YOSE 196416 Rehabilitate El Portal Wastewater Trea
ID: 140P2025R0008Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEDSC CONTRACTING SERVICES DIVISIONDENVER, CO, 80225, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

CONSTRUCTION OF WASTE TREATMENT AND STORAGE FACILITIES (Y1PD)
Timeline
    Description

    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of the El Portal Wastewater Treatment Facility and Administrative Camp located in Yosemite National Park, California. The project aims to modernize the 45-year-old wastewater treatment facility, which serves the Yosemite Valley and surrounding communities, by replacing outdated systems and enhancing operational capabilities while also rehabilitating the Administrative Camp for use as RV sites for construction workforce housing. This significant infrastructure investment, with an estimated construction cost between $150 million and $200 million, requires adherence to strict safety, environmental, and quality standards, with work expected to commence within 10 days of contract award and completed within 1,460 days. Interested contractors can contact Paula Teague at paula_teague@nps.gov for further details and must submit their proposals in accordance with the outlined guidelines.

    Point(s) of Contact
    Teague, Paula
    (000) 000-0000
    (305) 224-7728
    paula_teague@nps.gov
    Files
    Title
    Posted
    The document details a justification for the acquisition of Allen-Bradley Programmable Logic Controllers (PLCs) for the rehabilitation of the El Portal Wastewater Treatment Facility at Yosemite National Park. Prepared by the Department of the Interior – National Park Service, the justification explains that the PLCs are essential for controlling critical processes in the wastewater treatment system. The estimated cost for the PLCs is $233,700. The justification cites statutory authority under 41 U.S.C. 3304(a)(1), asserting that only Allen-Bradley products meet the unique technical and operational requirements needed for this project, given existing system compatibility. Despite conducting market research, no alternative systems were identified that could meet the specific needs without compromising functional integrity. The document concludes with assurances from the project manager and contracting officer regarding the accuracy and completeness of the justification, emphasizing ongoing market assessment to encourage competition in future acquisitions. This document underscores the government's commitment to ensuring that specialized equipment is procured to maintain operational efficiency and safety at national facilities.
    The document is a justification for the non-competitive acquisition of Hach brand water quality instrumentation for the rehabilitation of the El Portal Wastewater Treatment Facility at Yosemite National Park. The Department of the Interior's National Park Service seeks to procure specific Hach field instruments, valued at approximately $218,488, necessary for monitoring water quality during wastewater treatment processes. The justification cites the unique qualifications of Hach as the only responsible source that can meet the agency’s requirements, given that Hach’s instrumentation is standardized across the park, enhancing operational efficiency, consistency in training, and maintenance. Market research revealed no alternative instruments meeting the designated needs. The contracting officer expects competitive pricing and has outlined plans to continue assessing the market for future compatibility with other systems. The document concludes with certifications and approvals from key personnel, ensuring that the justification is accurate and in compliance with legal standards. This case illustrates a structured approach to procurement within government operations, emphasizing the need for specialized equipment to accommodate specific operational requirements.
    The Department of the Interior's National Park Service seeks approval for non-competitive procurement of two Huber Screw Presses for the El Portal Wastewater Treatment Facility rehabilitation at Yosemite National Park. The estimated cost for the Huber technology, crucial for dewatering aerobically digested biosolids, is $969,000. Based on 41 U.S.C. 3304(a)(1) and FAR 6.302-1, this justification cites the need for unique qualifications that only the Huber equipment can fulfill due to its compact design, energy efficiency, and operational effectiveness in tight spaces. Market research indicates no alternative systems meet the required specifications, as other options were either too large or lacked processing capacity. The team intends to maintain market awareness to enhance future competition, should advancements allow for compatible systems. Additionally, the contracting officer has deemed the anticipated costs fair and reasonable, continuing to evaluate the market for new solutions. This approval reflects a significant investment in compliance and operational efficiency at the facility while ensuring adherence to procurement regulations.
    The document appears to involve a government-related initiative, likely a Request for Proposals (RFP) or grant application process, as evidenced by the digital signature from Elizabeth McCabe dated September 18, 2024. It does not provide specific details regarding the topic, scope, or funding amounts, suggesting it may be part of a larger suite of proposals or grants. The purpose seems to be identifying, assessing, and soliciting proposals for projects that align with federal, state, or local government priorities. RFPs typically seek innovative solutions to social, economic, or infrastructure challenges, emphasizing compliance with regulatory frameworks. Consequently, the document likely serves as a framework for potential contractors and grantees, detailing expectations and requirements for submissions. However, the lack of substantive content limits specific insights into the exact nature of the projects it addresses. Overall, the focus is on establishing a structured process for proposals, underscoring the government's commitment to transparency, competitiveness, and proper funding allocation within its programs.
    The document outlines the rehabilitation project for the El Portal Wastewater Treatment Facility and Administrative Camp in Yosemite National Park. The project aims to upgrade the 45-year-old wastewater treatment plant to improve efficiency and meet modern standards, including new treatment processes, upgrades to electrical systems, and the construction of new maintenance facilities. Additionally, the Administrative Camp will be transformed into a staging area for workforce housing, requiring significant demolition and utility improvements while establishing a riparian buffer on the Merced River. The project will proceed in five phases, with specific work sequences designed to ensure operational continuity during construction. Key considerations include coordinating with existing utility providers, addressing construction constraints, and managing public access to the site. The document also defines contract line items for the project, detailing the scope of work and payment structures. Emphasis is placed on following regulations and maintaining environmental stewardship, all of which reflect a structured approach to government contracting and compliance with federal standards for construction within national parks.
    The document outlines the specifications for the rehabilitation of the El Portal Wastewater Treatment Facility at Yosemite National Park, California, as prepared by the National Park Service and Jacobs Engineering Group. It includes a detailed table of contents covering general requirements, construction constraints, contract procedures, project management, safety requirements, and quality control, among others. The report comprises various geotechnical assessments, including subsurface conditions, seismic hazard evaluations, and recommendations for foundation designs and construction procedures. Key findings reveal that the site's geological composition consists of sedimentary rock and alluvium, with recommendations for using spread or mat foundations supported by extensive over-excavation of undocumented fill. Groundwater management and stringent construction practices are emphasized to mitigate risks associated with potential seismic events and soil instability. The document serves as a critical guideline to ensure compliance with engineering standards and proper environmental stewardship during the rehabilitation project, reflecting the government's commitment to maintaining the integrity of the National Park facilities.
    The "Rehabilitate El Portal Administrative Camp" project at Yosemite National Park aims to restore and enhance the administrative facilities through various construction activities. The document outlines comprehensive specifications under the National Park Service (NPS), detailing methods for preserving existing conditions, demolition procedures, and guidelines for concrete work. Key tasks include protecting survey markers, restoring pavement, and safeguarding utilities throughout construction. The scope also involves the removal of existing structures, careful handling of historic items, and adherence to environmental regulations. The specifications emphasize quality assurance measures, with mandated pre-installation meetings and action submittals to ensure compliance with safety standards and effective project execution. The documentation is structured into various sections, covering everything from maintenance and demolition to detailed instructions on concrete forming, reinforcing, and placement. This project serves as a crucial investment towards maintaining the infrastructure of Yosemite National Park, aligning with government objectives to preserve national landmarks while enhancing visitor services through modernized facilities and improved safety measures.
    The project at Yosemite National Park involves the rehabilitation of the El Portal Wastewater Treatment Facility, elaborated in the specifications document authored by various members. It outlines a comprehensive demolition plan, which includes the management of hazardous materials, existing utility disconnections, and safe removal procedures to optimize material recycling. Key sections cover the necessary approvals required before work commencement, detailed descriptions of demolition methods for various structures, preservation measures for existing utilities, and strict adherence to environmental regulations. The document specifies that all demolition operations must maximize the recycling of materials, with protocols for the careful handling and disposal of potentially hazardous substances, including asbestos and PCBs. By detailing the operational logistics and safety requirements, this plan ensures that the rehabilitation process aligns with federal standards for waste management, preservation of resources, and worker safety. Ultimately, the project demonstrates the National Park Service's dedication to enhancing infrastructure while prioritizing safety and environmental compliance.
    The document outlines the rehabilitation project for the El Portal Wastewater Treatment Facility within Yosemite National Park, managed by the National Park Service. It serves as a comprehensive specification guide, detailing the necessary protocols and standards for various construction components, including demolition, concrete work, metal framing, gypsum board installation, and interior finishes. Each section is attributed to specific authors and provides in-depth directives on materials, methods, and safety measures essential for compliance with federal and environmental regulations. The specifications are categorized into distinct divisions, such as existing conditions, plumbing, HVAC, electrical systems, and finishes, interleaved with sustainability requirements emphasizing recycled content. The document emphasizes structured coordination among trades, compliance with safety standards, and the importance of properly documenting the use of materials to ensure eco-friendliness, all vital to federal grant and RFP processes. This detailed blueprint underpins efficient performance in enhancing park infrastructure while adhering to operational and environmental sustainability guidelines.
    The document outlines specifications and requirements for the rehabilitation of the El Portal Wastewater Treatment Facility within Yosemite National Park, prepared by the National Park Service. It spans multiple divisions, detailing processes from demolition to electrical systems, with emphasis on safety and quality standards. Each section is authored by designated individuals with their initials specified throughout the document. Key topics include the management of hazardous materials, structural repairs, plumbing, HVAC, electrical requirements, and environmental considerations. The project aims to upgrade the facility's infrastructure in compliance with federal and local regulations, ensuring effective and sustainable operation. Furthermore, there are guidelines for submittals, materials, and methods, emphasizing coordination with utility services while adhering to national safety codes. The comprehensive framework establishes a systematic approach to meet the necessary safety and operational protocols, reflecting a commitment to environmental stewardship and project efficacy.
    The document outlines a project proposal for the rehabilitation of the El Portal Wastewater Treatment Facility at Yosemite National Park, California. It is managed by the National Park Service’s Denver Service Center, involving various engineering and design specifications. The document details the authors responsible for different sections, each identified by initials. Key sections include demolition, hazardous material management, concrete work, metals fabrication, plumbing, electrical systems, heating, ventilation, and air conditioning (HVAC), as well as safety and construction materials related to the wastewater treatment facility. The proposal adheres to multiple standards for design and construction, ensuring compliance with local, state, and federal regulations. The purpose of the proposal is to solicit bids from qualified contractors for the rehabilitation tasks, enhancing the facility’s functionality and compliance with modern standards. This initiative is indicative of a broader commitment by the federal government to maintain and improve infrastructure within national parks, ensuring environmental protection and public safety while accommodating increasing visitor demands. A comprehensive set of specifications outlines both general requirements and detailed design criteria for contractors to follow.
    The file outlines the rehabilitation project for the El Portal Wastewater Treatment Facility at Yosemite National Park. The National Park Service (NPS) has prepared detailed specifications across various divisions, including demolition, concrete work, structural metals, and plumbing. Key sections describe the removal of hazardous materials like asbestos and lead, alongside structural enhancements such as concrete repairs and installation of new utilities. Significant components include the procurement and installation of davit cranes, jib cranes, and portable gantry cranes for effective material handling during the rehabilitation. The specifications detail equipment requirements, safety measures according to ANSI and OSHA standards, and submission guidelines for manufacturers and contractors. The project emphasizes compliance with regulatory standards and efficient design to improve the facility's operational capabilities, ensuring water treatment processes meet environmental standards. This comprehensive documentation supports the RFP process, guiding potential contractors in submitting proposals that align with NPS's project goals and safety regulations, ultimately enhancing service delivery at Yosemite National Park.
    The El Portal Administrative Camp Rehabilitation project at Yosemite National Park entails comprehensive construction and demolition efforts to enhance the administrative facilities while preserving sensitive cultural and natural resources. The project encompasses the demolition of existing structures, removal of hazardous materials, and the restoration of disturbed areas to align with surrounding landscapes. Key considerations include minimizing ground disturbance, proper utility location verification, and maintaining the ecological integrity of wetlands and riparian buffers. Contractors are required to submit travel control, traffic, and staging plans, ensuring compliance with environmental regulations and safeguarding archaeological sites. General site notes outline necessary precautions for construction, including avoiding sensitive resource areas and adhering to local and federal regulations related to hazardous materials. The project emphasizes collaboration with the contracting officer to finalize disturbance areas and adhere to robust safety and environmental standards throughout its execution. This initiative reflects an overarching aim to modernize park facilities while ensuring ecological and cultural conservation.
    The document outlines the detailed plans for the rehabilitation of the El Portal Administrative Camp at Yosemite National Park. It includes a wet utility demolition plan and road profile drawings, specifically addressing the removal and capping of existing water and sewer connections while preserving certain manholes to avoid extensive road work. The project also details the road reconditioning, emphasizing the re-compaction of aggregate and maintenance of sensitive resource areas. Multiple site plans illustrate the layout of roadways, RV pads, and utility hookups, while mentioning areas with existing residences that require protection. Important notes highlight coordination with various subsystems, adherence to strict environmental regulations, and careful management of disturbances near wetlands. This project reflects a commitment to enhancing infrastructure while being mindful of environmental impacts and the necessity for compliance with federal and state standards.
    The document details the "Rehabilitate El Portal Administrative Camp" project in Yosemite National Park, which encompasses grading and drainage plans as well as a water system layout. The initiative aims to improve the administrative camp's infrastructure to enhance usability and maintenance while adhering to environmental regulations. Key components include a grading plan that sets out various elevations and descriptions for specific work areas, indicating necessary elevations, drainage considerations, and proposed site connections. The water system design outlines the arrangements for a new water main and includes specific construction notes such as verification of existing connections and necessary separation from other utilities. It emphasizes proper dimensions for hydrants and valves and the need for efficient integration with current systems. The project prioritizes enhancing operational capacity while ensuring safety and compliance with local building and environmental standards. This rehabilitation effort reflects the government’s commitment to maintaining its national parks and improving facilities for staff and visitors alike.
    The document outlines the rehabilitation plan for the El Portal Administrative Camp located in Yosemite National Park, primarily focusing on the sewer infrastructure improvements. It includes detailed plans and profiles for sewer mains, service connections, and manholes, specifying materials such as 8” PVC SDR 35 pipes and illustrating various construction details like trenching and backfill methods. There are tables designating lengths, sizes, and depths for sewer service connections and a comprehensive set of general notes advising contractors on the necessary verification and installation procedures. The inclusion of electrical layouts indicates a holistic approach to upgrading the facilities, including safety measures and compliance with local regulations. This project aligns with government objectives to enhance infrastructure, ensuring proper sanitation and safety measures in public facilities. Overall, the document serves as a crucial guide for contractors engaged in sewage rehabilitation, promoting adherence to outlined specifications and standards throughout the construction process.
    The government document pertains to the rehabilitation of the El Portal Administrative Camp within Yosemite National Park, encompassing detailed planning and electrical engineering designs. The project aims to modernize electrical systems, remove outdated equipment, and establish safer, more efficient utilities for RV sites. Key components include site plans, demolition guidelines for existing electrical assets, and the installation of new utilities that comply with regulatory standards. The initiative addresses environmental concerns, outlines sensitive areas, and incorporates safety measures during construction. Emphasis is placed on collaboration with power utility companies—specifically PG&E—for the removal of transformers and existing infrastructure. Through this project, the government seeks to enhance infrastructure while ensuring compliance with safety and environmental standards, reflecting a commitment to restoring ecological integrity and improving visitor experience in the park.
    The document details the electrical control diagrams for the rehabilitation of the El Portal Administrative Camp located in Yosemite National Park. It consists of two main sheets, focusing on electrical details and a control diagram for lift station pumps. Key components include wiring schematics, control relays, pump starters, and safety features that ensure the pumps operate effectively and safely. Notably, it outlines the specifications for intrinsically safe barriers for level floats, reflects the state of the relays in a normally de-energized state, and notes requirements for control systems, such as PLC integration and alarm signaling. The design intends to modernize the existing infrastructure while adhering to safety standards. This technical documentation supports the project’s purpose by providing essential guidelines for electrical setup necessary for the administration camp's functionality, reflecting broader government objectives in maintaining national park facilities and promoting safety in electrical operations.
    The Yosemite National Park project encompasses site improvements in El Portal, California, focusing on wastewater management and associated infrastructure upgrades. This initiative aligns with federal standards and regulations, enhancing the functionality and sustainability of the park's facilities. Key components include precise site drawings detailing utility connections, construction procedures, and environmental considerations, such as stormwater management and vegetation restoration for disturbed areas. The project requires careful coordination with existing utilities to ensure minimal disruption during construction, as well as adherence to safety protocols and permitting processes. By improving wastewater infrastructure, the project aims to support the park’s operational efficiency and visitor experience while safeguarding scenic and natural resources. This government initiative reflects a commitment to preserving the park's heritage and ecological integrity as part of broader federal conservation efforts.
    The document outlines technical specifications for a multifaceted construction project at Yosemite National Park, El Portal, focusing on the demolition and cleaning processes within the facility’s existing digester building. Key elements include the total maintenance and removal of pipelines and electrical conduits, requirements for cleaning the internal structure of the digester, and safe disposal of waste materials. The plan mandates strict adherence to field verification for dimensions before any modifications, ensuring safety in confined spaces and standard cleaning protocols. It emphasizes the need for contractor coordination with park operations when executing sludge removal and cleaning products used during the process, as well as compliance with MSD sheets for chemical handling. The document also incorporates architectural and structural drawing details relevant to the facility's headworks, including multiple elevation and section views to establish necessary construction standards and design criteria. In the context of RFPs and government grants, the document serves as a guideline for contractors responding to the federal government's construction requests while highlighting environmental protection, safety measures, and rigorous execution of technical designs to meet project specifications on federal property.
    The document comprises engineering and architectural drawings and notes for a project at Yosemite National Park, specifically related to the installation of secondary clarifiers. It outlines the design specifications, construction details, and additional design criteria essential for the project. The drawings detail structural components, foundation plans, and mechanical configurations necessary for constructing the clarifiers, designed to handle various flows and ensure environmental compliance. Key features include seismic response coefficients, general sheet notes, and clarifier configurations that ensure efficient wastewater treatment processes. The project's purpose is to enhance the wastewater management systems within the national park, aligning with federal and state environmental regulations. Furthermore, various drawings highlight both mechanical and plumbing specifications necessary for installation. The document serves as a foundation for contractors to understand the design requirements and aids in systematic implementation, ensuring adherence to expected standards and fostering project efficiency. Overall, the comprehensive nature of the drawings supports the effective execution of the infrastructure upgrade at Yosemite National Park.
    The document outlines detailed architectural and structural plans for the RAS/WAS Pump Station located in Yosemite National Park, specifically in the El Portal area. It encompasses several engineering drawings, including floor plans, roof plans, elevations, sectional details, and mechanical designs crucial for the construction and operation of the facility. Key elements include the integration of prefabricated concrete and metal structures, plumbing layout, HVAC systems, and electrical specifications aimed at ensuring operational efficiency and adherence to safety codes. The drawings indicate various critical dimensions, material specifications, and the arrangement of components, such as pumps and blowers, essential for wastewater management. General notes emphasize compliance with building codes and reflect the project's complexity by requiring coordination among diverse engineering disciplines. The RFP and grant applications for this project signify federal investment in environmental sustainability and infrastructure development within national parks, highlighting the importance of restoring and maintaining water resources. Overall, the comprehensive plans provide a roadmap for construction while prioritizing safety, compliance, and environmental preservation in a sensitive ecological area.
    The architectural plans for the Yosemite National Park maintenance building detail the design, structure, and specifications required for the project scheduled for final submission in July 2024. Key elements include floor plans, roof plans, and elevations that outline both aesthetic and functional components like storage, office spaces, and maintenance areas. The design incorporates various building materials, including insulated precast concrete walls and steel frameworks, emphasizing durability and environmental integration. Significant design features include roof drainage systems, door types, window specifications, and overall structural integrity to withstand environmental loads from wind and snow, ensuring adherence to applicable safety and engineering standards. The documentation outlines the necessary architectural and structural details, as well as construction methods and general notes for reference. Additionally, it addresses compliance with government regulations relevant to federal RFPs, indicating thorough planning and commitment to eco-friendly practices in elevation design. The summary captures essential details without delving into excessive specifics, retaining coherence and clarity throughout. Emphasis on structural integrity, environmental consideration, and compliance with regulatory standards underscores the project’s importance within government-funded development initiatives.
    The file outlines the technical standards and requirements for the rehabilitation of the El Portal Wastewater Treatment Facility within Yosemite National Park, California, scheduled for July 2024. It specifies the responsibilities of various Engineers of Record associated with different divisions, specifically CSI Divisions 3, 22, 23, 26, 31, 32, and 34. The document includes detailed standard construction drawings and specifications for critical elements such as construction joints, waterstops, and structural reinforcements. Emphasizing quality control and adherence to engineering principles, it mandates the use of specified materials and techniques to ensure the facility's reliability and performance. This comprehensive technical framework aims to guide contractors during the rehabilitation process while ensuring compliance with federal standards and environmental protection regulations. Overall, it reflects the federal government's commitment to maintaining efficient infrastructure in national parks while supporting sustainable practices.
    The document outlines the General Decision Number CA20240018, effective from September 20, 2024, for construction projects in multiple counties in California, including Alameda, Fresno, and Santa Clara. It details wage rates required under the Davis-Bacon Act and relevant Executive Orders for various construction roles, emphasizing compliance with minimum wage standards based on contract dates. Significant wage per-hour rates vary by area and job type, such as Asbestos Removal workers and Electricians, which reflect ongoing adjustments and safety standards within the construction industry. Key sections include classifications with specific wage rates, fringe benefits, and required worker protections associated with federal contracts. Additionally, the information on project types—building, highway, dredging, and heavy construction—highlights government regulations to ensure fair labor practices and compliance during federally funded projects. The document serves as a reference for contractors to align with federal wage determinations and comply with applicable laws in their respective regions of California.
    The document is a Small Business Subcontracting Plan required from large business Offerors submitting proposals over $750,000, as outlined by federal regulations. The National Park Service (NPS) establishes specific subcontracting goals for fiscal year 2024, emphasizing the inclusion of small business concerns—42% for general small businesses, with additional targets for small disadvantaged businesses, HUBZone, Indian enterprises, service-disabled veteran-owned, and women-owned businesses. The plan mandates that prime contractors develop goals, identify potential subcontractors, and demonstrate a comprehensive approach to equitable participation of small businesses. It outlines the methods for goal determination, outreach efforts to solicit small businesses, and the monitoring and reporting requirements to ensure compliance with subcontracting commitments. The document stresses the contractor’s responsibilities to facilitate timely payments to subcontractors and report on compliance to federal agencies. Failure to meet the goals or demonstrate good faith efforts can result in penalties. Overall, this plan serves as a formal commitment to promoting small business participation in government contracting, thereby supporting broader economic and social objectives.
    The document outlines the equipment requirements and costs associated with the construction projects at the WWTF and Admin Camp. It specifies various types of government-furnished equipment, including transformers, switchboards, fire hydrants, network information panels, butterfly valves, SCADA thin clients, and workstations. Each item has an associated unit cost and total expense, culminating in a grand total of $619,000. The costs appear to cover both individual pieces of equipment and aggregations of multiple related items, emphasizing financial planning for these segments of the project. The detailed inventory shows a systematic compilation of essential equipment vital for the operational setup of the facilities, reflecting a structured approach to fulfilling the projects' infrastructural needs. The outline adheres to specifications noted in subsequent documentation, indicating compliance with government regulations and ensuring project accountability. This information is critical in the context of government Requests for Proposals (RFPs) and grants as it facilitates transparent budgeting and procurement strategies. Overall, the document plays a key role in the financial and logistical planning aspects of the government project.
    The Project Experience Questionnaire (Solicitation: 140P2019XXXX) serves as a primary document for prospective contractors to detail their relevant project experiences in response to a federal or state RFP. The questionnaire requires submission of specific project information, including title, location, description, and contractor details. Contractors must describe the work performed, and identify how their contributions align with evaluated project elements outlined in section L of the solicitation. Additionally, responses must address changes to the original project price and schedule, challenges encountered, and successful methods employed. The document emphasizes the importance of demonstrating past performance and relevant project experience as vital considerations for contract awards. This structured approach facilitates thorough evaluation of offerors' qualifications and capabilities, ensuring alignment with the project’s objectives and requirements.
    The Past Performance Questionnaire, associated with Solicitation No. 140P20, serves as a tool for contractors to assess their past performance on projects. The document outlines a two-part process where offerors complete sections detailing their company and project information, which is then transmitted to references who evaluate the performance based on various criteria. This information is deemed Source Selection Sensitive and cannot imply government endorsement of contractors. The evaluation covers several areas: quality, schedule management, cost control, management capabilities, small business subcontracting, and regulatory compliance, each scored with defined ratings—ranging from "Exceptional" to "Unsatisfactory." Comments supporting these ratings are solicited to provide context for the assessments. The completed questionnaire is submitted to the National Park Service’s Contracting Officer, reinforcing the importance of accurate reporting in federal contracting processes. This form contributes to transparency and accountability in federal grants and contracts by documenting contractor performance metrics essential for informed decision-making in future solicitations.
    The document is a form for offerors to provide general references as part of a federal Request for Proposals (RFP) process. It instructs offerors to fill out contact details for various entities including sureties, corporate banks, insurance companies, subcontractors, and material suppliers. Each entry requires the name, address, and contact information, along with specific inquiries about their services, type of accounts, and materials. Offerors must disclose any less-than-satisfactory relationships with these references and describe any remedial actions taken or planned to mitigate deficiencies, underscoring the importance of transparency. Failure to provide honest and detailed disclosures may negatively impact assessments of the offeror's past performance. The structure of the document is organized into sections for different types of entities, emphasizing thoroughness in reporting and communication with the government. This form is essential for evaluating the qualifications and reliability of potential contractors in the context of federal and local grant processes.
    The document outlines a Request for Proposal (RFP) from the National Park Service (NPS) for the rehabilitation of the El Portal Wastewater Treatment Facility and Administrative Camp in Yosemite National Park, under solicitation number 140P2025R0008. The project aims to modernize a 45-year-old wastewater treatment facility, which is pivotal for serving the Yosemite Valley and surrounding communities. The contract will follow a Full and Open Competition process, expecting proposals to be submitted on a Fixed-Price basis, with total construction costs estimated between $150 million and $200 million. Notable sections include requirements for sealed bids, proposal submission guidelines, and terms for performance and payment bonds. The timeline stipulates work commencement within 10 calendar days post-award, with a completion deadline of 1,460 days. Key emphasis is placed on the contractor's responsibility for quality control, adherence to safety standards, and the management of project schedules and performance assessments. The document includes additional clauses referencing labor and environmental compliance, along with provisions for options in extending services. This RFP indicates the government's strategic investment in infrastructure, aiming to enhance operational capabilities while ensuring environmental stewardship within the national park context.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Y--YOSE 196416 Rehabilitate El Portal Wastewater Treatment Facility and Admin Camp.
    Active
    Interior, Department Of The
    The National Park Service (NPS) is preparing to solicit proposals for the rehabilitation of the El Portal Wastewater Treatment Facility and Administrative Camp located in Yosemite National Park, California. This project aims to upgrade the 45-year-old wastewater treatment plant, which is critical for managing wastewater for Yosemite Valley and surrounding communities, by replacing outdated infrastructure and systems, demolishing obsolete structures, and creating RV sites for construction workforce housing at the former administrative camp. The estimated cost for this comprehensive project exceeds $150 million, with a performance period of approximately 1460 days, including potential environmental shutdowns. Interested contractors must be registered with the System for Award Management (SAM) to participate, and solicitation documents are expected to be issued around September 30, 2024. For further inquiries, contact Patrick Naulty at patricknaulty@nps.gov or call 303-987-6701.
    Y--YELL 310533 Rehabilitate and Improve Old Faithful
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation and improvement of the Old Faithful Water Treatment System at Yellowstone National Park (Solicitation No. 140P2024R0050). The project aims to construct a new water treatment facility, including the installation of advanced piping and control systems, while ensuring compliance with environmental protections and safety regulations. This initiative is crucial for maintaining essential infrastructure within the park, which supports both visitor services and environmental conservation efforts. Interested contractors must submit their proposals by November 12, 2024, at 2:00 PM MT, and can direct inquiries to Vicki Freese-supler at vickilfreese-supler@nps.gov or by phone at 720-402-8467.
    Z--YELL 307127 - Rehabilitate historic Structures
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of historic structures at Fort Yellowstone in Yellowstone National Park, under Solicitation No. 140P2024R0177. The project aims to restore and upgrade the exteriors of seventeen historic buildings, focusing on preserving their historical integrity while addressing necessary structural repairs, including roofing, masonry, and window restorations, in compliance with federal preservation standards. This initiative is crucial for maintaining the cultural heritage of the park while enhancing the facilities for operational use, with an estimated project value exceeding $10 million. Interested contractors must submit their proposals by November 4, 2024, and can contact Vicki Freese-supler at vickilfreese-supler@nps.gov or 720-402-8467 for further details.
    61--Transformer and Switchboards for Yosemite NP
    Active
    Interior, Department Of The
    The National Park Service, part of the Department of the Interior, is seeking qualified small businesses to provide one three-phase transformer and two switchboards for Yosemite National Park, California, under solicitation number 140P8524Q0128. The procurement aims to enhance the electrical infrastructure at the El Portal Administrative Camp, adhering to stringent specifications and industry standards for safety and performance. This opportunity is crucial for maintaining reliable power distribution within the park, with a contract period of performance from November 25, 2024, to October 1, 2025. Interested vendors must submit their quotes by October 24, 2024, at 1:00 p.m. Pacific time, and can contact Lisa Henson at LisaHenson@nps.gov or 928-612-0074 for further information.
    Z--Death Valley National Park - Repair Landfill Cap a
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting bids for the repair of the landfill cap and drainage systems at Furnace Creek in Death Valley National Park, California, under solicitation number 140PS124Q0039. The project involves critical construction services, including soil testing, erosion repairs, installation of new culverts, and the use of rip rap for stabilization, with a total project completion deadline of 90 days from the notice to proceed. This initiative is vital for restoring environmental functionality and safety within the park following severe flood damage in August 2023. Interested contractors must submit sealed offers, with a contract value expected to range between $100,000 and $250,000, and are required to attend a mandatory site visit on September 30, 2024. For further inquiries, contact Caitlin Hale at caitlinhale@nps.gov.
    Y--Source Sought Notice
    Active
    Interior, Department Of The
    The National Park Service (NPS) is seeking proposals for the rehabilitation of the Painted Desert Community Complex located within Petrified Forest National Park, under project number PEFO 267538. The project aims to address structural deficiencies, restore historical features, and upgrade facilities to meet current standards, with an estimated construction cost exceeding $10 million. This initiative reflects the federal government's commitment to preserving national landmarks while enhancing visitor experiences and public engagement. Interested contractors must submit their proposals by November 7, 2024, and can direct inquiries to James Waller at jameswaller@nps.gov or by phone at 303-969-2488.
    Y--ROMO 327127 Bridge Preservation
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the "Y--ROMO 327127 Bridge Preservation" project, aimed at preserving multiple bridges within Rocky Mountain National Park. Contractors will be required to perform various preservation tasks, including concrete repairs, masonry work, and scour countermeasures, with an estimated contract value between $1,000,000 and $5,000,000. This initiative is crucial for maintaining the park's infrastructure while ensuring compliance with environmental regulations and federal standards. Interested contractors should contact Shellie Murphy at shelliemurphy@nps.gov or call 720-610-2690, and must submit their proposals by the specified deadline, with a pre-proposal site visit scheduled for October 4, 2024.
    DEVA Lagoon & Access Road Repairs
    Active
    Buyer not available
    The National Park Service is seeking contractors for the repair and restoration of the Stovepipe Wells Lagoon and its access road at Death Valley National Park in California. The project involves addressing erosion issues, repairing drainage features, removing invasive vegetation, re-compacting lagoon berms, regrading the area, and replacing downed fencing. This initiative is crucial for maintaining the park's infrastructure and ensuring environmental sustainability. Interested contractors should submit their company information, including experience and socio-economic status, to the primary contact, Jason Burdett, at jasonburdett@nps.gov or by phone at 501-762-9517. The estimated project cost ranges from $250,000 to $500,000, with a completion timeline of 90 days post-contract initiation, contingent upon available funding.
    CA FTNP SEKI 13(2) Mineral King Road
    Active
    Transportation, Department Of
    The U.S. Department of Transportation, through the Federal Highway Administration, is soliciting bids for the rehabilitation of Mineral King Road in Sequoia and Kings Canyon National Park, California, under solicitation number 6982AF24B000017. The project involves rehabilitating approximately 12.09 miles of roadway, including tasks such as asphalt paving, drainage improvements, and construction of retaining walls, with an estimated cost range of $25 million to $35 million. This initiative is crucial for maintaining access to the park while ensuring compliance with federal regulations and environmental standards. Interested contractors must submit their bids by 2:00 p.m. local time on November 6, 2024, and are encouraged to attend a pre-bid meeting on October 8, 2024, for further project insights. For inquiries, contact Jorey Deml or Ryan Phillips at cflacquisitions@dot.gov.
    Z--ORPI 240841 Replace Primary Water System for Maint
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the replacement of the primary water system at the Organ Pipe Cactus National Monument in Ajo, Arizona. The project involves significant upgrades to the existing water distribution systems, which currently utilize outdated asbestos-cement piping, including the installation of a 100,000-gallon potable water tank and associated infrastructure improvements. This initiative is critical for ensuring a reliable water supply for maintenance and residential areas within the park, enhancing both operational efficiency and visitor experience. Interested small businesses must submit their proposals by the specified deadlines, with a project value exceeding $10 million and a completion timeline of 390 calendar days post-award. For further inquiries, potential bidders can contact Joy Ewalt at JoyEwalt@nps.gov or call 720-400-3897.