water piping from Building 188 to Building 3 at the Captain James A. Lovell Federal Health Care Center. This construction project, identified as Project Number 556-23-104, requires contractors to provide all necessary labor, materials, and equipment, with an estimated contract value between $1,000,000 and $2,000,000, specifically set aside for Service-Disabled Veteran Owned Small Business (SDVOSB) firms. The project is critical for modernizing healthcare facilities while ensuring compliance with stringent safety and operational standards, particularly in a medical environment. Interested contractors must submit their offers by February 19, 2025, and can contact Contracting Specialist Rebecca L. Picchi at rebecca.picchi@va.gov for further details.
    Z1DA--NRM-CONST 528A7-18-725 REPLACE AHUs 2, 7, 11
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the replacement of Air Handling Units (AHUs) 2, 7, and 11 at the Syracuse VA Medical Center, with a project budget estimated between $5 million and $10 million. This construction project aims to enhance the facility's HVAC systems, ensuring operational efficiency and compliance with safety standards, while being set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Key requirements include the execution of work in two phases, adherence to "Buy American" provisions, and the use of the Autodesk Build Construction Management platform for project coordination. Interested contractors must submit their bids electronically by February 5, 2025, and can contact Contract Specialist Sandra L. Fisher at sandra.fisher3@va.gov for further information.