CUIR_Master_Substation_Building_Expansion_Design-Build_Project
ID: SLAC_CUIR_Master_Substation_Building_Expansion_DB_Sources_Sought_121824Type: Sources Sought
Overview

Buyer

ENERGY, DEPARTMENT OFENERGY, DEPARTMENT OFSLAC Natl Accel Lab -DOE ContractorMenlo Park, CA, 94025, USA

NAICS

Commercial and Institutional Building Construction (236220)
Timeline
    Description

    The Department of Energy is seeking design-build contractors for the CUIR Master Substation Building Expansion project at the SLAC National Accelerator Laboratory in Menlo Park, California. The objective is to modernize the existing utility infrastructure by constructing a new two-story building adjacent to the current Master Substation, which includes installing new medium voltage switchgear and relocating an existing generator. This project is critical for enhancing the laboratory's operational capabilities to support advanced scientific research, with an estimated contract value ranging from $5 million to $13 million. Interested contractors must submit their expressions of interest to Quyen Weng at quyen@slac.stanford.edu by 5 PM PST on January 7, 2025, as this Sources Sought Notice is intended to gauge interest prior to a formal solicitation.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines Request for Proposal (RFP) #352442 issued by the University for the Critical Utilities Infrastructure Revitalization – Subproject 1, focusing on the Master Substation Building Expansion. It invites contractors to submit firm-fixed price proposals by a specified deadline, detailing required documentation and protocols for submission including a site visit for prospective bidders. The project, part of federal construction overseen by the U.S. Department of Energy, encompasses compliance with the Davis-Bacon Act and requires offerors to be registered in good standing with the System for Award Management (SAM). The RFP specifies a conflict of interest clause, prohibiting partnership with certain firms involved in the project’s design. All inquiries are directed to the procurement representative, with a deadline for questions provided. This RFP reflects the federal government's systematic procurement process aimed at enhancing critical infrastructure while ensuring compliance and transparency in contracting.
    The document outlines a subcontract form from the SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. The main purpose of the subcontract is to facilitate the acquisition of services related to the CUIR Master Substation Building Expansion under a firm fixed price agreement. It provides essential details such as the solicitation number, offer submission deadline, and contact information for the subcontract administrator, Quyen Weng. The document specifies the location of the project at SLAC and includes a table of contents covering various sections, including project specifications, delivery terms, and evaluation factors for award. Additionally, the subcontract clarifies the rights and obligations of the involved parties and requires the seller's acknowledgment through a signature. Compliance with the solicitation terms and associated clauses is implied throughout the agreement, ensuring transparency and accountability in the contracting process for federally supported projects. The structure of the document facilitates clear communication of terms related to the procurement process in a governmental context.
    The document pertains to a federal Request for Proposals (RFP) focused on the expansion of a Master Substation Building as part of a supply chain management initiative. It outlines the scope of services and the cost structure for the project, indicating a single lot as the quantity for the base scope. Key details include spaces for noting the total subcontract value and the funded amount, while also referring to necessary identifiers such as Unique Entity ID and DUNS Number. Payment terms are established as Net 30, unless otherwise specified, with potential discounts acknowledged for various categories, including educational and volume-based pricing. Overall, the emphasis is on structured financial documentation necessary for compliance and project facilitation within the context of federal funding and contracts.
    The document outlines the Statement of Work (SOW) for the Master Substation Building Expansion at SLAC National Accelerator Laboratory, managed by Stanford University for the U.S. Department of Energy. It references several attached documents essential for the project, including a detailed SOW, a Preliminary Design Report for Electrical Systems Improvements, and various technical specifications for critical infrastructure upgrades. Additionally, it includes specifications for government-furnished property and assessments of existing conditions necessary for project execution. The attached Plans and Procedures address power outage management, while Environmental, Safety, and Health (ES&H) documentation supports compliance with safety standards. The purpose of this document is to guide contractors in understanding project requirements and expectations for the timely and safe completion of the Master Substation Building Expansion.
    The document outlines the Statement of Work (SOW) for the Master Substation Building Expansion as part of the Critical Utilities Infrastructure Revitalization (CUIR) project at the SLAC National Accelerator Laboratory. This expansion aims to modernize electrical systems to meet current scientific demands and involves constructing a two-story addition, relocating equipment, and installing new switchgear. Key considerations include stringent safety protocols, coordination with ongoing operations, and managing environmental risks associated with existing hazardous materials. The project emphasizes safety, quality assurance, and minimal impact on SLAC operations as critical success factors. It requires comprehensive planning, including a temporary power plan to ensure operational continuity during construction. The design-build subcontractor is responsible for maintaining quality, adhering to permitting requirements, and ensuring all work complies with environmental regulations. The anticipated timeline includes design and construction phases concluding in 2028, with regular meetings and progress reports mandated for effective communication. This SOW reflects federal priorities to enhance infrastructure at national laboratories while upholding stringent safety and environmental standards.
    The SLAC National Accelerator Laboratory is conducting a Critical Utilities Infrastructure Revitalization (CUIR) project, which includes the Preliminary Design Report (PDR) for Subproject 1 focused on critical electrical system improvements. The project aims to modernize utility systems to support advanced scientific research, enhance existing infrastructure, and ensure compliance with stringent federal and state codes. Key objectives include improving the Master Substation's resilience, increasing power distribution capacity, and establishing a new electrical Supervisory Control and Data Acquisition (SCADA) system. The PDR outlines detailed scopes of work, including the expansion of the Master Substation Switchgear, installation of new medium-voltage switchgear, and construction of a B016 expansion building to house electrical equipment. It emphasizes compliance with design and safety regulations, including adherence to various building codes and environmental considerations. Significant emphasis is placed on coordinated planning between electrical, civil, structural, and architectural disciplines, ensuring that all elements satisfy safety and operational requirements. This document represents critical groundwork for executing a comprehensive electrical infrastructure upgrade, crucial to SLAC's mission to support the Department of Energy’s scientific initiatives.
    The document outlines the General Requirements and Specifications for the SLAC National Accelerator Laboratory’s CUIR Subproject 1 - Critical Electrical System Improvements. The specifications detail obligations for contractors, including compliance with subcontract terms, safety requirements, project management, and environmental procedures. It emphasizes the need for coordination with SLAC's operational teams to minimize disruptions during construction and includes procedures for requesting substitutions of materials and products. Specific roles and responsibilities for SLAC management, contractors, and subcontractors are highlighted, particularly concerning safety and quality oversight. The proposal also clarifies the process for handling potential conflicts, modifications, and approvals required for project changes. With adherence to building codes, necessary inspections, and the obligation for subcontractors to provide qualified personnel, the document sets a framework for achieving seamless project execution while ensuring environmental and safety standards are maintained. This structured approach underlines the government's commitment to efficiently manage federal grants and RFPs, providing a foundation for success in infrastructure projects.
    The document outlines a series of technical reports pertaining to environmental assessments and engineering studies at the Master Substation Building 016 within the SLAC National Accelerator Laboratory. The reports include results from lead testing, asbestos surveys, topographic surveys, a bus transfer study, soil characterization, and geotechnical investigations—all aimed at supporting infrastructure planning and compliance with health and safety standards. Key findings include the absence of lead in the steel paint used in the building, alleviating concerns over lead exposure during planned renovations. Additionally, the asbestos report indicates the presence of asbestos-containing materials from 1964, highlighting the necessity for caution during any repairs or demolition work. The bus transfer study evaluates the compatibility of new transformer installations with existing operations, analyzing transient behavior and recommending improvements for enhanced efficiency and reliability. This comprehensive documentation supports informed decision-making for project planning and environmental compliance, reflecting the agency's commitment to safety and regulatory adherence during upgrades to critical infrastructure.
    The document outlines the content for the SLAC (Stanford Linear Accelerator Center) As-Built Drawings, detailing various project scopes and specifications pertaining to the Master Substation and associated electrical systems. It is organized into subsections, including sitewide single-line diagrams, as-built drawings of the master substation, and structural details of the Klystron Gallery. Key elements involve technical drawings for electrical distribution, civil structures, transformer schematics, relay upgrades, and generator installations. Notably, drone footage will be made available only to the awarded vendor, indicating a selective access measure for proprietary information. The comprehensive scope covers essential infrastructure elements necessary for the operation and safety of the facility, while specific technical standards are adhered to for compliance and operational efficiency. This document is a critical component in fulfilling requests for proposals (RFPs) and grant applications within the context of federal and state regulations, addressing the need for structured documentation in large-scale engineering projects.
    The CUIR Subproject 1 Power Outages and Linac Downtime Plan outlines the critical upgrades to the electrical systems at the SLAC National Accelerator Laboratory under the Critical Utilities Infrastructure Revitalization (CUIR) initiative. The document establishes a power outage schedule, details roles and responsibilities for handling outages, and specifies procedures for executing electrical infrastructure improvements necessary for scientific operations. The project includes several key activities: the construction of a new substation, the installation of 12kV feeder cables, replacement of 230kV transformers, and installation of medium voltage switchgear, among others. Each activity has designated timelines and is planned to minimize disruption to scientific programs, emphasizing communication and coordination with stakeholders. Temporary power solutions, such as portable generators, will maintain critical operations during outages. The document aims to ensure a safe and reliable electrical environment essential for SLAC's scientific pursuits while adhering to Department of Energy requirements. It involves detailed planning for alternative power sources, outage durations, and communication strategies, highlighting the structured approach necessary for federal projects involving substantial infrastructure improvements.
    The SLAC Radiological Safety program establishes guidelines to minimize radiation exposure to personnel and the environment while ensuring compliance with federal regulations. Key requirements involve the design and operation of facilities, prohibiting unauthorized access to radiologically controlled areas, and mandating rigorous training for workers involved in radiological tasks. Workers must follow specific protocols, including the use of dosimeters and obtaining relevant authorizations for any radiological work. The program's overarching philosophy is to maintain radiation dose levels "As Low As Reasonably Achievable" (ALARA) through justification of activities, optimization of benefits, and dose limitation. Responsibilities are clearly defined among various stakeholders, including workers, management, and Radiation Protection Departments. The structure includes detailed procedures for radiological work, area entry requirements, and safety training, alongside documentation and recordkeeping. This document serves to guide federal and state RFPs and grants related to construction, operation, or research involving radiological materials, emphasizing safety and regulatory compliance throughout SLAC's operational framework.
    The SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy, outlines the delivery and performance expectations for the Base Scope of the Master Substation Building Expansion project. The contract specifies a performance period extending to June 30, 2028, with a clear indication that any evaluation of additive line items does not commit the SLAC to their award. Decisions regarding the addition of these items will be finalized prior to the official award announcement. This document is part of federal procurement processes, emphasizing clarity in scope and conditions while ensuring stakeholder understanding of potential project expansions under consideration. Overall, it establishes a framework for compliance and responsiveness in federal contracting environments.
    The document outlines the General Terms and Conditions associated with fixed-price construction and design-build subcontracts at the SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. It includes two key components: the General Terms and Conditions for Fixed Price Construction Subcontracts dated March 2024, and the Rider to Fixed Price Construction Subcontracts from August 2022. These terms establish the framework for contracts in construction and design-build projects, ensuring compliance with federal guidelines and maintaining operational standards. The terminology and structure provided serve as a reference for parties involved in these contractual agreements, underlining the importance of adherence to established protocols in federally funded projects. The document emphasizes the essentiality of maintaining consistency and clarity in procurement processes related to government-funded construction initiatives.
    The document outlines the General Terms and Conditions for Fixed Price Construction Subcontracts related to projects managed by the Board of Trustees of the Leland Stanford Jr. University, particularly through the SLAC National Accelerator Laboratory under the Department of Energy. It provides a comprehensive framework detailing responsibilities and expectations for subcontractors, emphasizing compliance with federal, state, and local laws. Key sections include definitions of essential terms, requirements for monitoring work performance, submission of necessary documents, and environmental, safety, and health regulations. Subcontractors must possess appropriate licenses, maintain safety protocols, and ensure cooperation with other contractors. They are also responsible for using government-furnished property and adhering to requirements for warranty and indemnification. A significant focus is placed on compliance with environmental standards and safety regulations, including the implementation of an Injury and Illness Prevention Program. The document stipulates procedures for changes in work scope, procedures for handling labor disputes, and requirements for insurance and bonding. Overall, the document serves to ensure that subcontractors are fully informed of their obligations, emphasizing the importance of safety, compliance, and effective communication throughout construction projects.
    The document outlines the General Terms and Conditions for Fixed Price Design-Build Subcontracts, serving as a rider to Fixed Price Construction Subcontract agreements. It defines key terms, clarifies the scope of work, and delineates responsibilities between the Seller and Buyer regarding design and construction services. The contract emphasizes that the Seller is liable for design and construction quality, including technical accuracy and coordination. It is divided into two stages: Design Services, covering all necessary project design work, and Construction Work, detailing the physical building process. Insurance requirements mandate that the Seller maintains Professional Errors and Omissions Insurance for projects over $25,000, ensuring the Buyer and related parties are additional insureds. The Seller must conduct site verification prior to project proposals and must handle discrepancies in design requirements immediately. Acceptance of deliverables includes a provision for the Buyer to inspect, reject, and request corrections within specified timelines. This document serves as a crucial framework for government RFPs and contracts, ensuring clarity in obligations and protections for both parties involved in design-build projects.
    The document outlines the special terms and conditions for subcontractors at SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. Key points include the requirement for electronic submission of labor compliance reports through the LPCtracker, the authority for field change orders by the Construction Manager or Project Manager up to $25,000, and the necessity for prior notification when changing essential personnel. Subcontractors must also provide a collaborative Project Management Information System to facilitate communications and documentation sharing among all project stakeholders. The contractual representation for the subcontract is specified, alongside arrangements regarding government-furnished property, which includes maintaining adequate records and ensuring its use solely for subcontract performance. The document underscores SLAC's commitment to compliance, proper administration, and management of subcontractors in government projects, maintaining high standards throughout the duration of the work.
    The document outlines the attachments related to the Supply Chain Management at SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. It lists ten attachments that include various important documents, such as the Davis Bacon Wage Determination, subcontractor safety plans, a Small Business Subcontracting Plan Model, and labor rates. Each attachment is designated with a specific page count and date, with some documents still in draft form, highlighting ongoing requirements for compliance and safety in subcontracting processes. The inclusion of these attachments indicates an emphasis on regulatory adherence, safety measures, and support for small businesses in federal contracting. This structure reflects the laboratory's commitment to uphold standards in managing supply chain operations within federally funded projects.
    The document outlines changes to wage determinations for construction projects in California, effective from October 18, 2024, under the Davis-Bacon Act. It details the applicable minimum wage rates for various classifications of laborers, including building, heavy construction, dredging, and highway projects across multiple counties. The minimum wage rates vary based on the project start date, with contracts initiated or extended after January 30, 2022, requiring a minimum wage of $17.20 per hour. Prior contracts awarded between January 1, 2015, and January 29, 2022, are subject to a rate of $12.90. The file provides a comprehensive list of classifications and corresponding rates for various trades, detailing areas within California and specific rates for each county. It emphasizes compliance with Executive Orders 14026 and 13658 regarding wage adjustments. Additionally, it addresses requirements for submitting conformance requests for classifications not listed. The document serves as a crucial resource for contractors and government entities involved in federally funded construction projects, ensuring adherence to labor standards and wage regulations within specified geographical locations.
    The document outlines the Injury and Illness Prevention Plan (IIPP) Acknowledgement Form for subcontractors working at the SLAC National Accelerator Laboratory, effective from May 21, 2021. It mandates that all subcontractors, both prime and sub-tier, acknowledge compliance with safety requirements as stipulated by the Department of Energy (DOE) Worker Safety and Health Program and ensures adherence to stringent occupational safety regulations. Subcontractors are required to complete a separate form for each project, with submission being a prerequisite for the notice to proceed. It emphasizes that subcontractors must either adopt or submit their own IIPP for SLAC's approval. The form also addresses occupational medicine requirements for employees working on-site for extended durations or participating in regulated medical programs. This acknowledgment document is critical for maintaining workplace safety and compliance with federal and state laws, underscoring the importance of subcontractor accountability within the framework of government contracts and regulations.
    The document appears to relate to government proposals (RFPs) and grants, addressing the processes and requirements for interested parties to submit their applications. It emphasizes the importance of adhering to specific guidelines and standards throughout the proposal development. Key ideas involve understanding eligibility criteria, project objectives, budget limitations, and compliance with regulatory frameworks. Additionally, it underscores the significance of accurate documentation and timely submissions to secure funding and support. The content reflects a structured format with sections likely detailing instructions, required documentation, evaluation criteria, and timelines critical for applicants. The overarching purpose serves to guide prospective bidders in understanding the application process for federal grants and local funding opportunities effectively. In summary, the document outlines essential criteria and procedural steps necessary for participating in government Requests for Proposals and grants, ensuring that applicants clearly grasp expectations for successful submission and adherence to regulatory requirements.
    The document titled "Statement and Acknowledgment" provides a structured format for prime contractors to officially acknowledge and report the details of a subcontract awarded under a federally funded contract. It includes sections for identifying both the prime contractor and subcontractor, along with necessary contract details such as contract numbers, dates, and the nature of the work. Key points include compliance clauses related to labor standards, worker compensation, and construction wage rates that subcontractors must acknowledge. The form is governed by the Office of Management and Budget (OMB) Control Number 9000-0066 and adheres to guidelines from the General Services Administration (GSA). The simplicity of this standard form ensures consistency and accountability in federal contracting practices, reflecting the importance of regulatory compliance in the execution of such contracts. Additionally, the document underscores the responsibilities related to labor standards and compliance requirements that both parties must acknowledge to ensure proper management of federal funds. Overall, this form facilitates transparency in government contracting processes.
    The Small Business Subcontracting Plan Form is designed for large business subcontractors working with SLAC National Accelerator Laboratory on contracts exceeding $750,000 (or $1,500,000 for construction). It aligns with the Federal Acquisition Regulation (FAR) requirements, specifically FAR 52.219-9, to foster subcontracting opportunities for small businesses across various socioeconomic categories. The document outlines the types of subcontracting plans, including Individual, Master, and Commercial Plans, and mandates reporting on planned subcontracting dollar values and percentages for small business categories. Key components include establishing goals for subcontracting, detailing methods for developing those goals, and ensuring equitable opportunities for small businesses. The form requires a designated Program Administrator and a structured approach to outreach, including contacting trade associations, development organizations, and participating in procurement events. It emphasizes compliance through periodic reporting, including Individual Subcontract Reports (ISR) and Summary Subcontract Reports (SSR), submitted via the Electronic Subcontract Reporting System. Recordkeeping is stipulated to demonstrate adherence to goals and a narrative is required if no opportunities for small business participation exist. The plan aims to ensure that small businesses are actively involved in government contracting, enhancing their opportunities to compete for federal contracts.
    The Subcontractor Safety Qualification Form, published by SLAC's Environment, Safety & Health Division, outlines the requirements for prime subcontractors engaged in construction or high-risk service work at SLAC. This form must be completed annually and includes an extensive range of documentation and information regarding the subcontractor's company, project experience, and safety protocols. Key components include a comprehensive written health and safety manual containing required elements like the California Injury and Illness Prevention Plan (IIPP) and specifics on safety procedures applicable to the proposed work. Subcontractors must detail their project experience and provide information on incident history, including any OSHA violations from the past three years. The form emphasizes the importance of safety qualifications, allowing SLAC to evaluate subcontractors based on their experience and safety performance. Compliance with safety regulations is mandatory, and submitted documentation must be accurate to avoid disqualification. Additionally, subcontractors must acknowledge their responsibility for worker safety and training requirements. Overall, this formalized qualification process aims to ensure that all subcontractors meet stringent safety standards before engaging in work at SLAC, reflecting the organization's commitment to maintaining a safe work environment.
    The document serves as a Final Inspection Report required by SLAC (Stanford Linear Accelerator Center) to authorize final payment to a subcontractor. It outlines the steps to verify that project deliverables meet contractual obligations. Key components include details of the final inspection, attendees from both SLAC and the subcontractor, along with submissions of necessary documents such as Red-Line As-Built drawings, Operation & Maintenance Manuals, and certified payrolls. The report signifies acceptance through signatures from various stakeholders, including the SLAC Project Manager, Field Construction Manager, and Subcontractor Project Manager. This procedure emphasizes compliance with project specifications and contributes to the overall accountability and quality assurance in government-funded projects.
    The document outlines a final release concerning the Linac Power Distribution System Improvements project, in which SLAC National Accelerator Laboratory provides payment to a general contractor (GC). This release signifies that the contractor relinquishes any claims against SLAC, Stanford University, and the Department of Energy related to the subcontract. It also confirms that the contractor has fully compensated all labor and material costs while agreeing to indemnify the university and the department for any potential claims stemming from their work. The release asserts that all improvements made are government property, thus exempt from certain state lien laws. Additionally, it concludes that the project work is complete, with no further billings anticipated, affirming that the signatory has the authority to bind the contractor legally. This document is a crucial element in federal contracting, ensuring financial and legal closure upon project completion while safeguarding the interests of the federal entities involved.
    The document outlines the Representations and Certifications Supplement from the SLAC National Accelerator Laboratory, which is operated by Stanford University on behalf of the U.S. Department of Energy. Dated August 25, 2022, this draft document is part of the Supply Chain Management protocol and emphasizes the importance of adhering to federal regulations and requirements in government contracts and grants. It serves to ensure that all parties involved provide necessary declarations regarding their capabilities, compliance with legal obligations, and ethical standards. This section is critical in the context of government RFPs, as it illustrates the commitment to transparency and accountability in the procurement process. By fulfilling these representations and certifications, stakeholders can contribute to an efficient and responsible supply chain management system vital for supporting governmental operations and projects.
    The document outlines the Representations and Certifications Supplement for Stanford University's compliance with a Prime Contract from the U.S. Department of Energy related to the SLAC National Accelerator Laboratory. It requires completing essential certifications, including verification of information in the System for Award Management (SAM) and employment eligibility checks through E-Verify for contracts exceeding $3,500. Additionally, the Offeror must disclose any potential conflicts of interest involving Stanford University employees or their relatives. It also involves certifications regarding toxic chemical release reporting, anti-kickback assurances, and export control regulations for items that may be provided under the contract. The document stresses that authorized representatives must ensure the accuracy of all statements made and remain in effect for one year, requiring updates for any changes in status. Overall, this supplement serves as a formal declaration of compliance with federal regulations governing government contracts, focusing on transparency, ethics, and environmental management.
    The RFP #352442 for the Critical Utilities Infrastructure Revitalization (CUIR) Project—specifically focusing on the Master Substation Building Expansion—provides detailed guidance for Offerors submitting proposals. The selection criteria prioritize an integrated evaluation of technical and cost factors and require current registrations with SAM and the University’s procurement system. The anticipated award value ranges from $5M to $13M, with compliance to federal construction regulations specified. Proposal submissions are organized into two volumes: Volume I focuses on technical proposals excluding pricing, while Volume II encapsulates the business/price proposals. Each volume has distinct requirements, including organizational charts, past project experiences, and safety qualifications among other factors. Key aspects evaluated include the technical approach, safety compliance, and project management capability. Interviews with Offerors will follow initial evaluations to further assess understanding and proposed solutions. The document outlines clear submission guidelines, including formatting, deadlines, and the need for clarity regarding any exceptions to the RFP terms. Overall, this RFP aims to ensure a robust selection process for subcontractors capable of executing complex infrastructure enhancements while maintaining safety and regulatory standards.
    The provided document is a Past Performance Questionnaire (PPQ) intended for evaluating contractors involved in government contracts, as part of the source selection process for proposals. It outlines various sections necessary for documenting a contractor's performance, including contract identification, customer identification, evaluation criteria, and contact details for evaluators. Key evaluation areas consist of quality of product or service, project management, timeliness, cost performance, and safety, each with a corresponding satisfaction scale ranging from exceptional to unsatisfactory. Respondents are encouraged to provide additional comments, particularly where performance was exceptional or unsatisfactory. The questionnaire also addresses potential concerns about future solicitations and any safety incidents related to the contractor. The purpose of this document aligns with standards set forth in federal requests for proposals (RFPs), aiming to ensure transparency and accountability in government contracting. This structured assessment facilitates informed decision-making when selecting contractors for future government projects, promoting high performance and safety compliance.
    The proposal breakdown sheet outlines the costs and requirements for a project focused on improvements to a master substation. It provides a detailed financial layout, including direct costs, indirect costs, general conditions, and specific construction components such as masonry, mechanical systems, and electrical work. The structure of the document lists various categories of work with corresponding cost implications, emphasizing the need for bonds, insurance, and architectural design fees. The project encompasses demolition, site preparation, and installation of utilities while adhering to safety and regulatory standards. It also highlights the need for temporary measures, such as generators, during construction. This comprehensive breakdown is crucial for facilitating government oversight and ensuring fiscal responsibility in the execution of the project.
    The document serves as an attachment for the SLAC Question and Answer Log concerning the RFP # 352442 for the Critical Utilities Infrastructure Revitalization (CUIR) Master Substation Building Expansion. It outlines the process for submitting Requests for Information (RFIs) related to the solicitation. Key components include the format for recording RFI submissions, responses from the contracting authority, and the overall intention to clarify solicitation details to prospective offerors and general contractors. It emphasizes accountability and communication, ensuring that stakeholders are informed of any clarifications needed throughout the bidding process. The document is structured to log various RFIs, allowing for systematic tracking of inquiry submissions and responses, essential for maintaining transparency within the procurement process. Ultimately, it aims to facilitate a clear understanding of project specifications and requirements among all participants, aligning with best practices in federal grant and procurement processes.
    This document outlines the evaluation criteria for awarding a contract under RFP #352442 for the Critical Utilities Infrastructure Revitalization (CUIR) Project, specifically for the Master Substation Building Expansion. The selection process employs a best-value tradeoff method based on both technical and price proposals. Technical proposals will be assessed through several factors including technical approach, safety compliance, project management experience, team synergy, and qualifications, with distinct subfactors for each. Offerors must demonstrate a solid project execution plan, safety record, and relevant past experience to qualify. Price proposals will also undergo evaluation based on bonding capacity, completeness of documentation, and overall realism compared to independent estimates. The document emphasizes the importance of subjective evaluations and the methodology for scoring proposals to ensure objectivity while allowing for professional judgment. The University retains discretion to reject unrealistic or non-compliant proposals and may hold discussions with top contenders if necessary. The structured approach ensures comprehensive assessment and promotes compliance with regulations, ultimately reflecting the commitment to quality and safety in project execution.
    Lifecycle
    Title
    Type
    Similar Opportunities
    SLAC LCLS-II-HE Cable Plant Installation Phase 1 & 2
    Active
    Energy, Department Of
    The Department of Energy, through the SLAC National Accelerator Laboratory, is seeking experienced electrical subcontractors for the installation of the LCLS-II-HE Cable Plant systems in Menlo Park, California. This procurement involves two phases of installation, which includes the setup of various cable types, electronics racks, and associated hardware, with a focus on compliance with safety and engineering standards. The project is critical for enhancing the operational capacity of the superconducting linear accelerator, thereby supporting advanced scientific research. Interested vendors must express their interest via the SAM.GOV posting or by contacting procurement specialists AJ Vandermeyden or James Yturralde, with the project timeline spanning from July 2025 to February 2027.
    Low to Medium Voltage Switchgear and Transformer Electrical Equipment
    Active
    Energy, Department Of
    The Department of Energy, through the SLAC National Accelerator Laboratory, is soliciting proposals for the procurement of low to medium voltage switchgear and transformer electrical equipment. This opportunity requires offerors to submit firm fixed-price proposals that include a comprehensive delivery schedule for various long-lead electrical equipment, with a desired completion date set for March 2, 2026. The procurement is critical for advancing energy research and ensuring operational readiness at the laboratory, emphasizing compliance with federal guidelines and safety standards. Proposals must be submitted by January 21, 2025, at 5 PM PST, and interested parties can contact Ryan Enos at ryan.enos@slac.stanford.edu for further information.
    Z--TRD GSU Transformer Replacements
    Active
    Interior, Department Of The
    The Department of the Interior, Bureau of Reclamation, is soliciting bids for the replacement of Generator Step-Up (GSU) transformers at three power plants within the Trinity River Division of the Central Valley Project in California. The project involves the supply, installation, and commissioning of nine transformers, along with associated components, while ensuring minimal disruption to power generation during the replacement process. This initiative is crucial for modernizing electrical infrastructure and maintaining operational efficiency, with an estimated contract value ranging from $35 million to $50 million. Interested contractors must acknowledge receipt of amendments and submit their proposals by January 31, 2025, with further inquiries directed to Matthew Thomas at mthomas@usbr.gov or by phone at 916-978-5117.
    Fermilab LBNF NSCF Construction - Beamline Complex RFP
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance, LLC, is soliciting proposals for the construction of the Long-Baseline Neutrino Facility (LBNF) Near Site Conventional Facilities Beamline Complex in Batavia, Illinois. The project aims to select a subcontractor to provide comprehensive construction services, including site preparation, structural work, and installation of various systems necessary for the facility's operation. This initiative is critical for advancing neutrino research and enhancing scientific infrastructure at Fermilab, reflecting the federal government's commitment to supporting significant scientific endeavors. Proposals are due by February 12, 2025, with a mandatory pre-proposal conference scheduled for July 11, 2024; interested parties can contact Brian Quinn at bquinn@fnal.gov for further details.
    Dilution Refrigerator Cryostat System
    Active
    Energy, Department Of
    The Department of Energy, through the SLAC National Accelerator Laboratory, is seeking proposals for the procurement of a Dilution Refrigerator Cryostat System. This system is essential for advanced scientific research, particularly in quantum sensing applications, and must meet specific technical requirements including a base temperature capability of 10 milliKelvin or lower and a cooling power of at least 400 microwatts at 100mK. Proposals must be submitted electronically by January 14, 2025, at 4 PM PST, and remain valid for 90 days post-submission. Interested vendors should direct inquiries to Stephanie Low at stephl@slac.stanford.edu and ensure compliance with all outlined terms and conditions in the RFP documentation.
    B1200 Compound High Voltage Electrical Design Study
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is seeking a contractor to conduct a comprehensive electrical design study at Beale Air Force Base, focusing on the 1200 Campus area. The objective of this presolicitation is to inspect and analyze primary electrical components, including transformers, circuit breakers, and emergency generators, to address ongoing power distribution issues and enhance the reliability and availability of the electrical network. This project is critical for maintaining operational readiness and ensuring minimal downtime of essential equipment, with the contractor required to adhere to Air Force guidelines and national standards throughout the process. Interested parties should direct inquiries to SSgt James Buyag at jamesbryan.buyag@us.af.mil or SSgt Christopher Nicolas at christopher.nicolas@us.af.mil, noting that funding is not currently available and the government reserves the right to cancel the presolicitation at any time.
    Fermilab LBNF NSCF Construction - Near Detector Complex RFP
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance (FRA), is seeking a qualified subcontractor for the construction of the Near Detector Complex as part of the Long-Baseline Neutrino Facility (LBNF) project located in Batavia, Illinois. The procurement involves comprehensive construction services, including the development of a service building, shafts, and utilities necessary to support the LBNF Near Detector, with a focus on adhering to strict safety and environmental regulations. This project is critical for advancing neutrino research and requires contractors to demonstrate relevant experience and compliance with federal guidelines, including the Buy American Act. Proposals are due by February 7, 2025, and interested parties should direct inquiries to Brian Quinn at bquinn@fnal.gov or Craig Schmitz at schmitzc@fnal.gov.
    DDJC Tracy Solar Covered Parking Structure
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers Sacramento District, is seeking small business firms for a potential contract involving the design and construction of a solar-covered parking structure and electric vehicle charging stations at the Defense Distribution Depot San Joaquin in Tracy, California. The project will include the installation of photovoltaic panels, inverters, EV charging stations, and all necessary infrastructure to ensure a fully operational system, adhering to applicable federal, state, and local codes. This initiative is part of a broader effort to enhance sustainability and energy efficiency within military facilities. Interested contractors are invited to submit capability statements by January 10, 2025, with an estimated project value between $5 million and $10 million, and a completion timeline of approximately 450 days post-award.
    RFP for PNNLMicrobial Molecular Phenotyping Capability (M2PC) Facility Design/Build Construction
    Active
    Energy, Department Of
    The Department of Energy is soliciting proposals for the design and construction of the Microbial Molecular Phenotyping Capability (M2PC) Facility at the Pacific Northwest National Laboratory (PNNL) in Richland, Washington. The project aims to establish a state-of-the-art facility with a minimum size of 34,500 square feet, which will include an automated laboratory and multiple laboratory modules, all designed to enhance research capabilities in microbial systems and molecular phenotyping. This initiative underscores the federal government's commitment to advancing biotechnology research infrastructure while adhering to environmental and safety standards. Interested contractors must submit their qualifications by January 17, 2025, with the project completion expected by May 11, 2028, and the total budget for the project is capped at $30 million. For further inquiries, potential bidders can contact Garrett Hyatt at Garrett.Hyatt@pnnl.gov or by phone at 15093717591.
    Cooling Fan
    Active
    Energy, Department Of
    The Department of Energy, through the SLAC National Accelerator Laboratory, is soliciting bids for the procurement of cooling fan components, specifically OEM parts for Tower Tech cooling fans. The requirement includes 15 units each of three specific products: FAN039, FAN008, and MTR009, with a focus on ensuring compliance with the Buy American Act for items exceeding $10,000. This procurement is crucial for maintaining operational efficiency at the laboratory, which is managed by Stanford University. Interested vendors must submit their quotations by January 1, 2025, to Anthony Chin at anthonyc@slac.stanford.edu, and are encouraged to review the attached certification documents and terms and conditions prior to bidding.