ID BOR SRAO 0017(1), Sportsman’s Park Transportation Improvements
ID: 69056724B000017Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL HIGHWAY ADMINISTRATION690567 WESTERN FEDERAL LANDS DIVVANCOUVER, WA, 98661, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Sportsman’s Park Transportation Improvements project (ID BOR SRAO 0017(1)) located in Aberdeen, Idaho. This project involves significant enhancements to transportation infrastructure, including the construction of highways, roads, and bridges, with a focus on compliance with federal standards and safety regulations. The initiative is particularly important for improving access to recreational facilities and ensuring efficient transportation routes in the region. Interested small businesses are encouraged to submit their bids, with project costs estimated between $700,000 and $2 million, and a completion timeline projected for early 2025. For further inquiries, bidders can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520.

    Point(s) of Contact
    Files
    Title
    Posted
    The document provides a structured survey control sheet related to the project "Sportsman's Park Transportation Improvements." It includes essential information such as project identification numbers, drawing numbers, and necessary data formats for the survey. The survey focuses on utilizing geospatial data to create an accurate point list for the project, detailing specifications like coordinate systems, vertical datum, and survey units in International Feet. The document outlines the process for organizing data in Excel, with instructions on transferring the survey control point list into the appropriate format. This involves specifying worksheet names, managing data locations, and calculating distances using state plane coordinates. Key survey details include orthometric elevation and ellipsoid height for surveyed points, emphasizing compliance with the National Geodetic Survey standards. Additional instructions for sheet revisions and adaptations for multiple project numbers ensure the document's usability within federal RFP and grant frameworks. The survey's outcomes will contribute to the planning and execution phases of the proposed transportation improvements, reflecting the government's procedure for managing land and construction projects.
    The document outlines an earthwork report for the Sportsman’s Park Transportation Improvements project, identified by ID BOR SRAO 0017(1), under the U.S. Department of Transportation's Federal Highway Administration. It details various earthwork quantities required for the project along a specified corridor, MAIN_01, from station 10+00.00 to 24+59.89. The report lists significant measurements, including areas and volumes for cut and fill operations, indicating precise cubic foot calculations necessary for construction. Moreover, it categorizes specific grading tasks and turf establishment efforts, defining the essential components in preparing the site. The structured data presentation enables accurate assessments of materials required, facilitating compliance with safety and engineering standards. The purpose of this document is to provide critical measurements and logistical information to support contractors in delivering the project effectively, demonstrating adherence to federal guidelines for highway improvements and infrastructure development at the local level. This meticulous documentation is essential for securing federal grants and ensuring the successful execution of government contracts in public works projects.
    The document outlines a federal transportation improvement project, ID BOR SRAO 0017(1), located in Sportsman’s Park, Bingham County, Idaho. The primary objective is to perform full-depth reclamation of the roadway, enhance minor drainage systems, and improve asphalt pavement over a length of 1.30 miles. The project adheres to the standards set forth by the U.S. Department of Transportation and the Federal Highway Administration. The project includes delineated plans detailing specifications, typical sections, drainage, traffic control measures, and approaches, ensuring a comprehensive approach to construction. The expected traffic volume is projected to be less than 400 vehicles per day for both 2025 and 2045. Implementation will follow protocols for erosion control and site management while ensuring temporary and permanent traffic controls are in place throughout the construction process. The document is classified as "preliminary" and explicitly noted as "not for construction," highlighting its role in the planning and design phases of the project. This federal initiative illustrates the commitment to enhancing transportation infrastructure while considering safety, compliance, and environmental management as integral components of the development process in local government projects.
    The document details the RFP for transportation improvements at Sportsman’s Park, encompassing various construction elements such as mobilization, surveying, erosion control, and roadway construction. It includes two schedules (A and B) that outline extensive lists of pay items, estimated quantities, and measures for temporary and permanent traffic control. Key activities involve clearing, grubbing, and the application of asphalt pavements, alongside the establishment of turf and soil erosion control measures. Additionally, it outlines survey control parameters based on precise coordinates and elevations in line with federal and state standards. This project emphasizes the importance of adhering to quality control and environmental safeguards, particularly in managing dust and erosion. As a part of federal and local RFPs, it reflects a structured approach to improve infrastructure while ensuring public safety and compliance with regulations. The timeline indicates ongoing efforts, with a completion report projected for early 2025.
    The Horizontal Alignment Review Report for the Sportsman’s Park Transportation Improvements project (ID BOR SRAO 0017(1)) by the U.S. Department of Transportation outlines specific design data focused on the earthwork necessary for the proposed transportation enhancements. This document, created on October 17, 2024, details horizontal and vertical alignment specifics, including station coordinates, tangent lengths, and radii for the different geometric elements involved in the project (including linear and circular sections). The report provides precise parameters for alignment style and direction, informing subsequent design and construction phases. Its structured layout contains technical data for a segment of the proposed alignment, which spans from station 10+00.00 to 24+59.89, detailing the important factors that engineers will need to consider. Overall, this report serves as a critical guideline for future project activities, ensuring compliance with federal standards and contributing to improved transportation infrastructure within the region.
    The file from the U.S. Department of Transportation, specifically the Federal Highway Administration's Western Federal Lands Highway Division, details the Horizontal Alignment Review for the Sportsman’s Park Transportation Improvements project (ID BOR SRAO 0017(1)). Commencing at a station of 3+00.00 and concluding at 3+58.38, the report outlines the alignment named "OVERLOOK." The document provides precise geographical data in terms of Northing and Easting coordinates, alongside elements of the alignment including linear and circular segments, with measurements related to direction, radii, and length. Central to this review is the structural plan of the road alignment, which includes critical dimensions such as tangential directions, delta angles, and curvature. The report serves to ensure compliance with design standards and facilitate the developmental process. The intent of this review aligns with federal guidelines aimed at enhancing transportation infrastructure, emphasizing meticulous planning in alignment to improve accessibility and safety. Overall, it reinforces the regulatory framework guiding federal and state/local RFPs and grants for transportation improvements.
    The Horizontal Alignment Review Report for the Sportsman’s Park Transportation Improvements, ID BOR SRAO 0017(1), outlines detailed horizontal alignments for a proposed trail project managed by the U.S. Department of Transportation's Federal Highway Administration. Created on October 17, 2024, the report includes precise measurements, angles, and radial directions for various trail elements, detailing linear and circular components throughout the alignment. Each segment is meticulously documented, providing stationing data, northing and easting coordinates, tangential directions, and radius specifications for circular elements. The critical analysis of alignment aims to ensure compliance with design standards, enhance safety, and facilitate efficient construction. This documentation is integral for guiding project implementation while securing funding and support from federal and state stakeholders, reflecting the federal government's ongoing investment in infrastructural improvements for recreational facilities.
    The U.S. Department of Transportation's Federal Highway Administration has issued a Horizontal Alignment Review Report for the Sportsman’s Park Transportation Improvements project, identified as ID BOR SRAO 0017(1). The report, created on October 17, 2024, outlines the proposed horizontal alignment of the project, detailing precise geographic coordinates for various segments of the alignment, including linear and circular elements along the route. Key components include starting and ending points delineating both straight and curved sections of the alignment, with specific tangential directions, lengths, and curvature details provided. The report emphasizes vital parameters like radius, delta angles, and directional changes essential for highway design. This analysis is integral for federal and state-level infrastructure projects, ensuring compliance with engineering standards for transportation improvements. It supports the ongoing federal initiative to enhance infrastructure safety and efficiency in alignment with funding requirements and guidelines set forth for public projects.
    The U.S. Department of Transportation, through the Federal Highway Administration, is overseeing the Sportsman’s Park Transportation Improvements project (ID BOR SRAO 0017(1)). The project involves significant earthwork and transportation enhancement activities, as documented in the Horizontal Alignment Review Report dated October 17, 2024. Key aspects include a proposed horizontal alignment identified as W1700SRD, with detailed specifications such as station coordinates, linear and circular elements, tangential directions, and curvature metrics. The report outlines specific measurements, including northing and easting coordinates for various segments, suggesting a detailed engineering approach to bush and modify the transport routes within the park's vicinity. This documentation serves to facilitate project planning and compliance with federal project standards, signaling a resource allocation aimed at improving infrastructure and transportation facilities in the area. The project's comprehensive alignment details are crucial for ensuring successful execution and adherence to engineering regulations.
    The U.S. Department of Transportation's Federal Highway Administration has issued a Vertical Alignment Review Report for the Sportsman’s Park Transportation Improvements project (ID BOR SRAO 0017(1)) located in Vancouver, Washington. The report outlines detailed physical data regarding the proposed profile, sectioned by alignment (MAIN_01) and profile components, including horizontal and vertical alignments, tangent grades, and lengths of various elements. It lists precise station elevations, grades, and calculations related to curvature and tangential properties. Each section is meticulously documented, detailing changes in vertical elevation and grades through linear and parabolic elements, ensuring compliance with highway design standards. This project aims to improve transportation infrastructure within the designated area, supporting both safety and functional enhancements to the roadway system. The data compiled in this report is essential for guiding project development and alignment assessments, reflecting the federal commitment to infrastructural improvement within localities.
    The U.S. Department of Transportation's Federal Highway Administration has released a Vertical Alignment Review Report for the Sportsman’s Park Transportation Improvements project (ID BOR SRAO 0017(1)), located in Vancouver, Washington. The report, dated October 17, 2024, details the project's physical data, including both horizontal and vertical alignments, as well as specific elevation measurements and design parameters critical for the transportation improvements. It outlines a proposed profile from station 1+00.00 to 2+39.39 along the alignment W1700SRD, with various alignment elements and their respective grades, lengths, and middle ordinates. The document emphasizes precise engineering calculations essential for roadway design, adhering to federal standards. The project's focus on improving transportation infrastructure aligns with federal initiatives to enhance safety and accessibility, underscoring the importance of thorough engineering reviews in publicly-funded developments. This report serves to guide further phases of project implementation while ensuring compliance with engineering standards.
    The document outlines the details of the Earthwork project ID BOR SRAO 0017(1) for the Sportsman’s Park Transportation Improvements, supervised by the Federal Highway Administration's Western Federal Lands Highway Division. It includes proposed cross-sections covering various segments of the project, providing precise elevation data for design considerations, focusing on subgrade, original ground levels, and the proposed design grade through detailed elevation measurements at specific intervals. The data spans from 10+00.00 to 22+93.03, illustrating progressive changes in the terrain with multiple elevation comparisons indicating adjustments for landscaping and construction requirements. Critical metrics include design grade, subgrade evaluations, and original ground readings presented in a structured format that provides clarity on project specifications. This document serves as a technical resource for contractors and engineers involved in transportation enhancement efforts, ensuring compliance with federal guidelines as part of RFP processes aimed at infrastructure development. It emphasizes the importance of precise grading and soil conditions for successful roadway and park improvements, reflecting government commitments to maintaining environmental standards while advancing public infrastructure.
    The document outlines the Invitation for Bids (IFB) for the Sportsman’s Park Transportation Improvements project, issued by the U.S. Department of Transportation's Federal Highway Administration. The project, identified by Solicitation No. 69056724B000017, focuses on road and bridge construction and is set within Bingham County, Idaho. Notably, this solicitation is a total small business set-aside, requiring bidders to fully comply with federal regulations, specifically the Federal Acquisition Regulation (FAR) and related clauses. The document provides detailed instructions for bid submission, including prerequisites such as bid guarantees and specific forms to be completed, like SF 1442. It emphasizes that only printed bids will be accepted, and outlines the project’s specifications and wage decisions. The timeline includes a pre-bid question period and a fixed completion date, while estimated project costs range from $700,000 to $2 million. Overall, the solicitation encourages qualified small businesses to participate in enhancing transportation infrastructure, ensuring compliance with legal and technical requirements throughout the bidding and contracting process. This aligns with federal initiatives to promote small-business engagement in public contracts while ensuring project quality and accountability.
    The Western Federal Lands Highway Division is announcing a solicitation for the Sportsman’s Park Transportation Improvements project in Bingham County, Idaho. The project, identified by ID BOR SRAO 0017(1) and Solicitation No. 69056724B000017, includes full depth reclamation, paving, minor drainage enhancements, and striping of parking and trail areas. Due to potential snow conditions, bidders are encouraged to visit the project site in fall before October 15, 2024, as access may be limited afterward. Technical inquiries should be directed via email, while general questions can be made through specified contact details. The solicitation documents will be available in winter 2024/2025, and interested parties should monitor the SAM website for updates and utilize the “Follow” feature for notifications. The notice invites prospective bidders to participate while providing essential project and contact information.
    The document outlines the RFP for the Sportsman’s Park Transportation Improvements project in Bingham County, Idaho. The primary goal is to execute full depth reclamation and asphalt surfacing of the park's parking area and trail, with additional tasks including striping and minor drainage work. Spanning 1.5 miles, the project is anticipated to be completed by summer 2025, with an estimated cost between $700,000 and $2,000,000. The scope of work entails various components, categorized under project requirements and earthwork. Specific tasks include clearing and grubbing, roadway excavation, and the installation of asphalt concrete pavement, alongside necessary signage and traffic control measures. The document includes detailed quantities and specifications for materials and labor required for successful project delivery. This RFP represents a structured approach by the federal and state governments to solicit bids for public infrastructure improvements, promoting transparency and compliance with development standards while addressing community recreational needs.
    The WFLHD Construction Contract Administration document outlines the Federal Highway Administration (FHWA) procedures for definitizing equitable adjustments for change orders in construction contracts, as mandated by FAR 36.211. It specifies the lack of agency-specific additional policies and focuses on data from the last three fiscal years regarding the duration required for definitizing these adjustments. The data table categorizes change order proposals by the time taken to finalize them from fiscal years 2021 to 2023, revealing trends in the processing times. The majority of change orders in FY 2021 and FY 2023 took over 91 days to definitize, whereas more expedient timeframes were noted in FY 2022. There were no definitizations completed for more extensive timeframes post-contract performance within the provided data. This report is crucial for understanding FHWA's efficiency and performance metrics in managing construction contract adjustments, underlining the agency's ongoing compliance with federal guidelines in the RFP and grant context surrounding construction projects.
    Similar Opportunities
    ID BOUNDARY 5806(1), Riverside Road Improvements & ID BOUNDARY 5806(1)B, Riverside Road Improvements B
    Buyer not available
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the Riverside Road Improvements project, identified as ID BOUNDARY 5806(1), located west of Bonners Ferry, Idaho. The project encompasses a range of construction activities including grading, drainage, paving, and bridge construction over a distance of approximately 4.489 miles, with an estimated budget between $10 and $20 million, and a tentative completion date set for Fall/Winter 2025. This initiative aims to enhance access to the Kootenai National Wildlife Refuge while ensuring compliance with federal and state regulations regarding safety and environmental considerations. Interested bidders can direct inquiries to the Western Federal Lands Highway Division at WFL.Contracts@dot.gov or by phone at (360) 619-7520, and are encouraged to monitor the SAM website for updates on detailed solicitation documents expected to be available in winter 2024/2025.
    ID FLAP BONNER 841(1), Trestle Creek Road, MP 100 to 103.7
    Buyer not available
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the reconstruction and paving of Trestle Creek Road in Bonner County, Idaho, under project ID FLAP BONNER 841(1). The project aims to enhance a 3.75-mile stretch of roadway by implementing improvements such as riprap placement, roadway aggregates, asphalt concrete pavement, and drainage enhancements, ultimately facilitating year-round access to the Kaniksu National Forest. This initiative is part of the government's commitment to infrastructure improvement and environmental stewardship, with an estimated contract value between $5 million and $10 million. Interested vendors should note that the solicitation is set to be released in Spring 2025, with a completion target of Fall 2025, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
    Buyer not available
    The Department of Transportation's Federal Highway Administration seeks contractors for the Crown Point Trail project in Idaho, involving extensive trail construction and repairs. This small business set-aside project, valued between $700,000 and $2 million, requires expertise in highway construction and will be awarded through a sealed bid process. The upcoming procurement, anticipated in early 2025, aims to enhance a 2.7-mile trail stretch with resurfacing, slope repairs, and new construction, accessible for physical inspection now before snow sets in.
    Rock Creek Park
    Buyer not available
    The Department of Transportation, through the Federal Highway Administration, is seeking sealed bids from certified Small Business Concerns for the Rock Creek Park Project (Solicitation Number 693C73-25-B-000006) in Washington, D.C. The project involves significant roadway repairs, including full-depth reconstruction, curb and gutter replacements, street light repairs, and drainage improvements, with an estimated total cost between $5 million and $10 million. This initiative underscores the government's commitment to engaging small businesses in public infrastructure projects while adhering to federal regulations and safety protocols. Bid documents are anticipated to be available around February 3, 2025, and interested parties must register on the SAM website for notifications and to complete necessary certifications. For further inquiries, contact Emily McCleary or C. Shawn Long at eflhd.contracts@dot.gov.
    Project CATO 10(5), 11(2), ETC - Catoctin Mountain Park
    Buyer not available
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Project CATO 10(5), 11(2), ETC, which involves the reconstruction and resurfacing of Foxville-Deerfield Road and Park Central Road within Catoctin Mountain Park, Maryland. The project aims to enhance park infrastructure by improving road conditions and includes ancillary improvements such as picnic areas and parking, with an estimated total cost between $5 million and $10 million. This initiative underscores the federal commitment to infrastructure development while promoting small business participation, as the contract is set aside for total small business concerns. Interested bidders must submit their electronic bids by the extended deadline of March 11, 2025, and can direct inquiries to Michael Sun or C. Shawn Long at EFLHD.CONTRACTS@DOT.GOV.
    WA ERFO FS MTBKR605 2020-1(1), Mt. Baker Snoqualmie ERFO Repairs 2020 Phase 1 & WA ERFO FS MTBKR605 2022-1(1), Mt. Baker Snoqualmie ERFO Repairs 2022
    Buyer not available
    The Department of Transportation, through the Federal Highway Administration, is seeking proposals for emergency repair projects in the Mt. Baker-Snoqualmie National Forest, specifically identified as WA ERFO FS MTBKR605 2020-1(1) and WA ERFO FS MTBKR605 2022-1(1). The projects involve critical infrastructure improvements, including earthwork, roadside development, wall construction, and drainage systems across multiple sites in Washington, covering a total length of 0.4 miles. This initiative is vital for enhancing safety and accessibility in the region's roadways, with an estimated budget ranging from $700,000 to $2,000,000 and a fixed completion target set for Winter 2025. Interested contractors should contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details and to stay updated on the solicitation documents expected to be released in Winter 2024/2025.
    WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
    Buyer not available
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the improvement and stabilization of Hawk Creek Road in Lincoln County, Washington, under the project titles WA FLAP LINCOL 57860(1) and WA NPS LARO 208(1). The project encompasses a range of construction activities, including earthwork, grading, paving, drainage improvements, and the installation of soil nail retaining walls and guardrails, aimed at enhancing access to the Lake Roosevelt National Recreation Area while ensuring environmental sustainability. With an estimated project cost between $5 and $10 million and a targeted completion date in Summer/Fall 2025, interested bidders are encouraged to contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details and to monitor the SAM website for solicitation updates.
    Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC)
    Buyer not available
    The Department of Transportation, specifically the Federal Highway Administration, is announcing a forthcoming solicitation for a Multiple Award Task Order Contract (MATOC) focused on construction work in Idaho, Montana, and surrounding areas. The opportunity includes a sample project for the rehabilitation of the parking area at the Glacier National Park Headquarters, designated as MT NP GLAC P HQ(3), which will be evaluated based solely on pricing, although it will not be awarded or constructed. This initiative underscores the government's commitment to enhancing infrastructure within national parks while adhering to federal and state guidelines for construction projects. Interested contractors are encouraged to visit the project site in West Glacier, Montana, before winter conditions limit access, and should direct technical inquiries via email to the provided address. The MATOC solicitation documents are expected to be available during the winter of 2024/2025, with updates accessible on the SAM site.
    AK USFS Chug1004 9(1), Vagt Lake Trailhead
    Buyer not available
    The Department of Transportation, specifically the Federal Highway Administration, is seeking qualified contractors for the Vagt Lake Trailhead project located in the Kenai Peninsula Borough, Alaska. The project involves excavation, grading, installation of a vault toilet, concrete work for ADA-compliant parking and walkways, and sign installation over a length of 0.13 miles. This initiative aims to enhance recreational access and ensure environmental conservation in the Chugach National Forest, aligning with federal infrastructure development goals. The contract is a sealed bid, firm-fixed-price type, with an estimated price range between $700,000 and $2,000,000, and is set to be solicited in winter 2024/2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further information.
    WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR
    Buyer not available
    Presolicitation notice from the Department of Transportation, Federal Highway Administration, for a project titled "WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR". The project is located 2 miles East of Long Beach, Washington in Pacific County. It involves roadway embankment, paving, and striping. The project is 0.15 miles in length and is expected to be completed by Fall 2025. The contract type is Sealed Bid, Firm-Fixed-Price. The estimated price range for the project is between $700,000 and $2,000,000. This solicitation is offered as a Total Small Business Set-Aside. Interested vendors must register as a SAM user to view the Interested Vendors List. The INVITATION FOR BIDS will be posted on SAM.gov.