Low to Medium Voltage Switchgear and Transformer Electrical Equipment
ID: RFP_351726(RE)Type: Combined Synopsis/Solicitation
Overview

Buyer

ENERGY, DEPARTMENT OFENERGY, DEPARTMENT OFSLAC Natl Accel Lab -DOE ContractorMenlo Park, CA, 94025, USA

NAICS

Switchgear and Switchboard Apparatus Manufacturing (335313)

PSC

MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT (6150)
Timeline
    Description

    The Department of Energy, through the SLAC National Accelerator Laboratory, is soliciting proposals for the procurement of low to medium voltage switchgear and transformer electrical equipment. This opportunity requires offerors to submit firm fixed-price proposals that include a comprehensive delivery schedule for various long-lead electrical equipment, with a desired completion date set for March 2, 2026. The procurement is critical for advancing energy research and ensuring operational readiness at the laboratory, emphasizing compliance with federal guidelines and safety standards. Proposals must be submitted by January 21, 2025, at 5 PM PST, and interested parties can contact Ryan Enos at ryan.enos@slac.stanford.edu for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    The SLAC National Accelerator Laboratory is soliciting proposals through Request for Proposal (RFP) 351726(RE) for the procurement of Long Lead Electrical Equipment. Prospective offerors are invited to submit firm-fixed price proposals by January 21, 2025, with a requirement for submissions to include specific documentation and adherence to stated terms and conditions. Each proposal must be valid for 90 days following submission and must confirm compliance with SLAC’s terms. The document outlines responsibilities regarding cost reasonableness, indicating that unrealistic pricing could disqualify offers. Offerors must be registered with the System for Award Management (SAM) and required to submit a range of forms, including insurance certificates and representations/certifications. The RFP also incorporates guidelines for communication and clarification requests, with a clear timeline for key milestones leading to subcontract awards and final delivery by March 2026. The procurement process emphasizes compliance, clarification communication through designated channels, and may reject proposals with unidentified exceptions to terms.
    The document pertains to the SLAC National Accelerator Laboratory's subcontract solicitation for Long Lead Electrical Equipment, part of the CRMF project. It outlines a firm fixed price subcontract, with offers due by January 21, 2025, at 5:00 PM PDT. Issued by Stanford University on behalf of the U.S. Department of Energy, the document identifies Ryan Enos as the subcontract administrator, providing his contact information for inquiries. It includes essential sections such as a summary of supplies or services being acquired, payment instructions, and terms governing the agreement between SLAC and the subcontractor. The subcontract requires the selected vendor to fulfill work and deliverables according to specified terms and conditions. The overarching goal of this solicitation is to acquire specific electrical equipment critical to the success of the CRMF project, emphasizing compliance with federal guidelines. The document is structured to include various necessary legal and administrative clauses, ensuring clarity and legality in the contract execution. This reflects the broader context of federal grants and requests for proposals, aiming to ensure transparency, accountability, and proper procurement processes in public sector projects.
    The document outlines a request for supplies and services related to supply chain management, specifically focusing on long-lead electrical equipment as detailed in the Section C Statement of Work. It lists various electrical components required, including 15kV class switchgear, transformers, and secondary switchgear, specifying quantities, units, and a lot for factory testing reports, inventory instructions, and on-site training. Each item is detailed with its respective quantity, unit, and pricing structure. Payment terms are provided as Net 30, alongside a request for unique identification numbers relevant to federal contracts. The purpose of this document is to solicit proposals for the procurement of essential electrical equipment and services aimed at improving operational capabilities, in alignment with federal and local RFP standards while ensuring compliance with existing specification documents. This reflects a commitment by the procuring agency to enhance infrastructure through strategic partnerships with suppliers.
    The document outlines the Statement of Work (SOW) and specifications for the “Sector 11 Site Restoration – Utilities Long-Lead Electrical Equipment” project at the SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. Dated October 2024, the SOW is integral for guiding the restoration initiative and is supported by related specifications and SLAC drawings, all dated November 1, 2024. The attached documentation includes technical specifications essential for the procurement or management of the utilities equipment and outlines the expected standards and performance metrics for successful project execution. This information serves as a framework for contractors and vendors responding to federal solicitation, ensuring compliance and alignment with project requirements. Overall, the document emphasizes the collaborative effort necessary to restore utility services, reflecting the government's commitment to upholding facility integrity and operational readiness at national research laboratories.
    The document outlines the SLAC Building Inspection Office's review of electrical infrastructure plans for a project associated with the Sector 11 Utilities at the Stanford Linear Accelerator Center. It describes compliance checks with relevant building codes and environmental, safety, and health (ESH) program requirements. Key components of the project include the installation of new transformers, switchgear, and vaults, alongside guidelines for conduit installation and electrical provisions. The procurement scope specifies detailed requirements for several systems, including 12.47kV transformers and metal-enclosed 15kV class switchgear, which are to be furnished and installed in coordination with specific contractors. Overall, the document emphasizes strict adherence to approved plans, proper handling of electrical installations, and ensuring that all changes receive prior approval from the Building Inspection Office. This serves to uphold safety standards and regulatory compliance, demonstrating the importance of systematic oversight in significant construction projects.
    The document outlines specifications for the electrical connections, medium voltage cables, low voltage wires, cables, connectors, grounding systems, and supporting devices for the Sector 11 Site Restoration – Utilities project. It emphasizes compliance with the latest National Electrical Code (NEC) and various industry standards. Key details include requirements for electrical characteristics verification, adherence to manufacturer recommendations for wiring, and safety measures for installing grounding systems. The specifications require careful testing and documentation of connections and cables, including torque verification, insulation testing, and maintaining safety against electrical faults. Supporting devices must withstand seismic forces per California Building Code standards, and various materials and manufacturers are specified for different components to ensure durability and safety. The document stresses the importance of thorough inspections, proper installation techniques, and maintaining clear documentation to meet regulatory requirements. Overall, the document serves as a comprehensive guide for contractors to ensure safe, efficient, and code-compliant electrical installation and connections as part of a federal or state-funded infrastructure project.
    The SLAC Building Inspection Office document pertains to the review process for compliance with relevant building codes, standards, and Environment, Safety, and Health (ESH) program requirements. The document indicates an ongoing series of approvals and rejections related to various procurement items, specifically marked with revision #24-160 and procurement #24-222, that involve oversight by an individual identified as "cnadler." Dated November 1, 2024, this document exemplifies the procedural framework for ensuring adherence to construction standards and safety protocols prior to project execution. It underscores the importance of regulatory compliance in government-funded projects, reflecting diligence in the building inspection process to safeguard health and environmental integrity throughout construction activities.
    The document outlines the delivery, shipping, and packing requirements for vendors shipping to the SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. It specifies shipping terms, distinguishing between foreign and domestic entities. International vendors must coordinate shipments with SLAC's customs agent, Green Worldwide Shipping, ensuring all goods clear customs in San Francisco. The document provides contact details for the customs agent and stress the importance of marking shipping containers adequately for identification, including the address of SLAC and relevant purchase order numbers. This guidance is critical for facilitating efficient logistical processes, ensuring compliance with customs regulations for federal entities, and supporting overall shipment integrity.
    This document outlines the inspection and acceptance terms for various long-lead electrical equipment being supplied to the SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. It specifies a range of equipment, including 15kV class solid dielectric outdoor pad-mounted switchgear, metal enclosed breaker switchgear, a 3000kVA transformer, and arc-resistant secondary switchgear. Each item is designated for inspection by both the vendor and SLAC, with acceptance occurring at SLAC. The document emphasizes the requirement for Electrical Factory Test Reports, a Final Factory Inspection/Testing Summary Report, and Operating and Maintenance Instruction Manuals for all equipment. Additionally, it notes the necessity for on-site training in accordance with specified SLAC documents. The instructions serve to ensure that equipment meets predefined standards and compliance criteria prior to acceptance, aligning with broader government procurement and quality assurance processes. Thus, the document underscores the importance of structured inspections and adherence to specifications in federal contracts related to electrical supply and service management.
    The SLAC National Accelerator Laboratory’s procurement document outlines the delivery requirements for various long-lead electrical equipment as part of a draft contract. The offeror is expected to propose a delivery schedule for SLAC's review, with the desired completion date set for March 2, 2026. Key items include a 15kV class outdoor switchgear, a metal-enclosed breaker, transformer units, and arc-resistant switchgear, among others. Essential documentation required includes electrical factory test reports, final inspection summaries, operation manuals, and on-site training. The document emphasizes that the proposed delivery dates by the offeror will be considered for final approval. This procurement relates to federal RFP processes, highlighting SLAC's role in advancing energy research through appropriate supply chain management and timely project delivery.
    The document outlines the general terms and conditions for subcontracts at the SLAC National Accelerator Laboratory, which is operated by Stanford University under the U.S. Department of Energy. Specifically, it references the applicable SLAC General Terms and Conditions for Fixed Price Commercial Supplies and Services as of August 2023 and the General Terms and Conditions for On-Site Non-Green Services Subcontract Rider, effective October 2024. The focus is on establishing the standards and protocols that govern supply chain management within these subcontract agreements. This structure ensures adherence to federal regulations, maintains quality in services and supplies, and provides clarity to contractors regarding their obligations and the laboratory's requirements. The context of these documents is significant in the landscape of government RFPs, federal grants, and state and local requests for proposals, as it promotes compliance, accountability, and transparency in the procurement processes necessary for effective laboratory operations.
    The document outlines the General Terms and Conditions for Fixed Price Commercial Supplies and Services, serving as a comprehensive legal framework for subcontracting with the Board of Trustees of Leland Stanford Jr. University, through SLAC National Accelerator Laboratory, under U.S. Department of Energy guidelines. Key components include definitions of terms, the scope of the subcontract, and the responsibilities of both the buyer and seller, particularly in relation to service quality, compliance with regulatory standards, and liability clauses. The seller is required to ensure the quality of products and services, manage travel reimbursements, and maintain confidentiality regarding proprietary information. A robust set of clauses addresses issues like inspection and acceptance, warranty provisions, indemnification, and material breach consequences. Dispute resolution favors negotiation, with jurisdiction designated to California courts. The document emphasizes adherence to federal acquisition regulations and provides a detailed structure for any applicable laws or additional clauses based on subcontract value. This ensures clarity and compliance in contracts for federal grants and RFPs, highlighting the importance of strict performance standards and legal responsibilities in government contracts.
    The "General Terms and Conditions for Non-Green Services Rider" outlines essential requirements and guidelines for subcontractors working on-site at the SLAC National Accelerator Laboratory. It emphasizes compliance with environmental, safety, and health regulations, covering responsibilities regarding government-furnished property, personnel qualifications, and work schedules. The document mandates coordination among contractors to minimize interference and details the procedures for managing labor disputes, monitoring work performance, and addressing compliance issues. Key provisions include strict control over site access, mandatory insurance coverage for contractors, and protocols for the safe handling of hazardous materials. The Contractor must ensure workforce safety through Injury and Illness Prevention Programs and adhere to specific environmental protection standards mandated by the state and local authorities. Additionally, there are provisions for dealing with security, including the return of SLAC security badges and penalties for non-compliance. This document serves as an integral part of the contractual obligations for those engaged in federally funded projects, ensuring alignment with government regulations and safety protocols.
    The document outlines special terms and conditions for a subcontract at the SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. It emphasizes subcontract administration, designating Ryan Enos as the sole contractual representative with the authority to approve changes and modifications to the subcontract. All communications requiring approvals must be directed to him. Additionally, the Technical Representative, still to be determined, will oversee the technical aspects but cannot alter the subcontract. Key personnel vital for the project's success must remain unchanged without prior written notification and consent from SLAC's contractual representative. The subcontractor is obliged to provide justification for any personnel changes along with the details of proposed replacements. This structure ensures that SLAC maintains control over the personnel involved in the subcontracted work and guarantees the project's integrity. Overall, the document serves as a framework for effective management and communication throughout the subcontract process, which is a common requirement under government RFPs and grants.
    The SLAC National Accelerator Laboratory's document provides an overview of essential supply chain management attachments for contractors. It includes a Certificate of Liability Insurance sample, a Work Classification Form, a Tax Resale and Exempt Certificate, an Injury and Illness Prevention Plan, and a Small Business Subcontracting Plan Model. Each attachment serves a specific purpose—ensuring compliance with insurance, categorizing work tasks, informing contractors about tax exemptions, promoting workplace safety, and facilitating subcontracting with small businesses. The document outlines the importance of these components for compliance with federal regulations and the efficient management of supply chains within government requests for proposals (RFPs) and grants. Overall, it underscores the need for thorough documentation in facilitating the contractual processes in government contracting.
    The government file presents an overview of federal and state/local funding opportunities available for non-profit organizations and community groups aimed at enhancing local public welfare initiatives. It outlines the eligibility criteria for applicants, which include non-profits with a history of community service, as well as the need for a clear project proposal detailing the intended use of funds. Key funding themes include education, health services, infrastructure improvements, and environmental sustainability. The file emphasizes the importance of demonstrating community impact and collaboration with local entities to improve project viability. Additionally, it highlights deadlines for proposals and the necessity for financial transparency and accountability in fund utilization. The document serves as a crucial resource for organizations seeking to leverage governmental support to boost their community service efforts while ensuring compliance with grant requirements and alignment with federal and local objectives.
    This document serves as a Work Classification Form for projects managed by SLAC, outlining the distinction between "Green" (low-risk) and "Non-Green" (high-risk) work types. Key sections cover project identification, project manager and coordinator details, and an assessment procedure that necessitates further evaluation for non-green activities. The form highlights various project activities that require specific safety plans, documentation, and training records related to Environmental Safety and Health (ES&H) protocols. It emphasizes the importance of documenting ES&H elements in project planning to ensure safety compliance. Non-green work includes construction, use of hazardous materials, and actions interrupting scientific operations, necessitating additional safety oversight. Essential safety measures, permits, and potential hazard controls are also outlined, guiding subcontractors on the necessary steps to take for compliance and safety planning prior to project execution. Overall, the form is critical for ensuring that contractors understand safety requirements and regulatory responsibilities throughout project execution, aligning with federal and state safety standards.
    The SLAC National Accelerator Laboratory, managed by Leland Stanford Jr. University under a U.S. Department of Energy contract, outlines its procurement and credit reference procedures through a communication from William Zangara, Director of Supply Chain Management. SLAC specializes in research across various scientific disciplines, with all operational costs covered by the U.S. Treasury. The document provides three specific credit references, highlighting key professional contacts for inquiries. In addition, it includes SLAC's California Resale Permit and Federal Tax ID information, noting that all equipment purchases are tax-exempt for resale to the U.S. Government. The purpose of this documentation is to facilitate vendor transactions while ensuring compliance with tax regulations. Overall, this correspondence serves to inform potential suppliers about SLAC's purchasing authority and responsibilities in tax-exempt transactions.
    The document outlines the requirements for subcontractors working with the SLAC Environment, Safety & Health Division, specifically focusing on the Injury and Illness Prevention Plan (IIPP) Acknowledgement Form. This form is necessary for documenting subcontractor compliance with safety protocols and is applicable to both green and non-green work. Key points include the obligation of prime subcontractors to ensure that sub-tier subcontractors also follow these protocols and the mandatory completion of a separate form by each subcontractor, ideally overseen by a designated job supervisor. Subcontractors must adhere to the Department of Energy's stringent safety regulations, which may exceed general California OSHA requirements. They can either adopt SLAC's compliant IIPP or submit their own for approval. Furthermore, subcontractors whose employees will be on-site for significant durations or enrolled in specific medical monitoring programs must provide evidence of adequate occupational medicine services and report relevant provider details. This document serves as a critical component for RFPs and grants, emphasizing compliance and safety in subcontractor operations, thereby aligning with federal regulations and enhancing workplace safety.
    The Small Business Subcontracting Plan Form outlines requirements for large contractors working with SLAC National Accelerator Laboratory, particularly related to subcontracting over $750,000. It mandates adherence to Federal Acquisition Regulation (FAR) provisions, encouraging participation from various small business categories, including veteran-owned and women-owned enterprises. Contractors must declare their subcontracting goals, including estimated monetary values and percentages of planned subcontracting according to specific small business classifications. The form emphasizes equitable opportunities for small businesses, mandating outreach efforts, cooperative reporting protocols, and record-keeping to ensure compliance. Contractors must submit Individual Subcontract Reports (ISR) and Summary Subcontract Reports (SSR) periodically through the Electronic Subcontract Reporting System. Additionally, a program administrator is designated to oversee subcontracting processes. The plan is integral to enhancing small business participation in federal contracting, ensuring all necessary steps for achieving stated goals are documented and actionable. The overarching objective is to facilitate a structured approach to subcontracting that supports small business development while ensuring compliance with federal regulations.
    The document from SLAC National Accelerator Laboratory outlines the requirements for representations and certifications necessary for entities participating in federal contracts. Specifically, it differentiates between domestic and foreign businesses, instructing domestic entities to complete the "Representations and Certifications Supplement" dated August 2022, while foreign entities must submit the "International Representations and Certifications Supplement" dated May 2023. Additionally, all offerors are required to provide a "Buy American Act Certificate" dated August 2023. These submissions are essential for compliance with U.S. Department of Energy regulations and ensure adherence to federal procurement policies. The document serves as a guide for potential offerors concerning necessary documentation based on their business affiliation, underscoring the importance of certification in federal contracting procedures.
    The document outlines a federal government Request for Proposals (RFP) related to the provision of specialized services aimed at advancing community development initiatives. Its primary focus is on encouraging qualified applicants to submit proposals that enhance local infrastructure, education, and economic opportunities. Key components include an emphasis on collaboration with community stakeholders and the necessity for innovative solutions tailored to specific regional needs. It details eligibility requirements, proposal evaluation criteria, and the funding allocation process, highlighting the importance of measurable outcomes and effective project management. The document aims to facilitate strategic investments that promote sustainable growth and empower local communities through targeted interventions, ensuring alignment with federal guidelines and objectives.
    This document outlines the "International Representations and Certifications" required for offerors whose performance occurs outside the United States, particularly in the context of a prime contract by Stanford University with the Department of Energy for the SLAC National Accelerator Laboratory. The representation process includes certifying the type of organization, disclosing debarment status, and compliance with anti-kickback regulations if the offer exceeds $150,000. Additionally, offerors must confirm that no payments have been made to influence federal transactions and consider potential conflicts of interest if Stanford employees are associated with the offeror. The signed document serves as a legal declaration, affirming the accuracy of all statements provided. This ensures accountability, promotes ethical conduct, and upholds federal contracting standards, aligning with the stipulations of government RFPs and grants.
    The “Representations and Certifications Supplement” serves as a formal requirement for Offerors participating in proposals related to the Prime Contract DE-AC02-76SF00515 with the Department of Energy for managing the SLAC National Accelerator Laboratory. It mandates that Offerors complete various certifications, including compliance with the System for Award Management (SAM) and participation in E-Verify for employment verification if proposals exceed $3,500. The document outlines criteria for identifying conflicts of interest, particularly in relation to Stanford University employees and their relatives. Additionally, Offerors must abide by environmental reporting regulations concerning toxic chemical release under specified conditions and certify against any kickback practices related to government contracts. Offerors must confirm whether their items fall under strict export controls, indicating responsibility in safeguarding sensitive materials. The document requires a signature from authorized personnel to validate the representations and retains relevance for one year. Compliance is essential for eligibility in subcontracting or securing awards under federal guidelines, underscoring the commitment to legal and ethical business practices in federal contracting.
    The Past Performance Questionnaire is designed for contractors involved in federal and local government procurement processes, providing a structured format for evaluating past contractual performance. The form requires the contractor to supply essential contract identification details, including contract name, number, type, and performance metrics. Evaluators—typically representatives from contracting companies—assess the contractor's performance across various dimensions, such as technical expertise, innovation, management responsiveness, program management, and personnel management. They categorize performance as satisfactory or unsatisfactory based on specific criteria and answer targeted questions regarding the contractor's ability to meet project deadlines and deliver quality work. Additional evaluator comments supplement the quantitative assessment. The questionnaire serves as an essential tool in the procurement process, helping organizations gauge the reliability and previous performance of potential contractors to inform their decision-making during the awarding of contracts.
    The document is an attachment related to Request for Proposal (RFP) No. SLAC_RFP_351726(RE) for Long Lead Electrical Equipment. It serves as a template for offerors to submit their requests for clarifications regarding the RFP. The template includes designated spaces for entering the offeror's name, submission date, item numbers, questions posed, references to the RFP document, and responses received from the agency. This structured approach enables potential bidders to seek clarification on specific aspects of the proposal. The clarity and thoroughness of the responses are critical for ensuring that bidders fully understand the requirements and can submit compliant proposals. This document plays a vital role in the RFP process by fostering transparent communication between the government agency and potential offerors, ensuring that all parties are aligned on expectations and requirements.
    The document outlines the Instructions to Offerors (ITO) for a Request for Proposal (RFP) regarding a firm fixed-price subcontract in Supply Chain Management at SLAC. The main purpose is to provide comprehensive guidance for preparing proposals with specific formatting and content requirements. Proposals are due by January 21, 2025, and must include an agreement that prices remain valid for 90 days. The document details the proposal submission structure, distinguishing between Volume I (Technical Proposal) and Volume II (Business Proposal), and sets a maximum page limit of 50 for Volume I. Key evaluation factors include technical compliance to specifications, past performance on similar projects, delivery schedules, and financial stability. Offerors must be registered with the System for Award Management (SAM) and are advised on proprietary information handling and insurance requirements. The document also highlights the necessity of notifying SLAC of any product availability concerns. Moreover, any exceptions to SLAC’s terms must be clearly declared upon submission. This structured approach aims to facilitate a formal and efficient proposal evaluation process in line with government contracting standards, ensuring clarity and compliance.
    The document outlines the supply chain management process for the award of subcontracts by SLAC through a best value tradeoff source selection. The evaluation focuses on selecting the proposal that not only meets but exceeds technical requirements, prioritizing technical evaluation over price considerations. The submission process requires comprehensive proposals comprising a Technical and Business Proposal, emphasizing past performance and manufacturing capabilities. Proposals must demonstrate compliance with specified requirements and capacity for timely delivery, with realistic cost structures. Evaluation factors include the ability to meet technical specifications, past performance reliability, delivery schedules, and financial organization, with specific attention to safety and risk management documentation. Debriefings for unsuccessful Offerors will be conducted to explain evaluation outcomes while maintaining confidentiality regarding other proposals. This RFP reflects SLAC's commitment to fair and competent procurement practices, ensuring best practices in subcontractor selection.
    Lifecycle
    Title
    Type
    Long Lead Equipment
    Currently viewing
    Combined Synopsis/Solicitation
    Similar Opportunities
    SLAC LCLS-II-HE Cable Plant Installation Phase 1 & 2
    Active
    Energy, Department Of
    The Department of Energy, through the SLAC National Accelerator Laboratory, is seeking experienced electrical subcontractors for the installation of the LCLS-II-HE Cable Plant systems in Menlo Park, California. This procurement involves two phases of installation, which includes the setup of various cable types, electronics racks, and associated hardware, with a focus on compliance with safety and engineering standards. The project is critical for enhancing the operational capacity of the superconducting linear accelerator, thereby supporting advanced scientific research. Interested vendors must express their interest via the SAM.GOV posting or by contacting procurement specialists AJ Vandermeyden or James Yturralde, with the project timeline spanning from July 2025 to February 2027.
    CUIR_Master_Substation_Building_Expansion_Design-Build_Project
    Active
    Energy, Department Of
    The Department of Energy is seeking design-build contractors for the CUIR Master Substation Building Expansion project at the SLAC National Accelerator Laboratory in Menlo Park, California. The objective is to modernize the existing utility infrastructure by constructing a new two-story building adjacent to the current Master Substation, which includes installing new medium voltage switchgear and relocating an existing generator. This project is critical for enhancing the laboratory's operational capabilities to support advanced scientific research, with an estimated contract value ranging from $5 million to $13 million. Interested contractors must submit their expressions of interest to Quyen Weng at quyen@slac.stanford.edu by 5 PM PST on January 7, 2025, as this Sources Sought Notice is intended to gauge interest prior to a formal solicitation.
    Dilution Refrigerator Cryostat System
    Active
    Energy, Department Of
    The Department of Energy, through the SLAC National Accelerator Laboratory, is seeking proposals for the procurement of a Dilution Refrigerator Cryostat System. This system is essential for advanced scientific research, particularly in quantum sensing applications, and must meet specific technical requirements including a base temperature capability of 10 milliKelvin or lower and a cooling power of at least 400 microwatts at 100mK. Proposals must be submitted electronically by January 14, 2025, at 4 PM PST, and remain valid for 90 days post-submission. Interested vendors should direct inquiries to Stephanie Low at stephl@slac.stanford.edu and ensure compliance with all outlined terms and conditions in the RFP documentation.
    Storage Ring ID Transition Chambers for the ALS-U
    Active
    Energy, Department Of
    The Department of Energy, through the Lawrence Berkeley National Laboratory (LBNL), is soliciting proposals for the procurement of Storage Ring ID Transition Chambers as part of the Advanced Light Source Upgrade (ALS-U) project. The procurement aims to enhance the capabilities of the ALS by acquiring 31 custom ID Transition chambers, which are critical for particle accelerator applications, ensuring compliance with stringent quality assurance and engineering specifications. Proposals must be submitted by January 10, 2025, and interested vendors can direct inquiries to Arielle Anoop at aanoop@lbl.gov or by phone at 510-486-5519. Additional documentation and specifications can be accessed via the provided Google Drive link.
    Ion Pump
    Active
    Energy, Department Of
    The Department of Energy, through the SLAC National Accelerator Laboratory, is soliciting bids for the procurement of 14 Ion Pumps, specifically the 25S Titan CV model with Safeconn connectors. The requirement emphasizes that the pumps must meet specific technical specifications, including a maximum footprint and minimum pumping speed, and the procurement will be evaluated based on the Lowest Price and Technically Acceptable Method. This equipment is crucial for various scientific and technological applications within the laboratory, which is operated by Stanford University. Interested vendors must submit their quotations by COB on December 3, 2025, to Anthony Chin at anthonyc@slac.stanford.edu, and comply with the Buy American Act Certification and other specified terms and conditions.
    Semiconductor Parameter Analyzer
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance, LLC, is seeking proposals for a Semiconductor Parameter Analyzer to support research at the Fermi National Accelerator Laboratory in Batavia, Illinois. The procurement aims to acquire a commercial product that includes an analyzer mainframe, medium-power source measurement units, a pulse measurement unit, and a capacitance-voltage unit, all essential for advanced semiconductor testing and analysis. This equipment is critical for enhancing research capabilities in energy-related projects, ensuring compliance with federal regulations and standards. Interested vendors must submit their quotes, including completed certifications (SARC and PUR-466), by January 27, 2025, and can direct inquiries to Cathleen Stadler at cstadler@fnal.gov or by phone at 630-840-2763.
    Macromolecular Femtosecond Crystallography (MFX) and Coherent X-ray Imaging (CXI) Bendable Kirkpatrick-Baez (KB) Mirror Chamber Systems
    Active
    Energy, Department Of
    The Department of Energy, through the SLAC National Accelerator Laboratory managed by Stanford University, is soliciting proposals for the design, fabrication, and installation of two Bendable Kirkpatrick-Baez (KB) Mirror Chamber Systems for the Macromolecular Femtosecond Crystallography (MFX) and Coherent X-ray Imaging (CXI) facilities. Offerors are required to submit firm fixed price proposals that comply with detailed technical specifications and safety protocols, as outlined in the associated documents, including a Statement of Work and Engineering Specifications. These advanced mirror systems are critical for enhancing research capabilities in high-energy physics, supporting the laboratory's mission to advance scientific knowledge. Proposals must be submitted by January 27, 2025, at 5:00 PM Pacific Time, and interested parties can contact Giang Ngo at giangn@slac.stanford.edu for further information.
    Special Notice - Source Sought
    Active
    Energy, Department Of
    The Department of Energy, specifically the Western-Rocky Mountain Region, has issued a Special Notice for a Source Sought regarding the procurement of switchgear and switchboard apparatus manufacturing services. This solicitation aims to identify potential sources capable of providing circuit breakers, which are critical components in electrical distribution systems. The goods and services sought are essential for ensuring reliable and efficient energy distribution, reflecting the importance of maintaining infrastructure in the energy sector. Interested parties can reach out to Mona M. Howey at howey@wapa.gov or call 970-813-0060 for further information regarding this opportunity.
    VC04 & VC12 Pumping Station
    Active
    Energy, Department Of
    The Department of Energy, through the Berkeley National Laboratory, is soliciting bids for the manufacturing design, fabrication, inspection, and delivery of VC04 and VC12 Pumping Stations for the Advanced Light Source Upgrade (ALS-U) project. The procurement involves a total of eight vacuum chambers, with specific requirements for ultra-high vacuum (UHV) capabilities, CNC machining, and clean room assembly. This equipment is critical for the laboratory's operations, ensuring compliance with federal standards and contributing to advanced scientific research. Interested bidders must submit their quotations by January 22, 2025, and can direct inquiries to Janet Schlock at JSchlock@lbl.gov or by phone at 510-486-5314.
    Cooling Fan
    Active
    Energy, Department Of
    The Department of Energy, through the SLAC National Accelerator Laboratory, is soliciting bids for the procurement of cooling fan components, specifically OEM parts for Tower Tech cooling fans. The requirement includes 15 units each of three specific products: FAN039, FAN008, and MTR009, with a focus on ensuring compliance with the Buy American Act for items exceeding $10,000. This procurement is crucial for maintaining operational efficiency at the laboratory, which is managed by Stanford University. Interested vendors must submit their quotations by January 1, 2025, to Anthony Chin at anthonyc@slac.stanford.edu, and are encouraged to review the attached certification documents and terms and conditions prior to bidding.