Superior National Forest Bridge Repair
ID: 12445525Q0004Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA-FS, CSA EAST 13Atlanta, GA, 303092449, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of Agriculture, through the Forest Service, is soliciting proposals for the emergency repair of the Cloquet River Bridge located in the Superior National Forest, Minnesota. This project, necessitated by severe storm damage from June 2024, aims to stabilize the bridge, which has suffered significant undermining and scour, to prevent its collapse before a future replacement can be constructed. The bridge, built in 1957, is critical for maintaining infrastructure safety in the area and is currently closed to all traffic. Contractors are required to submit sealed bids by November 4, 2024, with an estimated project budget between $25,000 and $100,000, and work is expected to commence shortly after contract award, concluding within thirty days. For further inquiries, interested parties may contact Clark A. Bartelt at clark.a.bartelt@usda.gov or Brad Higley at bradley.higley@usda.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines a solicitation for construction services related to the repair of the Cloquet River Bridge within the Superior National Forest, as issued by the USDA Forest Service. The solicitation number is 12445525Q0004, with a due date for bids set for 11/04/2024. The contractor will be required to initiate performance after receiving the notice to proceed, with an anticipated performance period from November 26, 2024, to December 31, 2024. The expected delivery date for materials is October 28, 2024, to the Laurentian Ranger District. Key requirements include the submission of sealed bids, performance and payment bonds, and compliance with various work requirements outlined in the solicitation. The document stresses the importance of adhering to deadlines, ensuring that any offer must be received within a specified timeframe, and emphasizes the need for an acknowledgment of any amendments to the original solicitation. Overall, this solicitation reflects the federal government's commitment to infrastructure maintenance and improvement while adhering to regulatory and procedural standards.
    The government solicitation 12445525Q0004 focuses on repairs to the Cloquet River Bridge within the Superior National Forest, necessitated by severe damage from a June 2024 storm. The bridge, a two-span concrete beam structure built in 1957, experienced significant undermining and scour due to flooding, prompting the need for urgent stabilization to prevent collapse before a future replacement can be constructed. The project encompasses various elements including the evaluation of structural integrity, clearing debris, and protecting the site during construction, with a budget estimated between $25,000 and $100,000. Contractors must submit comprehensive proposals for all items outlined in the schedule and are required to carry specific insurance coverages. All work must commence within ten days of contract award, with the entire project expected to conclude within thirty days. This initiative demonstrates the government’s commitment to maintaining infrastructure safety and addressing immediate repair needs in response to natural disasters.
    The Cloquet River Bridge project, listed under the Larentian Ranger District of the Superior National Forest, outlines services and estimated prices for its execution. The schedule includes mobilization services and grout bag supply, with each item requiring a single unit. The total estimated cost remains unspecified, with detailed pricing for each necessity set to be determined as the project progresses. This document serves as part of the federal Request for Proposals (RFPs) pertaining to infrastructure development, emphasizing precision in the budgeting and planning of federally funded projects. It reflects compliance with established government procurement processes while detailing specific services necessary to facilitate the construction of the bridge, illustrating broader efforts to maintain and improve national forest infrastructure.
    The document outlines the emergency repair project for the Cloquet River Bridge in Aurora, MN, initiated by the U.S. Department of Agriculture. Following significant storm damage in June 2024, the bridge, built in 1957, suffered severe scour and undermining of its center pier, necessitating immediate stabilization. The scope of work includes the installation of grout bags and grout to secure the structure and prevent its collapse. The contractor is required to provide all necessary materials and labor, with a clear timeline for deliverables such as a project plan and post-work report, both accompanied by photographic documentation. The government will furnish dive inspection reports for reference. No specific security requirements are noted, and all produced data will be subject to FOIA regulations. This project emphasizes the urgent need for temporary structural support before future planning for a permanent repair or replacement, while ensuring the bridge remains closed to traffic throughout the intervention. Overall, the document serves as a formal request for proposals, detailing the technical requirements and expectations for contractors involved in this critical infrastructure stabilization project.
    Lifecycle
    Title
    Type
    Solicitation
    Similar Opportunities
    LOLO NATIONAL FORES T - Upper West Fork Fish Creek Trail Bridge Replacement
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the Upper West Fork Fish Creek Trail Bridge Replacement project located in the Lolo National Forest, Montana. The project involves the removal and replacement of an existing trail bridge along Trail 101 at milepost 3.1, including structural excavation and the installation of a new bridge, while adhering to specific Resource Protection Measures due to its location in a proposed wilderness area. This initiative is crucial for maintaining infrastructure within the national forest and ensuring safe access for visitors, with an estimated construction cost between $500,000 and $1,000,000. Interested vendors are encouraged to attend a formal site visit on October 17, 2024, and must notify the primary contact, Alisha Knaub, at alisha.knaub@usda.gov by October 15, 2024, to confirm attendance.
    WA ERFO FS MTBKR605 2020-1(1), Mt. Baker Snoqualmie ERFO Repairs 2020 Phase 1 & WA ERFO FS MTBKR605 2022-1(1), Mt. Baker Snoqualmie ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking proposals for emergency repair projects in the Mt. Baker-Snoqualmie National Forest, specifically identified as WA ERFO FS MTBKR605 2020-1(1) and WA ERFO FS MTBKR605 2022-1(1). The projects involve critical infrastructure improvements, including earthwork, roadside development, wall construction, and drainage systems across multiple sites in Washington, covering a total length of 0.4 miles. This initiative is vital for enhancing safety and accessibility in the region's roadways, with an estimated budget ranging from $700,000 to $2,000,000 and a fixed completion target set for Winter 2025. Interested contractors should contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details and to stay updated on the solicitation documents expected to be released in Winter 2024/2025.
    NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the El Porvenir Bridge Replacement project in the Santa Fe National Forest, New Mexico. The project aims to replace a bridge destroyed by the Hermits Peak/Calf Canyon fire in April 2022, with the new structure designed as a prefabricated steel bridge spanning 97 feet and accommodating increased hydrological demands post-fire. This initiative is critical for restoring access to local camps and ensuring compliance with federal standards, particularly regarding flood management and structural integrity. Interested contractors must submit their bids by November 19, 2024, and are encouraged to contact Jon Holsopple at CFLContracts@dot.gov or Leslie Karsten at CFLcontracts@dot.gov for further information.
    MT FLAP BOR 2980(1), Sun River Bridge Replacement
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Sun River Bridge Replacement project (MT FLAP BOR 2980(1)), located approximately 50 miles northwest of Augusta, Montana. The project entails constructing a new three-span, 462-foot long precast-post-tensioned girder bridge, along with new approaches, and may include the demolition of the existing steel truss bridge upon completion. This initiative is critical for enhancing transportation infrastructure and ensuring safety, with an estimated contract value between $10 million and $20 million, and a tentative completion date set for Fall 2026. Interested vendors can obtain further details and submit inquiries to the Contracts G. Office via email at contracts@mail.wfl.fhwa.dot.gov or by phone at 360-619-7520, with all bids due by the specified deadline.
    UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The United States Forest Service, under the Department of Agriculture, is seeking contractors for road and bridge construction services in the Rocky Mountain Region 2, specifically through a Multiple Award Task Order Contract (MATOC). The procurement includes several seed projects, such as the replacement of the PSICC South Cottonwood Creek Bridge, the White River Berry Creek Culvert Replacement, and roadway reconditioning work in the Washakie Ranger District of Wyoming. These projects are crucial for maintaining infrastructure within national forests, enhancing road safety, and ensuring proper water drainage. Interested contractors are encouraged to attend scheduled site visits on October 3 and October 9, 2024, for the bridge and culvert projects, respectively, and to review the Washakie Roadwork site independently. For further inquiries, prospective offerors can contact Paul Larsen at paul.larsen@usda.gov.
    FALL SITE VISIT - Smiley Creek Bridge Replacement & Road Realignment
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, is inviting vendors to participate in a site visit for the Smiley Creek Bridge Replacement and Road Realignment project located in the Sawtooth National Forest, Idaho. This project entails the construction of a new single-lane steel bridge, approximately 600 feet of road approaches, and various associated improvements, with an estimated construction cost ranging from $500,000 to $1 million. The site visit is scheduled for November 7, 2024, at 11:00 AM Mountain Time, allowing prospective contractors to assess the project site before inclement weather restricts access. Interested vendors must notify Assistant Forest Engineer Braidy Richins via email if they plan to attend, as this notice is for informational purposes only and does not constitute a formal request for proposals or bids.
    MS NP NATR 3N18 3H27 ETC - Geotechnical, Pavement Rehabilitation, and Structural Repairs
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Geotechnical, Pavement Rehabilitation, and Structural Repairs project (MS NP NATR 3N18 3H27 ETC) in Mississippi. This project, which spans between mileposts 121 and 204, involves extensive repairs including addressing slide areas, bridge joints, delaminated concrete decks, and pavement rehabilitation, with an estimated budget of $40 million to $50 million. The work is critical for maintaining the integrity and safety of highway infrastructure in the region. Bid documents will be available starting November 4, 2024, and interested contractors must register on the SAM website to access them. For inquiries, contact Rubrena Johnson or Shirley A. Anderson at eflhd.contracts@dot.gov, and ensure compliance with federal registration and subcontracting requirements.
    UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The United States Department of Agriculture's Forest Service is seeking qualified contractors for the Road and Bridge Construction Services Multiple Award Task Order Contract (MATOC) in the Intermountain Region 4, specifically focused on road and bridge construction and related services. The procurement includes a range of activities such as the repair and construction of various types of roads, bridges, culverts, and aquatic passages, with a total small business set-aside and a minimum of ten contracts anticipated to be awarded. This initiative is crucial for maintaining and enhancing infrastructure within national forests, ensuring both public accessibility and environmental stewardship. Interested vendors are encouraged to participate in scheduled site visits from October 9 to October 17, 2024, to familiarize themselves with the project locations, and must direct inquiries to Paul Larsen at paul.larsen@usda.gov. The full solicitation is expected to be available in fall 2024, with task orders ranging from $2,000 to $3,000,000 and a shared ceiling limit of $50,000,000 for all orders.
    BCLH Stewardship IRSC Phase 3
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service, is seeking contractors for the BCLH Stewardship IRSC Phase 3 project, aimed at mitigating hazardous fuel risks and restoring access routes affected by the 2020 Beachie Creek and Lionshead Fires in Oregon's Willamette National Forest. The project encompasses cutting and removing fire-killed timber within 100 feet of roads, felling hazard trees, and conducting small fuels treatment, alongside essential road maintenance and reconstruction to ensure safe access. This initiative is critical for enhancing forest health and safety while adhering to federal regulations, with an estimated contract value between $1 million and $5 million. Interested contractors must contact Karen Ruklic at karen.ruklic@usda.gov or 208-702-3519, and are encouraged to attend a pre-solicitation site visit on November 5, 2024, with the final solicitation expected to be issued around March 31, 2025.
    CA FTNP SEKI 13(2) Mineral King Road
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the rehabilitation of Mineral King Road, a critical infrastructure project located within Sequoia and Kings Canyon National Park in California. The project encompasses approximately 12.09 miles of roadway, requiring extensive work including asphalt paving, drainage improvements, and stabilization measures to enhance visitor access and ensure environmental compliance. This initiative is vital for maintaining access to the national park while addressing the challenges posed by the remote mountainous terrain and sensitive ecological areas. Interested contractors must submit their bids by 2:00 p.m. local time on November 6, 2024, with an estimated project cost ranging from $25 million to $35 million. For further inquiries, potential bidders can contact Jorey Deml or Ryan Phillips at cflacquisitions@dot.gov.