Baker Draw Shooting Area Shade Structure Installation
ID: 1240LT24R0052Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA-FS, CSA INTERMOUNTAIN 8Ogden, UT, 844012310, USA

NAICS

Other Foundation, Structure, and Building Exterior Contractors (238190)

PSC

CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of Agriculture's Forest Service is seeking qualified contractors for the installation of a shade structure at the Baker Draw Designated Shooting Area in Ault, Colorado. The project requires the contractor to provide all necessary materials, labor, and equipment to construct a shade structure approximately 12 ft. by 90 ft., adhering to the International Building Code and specific Forest Service requirements, with a completion deadline of 60 days following the notice to proceed. This initiative aims to enhance public safety and recreational use of the shooting area, reflecting the federal commitment to improving public facilities. Interested vendors should submit their proposals electronically by September 20, 2024, and direct any questions to Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov by August 23, 2024, with a project budget estimated between $25,000 and $100,000.

    Point(s) of Contact
    Elizabeth Ratcliff
    elizabeth.ratcliff@usda.gov
    Files
    Title
    Posted
    The Baker Draw Shade Structure Installation project aims to construct a shade structure over the firing line of the 25-yard shooting area at the Baker Draw Shooting Area, located in Ault, Colorado. The contract covers mobilization, excavation, installation of the shade structure, and site restoration, adhering to the International Building Code and specific Forest Service requirements. The project must be completed within 60 days of the Notice to Proceed, with operations restricted to weekdays and excluding federal holidays. Key requirements include ensuring public safety during construction, including appropriate barriers and signage. The contractor is responsible for all necessary permits, management of debris, and compliance with local regulations. Various interim submissions, such as construction timelines and material specifications, must be provided for approval before work commences. The shade structure's dimensions will approximately be 12 ft. by 90 ft., constructed from weathering steel and rot-resistant wood. Overall, the initiative serves to enhance public use of the recreational shooting area while ensuring safety and regulatory compliance throughout the installation process, reflecting the federal commitment to maintaining and improving public recreational facilities.
    The document outlines the specifications and procedural guidelines for the construction and maintenance of National Forest System Roads as adopted by the Forest Service, U.S. Department of Agriculture. It covers terms and definitions, bidding processes, scope of work, material control, inspection and acceptance standards, and safety measures regarding public traffic during construction. Key revisions include the removal of several subsections detailing the bid, award, contract execution, and progress, indicating a streamlined process. The document emphasizes adherence to various accepted standards for materials and inspection, ensuring conformity with contract requirements. Specific sections detail the responsibilities of contractors, including the management of materials found during work, the measurement and payment processes, and clarity on acceptance criteria based on visual inspections and compliance with established standards. Additionally, the document stresses traffic control protocols to maintain public safety near construction sites, including the submission of traffic control plans and the installation of temporary signage and barriers as needed. Ultimately, this file serves as a comprehensive guide for contractors to navigate the requirements set forth for federal road projects within forest areas, ensuring quality, safety, and compliance.
    The document outlines the structural design criteria and specifications for a shooting range shade structure in Ault, Colorado, prepared by Mountain View Engineering, Inc. It adheres to the 2012 International Building Code and includes design loads for live, wind, snow, and seismic considerations. Key detailed specifications include a roof live load of 20 psf, a ground snow load of 30 psf, and an ultimate design wind speed of 115 mph, categorized as Risk Category II. Foundation values are provided with an allowable soil bearing pressure of 1500 psf. Construction materials specified include concrete meeting ASTM standards with a required compressive strength of 4500 psi, and reinforcing steel conforming to ASTM A615. Wood framing must consist of Douglas-Fir Larch lumber #2 or better, with stringent nailing and connector requirements. The engineer clarifies that all construction safety and quality control fall under the contractor's responsibilities. Any violations or deviations from plans must be documented and approved by the engineer. The document serves not only as a design guideline but also emphasizes compliance with regulations and safety procedures throughout the construction phases, critical for government procurement and grant processes.
    The document outlines the General Wage Determination for building construction projects in Weld County, Colorado, effective July 5, 2024. It underscores compliance with the Davis-Bacon Act, mandating specific minimum wage rates based on Executive Orders 14026 and 13658 for contracts awarded post-January 30, 2022. For instance, workers must be paid a minimum of $17.20 per hour (or higher) for contracts post this date, while older contracts require at least $12.90 per hour. The document provides detailed wage rates for various trades, such as electricians, plumbers, and laborers, noting both hourly rates and fringe benefits. It also mentions that unlisted classifications can be added post-award through a conformance request. Additionally, it highlights requirements related to paid sick leave for federal contractors under Executive Order 13706, applicable for contracts awarded after January 1, 2017. Finally, the document describes the appeals process for any disputes regarding wage determinations, emphasizing adherence to federal guidelines for worker protections and wage standards in government construction projects.
    The U.S. Forest Service (USDA) Experience Questionnaire is designed for contractors to demonstrate their qualifications for project solicitations. Key sections include contractor identification, business structure, experience, and resources available for the project. Contractors must detail their experience over the past three years, including completed projects, contractual commitments, and personnel qualifications. Specific queries assess prior performance issues and resource availability, including employee numbers and equipment. The questionnaire also requires a certification from a designated official affirming the accuracy of the provided information. This form plays a vital role in evaluating potential contractors' capabilities and suitability for federal projects, ensuring compliance with government standards and promoting transparency in the procurement process. Overall, it aims to gather comprehensive information to aid in the selection of qualified parties for government contracts effectively.
    This document serves as a Question and Answer (Q&A) resource for a Request for Proposals (RFP), detailing inquiries made by potential contractors and the responses from the Department of Medicaid (DOM). The RFP includes two pages dedicated to questions focused on various sections and pages of the proposal document. The questions cover topics relevant to the RFP requirements, and the DOM provides specific responses intended to clarify expectations and guidelines for interested parties. The structured format of questions and responses indicates an organized approach aimed at addressing contractor needs and ensuring transparency during the proposal process. This document is essential for fostering a clear understanding of the RFP criteria and facilitates a competitive bidding environment by equipping contractors with the information necessary to prepare their proposals effectively.
    The document presents a solicitation for the installation of a shade structure at the Baker Draw Designated Shooting Area in Ault, Colorado. The U.S. Forest Service is inviting bids from contractors to provide all necessary materials, labor, and equipment, with a project budget estimated at less than $50,000. This contract is set aside for small businesses and has a performance window of 60 days from the notice to proceed, with project completion due by September 1, 2025. Key requirements include a site visit without government escort, submission of contractor questions by August 23, 2024, and proposals due by September 2, 2024. The contractor is responsible for compliance with safety, traffic control, and waste disposal regulations while the recreation site remains open during construction. There are specific guidelines for the shade structure's design, including dimensions and material specifications, ensuring compatibility with existing site structures. The document emphasizes the importance of federal regulations regarding bid guarantees and the necessity for contractors to submit invoices through the designated electronic Invoice Processing Platform. Overall, the solicitation outlines a structured approach to acquired services while adhering to federal standards aimed at promoting small business participation.
    The document outlines a Request for Proposal (RFP) for the installation of a shade structure at the Baker Draw Shooting Area in Ault, Colorado, issued by the U.S. Forest Service. The contractor is tasked with providing all necessary materials, labor, and equipment for the project, which has a budget between $25,000 and $100,000, with a mandatory completion time of 60 days following the notice to proceed. Offers must be submitted electronically by September 20, 2024, with a deadline for contractor questions set for August 23, 2024. The RFP emphasizes the need for a small business set-aside, and all proposals must comply with specific clauses and requirements outlined in the solicitation. Additional details include site conditions, inspection protocols, insurance requirements, and specifications for the shade structure, which must match existing installations at the site. Contractor responsibilities cover safety, utility locates, public access maintenance, and debris disposal during construction. A post-award conference is mandated to ensure clarity and compliance with contract expectations. Overall, this document reflects a structured approach to government contracting aimed at enhancing recreational facilities in a safe and compliant manner.
    The document is an amendment to a solicitation issued by the U.S. Forest Service, specifically modifying the RFP numbered 1240LT24R0052. The primary purpose of this amendment is to extend the solicitation close date to September 20, 2024, at 12:00 PM MDT, and to replace the original RFP document with an amended version. The amendment outlines the procedures contractors must follow to acknowledge receipt of this amendment and make any changes to previously submitted offers before the newly specified deadline. It emphasizes the importance of acknowledging the amendment to ensure that offers are not rejected. The document details administrative changes under the authority of the Federal Acquisition Regulation (FAR) and specifies that, aside from stated changes, all other terms and conditions remain in effect. This amendment is part of typical RFP processes aimed at facilitating fair and transparent procurement practices within government agencies while ensuring compliance with established guidelines.
    Lifecycle
    Title
    Type
    Similar Opportunities
    1240LT25Q0008 Notice of Site Visit Nov 14, 2024 - Stanley Admin Site Housing - Sawtooth NF - Replacement of asphalt shingle roofs, blown insulation into attic and all other work as required. Sawtooth NF - Upper Loop Stanley, ID 83278
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking contractors for a project involving the replacement of asphalt shingle roofs at the Stanley Administrative Site Housing in Sawtooth National Forest, Idaho. The project entails the removal of existing roofs, installation of new asphalt roofs with cold roof ventilation, and the addition of blown insulation into attic spaces, along with any other necessary work. This procurement is crucial for maintaining the integrity and functionality of the housing units, ensuring they are adequately protected against seasonal weather conditions. Interested vendors are invited to a site visit scheduled for November 14, 2024, at 11:00 AM MDT, and must notify the primary contact, Ida Marino, via email at ida.r.marino@usda.gov, to confirm attendance. The estimated construction cost for this project is between $100,000 and $250,000, and it is set aside for small businesses under the SBA guidelines.
    Shake Creek Guard Station Siding Replacement
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking qualified contractors for the Shake Creek Guard Station Siding Replacement project located in Idaho. The project involves rehabilitating the siding of historic buildings, which includes cleaning, preparing, and potentially replacing or repairing siding, as well as managing hazardous lead-based paint. This initiative is crucial for preserving the integrity of these historic structures, particularly as the site will be closed seasonally due to inclement weather. Interested vendors are invited to a site visit on November 5, 2024, at 1:00 PM (MST), and must notify Project Engineer Braidy Richins of their attendance by the previous day. The estimated budget for this project ranges between $100,000 and $250,000, and further inquiries can be directed to Braidy Richins at Braidy.Richins@usda.gov or by phone at 208-423-7545.
    UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The United States Forest Service, under the Department of Agriculture, is seeking contractors for road and bridge construction services in the Rocky Mountain Region 2, specifically through a Multiple Award Task Order Contract (MATOC). The procurement includes several seed projects, such as the replacement of the PSICC South Cottonwood Creek Bridge, the White River Berry Creek Culvert Replacement, and roadway reconditioning work in the Washakie Ranger District of Wyoming. These projects are crucial for maintaining infrastructure within national forests, enhancing road safety, and ensuring proper water drainage. Interested contractors are encouraged to attend scheduled site visits on October 3 and October 9, 2024, for the bridge and culvert projects, respectively, and to review the Washakie Roadwork site independently. For further inquiries, prospective offerors can contact Paul Larsen at paul.larsen@usda.gov.
    BCLH Stewardship IRSC Phase 3
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is seeking contractors for the BCLH Stewardship IRSC Phase 3 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead Fires in Oregon's Willamette National Forest. The project encompasses cutting and removing fire-killed timber within 100 feet of roads, managing non-commercial hazard trees, and conducting essential road maintenance and reconstruction across a total area of 1,843 acres. This initiative is critical for enhancing forest health and safety while ensuring compliance with federal regulations, with an estimated contract value between $1 million and $5 million. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, and note that the final solicitation is anticipated to be issued around March 31, 2025, with contract awards planned for June 6, 2025.
    UTV Trailer for Gunnison Timber
    Active
    Agriculture, Department Of
    The USDA Forest Service is seeking proposals from small businesses for the procurement of a Gunnison Timber UTV Trailer, with a focus on meeting specific technical specifications for delivery to the GMUG Fleet Shop in Delta, Colorado. The trailer must be an 83” x 16' tandem axle utility model, featuring a black powder coat finish, a gross vehicle weight rating of 7000 lbs, and various safety and functionality enhancements such as electric brakes, heavy-duty steel fenders, and a complete breakaway system. This procurement is crucial for the agency's operational needs, emphasizing durability and functionality tailored to specific requirements. Interested contractors must submit their updated quotes by November 8, 2024, at 5 P.M. ET, and can direct inquiries to Morgan Sharp at morgan.sharp@usda.gov.
    UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service, Rocky Mountain Region 2, is seeking qualified contractors for road and bridge construction services through a Multiple Award Task Order Contract (MATOC). The procurement involves an Indefinite Delivery-Indefinite Quantity (IDIQ) contract for various construction projects, including the replacement of bridges and culverts, roadway reconditioning, and related services across USFS Region 2. This initiative is crucial for maintaining and enhancing infrastructure within national forests, ensuring safe access for both public and forestry operations. Interested vendors must register in the System for Award Management (SAM.gov) and are encouraged to attend scheduled site visits for seed projects, with the full solicitation anticipated to be available in late July 2024. For inquiries, contact Paul Larsen at paul.larsen@usda.gov.
    BCLH Stewardship IRSC Phase 1
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, is seeking contractors for the BCLH Stewardship IRSC Phase 1 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead fires in Oregon's Willamette National Forest. The project encompasses approximately 1,612 acres and includes mandatory activities such as cutting fire-killed timber, managing hazard trees, small fuels treatment, and extensive road maintenance and reconstruction. This initiative is critical for enhancing safety and accessibility in the region while adhering to sustainable forest management practices. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, with a projected contract value between $5 million and $10 million for mandatory items and $500,000 to $1 million for optional items, and the solicitation is expected to be issued around January 15, 2025.
    BCLH Stewardship IRSC Phase 3
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is seeking contractors for the BCLH Stewardship IRSC Phase 3 project, aimed at restoring access routes and mitigating hazardous fuels in the Detroit Ranger District of the Willamette National Forest, Oregon. The project encompasses approximately 1,843 acres affected by the Beachie Creek and Lionshead Fires of 2020, with work including the removal of fire-killed trees, road reconstruction, and maintenance activities to enhance forest management and community safety. Interested contractors are encouraged to attend a pre-solicitation site visit on October 5, 2024, with the final solicitation expected to be issued around March 31, 2025, and contract awards planned for June 6, 2025. For further inquiries, contact Karen Ruklic at karen.ruklic@usda.gov or Heidi Andersen at heidi.andersen@usda.gov.
    LOLO NATIONAL FORES T - Upper West Fork Fish Creek Trail Bridge Replacement
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the Upper West Fork Fish Creek Trail Bridge Replacement project located in the Lolo National Forest, Montana. The project involves the removal and replacement of an existing trail bridge along Trail 101 at milepost 3.1, including structural excavation and the installation of a new bridge, while adhering to specific Resource Protection Measures due to its location in a proposed wilderness area. This initiative is crucial for maintaining infrastructure within the national forest and ensuring safe access for visitors, with an estimated construction cost between $500,000 and $1,000,000. Interested vendors are encouraged to attend a formal site visit on October 17, 2024, and must notify the primary contact, Alisha Knaub, at alisha.knaub@usda.gov by October 15, 2024, to confirm attendance.
    BCLH Stewardship IRSC Phase 2
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the BCLH Stewardship Integrated Restoration Silviculture Contract (IRSC) Phase 2, aimed at hazardous fuel reduction and road maintenance in the Willamette National Forest, specifically following the 2020 Beachie Creek and Lionshead fires. The project encompasses a total area of 1,152 acres and includes mandatory and optional work activities such as cutting and removing fire-killed trees, maintaining and reconstructing roads, and performing small fuels treatments to enhance access and mitigate fire risks. This initiative is critical for restoring access to affected areas while ensuring compliance with environmental regulations and sustainable forestry practices. Interested contractors should contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519 for further details, with the anticipated solicitation issuance around February 21, 2025, and a project value estimated between $5 million and $10 million for mandatory items.