Y1DA--460-22-700 | Construct EHRM Infras Upgrades | Wilmington, DE
ID: 36C77625B0044Type: Solicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OFPCAC (36C776)INDEPENDENCE, OH, 44131, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF HOSPITALS AND INFIRMARIES (Y1DA)
Timeline
    Description

    The Department of Veterans Affairs is seeking proposals for the EHRM Infrastructure Upgrades project at the Wilmington VA Medical Center, designated as Project No. 460-22-700, with construction set to commence on October 1, 2024. This project aims to enhance the facility's infrastructure, focusing on comprehensive upgrades to the electronic health record management systems, ensuring compliance with current healthcare standards and improving service delivery for veterans. The estimated construction value ranges between $10 million and $20 million, and the solicitation is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Interested contractors must submit their proposals electronically by August 22, 2025, and can direct inquiries to Procurement Technician Melissa S. Waddell at melissa.waddell@va.gov.

    Point(s) of Contact
    Melissa S WaddellProcurement Technician
    melissa.waddell@va.gov
    Files
    Title
    Posted
    The document pertains to the EHRM (Electronic Health Record Management) Infrastructure Upgrades project at the Wilmington VA Medical Center in Delaware. As of October 1, 2024, it details the specifications and construction documents for the project, identified as Project No. 460-22-700. The primary goal of this initiative is to enhance the medical center's infrastructure, likely to improve the efficiency and effectiveness of its electronic health record systems. This upgrade is part of a broader effort to modernize healthcare facilities within the VA system, ensuring compliance with current standards and fostering better healthcare delivery. Emphasis is placed on meticulous planning, coordination among various trades, and adherence to safety regulations throughout the construction phase. Overall, this project indicates the VA's commitment to advancing healthcare technology and infrastructure for enhanced patient services and outcomes.
    The EHRM Infrastructure Upgrades project at Wilmington VA Medical Center, set to commence on October 1, 2024, focuses on comprehensive enhancements to the facility's infrastructure. This project encompasses the construction documents and specifications required for an extensive upgrade of the electronic health record management (EHRM) systems. The initiative aims to elevate operational capabilities, improve service delivery, and ensure compliance with existing regulations and standards within healthcare infrastructure. Key activities involved include the assessment of current systems, the implementation of necessary upgrades, and coordination with various trades to minimize disruption. This structured approach reflects the government's commitment to modernizing healthcare facilities, ensuring they meet current technological and safety standards while efficiently serving veterans. The Wilmington VA Medical Center project is part of a broader trend to enhance healthcare delivery through improved infrastructure across federal medical complexes.
    The Wilmington VA Medical Center is initiating the EHRM Infrastructure Upgrades project, designated as Project No. 460-22-700, with a start date of October 1, 2024. The document outlines the consultants involved in the project, highlighting three key firms: Awen Solutions Group, specializing in architecture and physical security, and IMEG Corp, which provides mechanical, electrical, plumbing, and fire protection engineering, as well as structural engineering services. This consultants directory is a crucial component of the project as it lists the expertise required for the planned infrastructure enhancements aimed at improving the facility's efficiency and security. The project reflects the government's commitment to upgrading healthcare facilities to meet modern standards and serve veterans better while ensuring compliance with applicable regulations.
    The Wilmington VA Medical Center is initiating the EHRM Infrastructure Upgrades project (Project No. 460-22-700) scheduled for October 1, 2024. This comprehensive project targets enhancements across various building systems, ensuring adherence to the Department of Veterans Affairs (VA) VHA Master Specifications. The project's structure encompasses multiple divisions, including general requirements, existing conditions, and mechanical, electrical, and plumbing systems, among others. Key components involve upgrading infrastructure through rigorous planning, demolition, and installation procedures while maintaining quality control and safety standards throughout. Specific attention is paid to environmental protection, including asbestos and lead paint remediation, ensuring thorough compliance with health regulations. Supporting details outline the requirement for collaboration between engineering, architecture, and construction trades to facilitate smooth execution and adherence to specified guidelines. This undertaking underscores the VA's commitment to modernizing facilities to enhance service provision for veterans while prioritizing safety and regulatory compliance throughout the project lifecycle.
    The Wilmington VA Medical Center is initiating the EHRM Infrastructure Upgrades under Project No. 460-22-700, set to commence on October 1, 2024. This project encompasses comprehensive modifications and enhancements across various buildings in the medical center. The documentation includes an extensive list of drawing sheets detailing specifications for structural, mechanical, electrical, and telecommunication upgrades. Key aspects of the project involve the installation of updated systems for fire protection, mechanical infrastructure, and telecommunications. Each building within the complex features specific demolition and installation plans to align with functional requirements and safety regulations. The drawings are categorized by categories such as general notes, architectural details, and security plans, ensuring a structured approach to the upgrades. This undertaking aims to modernize the medical center’s facilities, improving operational efficiency and patient care quality while adhering to government standards and safety measures. The project’s intricate blueprint illustrates the commitment to enhancing the facility's infrastructure, highlighting the pivotal role of meticulous planning in achieving these objectives.
    The Wilmington VA Medical Center's EHRM Infrastructure Upgrades project aims to enhance the facility's infrastructure by executing general construction and alterations while ensuring safety and compliance with VA regulations. The contractor is responsible for site preparation, including the demolition of existing structures and installation of new systems, with continuous operation of the Medical Center prioritized. Compliance with security measures and protocol is essential for all personnel, including obtaining required permissions and identifying badges. Key obligations include maintaining existing utility services and adhering to a phased work schedule to minimize disruptions. The contractor will conduct thorough surveys of existing conditions before and after construction to ensure proper restoration. The project demands strict adherence to safety and environmental controls, with documentation requirements for progress tracking and warranty management. This initiative demonstrates the VA's commitment to improving healthcare facilities, ensuring a functional environment for both patients and staff through meticulous planning and execution of upgrades.
    The Wilmington VA Medical Center's EHRM Infrastructure Upgrades project aims to enhance electronic health records management through a comprehensive project scheduling framework. The contractor is required to develop a Critical Path Method (CPM) plan to coordinate all activities, including those of subcontractors and suppliers. An authorized representative from the contractor must manage the project schedule, and any chosen scheduling consultant must be approved by the Contracting Officer. Monthly updates of the project schedule, including computer-generated reports on activities and costs, must be submitted to the Department of Veterans Affairs (VA) to support progress payments. The schedule must clearly depict tasks, durations, and relationships, while also complying with specific requirements such as sequencing, cost loading, and tracking delays. The contractor is responsible for ensuring timely updates and accuracy of reports, with potential remedial actions required if delays occur. The document underscores the importance of adherence to specified guidelines and procedures to ensure successful project completion within contractual timeframes. This reflects the government's focus on accountability, transparency, and effective management processes in federal RFPs and grants related to construction projects.
    The Wilmington VA Medical Center is undertaking the EHRM Infrastructure Upgrades project. This document outlines the primary requirements for submittals necessary for compliance with the contract specifications. Submittals include preconstruction documents, shop drawings, product data, samples, operation and maintenance data, and test reports. It emphasizes that all submissions must be complete and accurately prepared for timely approval without compromising project timelines. The contractor must maintain a submittal register to track documents, ensuring they are submitted and approved before procurement of materials. The VA retains the authority to approve or disapprove based on compliance with technical specifications. Notably, VA approval does not exempt the contractor from assuming full responsibility for errors or non-compliant materials. Additionally, the contractor must provide operation and maintenance data promptly, with consequences for delays. This structured approach reflects the VA's emphasis on quality assurance and regulatory adherence, integral to government contracts and federal projects.
    The Wilmington VA Medical Center's EHRM Infrastructure Upgrades project emphasizes stringent safety requirements to ensure a safe working environment during construction activities. Key standards from various organizations such as OSHA, NFPA, and ASSE govern safety protocols, accident prevention plans, and personnel training. The document outlines definitions of critical lifts, accident categories, and requirements for accident prevention plans (APPs), which must be site-specific and submitted for approval prior to work commencement. Training protocols for workers, including required certifications and site-specific briefings, are detailed alongside mandatory inspections by qualified personnel. Furthermore, it establishes protocols for infection control crucial to medical environments, addressing dust and debris management, and the maintenance of air quality. Emphasis is placed on fire safety, electrical compliance, fall protection, and safe excavation practices. The comprehensive guidelines aim to ensure worker safety while minimizing risks, adhering to both federal and facility-specific regulations, thereby showcasing the VA's commitment to safety and operational integrity in healthcare-related construction.
    The Wilmington VA Medical Center is initiating EHRM Infrastructure Upgrades under Project No. 460-22-700, set for October 1, 2024. This document outlines the reference standards applicable to the project, emphasizing the importance of adherence to federal specifications and industry standards. The General Services Administration (GSA) has provided a channel for accessing these specifications, and additional details on various organizations responsible for the standards are included. It specifies that free single copies of specified standards can be requested from designated departments, with further copies available for a fee. Numerous professional organizations ranging from the American Society of Civil Engineers to the National Fire Protection Association are listed for obtaining additional specifications not covered in the GSA index. This structured approach ensures that all parties involved in the upgrades comply with established guidelines, reflecting the VA's commitment to high-quality infrastructural developments while ensuring safety and regulatory compliance within federal contracting processes.
    The Wilmington VA Medical Center is implementing quality control measures for the EHRM Infrastructure Upgrades project, designed under Design-Bid-Build (DBB) or Design-Build (DB) frameworks. Key aspects include an established Contractor Quality Control (CQC) system that aligns with federal guidelines, particularly FAR Clause 52.246.12 regarding construction inspection. Contractors must submit a detailed CQC Plan covering all design and construction operations, ensuring compliance through defined roles and responsibilities, procedural controls, and quality assurance testing. The CQC System Manager is accountable for managing quality control, supported by qualified personnel with specific credentials in various disciplines. The document outlines processes for preparatory, initial, and follow-up control phases, establishing rigorous standards for inspections and tests. Furthermore, it emphasizes effective communication, documentation of quality activities, and the importance of correcting deficiencies. This structured approach aims to uphold construction quality and safety while ensuring contractor accountability. Overall, the framework demonstrates the VA's commitment to facilitating a compliant, efficient, and thorough execution of infrastructure upgrades while holding contractors to high standards of performance.
    The Wilmington VA Medical Center is initiating the EHRM Infrastructure Upgrades project, which includes comprehensive materials testing and inspection services essential for construction quality assurance. The document outlines the required accreditation for testing laboratories, mandating compliance with specific ASTM and AASHTO standards across various construction disciplines, including concrete, structural steel, and sprayed-on fireproofing. The testing laboratory must provide inspections, conduct tests, and submit detailed reports to the Resident Engineer, highlighting any materials or workmanship that do not meet contractual specifications. This approach ensures a high standard of safety, compliance, and structural integrity throughout the upgrades. Key points include batch plant inspections for concrete, structural inspections for steel welding, and thorough monitoring of fireproofing applications. Overall, the document serves to enforce rigorous testing requirements and oversight aimed at achieving the project's quality and regulatory objectives.
    The Wilmington VA Medical Center's EHRM Infrastructure Upgrades project outlines the Special Inspections requirements vital for both new construction and renovations. These inspections focus on ensuring compliance with building codes, particularly regarding structural observations, which are mandatory for specific conditions such as high wind speeds and building heights. An independent third party must conduct these inspections to maintain objectivity and quality control, and the contractor is responsible for notifying the government 14 days prior to significant construction phases. Key definitions clarify roles, including the Special Inspector and the Designer of Record, while detailing the qualifications needed for various inspection roles. The document emphasizes that while Special Inspections serve to verify adherence to the contract and codes, they do not replace the contractor's own quality control efforts. A structured responsibilities matrix delineates tasks among the Special Inspectors, Quality Control Managers, and the government, ensuring accountability and clear communication throughout the project's lifecycle. Compliance with comprehensive reporting requirements, including daily and biweekly reports, is critical for documenting the inspection process and any identified discrepancies. Overall, the document aims to uphold high-quality standards and safety in the construction project while ensuring effective oversight by relevant authorities.
    The Wilmington VA Medical Center is undertaking the EHRM Infrastructure Upgrades project, emphasizing temporary environmental controls to prevent pollution and manage environmental impacts during construction. The Contractor is required to implement measures for air, water, and land protection, covering aspects such as noise control, waste management, and pollution prevention. Definitions of pollutants, including chemical waste and solid waste, are specified to ensure clear compliance standards. Key submittals include an Environmental Protection Plan that outlines responsibilities, regulatory compliance, and strategies for protecting natural and cultural resources. The document mandates that construction activities must preserve existing land features and protect water and air quality from pollution. Additionally, there are strict noise regulations to minimize disturbances. In the event of property damage caused during the project, the Contractor must restore the affected areas without additional costs to the government. A final clean-up procedure is also required upon project completion. This document reflects the federal government's commitment to environmental stewardship while executing infrastructure improvements, aligning with broader regulatory compliance and safety objectives.
    The Wilmington VA Medical Center's project for EHRM Infrastructure Upgrades focuses on the implementation of temporary interior signage as part of the facility modifications. This section outlines specifications for temporary signs, which are to be made from a durable mat finish white paper, measuring 100 mm by 300 mm. Each sign includes a reinforced hole for attachment with steel wire ties and is designed for easy identification of rooms based on designated floor plans. The installation procedures require signs to be affixed to door frames or knobs at corridor openings, using clear markings for legibility. Specific guidelines are provided regarding sign placement, with exclusions for certain door types, such as cross-corridor barriers and closet doors. Additionally, the document emphasizes the need to replace any missing or damaged signage to ensure continuous identification across the upgraded infrastructure. Overall, this section contributes to operational clarity within the medical center during the construction and upgrade phases, highlighting compliance with health and safety protocols.
    The Wilmington VA Medical Center's EHRM Infrastructure Upgrades project includes a comprehensive Construction Waste Management plan aimed at minimizing non-hazardous construction and demolition waste. The primary objective is to divert as much waste from landfills as possible through strategies such as recycling, salvaging, and reusing materials. Contractors must develop a Waste Management Plan detailing waste reduction techniques, separate recyclables, and manage items including soil, metals, and plastics effectively. A minimum diversion rate of 50% is mandated, with comprehensive reporting on waste management efforts required. The document outlines that contractors are responsible for legal disposal and must ensure compliance with relevant regulations. They are also instructed to maintain records quantifying waste generated, recycled, or disposed of, thus emphasizing sustainable practices in construction. This initiative reflects the government's commitment to environmentally responsible construction and aligns with federal guidelines and sustainability standards.
    The Wilmington VA Medical Center's EHRM Infrastructure Upgrades project intends to implement comprehensive commissioning requirements to ensure building systems function as per design specifications. The commissioning process involves the verification and testing of various systems, including mechanical, electrical, and fire safety, with emphasis on operational efficiency and maintenance accessibility. Responsibilities are clearly defined among key stakeholders, including the VA, contractors, and the Commissioning Agent. This structured approach ensures effective communication, training, and troubleshooting throughout the construction and post-occupancy phases. The project aims to document all commissioning activities and outcomes, aligning with the VA's operational needs and regulatory standards. Overall, it demonstrates the VA’s commitment to enhancing facility performance through systematic assessment and integration of multiple building systems while ensuring safety, functionality, and compliance.
    The Wilmington VA Medical Center is initiating EHRM Infrastructure Upgrades, specifically focused on demolition and removal of structures as part of Project No. 460-22-700. The document outlines detailed protocols for safe demolition, emphasizing the need to protect personnel and adjacent properties, while complying with environmental and safety regulations. Key procedures include the management of asbestos and lead-based paint removal, ensuring safety through barricades and dust control, and properly disposing of materials. Demolished materials become the contractor's property, which must be legally disposed of away from the site. The contractor is also responsible for maintaining site cleanliness and ensuring safety measures, such as access to fire hydrants and fire extinguisher readiness. Overall, the project aims to facilitate a smooth demolition process while maintaining compliance with federal, state, and local regulations, ultimately contributing to the infrastructure upgrades at the medical center.
    The Wilmington VA Medical Center is initiating a project for Traditional Asbestos Abatement as part of the EHRM Infrastructure Upgrades. The document outlines the responsibilities and requirements of asbestos abatement contractors, emphasizing compliance with federal, state, and local regulations. Key components of the project include the removal, encapsulation, and disposal of asbestos-containing materials (ACM) within designated regulated areas, while ensuring minimal disruption to ongoing facility operations. Contractors must adhere to strict safety protocols, including respiratory protection standards and worker training certifications, to ensure a safe work environment for personnel. The abatement process necessitates detailed planning, including pre-abatement inspections, emergency action plans, and procedures for mitigating airborne asbestos released during operations. Documentation, such as Certificates of Compliance and waste shipment records, is essential for regulatory accountability. This project reflects the VA's commitment to maintaining safe facilities by addressing hazardous materials in accordance with legal and health standards, ensuring the well-being of both workers and patients throughout the abatement process. Comprehensive monitoring and documentation processes are integral to uphold safety measures and regulatory compliance in the execution of the abatement tasks.
    The Lead-Based Paint Removal and Disposal documentation outlines the procedures and requirements for safely abating lead-based paint (LBP) at the Wilmington VA Medical Center as part of the EHRM Infrastructure Upgrades project. It specifies the areas with confirmed lead contamination, engineering controls for limiting exposure, and the requisite compliance with local, state, and federal regulations. Key components include monitoring airborne lead concentrations, establishing lead control areas, and employing certified personnel for oversight. The document mandates a comprehensive training program for workers handling lead and stipulates the need for medical examinations where applicable. It emphasizes the use of protective equipment, decontamination procedures, and clear operational boundaries to prevent lead exposure. Amidst stringent cleanup and disposal protocols, waste handling must align with hazardous waste regulations, with proper documentation and certifications required. The structured approach ensures that all safety measures are in place to protect both workers and the environment, underscoring the project's commitment to compliance and health standards during renovations. This specification is vital for maintaining safety and facilitating responsible lead abatement practices in the healthcare facility.
    The Wilmington VA Medical Center's EHRM Infrastructure Upgrades project encompasses specifications for cast-in-place structural concrete, detailing materials, testing, and procedures necessary for construction. Key points include the requirement for various concrete mix designs, regulatory compliance with the American Concrete Institute (ACI) standards, and strict tolerances for placement and finishing. The document outlines the roles of testing agencies, submittal requirements, and related work specifications linked to this project's construction phase. Emphasis is placed on sustainable practices, defined testing methods, and monitoring systems to ensure quality finishes. The appropriate handling of aggregates, the use of admixtures, and specifications for curing methods highlight a comprehensive approach to concrete placement. Additionally, the execution section details requirements for reinforcing, vapor barriers, and expansion joints, emphasizing quality assurance throughout the process. This document serves as a guideline for contractors to uphold structural integrity and compliance with all relevant standards during the upgrades.
    The Wilmington VA Medical Center is proposing infrastructure upgrades as part of the EHRM Infrastructure Upgrades project (Project No. 460-22-700), scheduled for October 1, 2024. This document outlines specifications for structural steel framing, detailing the materials, applicable codes, and construction standards required for the project. Key sections include the types of materials (e.g., W-shapes, plates, bolts) and standards from organizations such as the American Institute of Steel Construction (AISC) and American Welding Society (AWS). It emphasizes quality assurance through testing and certification of products, including steel and welding materials, and mandates documentation of compliance for recycled content in materials used. Additionally, the erection of structural steel is to follow strict tolerances and guidelines to ensure safety and structural integrity. The comprehensive details aim to guarantee that the construction meets regulatory standards while promoting sustainable practices and minimizing environmental impacts. Overall, the file serves as a critical component of a federal RFP, outlining essential requirements for contractors engaged in the project while ensuring adherence to safety and design standards.
    The Wilmington VA Medical Center is initiating a project focused on EHRM Infrastructure Upgrades, specifically outlining the requirements for steel decking installation outlined in Project No. 460-22-700. This section covers the specifications necessary for single pan and corrugated metal decks that will serve as concrete-filled roof substrates. Relevant standards from the American Iron and Steel Institute, American Welding Society, ASTM International, and the Steel Deck Institute are referenced to ensure compliance during construction. Key elements include material specifications, structural integrity, wind uplift resistance, fire resistance standards, and sustainable construction requirements, including a minimum recycled content of 30 percent for steel. Detailed submission requirements revolve around providing drawings and product data for review, ensuring quality assurance through certified welding techniques, and implementing post-installation warranty measures. The document prioritizes coordination with structural framing elements to prevent overloading and ensure accurate installation while detailing procedures for preparation, erection, and reinforcement as necessary. This summary encapsulates the overarching goals of adherence to specifications and standards to promote safety, sustainability, and functionality in the VA Medical Center's infrastructure upgrades.
    The Wilmington VA Medical Center is planning infrastructure upgrades under the EHRM Infrastructure Upgrades project. This specific section addresses the installation of cold-formed metal framing, detailing the necessary materials and design requirements for creating an exterior non-load-bearing steel stud curtain wall. Key design requirements include adhering to industry specifications for strength, load resistance (gravity, wind, and seismic), and accommodating temperature changes and structural deflections. The document outlines specific submittals required from contractors, emphasizing sustainable construction practices, such as identifying recycled materials used in the project. It references industry standards from the American Iron and Steel Institute and ASTM for framing materials and accessories, ensuring compliance with best practices. Furthermore, the execution plan specifies precise fabrication and erection methods to ensure structural integrity, alignment, and adherence to tolerances throughout the construction process. Attention to details like anchoring, welding standards, and load distribution is emphasized, alongside provisions for field repairs of materials. Overall, this section is integral to achieving a resilient, compliant, and sustainable upgrade to the Wilmington VA Medical Center's infrastructure.
    The Wilmington VA Medical Center's EHRM Infrastructure Upgrades project focuses on the installation of rough carpentry components, such as wood blocking, framing, sheathing, and related construction materials. This document outlines specifications, submittals, and quality assurance requirements for lumber and wood products to be used in the project. Key standards emphasize the need for grade-marked materials and compliance with relevant American and military specifications. The guidelines also stipulate proper delivery, storage, and handling practices to prevent damage or deterioration of wood products. Important sections detail installation methods and fastener requirements for framing, ensuring structural integrity. With a minimum experience requirement of three years for installers, the project aims to enhance the medical center's infrastructure with high-quality materials and stringent oversight, reflecting the government's commitment to maintaining safe and efficient health facilities. Overall, this specification serves as a comprehensive guide for contractors to follow during the construction process, ensuring compliance with federal standards.
    The Wilmington VA Medical Center is initiating the EHRM Infrastructure Upgrades project, focusing on the commissioning of facility exterior closure systems. The commissioning process, which the contractor must execute, will be overseen by a Commissioning Agent appointed by the VA. This document outlines the requirements for the commissioning of various building systems as defined in the General Commissioning Requirements. It specifies the need for construction inspections, pre-functional checklists, contractor tests, performance testing, and training for VA operation and maintenance personnel. Key submittal processes need to be followed to ensure proper review and approval from the Commissioning Agent and VA before proceeding with installations. This project reflects the VA’s commitment to improving operational efficiency and compliance through a structured commissioning approach, ensuring that all systems are tested, documented, and staff trained effectively before project completion.
    The Wilmington VA Medical Center is initiating infrastructure upgrades, specifically focusing on sheet waterproofing for the building envelope in new construction. The document outlines required materials and procedures, emphasizing quality control through mandatory approval from the Contracting Officer's Representative (COR) for proposed manufacturers. Submittals include product data, installation instructions, and waterproofing test reports to ensure materials meet specified standards. The primary waterproofing product is a non-reinforced rubber sheet and a laminated asphalt sheet, both designed to be impermeable and resistant to environmental factors. Additionally, it highlights storage conditions, warranties extending to two years, and the importance of following federal specifications for building paper. Execution guidelines necessitate preparation of surfaces and specific installation techniques including adhesive application and proper sealing. The protocol aims to ensure a durable waterproofing system, essential in maintaining the integrity of the building's infrastructure. These directives serve the overall goal of enhancing the facility’s defenses against water intrusion, which is vital for safety and long-term maintenance of the medical center.
    The Wilmington VA Medical Center is undertaking the EHRM Infrastructure Upgrades project, which includes critical enhancements to the waterproofing systems of the facility, specifically implementing modified bituminous sheet waterproofing. This project specifies the installation process, materials, and quality assurance measures required for effective split slab waterproofing. Key steps include preinstallation meetings, detailed product specifications, and quality checks to ensure materials meet compliance standards. It mandates a warranty period of 10 years for material and workmanship defects, emphasizing the importance of installation under dry weather conditions and a temperature threshold prior to application. The document outlines specifications for various components like adhesives, primers, and protection materials, ensuring that all products come from a single manufacturer to maintain standards. Field quality control measures include extensive testing for leaks with a water head pressure test prior to covering the work. The comprehensive guidelines aim to protect existing structures and ensure the project meets safety and regulatory standards. This document is integral to ensuring reliable execution and compliance within the context of federal RFPs and grant processes, reflecting the ongoing commitment to maintaining the integrity of VA facilities.
    The Wilmington VA Medical Center is initiating infrastructure upgrades for the EHRM project, focusing on thermal insulation installations. This section outlines the comprehensive requirements for thermal and acoustical insulation, specifying materials such as batt insulation for exterior walls and semi-rigid insulation for interior partitions. It highlights adherence to various ASTM standards for insulation products, ensuring suitability and compliance. Key aspects include submittal procedures for product data, sustainable construction practices that address recycled content and low pollutant emissions, as well as delivery and storage guidelines for the insulation products. Furthermore, it stipulates installation practices aimed at minimizing voids and ensuring effective thermal and acoustic performance, along with necessary protective measures during construction. The document emphasizes stringent quality and warranty requirements to ensure alignment with federal construction standards, reflecting the government's commitment to effective facility upgrades. This upgrade project signifies an investment in improving healthcare infrastructure while adhering to environmental and safety protocols.
    The Wilmington VA Medical Center is initiating the EHRM Infrastructure Upgrades project, specifically focusing on roof and deck insulation as outlined in Project No. 460-22-700. This section emphasizes the installation of insulation on new metal deck substrates and the repair of existing roof insulation. Key specifications include compliance with numerous ASTM standards, which dictate the quality and fire resistance of materials used. The project requires submittals for shop drawings and qualifications to ensure proper installation. Insulation performance must meet minimum thermal resistance (R-value) standards, supported by eco-friendly practices such as using products with recycled or bio-based materials. The document outlines installation processes, including examination and preparation of substrates, secure fitting techniques, and proper sealing methods to prevent moisture intrusion. An important inclusion is the warranty provisions covering both construction and materials, ensuring long-term reliability. This upgrade reflects the VA's commitment to enhancing facility safety, efficiency, and compliance with regulatory standards, highlighting a holistic approach to infrastructure development.
    The Department of Veterans Affairs (VA) is issuing a presolicitation notice for the construction of EHRM Infrastructure Upgrades at the Wilmington VA Medical Center (VAMC) in Delaware. This project requires a general contractor to provide all necessary labor, materials, and supervision, with a budget range between $10,000,000 and $20,000,000, under a Firm-Fixed-Price contract. The solicitation will be a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, meaning only bids from SDVOSB entities will be considered. The anticipated issuance of the solicitation is in August 2025, and the work is expected to be completed within approximately 365 days. The point of contact for inquiries is Contract Specialist Melissa Waddell, who will handle written questions via email. This presolicitation signifies the VA's commitment to upgrading its facilities and improving services for veterans, complying with federal competitive bidding regulations.
    The solicitation pertains to the Wilmington VA Medical Center’s EHRM Infrastructure Upgrades project, with an estimated construction value between $10 million to $20 million. It is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The project involves complete site preparation, including demolition and labor, in accordance with provided specifications. Proposals must be submitted electronically by August 22, 2025, with specific requirements for bid guarantees and performance bonds outlined. Bidders must comply with various regulations, including submission of technical questions and attendance at a mandatory pre-bid site visit. All documentation, including representations and certifications, must be completed accurately to avoid disqualifications. The successful bidder will assist with background investigations for personnel and adhere to strict timelines for the project’s commencement and completion. This solicitation exemplifies the federal government's effort to ensure competitive bidding while supporting small veteran-owned businesses in securing government contracts for construction projects.
    The document outlines the final bid documents for the EHRM Infrastructure Upgrades project at the Wilmington VA Medical Center. It details the planned enhancements for mechanical, electrical, plumbing, fire protection, and technological systems across multiple floors of the facility. The project’s focus is on ensuring compliance with various codes and standards, including VA directives, NFPA codes, IBC, and NEC, emphasizing the importance of safety and functionality. Contractors are tasked with demolishing existing structures as necessary, to facilitate new installations, while following strict guidelines to minimize disruption and maintain safety during construction. The document serves as a comprehensive guide for contractors to understand the project scope, specific requirements, and standards for successful execution, reflecting the VA's commitment to advancing healthcare infrastructure.
    The VAAR 852.219-75 outlines the certification process for contractors regarding compliance with limitations on subcontracting for services and construction contracts involving Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and Veteran-Owned Small Businesses (VOSBs). Offerors must certify that they will not subcontract more than 50% for services, 85% for general construction, and 75% for special trade construction to firms that are not certified SDVOSBs or VOSBs. Costs for materials are excluded from these percentages. The document emphasizes the importance of accurate certifications and the potential legal repercussions for false claims under Title 18, U.S. Code, Section 1001. Contractors may be required to provide documentation to demonstrate compliance, and failure to do so may lead to remedial actions from the VA. The offeror must complete and sign the certification, which is a prerequisite for bid consideration. This stipulation ensures that contracts support veteran-owned businesses and fosters compliance with established federal regulations.
    The document outlines the General Decision Number DE20250008 for construction projects in New Castle County, Delaware, specifying wage rates required under the Davis-Bacon Act and applicable Executive Orders for covered contracts. It details minimum wage rates for various classifications of labor, including the necessity of annual adjustments, and provides instructions for appeals related to wage determinations. Additionally, the document addresses worker protections and obligations for contractors concerning sick leave and classification requests.
    The Department of Veterans Affairs (VA) is seeking to implement infrastructure upgrades as part of the EHRM Infrastructure Upgrades project at the Wilmington VA Medical Center. This procurement involves a firm-fixed-price contract for specific construction materials and systems, uniquely standardized throughout the facility, necessitating an exception to full and open competition. Key components include security systems (Avigilon), access control (Bosch, Lenel On Guard), building automation (Johnson Controls International), fire alarm systems (Notifier by Honeywell), and locksets (Best Locksets). The justification for this approach centers on interoperability and functionality, indicating that using alternative brands would lead to operational incompatibilities and increased costs. The procurement will be tailored for Service-Disabled Veteran-Owned Small Businesses, and market research performed confirms compliance with the Buy American Act. The overarching goal is to enhance security and efficiency in the Wilmington VAMC while mitigating unnecessary fiscal duplication and maximizing operational integrity.
    The VHA Directive 1013(1) outlines the policy for preventing and controlling seasonal influenza for Veterans Health Administration (VHA) personnel through vaccination. Issued on August 12, 2020, with updates in October 2020, it emphasizes the importance of influenza vaccination for both patients and healthcare personnel (HCP) to diminish morbidity and mortality. It delivers key updates on definitions, documentation requirements, and guidance for managing vaccine administration and adverse events. The directive mandates a comprehensive vaccination program, detailing the responsibilities of various VHA leadership roles—from the Under Secretary for Health to local VA facility directors—ensuring compliance and adequacy of resources related to vaccine distribution. It requires informed consent, documentation procedures, training for healthcare staff, and the management of records according to federal standards. There is a specific focus on prioritizing vaccination efforts during shortages and involves communication with affected stakeholders. The directive serves as a crucial guideline for the VHA's approach to influenza vaccination, reflecting its commitment to both patient and employee health. This document functions within the context of government compliance and public health initiatives, aligning with CDC recommendations and federal health mandates.
    The project, identified as "Construct EHRM Infras Upgrades," located in Wilmington, DE, focuses on establishing efficient project management and coordination through a web-based software platform. This document outlines the necessary administrative provisions for managing construction operations and emphasizes collaboration among contractors, the owner, and architects. Key components of the web-based project management system include tracking project communications (such as RFIs and change orders), document management, access control for different entities, and mobile compatibility. Additionally, user licenses and software training will enhance collaboration and functionality, ensuring that all parties can effectively engage with the system. Upon project completion, a digital archive will be provided to the architect in a secure and unalterable format. This initiative reflects the government's commitment to streamlining construction project management and fostering effective communication among all stakeholders involved in federal and local RFP processes.
    Similar Opportunities
    Y1DA--516-21-106 EHRM Infrastructure Upgrades Construction - Bay Pines VAMC
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the EHRM Infrastructure Upgrades Construction project at the Bay Pines VA Medical Center in Florida. This procurement, identified by solicitation number 36C77625B0023, involves construction services aimed at enhancing the electronic health record management infrastructure, with a total estimated contract value of approximately $34,888,000. The project is particularly significant as it supports the modernization of healthcare facilities for veterans, ensuring improved service delivery. Interested parties, especially Service-Disabled Veteran-Owned Small Businesses, should direct inquiries to Contract Specialist Thomas Council at Thomas.Council@va.gov, with bids having been opened on November 12, 2025, following the issuance of the solicitation on July 2, 2025.
    Y1DZ--EHRM Infrastructure Upgrades Tier 1 Construction 695-21-700 Milwaukee
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking proposals for the EHRM Infrastructure Upgrades Tier 1 Construction project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. This project involves a single firm-fixed-price contract for design-bid-build infrastructure improvements, including electrical upgrades, HVAC assessments, communication infrastructure enhancements, and physical security upgrades across multiple buildings on the campus. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and is anticipated to be issued in early to mid-January 2026, with a performance period of approximately 1,460 calendar days and an estimated construction magnitude between $50 million and $100 million. Interested parties should direct all inquiries to Contract Specialist Bailey Donato at bailey.donato@va.gov.
    Z1DA--648-24-701 EHRM Infrastructure Upgrades Phase 2 Construction - Portland, OR
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is preparing to solicit bids for the Design-Bid-Build EHRM Infrastructure Upgrades Phase 2 project at the Portland VA Health Care System, which encompasses significant construction and infrastructure enhancements in Portland, OR, and Vancouver, WA. The project requires contractors to assess existing conditions, perform demolition, and provide comprehensive labor, materials, and supervision across various disciplines, including civil, plumbing, mechanical, electrical, and electronic work. This initiative is crucial for upgrading the facility's infrastructure, including fiber optic installations, HVAC systems, and fire safety measures, ensuring improved operational efficiency and safety for veterans. The solicitation, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), will be issued as an Invitation for Bid (IFB) in late October 2025, with an estimated construction value between $5 million and $10 million and a performance period of approximately 365 days. Interested parties can direct inquiries to Contract Specialist Sierra Tate at Sierra.Tate@va.gov or by phone at 216-447-8300.
    Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Springs
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the EHRM Tier 2 Data Center Construction project located at the West Texas VA Health Care System in Big Spring, Texas. This procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, requiring contractors to provide all necessary tools, equipment, materials, labor, and supervision to complete the renovation within 225 calendar days. The project is crucial for enhancing the data management capabilities of the VA, with an estimated cost between $5,000,000 and $10,000,000. Interested bidders must submit their proposals electronically by January 8, 2026, at 12:00 PM EST, and can direct inquiries to Contract Specialist Devin M. Russell at devin.russell@va.gov.
    Y1BG--Brooklyn EHRM Infrastructure Upgrades Construction VA Medical Center Brooklyn, NY 630A4-22-700
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking bids for a firm-fixed-price contract for the EHRM Infrastructure Upgrades construction project at the Brooklyn VA Medical Center in New York. The project entails comprehensive site preparation, including demolition and removal of existing structures, and the provision of labor and materials for various infrastructure upgrades, such as electrical systems, HVAC, communication infrastructure, and physical security enhancements. This initiative is critical for modernizing the facility's capabilities and ensuring efficient operations within the healthcare system. The solicitation, set to be issued in January 2026, is designated as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with an estimated construction magnitude between $20 million and $50 million. Interested parties should direct inquiries in writing to Kara Evert at kara.evert@va.gov, as phone calls will not be accepted.
    Z1DA--Renovate Pharmacy for USP800 Compliance Project 540-18-102
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking bids for the "Renovate Pharmacy for USP800 Compliance Project 540-18-102" at the Louis A. Johnson VA Medical Center in Clarksburg, West Virginia. This project involves comprehensive construction services to ensure the pharmacy meets USP 800 compliance standards, requiring the contractor to provide all necessary labor, materials, equipment, permits, and supervision over a performance period of 496 calendar days. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $2,000,000 and $5,000,000. Interested parties must submit questions in writing to Contracting Officer Rebecca Besten at rebecca.besten@va.gov, and the response deadline for bids is January 7, 2026, at 3 PM Eastern Time, with the solicitation anticipated to be issued on or about January 20, 2026.
    Y1DA--Project 549A4-21-703 EHRM Training and Admin build
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the EHRM Training and Admin Support Space project (Project Number 549A4-21-703) at the Sam Rayburn Memorial Veterans Center in Bonham, Texas. This project involves the renovation of four rooms to create temporary EHRM classrooms and an office, including asbestos abatement, interior demolition, and installation of new HVAC equipment and finishes. The procurement is set aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSBC) under NAICS code 236220, with a contract value estimated between $500,000 and $1 million. Interested contractors must submit their proposals by January 15, 2026, and can contact Contract Specialist Jose Reveles at jose.reveles@va.gov for further information.
    NEW | 549-22-800 Replace Windows Building 2J
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the replacement of windows in Building 2J at the Dallas VA Medical Center. This project, valued between $5,000,000 and $10,000,000, requires the contractor to provide all necessary labor, materials, and supervision to replace operable and non-operable windows, skylights, and atrium windows, ensuring compliance with current energy efficiency standards and building codes. The work is critical for maintaining the operational integrity of the medical facility while adhering to stringent safety and infection control protocols due to the continuous occupancy of patient care areas. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSB) must submit proposals via email by January 14, 2025, with a site visit scheduled for December 17, 2025, and questions accepted until January 6, 2026. For further inquiries, contact Nicholas L. Smith at nicholas.smith21@va.gov or Rhonda Richardson at rhonda.richardson5@va.gov.
    Y1DA--589-703 Construct Addition and Renovate Community Living Center, Building 60 (VA-24-00028736)
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking contractors for the construction of an addition and renovation of the Community Living Center, Building 60, under project VA-24-00028736. This procurement aims to enhance facilities for veterans, aligning with the VA's mission to improve care and living conditions. The estimated project cost is approximately $24.4 million, with bids received ranging from $18 million to nearly $20 million, emphasizing a competitive bidding process. Interested parties should contact Contract Specialist Joshua Slapnicker at joshua.slapnicker@va.gov, and note that responses to the solicitation must be submitted by the specified deadline, with all bids archived 90 days afterward.
    Z2DA--674A4-22-254 - CON CTX Consolidate Engineering Bldg. 17 (VA-26-00003326)
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the project titled "Z2DA--674A4-22-254 - CON CTX Consolidate Engineering Bldg. 17," which involves the reconfiguration and renovation of the old laundry facility at the Waco VA Medical Center in Texas. The project aims to convert the facility into offices and shops for engineering tradesmen, administrative, and professional staff, requiring comprehensive work on electrical, mechanical, plumbing, IT, and other systems. This procurement is significant as it supports the operational needs of the Central Texas Veterans Health Care System, with a contract value estimated between $5 million and $10 million. The solicitation is set to be released on or about November 28, 2025, and is exclusively reserved for Service-Disabled Veteran-Owned Small Businesses. Interested parties can contact Contract Specialist Stephanie Ingersoll at stephanie.ingersoll@va.gov or (210) 883-5654 for further information.