Orlando Executive Airport Air Traffic Control Tower Slatwall/Consoles Design, Fabrication, Delivery and Installation
ID: 697DCK-25-R-00069Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL AVIATION ADMINISTRATION697DCK REGIONAL ACQUISITIONS SVCSFORT WORTH, TX, 76177, USA

NAICS

Office Furniture (except Wood) Manufacturing (337214)

PSC

OFFICE FURNITURE (7110)
Timeline
    Description

    The Department of Transportation, through the Federal Aviation Administration (FAA), is seeking qualified small businesses to design, fabricate, deliver, and install a slatwall/consoles system at the Orlando Executive Airport Air Traffic Control Tower. The project aims to modernize the existing equipment by replacing it with modular slat-wall style consoles that ensure durability and efficiency for continuous use in a high-demand environment. This procurement is critical for enhancing operational efficiency and safety at the airport, with a performance deadline set for December 17, 2025. Interested vendors must submit their proposals by the specified deadline and direct any inquiries to Hector L. De Jesus at hector.l.de.jesus@faa.gov or call 404-305-5883.

    Point(s) of Contact
    Files
    Title
    Posted
    The document is an amendment to a government solicitation regarding the Orlando Executive Airport Air Traffic Control Tower project, specifically for the design, fabrication, delivery, and installation of slatwall/consoles. The amendment, identified as 0001, addresses vendor questions and provides clarifications related to the statement of work. The amendment emphasizes the importance of acknowledging the receipt of this document prior to the specified deadline, as failure to do so may result in the rejection of offers. Additionally, it incorporates essential documents, including responses to vendor inquiries and a power drawing for the airport control tower positions. The amendment maintains that all other terms and conditions from the original solicitation remain unchanged and in full effect. The contracting officer, Hector De Jesus, is responsible for the document's authorization, highlighting a structured process of communication and clarification in the procurement cycle.
    This document comprises Amendment 0001 for the Orlando Executive Airport's project concerning the design, fabrication, delivery, and installation of air traffic control tower slatwall and consoles. It outlines responses to bidder inquiries regarding site accessibility, project specifications, and requirements. Notably, there will be a singular mandatory site visit on January 22, 2025, allowing bidders to assess existing conditions within the operational tower under certain access restrictions. A subsequent post-award site visit will be coordinated to confirm specific conditions. Key electrical and plumbing work details are provided, such as the connection of utilities and circuits for operational needs. Specifications for materials like raised flooring and plexiglass are addressed, indicating acceptable alternatives to the originally suggested materials. The expected delivery date for the consoles is estimated for early August 2025. In summary, the document clarifies project scopes, timelines, and material specifications critical for prospective bidders under the FAA's jurisdiction, ensuring transparency and preparedness for the bidding process.
    The Orlando Executive Airport Air Traffic Control Tower (ATCT) is undertaking a modernization effort through the Tower Facilities Improvement Program, which includes replacing its existing equipment consoles with new slatwall-style consoles. The scope of work encompasses the design, demolition, fabrication, and installation of these new consoles, alongside associated electrical and plumbing modifications. Key components of the project include a raised floor for the supervisor's area, updated convenience units, and the integration of modern task lighting and equipment mounting features. The contractor is tasked with managing the transition plan to maintain air traffic operations during installation, coordinating closely with FAA personnel for electrical work and equipment removal. A phased approach to installation is outlined, with specific milestones and deliverables for design submissions, mock-ups, and installation planning. Quality control and safety plans are mandated, alongside warranties for various components. This initiative demonstrates the FAA's commitment to enhancing operational efficiency and safety at the Orlando Executive Airport.
    The ORL Equipment List outlines required equipment for operational readiness, specifying quantities and types necessary for various functions. Key items include 5 IVSR TED units, 5 IVSR speakers, and multiple specialized controls such as IVSR jackboxes and remote alarms. Among other equipment, the list includes displays and interfaces like monitors and keyboards for systems such as TAMR and ASOS, as well as administrative tools like an administrative laser printer and various storage options. It also notes specific installation requirements, indicating certain items will not be relocated after mounting. The comprehensive equipment listing is designed to support operational functions efficiently, emphasizing the allocation and organization of resources needed for effective government operations. The document's structure categorizes equipment based on function and installation, showing a clear plan to enhance performance and streamline workflows consistent with federal and local operational standards.
    The document is a wage determination issued by the U.S. Department of Labor under the Service Contract Act, specifically Wage Determination No. 2015-4553. It outlines minimum wage rates and fringe benefits applicable to federal contracts in specific Florida counties (Orange, Osceola, and Seminole) for 2025. Contractors must comply with wage rates prescribed by Executive Orders 14026 and 13658, depending on contract dates and renewals, mandating at least $17.75 or $13.30 per hour, respectively. The document lists numerous occupations with corresponding wage rates, highlighting positions in administrative support, automotive service, healthcare, and food preparation, among others. It stipulates additional benefits such as health and welfare allowances, vacation, and sick leave requirements under Executive Order 13706. Additionally, it includes provisions for uniform allowances and hazardous pay differentials for specific job roles involving high-risk tasks. The purpose of this wage determination is to ensure fair labor practices and compliance with federal labor laws in government contract work. It serves as a critical guide for contractors and workers to understand their rights and obligations within the framework of federal contracts.
    The document outlines the configurations for six distinct circuits and a raised floor area, integral to a proposed project. Each circuit appears to correspond to specific areas or systems, potentially linked to infrastructure development or technological upgrades. The mention of a raised floor suggests a focus on managing electrical wiring or ventilation, indicating a technological or industrial context. The document likely serves as a preliminary specification for contractors responding to an RFP regarding substantial environmental or structural modifications, emphasizing the physical layout's importance in project planning. The precise articulation of “Circuit” labels and the “Raised Floor” design implies meticulous attention to electrical and structural systems, necessary for compliance and efficiency in subsequent phases of development. Overall, this file appears to function as a technical outline crucial for guiding bids and ensuring potential vendors understand the project's infrastructure requirements.
    The document outlines a Request for Proposal (RFP) issued by the Federal Aviation Administration (FAA) for the design, fabrication, delivery, and installation of a consoles/slatwall system at the Orlando Executive Air Traffic Control Tower. The project is set to commence on March 15, 2025, with a performance deadline of December 17, 2025, highlighting the importance of timely execution. Key components include compliance with labor standards and wage determinations, adherence to various federal contract clauses, and the necessity for contractors to ensure employment eligibility verification through the E-Verify system. Additional stipulations mandate strict protocols around the management of government property and records, ensuring environmental compliance, and the prohibition of certain products and technologies linked to foreign entities like Kaspersky Lab and ByteDance. The RFP emphasizes the expectation of quality workmanship and regulatory adherence, while also ensuring that the awarded firm provides all necessary resources and documentation in alignment with federal contracting guidelines. This procurement initiative reflects the FAA's commitment to operational efficiency and safety enhancements at air traffic control facilities.
    Similar Opportunities
    697DCK-25-R-00133 FLL ASR Trolley Hoist Replacement Project
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking proposals for the Trolley Hoist Replacement Project at the Ft. Lauderdale ASR Radar Site in Davie, Florida. The project requires the contractor to provide all necessary labor, tools, equipment, materials, and supervision to replace the trolley hoist, adhering to specific safety and operational standards outlined in the Statement of Work. This procurement is crucial for maintaining the operational efficiency and safety of FAA facilities, with an estimated contract value between $25,000 and $50,000. Interested small businesses must submit their proposals by February 21, 2025, and can direct inquiries to Regina Singleton at regina.singleton@faa.gov.
    Basic Ordering Agreements (BOA) for Design/Build (D/B) and Bid/Build (B/B) Services
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking to establish Basic Ordering Agreements (BOA) for Design/Build (D/B) and Bid/Build (B/B) services related to Air Traffic Control (ATC) facilities across the United States. The FAA intends to add up to five qualified contractors to these agreements, which will facilitate various construction and modernization projects essential for maintaining and enhancing the National Airspace System (NAS). This procurement is critical for ensuring the safety and efficiency of air traffic operations, with projects potentially valued at $50 million or more. Interested vendors must submit their proposals by February 14, 2025, and direct any inquiries to Katherin Fogle at katherine.fogle@faa.gov.
    Replacement of Door in Albuquerque, New Mexico
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking qualified contractors for the replacement of Control Room Double Doors at the Albuquerque Air Route Traffic Control Center in New Mexico. The project requires contractors to provide all necessary engineering, materials, labor, and supervision to complete the work in accordance with the attached Statement of Work (SOW) and relevant safety standards. This initiative is part of the FAA's commitment to maintaining secure and functional aviation control facilities, with a project budget estimated between $25,000 and $50,000, and is designated as a 100% Small Business Set-Aside. Proposals must be submitted via email by February 3, 2025, with questions directed to Haylee Hildebrand at haylee.p.hildebrand@faa.gov by January 22, 2025.
    Roof replacement at MFE ATCT (McAllen, TX)
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is soliciting proposals for a roof replacement project at the McAllen Air Traffic Control Tower (MFE ATCT) in Texas. The project involves extensive civil, mechanical, and architectural work, including the replacement of roof membranes, HVAC units, and lead paint abatement, all to ensure the structural integrity and safety of the facility. This initiative is part of a broader commitment to maintaining critical infrastructure within the National Airspace System, with an estimated contract value between $1 million and $5 million. Interested contractors must be registered in the System for Award Management (SAM) and adhere to the small business size standard, with key deadlines including a mandatory site visit on December 17, 2024, and proposal submissions due by January 27, 2025. For further inquiries, contact Elisha Distler at elisha.distler@faa.gov or call 817-222-4196.
    Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is soliciting proposals for the construction of a new Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facility at Ted Stevens International Airport in Anchorage, Alaska. This project aims to enhance air traffic management capabilities by replacing outdated facilities and ensuring compliance with modern safety and operational standards. The estimated construction cost ranges from $100 million to $200 million, reflecting the project's significance in improving aviation infrastructure in the region. Interested vendors must submit proposals by 3:00 PM PT on January 31, 2025, and can direct inquiries to Katherine Fogle at katherine.fogle@faa.gov.
    Fire Life Safety at EVV ATCT in Evansville, Indiana
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is seeking qualified contractors for a fire life safety upgrade at the Evansville Air Traffic Control Tower (ATCT) in Indiana. The project involves enhancing the architectural, mechanical, electrical, and fire protection systems to meet OSHA, FAA, and fire code requirements, including the replacement of the existing fire detection and alarm system components. This upgrade is crucial for ensuring the operational safety and effectiveness of the ATCT, with an estimated project cost ranging from $400,000 to $750,000. Interested small businesses must submit their proposals by February 7, 2025, and can contact Elisha Distler at elisha.distler@faa.gov or 817-222-4196 for further information.
    Market Survey - Replace existing window washdown system at Wilmington, NC, ATCT
    Transportation, Department Of
    The Department of Transportation, through the Federal Aviation Administration (FAA), is conducting a market survey for the replacement of the existing window washdown system at the Wilmington, NC Air Traffic Control Tower (ATCT). The project involves the removal of current system components and the installation of new equipment, including chemical surfactant tanks, expansion tanks, and associated plumbing and electrical systems, all while ensuring minimal disruption to air traffic operations. This procurement is crucial for maintaining operational safety and efficiency at the airport, with an estimated contract value ranging from $25,000 to $75,000. Interested small businesses are encouraged to express their interest by contacting Angela Layman at angela.layman@faa.gov, providing their company details and business size, as this announcement serves informational purposes only.
    BIL Funded - Program and Project Schedule Analysis (Forensic Scheduler)
    Transportation, Department Of
    The Department of Transportation's Federal Aviation Administration (FAA) is seeking proposals for a contract focused on Program and Project Schedule Analysis, specifically for the replacement and modernization of Airport Traffic Control Towers (ATCTs) under the Bipartisan Infrastructure Law (BIL). The selected contractor will provide forensic scheduling services to support 14 ATCT projects across the Western and Central Service Areas, ensuring compliance with FAA standards and maintaining project timelines through detailed analysis and reporting. This initiative is crucial for enhancing aviation infrastructure, with a contract ceiling of $4.5 million over a five-year period, and a minimum obligation of $100,000 for initial task orders. Interested firms must submit their proposals by January 29, 2025, and ensure they are registered in the Systems for Award Management (SAM) database. For further inquiries, contact Thuylinh TranNguyen at thuylinh.t.trannguyen@faa.gov.
    MARKET SURVEY/CAPABILITY ASSESSMENT FOR – ARSR-4 DATA EXTRACTION ASSEMBLY MODIFICATION KITS
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is conducting a market survey to identify potential sources capable of providing ARSR-4 Data Extraction Assembly Modification Kits, as outlined in the attached Statement of Work (SOW). The FAA seeks vendors who can manufacture, assemble, and deliver these modification kits, which are critical for upgrading the Air Route Surveillance Radar systems due to obsolescence issues. This procurement is essential for maintaining operational efficiency and compliance with FAA standards, ensuring the reliability of aviation infrastructure. Interested parties must submit their capability statements and any questions via email to Scott Roberson at scott.roberson@faa.gov by 5:00 PM CST on January 27, 2025, and should include "MARKET SURVEY RESPONSE: ARSR-4 Data Extraction Assembly Modification Kits" in the subject line.
    Market Survey - Gate and Motor Operator Replacement at Wilmington, NC, ATCT
    Transportation, Department Of
    The Federal Aviation Administration (FAA) is conducting a market survey for the replacement of the chain link cantilever sliding gate and operator at the Wilmington, NC, Air Traffic Control Tower (ATCT). The project entails removing existing gates, installing a new 18-foot-wide vertical pivot gate, upgrading motor controllers, and relocating related electrical systems, all while ensuring compliance with federal, state, and local safety regulations. This initiative is crucial for enhancing security at the ATCT and maintaining the safety and efficiency of air traffic operations. Interested businesses should contact Angela Layman at angela.layman@faa.gov by January 31, 2025, at 4 PM MST, providing their company details and indicating their capability to undertake the project, which has an estimated value between $25,000 and $75,000 and a performance period of 40 days post-notice to proceed.