JUBJ 23-4636 Replace Chiller Building 863 - Sources Sought
ID: FA330025RFI0014Type: Sources Sought
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE AIR FORCEFA3300 42 CONS CCMAXWELL AFB, AL, 36112-6334, USA

NAICS

Plumbing, Heating, and Air-Conditioning Contractors (238220)

PSC

INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT (N041)
Timeline
    Description

    The Department of Defense, through the 42d Contracting Squadron at Maxwell Air Force Base (AFB) in Alabama, is seeking industry input for the replacement of the chiller at Building 863, Maxwell-Gunter AFB. This sources sought notice aims to gather information on market capabilities to assist in finalizing the acquisition strategy for the project, which involves the removal of existing chillers, installation of new systems, and ensuring minimal downtime for chilled water supply. The project is critical for maintaining operational efficiency and compliance with safety and environmental regulations, with a timeline of 360 days and two planned outages of chilled water. Interested parties are encouraged to submit their capabilities and qualifications by 12:00 PM CST on April 28, 2025, and may direct inquiries to SrA Trevor Wilson at trevor.wilson.8@us.af.mil or Eldrae A. Perdue at eldrae.perdue@us.af.mil.

    Point(s) of Contact
    SrA Trevor Wilson
    trevor.wilson.8@us.af.mil
    Eldrae A. Perdue
    eldrae.perdue@us.af.mil
    Files
    Title
    Posted
    The document outlines the specifications for replacing Chiller B863 at the Gunter Annex, Maxwell Air Force Base, under Project Number JUBJ 23-4636. The work entails removing existing chillers and related equipment, installing new systems, and ensuring minimal downtime for the chilled water supply. Key tasks include installation of mechanical and electrical components, balancing the chilled water system, and maintaining fire protection equipment. The contractor is responsible for submitting a work schedule, environmental protection measures, and ensuring compliance with safety regulations. The project spans 360 days with two planned outages of chilled water. Additionally, it mandates adherence to environmental regulations, including hazardous materials management and site protection during construction, underlining the necessity for proper training and compliance with federal and state laws. The summary reflects a commitment to efficient process management while safeguarding environmental and safety standards.
    The 42d Contracting Squadron at Maxwell AFB, AL, is seeking information from industry to assist in determining available market capabilities for a project entailing the replacement of a chiller at Building 863, Maxwell-Gunter AFB, Alabama. This sources sought synopsis is a preliminary request; no contract award will be made based on responses. Interested parties are instructed not to submit proposals at this stage. Responses should include company details, business classification, relevant NAICS code, scope of work capability, and evidence supporting capacity to meet project specifications. Responses are due by 12:00 PM CST on April 28, 2025, and inquiries may be directed via email to designated contacts. The initiative aims to finalize an acquisition strategy by understanding potential contractors' abilities and qualifications without the expectation of reimbursement for responses or return of submitted information. The announcement emphasizes local respondent eligibility within a 250-mile radius of the AFB.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Z2DA--Replace Auxiliary Chiller
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the replacement of a 120-ton auxiliary chiller and two 250 gpm pumps at Building 3 of the Fayetteville VAMC, under project number 565-24-113. The contractor will be responsible for removing the existing chiller, installing a new one of the same capacity, and ensuring integration with the existing Building Automation System, while adhering to all applicable safety and regulatory standards. This project is crucial for maintaining chilled water redundancy for the facility, ensuring continuous operation and safety for its medical services. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit their bids by January 26, 2026, and can direct inquiries to Contract Specialist Michael R Proctor at Michael.Proctor2@va.gov. The estimated construction magnitude is between $250,000 and $500,000.
    Maxwell AFB - Airfield Repairs - Amendment 0002
    Dept Of Defense
    The Department of Defense, through the Department of the Air Force, is soliciting proposals for airfield improvements at Maxwell Air Force Base in Montgomery, Alabama. This project, designated as PNQS 24-4829, involves construction and repair work, including pavement pressure washing, sinkhole repairs, and markings replacement, with a completion timeline of 120 calendar days from the Notice to Proceed. The contract is a total small business set-aside, with an estimated value between $250,000 and $500,000, and proposals are due by December 19, 2025, at 1:00 PM CST. Interested contractors should direct inquiries to SrA Trevor Wilson at trevor.wilson.8@us.af.mil and are encouraged to attend the scheduled site visits on December 3 and December 12, 2025, for which prior registration is required.
    Replace Chillers, B4335
    Dept Of Defense
    The Department of Defense, through the Naval Facilities Engineering Command Mid-Atlantic, is soliciting proposals for the replacement of a chiller unit at Building 4335, Marine Corps Air Station Cherry Point, North Carolina. The project involves removing an existing 160-ton TRANE RTAC 1404 chiller and installing a new like-in-kind air-cooled scroll chiller, ensuring integration with existing systems and adherence to strict safety protocols. This procurement is crucial for maintaining operational efficiency in the Training and Education building, with a contract completion timeline of 245 calendar days and an estimated cost range of $100,000 to $250,000. Interested Mechanical MACC contractors must submit proposals by December 16, 2025, and can contact Mason Sholar at mason.l.sholar.civ@us.navy.mil or Juan Barra at juan.m.barra.civ@us.navy.mil for further details.
    Two Chiller Replacement Project
    Justice, Department Of
    The Department of Justice, Drug Enforcement Administration (DEA) is seeking qualified contractors for the Two Chiller Replacement Project at the DEA Training Academy in Quantico, Virginia. The project involves replacing two aging 275-ton Trane chillers with new 300-ton Trane ACR 300T Series C R513A chillers and associated chilled water pumps to enhance energy efficiency and comply with environmental regulations. This procurement is critical for maintaining the operational integrity of the facility's climate control systems, ensuring a safe and effective training environment. Interested contractors must submit their proposals electronically by email to the designated contacts, Alycia Stevenson and Andrew Craig, and must be registered in the System for Award Management (SAM) at the time of submission. The project completion timeline is set for 12 weeks post-award, and all proposals must adhere to the specified requirements outlined in the solicitation.
    MMW Chiller for Balance of Plant
    Energy, Department Of
    The Department of Energy is seeking qualified vendors to provide an outdoor air-cooled MMW Chiller system for its Multi-Megawatt electrolyzer project, with a minimum cooling capacity of 30 tons required by March 2026. This chiller will play a crucial role in drying hydrogen produced by a proton exchange membrane (PEM) electrolyzer by cooling glycol to condense water from the hydrogen stream, ensuring the hydrogen is suitable for use in fuel cells and other applications. The procurement includes specific technical requirements such as a flow rate of 90-120 gpm, operation in extreme conditions, and compatibility with a 50/50 propylene glycol and water mixture. Interested parties should contact Kirby Hoffman at Kirby.Hoffman@nrel.gov for further details regarding the Request for Quote (RFQ) No. 2026027456.
    PNQS 09-4491 Repair Dining Facility Bldg. 668, Maxwell AFB, AL (Solicitation Amendment 0002)
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the repair of Dining Facility Building 668 at Maxwell Air Force Base in Montgomery, Alabama. This project involves comprehensive renovations, including hazardous material abatement, interior alterations, and the installation of new systems, with a total estimated contract value between $5,000,000 and $10,000,000. The work is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and must be completed within 640 calendar days, divided into procurement and construction phases. Interested contractors should direct inquiries to SSgt Khadijah Jones at khadijah.jones.1@us.af.mil or Marc Engel at marc.engel@us.af.mil, and proposals are due by December 15, 2025.
    B185 Cooling Tower Repairs
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the B185 Cooling Tower Repairs project at Offutt Air Force Base in Nebraska. The primary objective is to procure and replace two cooling tower fan transmissions, associated hardware, and a new fan motor for Tower 2, ensuring the proper functioning and maintenance of the cooling systems. This project is critical for maintaining operational efficiency and safety at the base, with a total estimated award amount of $19 million and a performance period scheduled from January 1, 2026, to March 31, 2026. Interested contractors must submit their offers by December 17, 2025, at 11:00 AM CST, and can direct inquiries to SSgt Eyvind Boyesen or Mr. Daniel Kuchar via the provided email addresses.
    NASIC DISTRICT COOLING PLANT
    Dept Of Defense
    The Department of Defense, through the Department of the Army, is soliciting proposals for the design and construction of a cooling plant at Wright Patterson Air Force Base in Ohio. This project, titled "NASIC District Cooling Plant," involves a significant construction effort with a magnitude estimated between $25 million and $100 million, categorized under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors. The procurement is classified as full and open, with a specific requirement for a 10% price evaluation preference for HUBZone businesses, emphasizing the importance of compliance with federal regulations regarding business size classifications. Interested vendors should contact Chase Rost at chase.j.rost@usace.army.mil or Patrick J. Duggins at Patrick.J.Duggins@usace.army.mil for further details, and access to solicitation documents is available via the PIEE link provided in the solicitation posting.
    IHAT CRAC Unit Replacement Edwards AFB
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting bids for the replacement of Computer Room Air Conditioning (CRAC) units at Edwards Air Force Base, California. This project involves the procurement and installation of new 26-30 ton CRAC units to replace aging systems, ensuring energy efficiency and compatibility with existing infrastructure, including integration with the Siemens Desigo control system. The successful contractor will be responsible for all aspects of the project, including decommissioning old units, installation, and compliance with government specifications. Interested parties must submit their quotes by December 23, 2025, at 10:00 AM PT, and are encouraged to attend a mandatory site visit on December 9, 2025, with prior registration required for security clearance. For further inquiries, contact Karla Vazquez at karlalizette.vazquezmontes@us.af.mil or Jamil Minosa at jamil.minosa.2@us.af.mil.
    WPAFB 3rd Air Stream/ B18
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE) Louisville District, is conducting a market survey to identify potential contractors for the construction of a new industrial compressed air plant at Wright-Patterson Air Force Base in Ohio. The project, estimated to cost between $5 million and $10 million, involves the installation of two 4,000 HP centrifugal air compressors, two natural gas-fired air heaters, specialty steel piping, and associated controls, along with the demolition of existing equipment and significant electrical work. This initiative is crucial for enhancing the operational capabilities of the facility, and the procurement may be set aside for small businesses, including HUBZone, 8A, Woman-Owned, and Service-Disabled Veteran Owned firms. Interested parties must submit their responses via the Market Survey Response Form by October 31, 2025, at 1:00 PM Eastern Time, and can contact Thomas Nauert at thomas.s.nauert@usace.army.mil for further information.