Guatemala - CMR - Back Patio Awning Construction
ID: 19GT5025Q0013Type: Solicitation
Overview

Buyer

STATE, DEPARTMENT OFSTATE, DEPARTMENT OFUSEMBASSY GUATEMALA CITYWASHINGTON, DC, 20520, USA

NAICS

Other Foundation, Structure, and Building Exterior Contractors (238190)

PSC

ARCHITECT AND ENGINEERING- CONSTRUCTION: MAINTENANCE BUILDINGS (C1EB)
Timeline
  1. 1
    Posted Mar 28, 2025, 12:00 AM UTC
  2. 2
    Updated Mar 28, 2025, 12:00 AM UTC
  3. 3
    Due May 16, 2025, 9:00 PM UTC
Description

The U.S. Department of State is seeking qualified contractors for the construction of a back patio awning at the Chief of Mission Residence in Guatemala City, Guatemala. The project involves various construction tasks, including demolition, foundation work, metal structure fabrication, electrical installations, and drainage management, all aimed at enhancing the functionality and aesthetics of the residence. This procurement reflects the U.S. Government's commitment to maintaining high-quality standards for its overseas facilities while ensuring compliance with safety regulations. Interested contractors must submit their bids by May 16, 2025, and are encouraged to attend a site visit on April 23, 2025, with registration required by April 11, 2025. For further inquiries, contractors can contact Beau Garrett at guatemalabids@state.gov or Zayda Serech at serechza@state.gov.

Point(s) of Contact
Files
Title
Posted
Mar 28, 2025, 7:05 PM UTC
The U.S. Government is seeking quotations for the construction of a back patio awning at the Chief of Mission Residence in Guatemala through Request for Quotations (RFQ) number 19GT5025Q0013. The procurement is a firm-fixed price contract; bids must be submitted by May 16, 2025. Interested contractors are invited to a site visit on April 23, 2025, and must register by April 11, 2025. Specific requirements include completion of forms such as SF-1442, submitted via email in designated formats. The project entails various construction tasks including demolition, foundation, fabrication of the metal structure, electrical installation, and drainage management, with a focus on protecting existing infrastructures. The contractor is responsible for obtaining the necessary permits and adhering to safety and quality control standards. Weekly and monthly reports on progress are mandatory. Liquidated damages of $500 per day will be incurred for delays beyond the stipulated period of 115 days. This project reflects the U.S. Government's commitment to maintaining quality in its overseas facilities and ensuring compliance with safety regulations, while also providing an opportunity for local and international contractors to engage in federal work.
Mar 28, 2025, 7:05 PM UTC
The document outlines the project specifications for an architectural and structural initiative involving the construction of an awning at the official residence located at 20 Calle 4-30 Zona 14, Guatemala City. It details compliance with applicable codes and standards, including Guatemalan regulations and American standards for structural safety and electrical systems. Fundamental elements such as general contractor responsibilities, structural design loads, and safety protocols are emphasized. The text includes guidelines for dimensional standards, coordination among various trades, and quality control measures, particularly regarding welding and concrete. Specific structural requirements are also outlined, including seismic design parameters and material testing protocols. Overall, the document serves as a comprehensive reference for contractors and engineers engaged in the project, ensuring adherence to safety standards and quality assurance throughout construction.
Mar 28, 2025, 7:05 PM UTC
The document outlines architectural and structural plans for the construction of an A&E patio awning at an official residence in Guatemala City. It includes detailed specifications, project notes, and guidelines for contractors and subcontractors involved in the construction process. Key requirements stipulate adherence to structural codes, construction safety protocols, material quality assurances, and detailed architectural drawings across multiple levels and systems. The document emphasizes compliance with various engineering standards, including those governing seismic design and structural integrity, mandating thorough inspections and tests for both metallic and concrete components throughout the project's lifecycle. Health and safety compliance under official U.S. standards is highlighted, along with a call for rigorous quality control measures on materials used, especially steel. Completion of the project is slated for December 2024, showcasing a commitment to detailed planning and regulatory adherence for effective project execution.
Mar 28, 2025, 7:05 PM UTC
The document outlines the specifications for an architectural and engineering project involving the construction of a patio awning at an official residence in Guatemala City. It includes detailed material standards for various components, such as structural steel, concrete, and exterior finishes, specifying compliance with ASTM standards for strength and dimensions. Key construction elements include requirements for foundations, cast-in-place concrete, reinforcements, and finishes like metal paint, exterior pavers, wallboard systems, and ceilings. Emphasis is placed on proper installation practices, material specifications, and quality controls necessary to achieve a reliable and durable structure. The project underscores the importance of adherence to regulatory standards for safety and structural integrity. This document serves as an essential reference for contractors responding to the federal RFP, ensuring compliance with design and construction requirements while promoting operational efficiency.
Mar 28, 2025, 7:05 PM UTC
The document details the specifications for the construction of an A&E patio awning for an official residence in Guatemala City, Guatemala. The project outlines various construction processes, including site preparation, foundation work, the use of structural steel, and the application of concrete. Specific requirements are defined for excavation, compaction, and reinforcement, adhering to industry standards such as ASTM and ACI. Key features include the proper management of existing field conditions, the necessity for clean and compacted surfaces, and detailed instructions on materials and structural integrity. Emphasis is placed on the proper installation of electrical and plumbing systems, ensuring no interference with foundational elements without prior approval from contracting officials. Additionally, the document specifies requirements for the external finish, including paint systems, exterior flooring, and wall systems, highlighting the importance of selecting appropriate materials and techniques to ensure durability and aesthetic coherence. The overall emphasis on compliance with standards reflects a commitment to quality construction and safety protocols, making it essential for contractors engaged in the bidding process under relevant government bids or grants.
Mar 28, 2025, 7:05 PM UTC
The government document details the specifications and requirements for the installation of an awning and related renovations at an official residence located at 20 Calle 4-30 Zona 14, Guatemala City. The project includes the installation of outdoor lighting fixtures, wall and ceiling finishes, exterior slab waterproofing, stain glass panel installations, and stormwater drainage systems. Key components include the use of specific LED lighting and outdoor wall lamps, adherence to application and curing processes for painting and waterproofing, and compliance with safety standards set by the US Army Corps of Engineers. Additionally, proper treatment of existing concrete surfaces and criteria for stained glass installation are highlighted. This document serves as part of a broader request for proposals (RFP), ensuring that contractors understand the precise materials and methods required to meet both functional and aesthetic standards for the property renovations, indicative of federal government project management and construction protocols.
Mar 28, 2025, 7:05 PM UTC
The government file outlines the detailed specifications for the installation of an awning at the official residence in Guatemala City. The project focuses on various construction aspects, including painting, stained glass, lighting, waterproofing, and rainwater drainage systems, ensuring compliance with U.S. Army Corps of Engineers safety standards. Key tasks involve surface preparation and the use of specific products, such as Sherwin Williams latex paints and Silpast waterproofing systems. For the stained glass installations, guidelines ensure durability and artistic integrity. The document emphasizes proper installation and maintenance procedures for lighting to achieve optimal performance while minimizing glare. Additionally, it details rainwater system specifications, including drainage pipe materials, excavation techniques, and proper filling procedures to maintain integrity and functionality. The overall goal is to enhance the aesthetic and functional aspects of the official residence in a manner that adheres to safety and quality standards, reflecting the government's commitment to maintaining its properties responsibly.
Mar 28, 2025, 7:05 PM UTC
The document outlines a topographic survey project pertaining to the installation of an awning at the official residence located in Guatemala City, Guatemala. Scheduled for December 17th, 2024, the survey is identified with a scale of 1/100 and is classified under the code A-04, indicating the nature of the survey work involved. It appears to be associated with a building permit, though the permit number is not provided. The document reflects typical elements found in government RFPs, emphasizing the need for detailed geographical data for construction or modification projects. The contact information for GEOS, the engineering firm responsible for the survey, is included, underscoring the administrative structure essential for project coordination. Overall, the file represents formal documentation necessary for regulatory compliance and project planning in a government context.
Mar 28, 2025, 7:05 PM UTC
The document pertains to the design and planning of an A&E patio awning project for an official residence located at Calle 4-30 Zona 14 in Guatemala City, Guatemala. The project, denoted by permit number 19GT5024C0005, is sensitive but unclassified and is scheduled for completion by December 2024. Key elements include proposed modifications such as an exterior awning, various landscaping features, existing folding doors, and irrigation valves indicated on architectural drawings. The first floor plan reflects both existing and new structural elements, incorporating mass plantings and screening plants for aesthetic enhancement. The content emphasizes coordination of architectural and environmental aspects, ensuring compliance with relevant guidelines and enhancing the residence's functionality and appeal. This project likely falls under federal or local government considerations regarding infrastructure upgrades, focusing on improving official residences while adhering to design standards and environmental regulations.
Mar 28, 2025, 7:05 PM UTC
The document outlines the specifications for a construction project concerning an awning installation at the Official Residence located in Guatemala City, Guatemala. The project is referenced under permit number 19GT5024C0005 and is labeled as "sensitive but unclassified." Key elements include detailed elevations and dimensions of the proposed structure, with all measurements provided in meters. The drawing indicates specific features such as overhangs and existing infiltration pits, which are vital for understanding the project's scope. The first-floor plan is included, along with dimensions and elevations that guide the construction process. Notably, the project date is set for December 2024, reflecting timelines for completion. This proposal aligns with government RFP requirements, indicating planning efforts for infrastructure enhancements in official properties, and underscores the collaboration between architectural and engineering teams in executing federal projects. The document's emphasis on precise metrics and construction notes is essential for meeting safety and regulatory standards.
Mar 28, 2025, 7:05 PM UTC
The document outlines the specifications for the A&E Patio Awning project at the Official Residence located at 20 Calle 4-30 Zona 14, Guatemala City, Guatemala. It includes details such as project identification number (19GT5024C0005), design scale (1:75), relevant dates (December 2024), and the types of materials and finishes to be used. Key architectural details feature a first-floor plan, wall schedules, and notes on existing and new structures. New wall partitions are to be constructed with metal studs and Durock cement board, replacing existing masonry walls made of concrete blocks. Specific instructions include the installation of new pavers aligned with existing slopes without creating any steps. The document's formatting indicates various symbols and notes, aimed at ensuring clarity during construction, thus facilitating compliance with structural requirements. Overall, this document serves as a technical guide for contractors involved in government-requested funding and construction grants related to infrastructure development in governmental residences, emphasizing precision and adherence to standards.
Mar 28, 2025, 7:05 PM UTC
The document outlines the architectural and construction specifications for an awning project at an official residence located at Calle 4-30 Zona 14, Guatemala City. It includes a first-floor plan with reflected ceilings, detailed dimensions, and specific design elements such as metal facia and recessed LED strip lighting. The elevations are referenced against the residence floor level, ensuring clarity in construction heights. The plan emphasizes compliance with structural standards and highlights various materials including Densglass panels and cement base coats for interior finishing. A notable detail includes the incorporation of plaster-in LED diffusers. This project is sensitive but unclassified, indicating a level of confidentiality while being accessible for government oversight. The detailed descriptions serve to guide contractors in execution, contributing to the overall aesthetic and functional enhancements of the property. This initiative reflects the government’s commitment to maintaining its facilities effectively and meeting operational standards.
Mar 28, 2025, 7:05 PM UTC
The document outlines the design and construction plans for an A&E Patio Awning project at an official residence located at 20 Calle 4-30 Zona 14, Guatemala City. It includes detailed engineering drawings categorized into sections A-A, B-B, C-C, and D-D, each specifying elevations, materials, and structural components such as metal gutters, concrete decking, and existing walls. The project emphasizes the use of durable materials, such as Densglass for ceiling panels and a metal structure for enhanced stability. Key measurements and specifications, including elevations at 49.95m and 50.05m, are meticulously presented to guide construction accurately. The document also contains references to necessary permits and identifies its sensitive but unclassified status, reflecting compliance with federal and local guidelines for project initiation. The timeline highlights a target completion date in December 2024, focusing on the proper design for function and aesthetic appeal in a governmental context. This project's details are essential for contractors and planners involved in federal RFPs aimed at ensuring quality and adherence to standards for government facilities.
Mar 28, 2025, 7:05 PM UTC
The document outlines a project for the construction of an A&E patio awning at an official residence located at 20 Calle 4-30 Zona 14, Guatemala City. It includes architectural drawings and specifications detailing elevations and structural elements, such as new columns and various roofing designs. Notable components include a pyramid skylight, a metal fascia trim, and a concrete kerb upstand. The project is scheduled for completion by December 2024 and is categorized as “Sensitive But Unclassified.” The drawings include various elevations (identified as Elevation 1, 2, and 3) showing different views and measurements for accurate reconstruction. The details cater specifically to compliance regulations and architectural standards for federal projects. This document serves as a working outline for contractors to follow during execution and is part of a broader government effort to maintain and enhance official residences abroad.
Mar 28, 2025, 7:05 PM UTC
The document outlines a project for the installation of an A&E patio awning at an official residence located at 20 Calle 4-30 Zona 14, Guatemala City, Guatemala. It includes detailed drawing specifications for the roof plan and the awning's structure, with a focus on waterproofing systems, metallic gutters, and metal fascia. The design features a slope of 2% for effective drainage and utilizes materials like PMMA concrete for waterproofing and Amerimax components for plumbing. The project is set to commence with significant architectural considerations detailed, ensuring both function and compliance. The plans are under the oversight of the federal government, aimed at maintaining the integrity and safety of the official residence while adhering to necessary building regulations. The anticipated completion date for the project is December 17, 2024, underscoring its importance within government infrastructure initiatives.
Mar 28, 2025, 7:05 PM UTC
The document outlines the specifications for an awning project at an official residence located in Guatemala City, Guatemala. It primarily focuses on the structural design and material details necessary for constructing a patio awning, emphasizing the use of high-quality components such as stainless steel for support structures and gray laminated glass for the roof. Key plans include a roof placement plan, sections detailing metal roof support structures, and installation details for glass panels. Various details also address condensation prevention and sealing methods with the use of advanced waterproof materials. The project is scheduled for completion by December 2024, with various construction details carefully noted for accuracy and compliance with building standards. Overall, the document serves as a technical blueprint to guide contractors in fulfilling the project while adhering to safety and quality requirements.
Mar 28, 2025, 7:05 PM UTC
The document outlines the design and construction specifications for a patio awning and stained glass details at an official residence in Guatemala City. It features architectural and engineering drawings, detailing materials like stained glass in red, white, and blue (representing the U.S. flag), as well as structural elements such as metal beams, rubber bases, and various types of steel and aluminum components. The drawings include information about dimensions, scales, and placement sections for features like a fall protection screen. The project is scheduled for completion by December 2024, highlighting a commitment to aesthetic enhancements and safety measures at the residence. This initiative is likely part of a broader effort within government RFPs and grants focusing on property management, maintenance, and improvement of official government buildings while ensuring compliance with safety regulations.
Mar 28, 2025, 7:05 PM UTC
The document outlines the construction details for an A&E Patio Awning project designated for the Official Residence located at 20 Calle 4-30 Zona 14, Guatemala City, Guatemala. The drawing is part of a design plan set for completion in December 2024, adhering to specific construction and material specifications, including galvanized channels and detailed ceiling treatments. Key structural elements consist of various ceiling joints, furring channels, and metal components aimed at ensuring stability and functionality. Significant details include the use of Densglass panels, metal beams, and a PMMA waterproofing system to enhance durability and performance in adverse weather. The document emphasizes the importance of maintaining specific construction methodology, particularly in joint handling and material placement, to meet safety and structural integrity standards. It is part of a government contract likely addressing requirements for public infrastructure improvements under federal or local guidelines. Overall, the document serves as a technical blueprint essential for contractors involved in the project, highlighting the importance of adherence to quality standards and regulatory compliance in government-funded construction efforts.
Mar 28, 2025, 7:05 PM UTC
The document outlines the architectural and engineering details for the construction of an awning project at the Official Residence located at 20 Calle 4-30 Zona 14, Guatemala City, Guatemala. Permits were approved in December 2024, indicating plans for various structural elements, including isolated columns, glass fountain columns, and details on deflection mitigation. Key materials include metal columns, concrete bases, and furring details with specific dimensions provided. The details reflect a compliance with engineering standards essential for structural integrity, addressing load-bearing and stability concerns. The document serves as a proposal for federal and state/local funding, emphasizing safety and architectural aesthetics for government facilities. Such detailed specifications are crucial in the bidding and approval processes of RFPs, demonstrating a commitment to modern construction practices and public infrastructure enhancement.
Mar 28, 2025, 7:05 PM UTC
The document outlines the specifications for a project involving the construction of an awning at an official residence located at Calle 4-30 Zona 14, Guatemala City. It includes detailed architectural and engineering drawings with precise measurements, dimensions, and materials required for the project. Key elements such as metal fascia trim frames and metal gutter frames are highlighted, along with their respective installation details and associated scales. Structural components like PVC pipes and steel beams are also specified, indicating necessary dimensions and angles for proper construction. The document emphasizes the importance of compliance with building standards and includes specific notes about welding and cutting practices. The provision of detailed technical drawings suggests a meticulous planning process aimed at ensuring the project meets both safety and aesthetic standards. Overall, this document serves as a crucial resource for contractors involved in the bidding process for government RFPs by providing the necessary information for accurate project execution and adherence to regulatory requirements.
Mar 28, 2025, 7:05 PM UTC
The document outlines the specifications and architectural details for the installation of an awning at an official residence in Guatemala City, identified as Project 19GT5024C0005. It includes detailed drawings and notes regarding the use of materials such as concrete, metal decking, and steel kerbing, with specific requirements for hardware fittings like Nelson studs and exterior hex screws. Key dates are highlighted, including a completion target of December 2024. The structural details emphasize compliance with federal standards, specifying the materials' gauge and strength, necessary installation techniques, and spacing requirements for structural elements. This project aligns with the government's objective to enhance facilities while ensuring safety and aesthetic integrity. Overall, the document serves as a technical guide for contractors executing the project, ensuring all aspects meet governmental regulations and design expectations.
Mar 28, 2025, 7:05 PM UTC
The Backyard Awning Specifications document outlines the standards and requirements for a construction project, emphasizing safety, structural integrity, and compliance with various regulatory codes. Key regulations include AGIES 2018, the International Building Code (IBC), and American Concrete Institute (ACI) standards. The document details responsibilities for contractors, including the need to verify dimensions and coordinate work with different drawings to ensure consistency. Crucial aspects include guidelines for excavation and backfill, proper concrete mixes with specified compressive strengths, and quality control testing. Structural components must adhere to specific reinforcement standards using grade 60 rebar and detailed specifications for waterproofing and electrical installations. Each section mandates compliance with localized safety regulations and general construction practices, highlighting the importance of thorough inspections and material certifications. Overall, the document serves as a comprehensive framework for ensuring that the construction project meets federal and state grant requirements while maintaining high safety and quality standards throughout the process.
Mar 28, 2025, 7:05 PM UTC
The document outlines a comprehensive list of construction requirements and specifications for a project involving various structural tasks, safety protocols, and installations. Key activities include the demolition of concrete, excavation, and the installation of drainage systems, structural concrete, and metal framing. It also details electrical system installations, such as feeders, lighting, and outlets. Additionally, specialized tasks like skylight fabrication, waterproof roofing, and the installation of stained glass are highlighted. Health and safety equipment for construction personnel is emphasized, along with necessary concrete and soil testing procedures. The document serves as a reference for contractors responding to requests for proposals (RFPs), ensuring compliance with federal and local regulations throughout the construction process. It emphasizes coordination among different trades and adherence to safety standards, illustrating the government's commitment to maintaining high-quality construction practices.
Mar 28, 2025, 7:05 PM UTC
The document outlines a project to install a patio awning at the official residence located in Guatemala City, Guatemala. It contains various technical drawings, including a first-floor plan and an electrical survey, indicating existing fixtures that must remain in place. The document specifies electrical panel names, circuits, and equipment to be retained, detailing the necessary modifications for safety and compliance with local standards. The project is scheduled for completion by December 2024 and emphasizes the importance of maintaining certain existing electrical installations while integrating new elements. This initiative reflects the government's commitment to enhance official residences while adhering to stringent standards for functionality and safety.
Mar 28, 2025, 7:05 PM UTC
The document outlines the construction project for an awning installation at the official residence in Guatemala City, identified by permit number 19GT5024C0005, scheduled for completion in December 2024. It includes detailed architectural and engineering drawings, specifying the demolition and existing foundation plans necessary for the installation. Key elements involve the demolition of existing pavers and footings, with notes instructing contractors to notify the Contracting Officer Representative (COR) if additional foundations are discovered during excavation. Additionally, the document delineates materials to be used, including specific paver types, mortar mixes, filling materials, and polyethylene underlay requirements. This project falls under government-funded initiatives, emphasizing adherence to safety and regulatory standards in construction practices. Overall, the file serves as a framework for compliance and execution of the construction project, ensuring the appropriate handling of existing structural elements and the integration of new installations.
Mar 28, 2025, 7:05 PM UTC
The document outlines the lighting calculation plan for a patio awning project at the Official Residence located in Guatemala City, Guatemala. It includes a luminaire schedule detailing the model and specifications of lighting fixtures, indicating a total of 72 LED tape strips with a tunable color temperature range of 3000K to 6500K. The illumination calculations report average, maximum, and minimum foot-candle (Fc) values for the workplane, showing a range of light levels necessary for effective outdoor lighting. The project is slated for completion in December 2024 and requires adherence to specific design and safety standards. This document serves as a technical proposal relevant to the federal government’s RFP processes and grants, aiming to ensure optimal implementation through standardized lighting solutions for public facilities.
Mar 28, 2025, 7:05 PM UTC
This document outlines the electrical specifications for the A&E Patio Awning project intended for an official residence located at 20 Calle 4-30 Zona 10, Guatemala City, Guatemala. It details the main switchboard and panelboard service area, noting their electrical capacities (400A and 225A, respectively), as well as existing and new circuits designated for the awning installation. The drawing titled "Alimentadores y Tableros Eléctricos" was developed by MROA, and critical timelines include a completion target of December 17, 2024. The project denotes clear involvement from various stakeholders, including a landlord, planner, and constructor. Additionally, it is classified as "Sensitive but Unclassified," indicating a level of confidentiality. Key points include the importance of adhering to specific electrical standards while planning infrastructural changes and the coordination required among involved parties for a successful implementation. This document adheres to the guidelines of federal RFPs, reflecting federal interests in infrastructure improvements at official residences.
Mar 28, 2025, 7:05 PM UTC
The document outlines the electrical nomenclature related to the lighting project for an official residence located in Guatemala City, Guatemala. It specifies that the project is known as "A&E Patio Awning" and was designed and drawn by individuals identified by initials MROA and LNN. The drawing is detailed with project specifics, including an address (20 Calle 4-30 Zona 10) and a scale of 1:33, indicating its dimensional accuracy. The date on the document is noted as December 17th, 2024. It is categorized as "Sensitive but Unclassified," emphasizing that while it contains important information, it is not classified at the highest security level. The project aims to provide a structured and compliant lighting installation aligned with the designated plans, contributing to the overall aesthetic and functionality of the residence. This document is a standard part of project documentation required in federal and local government construction and renovation initiatives.
Mar 28, 2025, 7:05 PM UTC
The document concerns the planning and construction of an electrical power outlet installation at 20 Calle 4-30 Zona 10, Guatemala City, under the title "A&E Patio Awning for Official Residence." The project's design includes specific notes regarding the electrical nomenclature, as well as a designated drawing scale of 1:33 for easier interpretation of plans. The document is marked as sensitive but unclassified and includes a specific drawing number and permit details. The lead personnel involved in the project consists of the landlord, planner, and constructor, indicating a collaborative approach to ensure compliance with regulatory standards. The scheduled completion date is set for December 17, 2024. Overall, the file outlines the necessary technical specifications and administrative details relevant to the proper execution of the electrical installation, emphasizing adherence to safety and planning standards associated with government contracts.
Mar 28, 2025, 7:05 PM UTC
The document outlines the foundation and structural specifications for an architectural project, specifically focusing on the A&E Patio Awning at an official residence in Guatemala City. Key specifications include the compressive strength of concrete (4,000 psi), yield strength of steel (60,000 psi), and design ground bearing capacity (2,500 psf). Various structural components, such as columns (CM-1 and CM-2), beams, and footings, are detailed with their corresponding materials and assembly requirements. The document specifies design codes, seismic design coefficients, and various structural design standards, including AISC and ACI guidelines. Notably, it emphasizes the importance of full penetration weld testing, requiring visual and ultrasonic inspections. The timeline for project completion is set for December 2024, highlighting the urgency and compliance with local building regulations. This document reflects the thorough approach taken in government-related construction projects and provides essential information for bidding, planning, and safety compliance.
Mar 28, 2025, 7:05 PM UTC
The document outlines the roof framing plan for a project titled "A&E Patio Awning for Official Residence" located at Calle 4-30 Zona 14, Guatemala City. It includes detailed structural specifications related to steel beams, concrete kerbs, and welding details essential for the construction process. The plan emphasizes safety and structural integrity, adhering to local codes, such as the AGIES standards. Key elements include various beam specifications (e.g., W16 and W10 steel beams), concrete characteristics (4,000 psi), and reinforcement details. Additionally, it mentions the required visual and ultrasonic testing for welding by accredited facilities prior to proceeding with concrete slab work. The architectural drawing details allow for precise construction management, crucial for compliance with federal and state regulations pertinent to construction projects. The overall emphasis is on ensuring structural safety, quality control, and adherence to specified design codes while preparing for the construction of the awning.
Mar 28, 2025, 7:05 PM UTC
The document outlines the structural details and design specifications for the "A&E Patio Awning for Official Residence" project located at Calle 4-30 Zona 14, Guatemala City. It includes information on structural framing, material specifications, and seismic design criteria, referencing the relevant codes and standards such as the AISC and AGIES-2018. Key structural components include beams (W16 x 36, W16 x 50, and W16 x 67), columns, and plates, detailing their dimensions, welding requirements, and bolt specifications. Seismic coefficients and soil type classifications indicate the building's preparedness for potential seismic activity, critical for compliance with safety regulations. The design reflects meticulous attention to construction details aimed at ensuring structural integrity and safety in an official government setting. This document supports the broader framework of government procurement, particularly in managing federal and local construction projects, ensuring they meet established safety guidelines and engineering standards.
Mar 28, 2025, 7:05 PM UTC
The document outlines specifications for a PVC drainage and cleanout system at a project site located in Guatemala City. It details the various components, including PVC pipes of different diameters, infiltration wells, and drainage plans, all relating to stormwater management for the project, which appears to involve the construction of an awning for an official residence. Key features highlighted include the size and placement of cleanouts, reinforced concrete components, and grading levels for water management. The design also demonstrates careful consideration of ventilation and drainage systems to ensure adequate water flow and environmental compliance. The overall purpose is to provide a comprehensive drainage plan that aligns with federal and possibly local construction regulations while maintaining sustainable practices within the infrastructure development framework. This document serves as a resource for contractors and planners in executing the construction safely and effectively within the project guidelines.
Lifecycle
Title
Type
Solicitation
Similar Opportunities
Site Upgrade for Fall Hazard Protection and Mitigation Project
Buyer not available
The U.S. Department of State, through the Embassy in Guatemala, is seeking proposals for a Site Upgrade for Fall Hazard Protection and Mitigation Project at the Embassy compound in Zone 16, Guatemala City. The selected general contractor will be responsible for providing qualified personnel, materials, and supervision to complete the construction services within a 90-day performance period, adhering to U.S. design standards and local regulations. This project is critical for ensuring safety and compliance on embassy grounds, with a firm fixed-price contract anticipated. Interested contractors must submit their proposals electronically by May 9, 2025, and are encouraged to register on the System for Award Management (SAM) to meet federal requirements. For further inquiries, contractors may contact Beau Garrett at guatemalabids@state.gov or Ingrid Cifuentes at guatemalabids@state.gov.
US Embassy Guatemala Gardening Services for Official Residences
Buyer not available
The U.S. Embassy in Guatemala is seeking proposals for gardening services to maintain its official residences, including the Chief of Mission Residence and Deputy Chief of Mission Residence. The contractor will be responsible for providing all necessary labor, materials, and management to ensure the upkeep of garden areas across properties owned or managed by the embassy. This procurement reflects the embassy's commitment to maintaining its properties effectively and professionally, with a contract expected to span a base year and up to four optional one-year extensions. Proposals must be submitted electronically by April 16, 2025, following a pre-proposal conference scheduled for March 25, 2025, and interested contractors must be registered in the System for Award Management (SAM) to be eligible for consideration. For further inquiries, contact Beau Garrett at guatemalabids@state.gov or Ingrid Cifuentes at the same email address.
US Embassy Guatemala Exterior Cleaning Services
Buyer not available
The U.S. Department of State is preparing to issue a Request for Proposal (RFP) for exterior cleaning services at the U.S. Embassy in Guatemala, identified by RFP number 19GT5025R0006. The procurement aims to secure comprehensive exterior cleaning services for the embassy compound, requiring the contractor to provide all necessary labor, personnel, and management to fulfill these duties. This opportunity is crucial for maintaining the embassy's facilities and ensuring compliance with government procurement regulations. Interested vendors must be registered in the System for Award Management (SAM) prior to submission, and electronic responses are encouraged. The solicitation will be publicly available on SAM.gov, with a pre-proposal conference planned, and details will be provided in the formal solicitation.
GUATE - FACPMSC - FCUs AND VRF-VRV SYSTEMS
Buyer not available
The U.S. Department of State, through the U.S. Embassy in Guatemala, is seeking qualified contractors to provide preventive maintenance services for fan coil units and variable refrigerant flow (VRF/VRV) systems. The contract is set for one year, with the possibility of extending up to four additional years, and aims to ensure the efficient operation of these critical systems in compliance with established performance standards. Interested bidders must be registered in the System for Award Management (SAM) database and submit their quotations electronically by April 11, 2025, following a mandatory site visit on March 18, 2025. For further inquiries, potential bidders can contact Beau Garrett at guatemalabids@state.gov or Zayda Serech at serechza@state.gov.
GUATEMALA - Lighting Controlls Parts
Buyer not available
The U.S. Department of State, through the U.S. Embassy in Guatemala, is seeking proposals for the acquisition of spare parts for the lighting systems at the embassy. This procurement aims to ensure the functionality and compliance of the embassy's lighting systems with industry standards, requiring all materials to be new and of high quality. Interested vendors must submit their quotations by April 10, 2025, and adhere to specific submission requirements, including SAM registration and the completion of necessary forms. For further inquiries, potential offerors can contact Beau Garrett at guatemalabids@state.gov or Zayda Serech at serechza@state.gov.
Residential Generator Post Program Installation Civil Work
Buyer not available
The U.S. Embassy in Quito, Ecuador, is seeking a contractor for the Residential Generator Post Program Installation Civil Work, which involves the construction of concrete pads and civil structures to support generator installations at 17 embassy-owned and leased residences. The contractor will be responsible for providing all necessary labor, materials, and equipment under a firm fixed-price contract, ensuring compliance with U.S. and international building codes, and adhering to strict safety protocols throughout the project. Interested contractors must submit their quotations electronically by April 21, 2025, and ensure they are registered in the System for Award Management (SAM) prior to submission. For further inquiries, potential bidders can contact Deryl van Coblijn at QuitoContracts@state.gov or by phone at 59323985106.
Phase I – Minimum Mandatory Requirements of Offerors: Ulaanbaatar, Mongolia - New Embassy Compound
Buyer not available
The U.S. Department of State is seeking proposals for a Design-Build Contract for a New Embassy Compound in Ulaanbaatar, Mongolia, with an estimated project value between $300 and $330 million. The procurement aims to secure comprehensive design and construction services for various facilities, including office buildings, residential accommodations, and essential infrastructure, while ensuring compliance with the Omnibus Diplomatic Security and Antiterrorism Act of 1986. Offerors must demonstrate relevant experience on similar projects valued at a minimum of $150 million and possess a Secret facility security clearance, with proposals due by April 7, 2025. Interested parties can contact Dudley Greene at GreeneDL@state.gov for further information.
Ghana Warehouse, Maintenance, and Motor Pool Facility Project
Buyer not available
The U.S. Department of State is seeking qualified contractors for the Ghana Warehouse, Maintenance, and Motor Pool Facility Project, which involves the construction of multiple facilities at Camp Michel, Ghana. The project aims to enhance the operational capabilities of the Ghanaian Armed Forces by providing a multifunctional facility that includes an administration warehouse, maintenance bays, classrooms, and a motor pool, all essential for supporting peacekeeping missions. This initiative reflects the U.S. Government's commitment to strengthening international peacekeeping capacities through infrastructure development, with a focus on compliance with local building codes and quality assurance throughout the construction process. Interested contractors should contact Coy Brown at browncl1@state.gov or Joonpil Hwang at hwangj2@state.gov, with proposals due by July 21, 2025, following an extension from the original deadline.
19UZ8025Q0013 - Painting contract for residences.
Buyer not available
The U.S. Department of State, through the U.S. Embassy in Tashkent, is seeking qualified contractors for a painting contract for residences in Uzbekistan. The procurement involves providing all necessary labor, materials, equipment, and services to perform painting services at the embassy, with the contract expected to be awarded based on the lowest priced technically acceptable offer. This contract is crucial for maintaining the aesthetic and functional quality of embassy residences, ensuring a conducive living environment for staff. Interested contractors must submit their offers by April 18, 2025, and are required to be registered in the System for Award Management (SAM) prior to contract award. For further inquiries, potential bidders can contact Kathleen Murphy at murphykc@state.gov or Shukhrat Arifdjanov at ArifdjanovSS@state.gov.
CG25 GENERATORS/LIGHT TOWERS/MHE SERVICES
Buyer not available
The Department of Defense, specifically the Department of the Army, is soliciting proposals for the provision of Generators, Light Towers, and Forklift Services to support operations in Guatemala. The contractor will be responsible for supplying all necessary personnel, equipment, and supplies, while adhering to a Performance Work Statement (PWS) that outlines service requirements, including maintenance and fuel provisions, over a contract period from May 7 to May 24, 2025. This procurement is crucial for ensuring operational efficiency and emergency preparedness for U.S. military operations in the region. Interested vendors must submit their proposals by April 17, 2025, and can contact Phillip Magliba at phillip.t.magliba.mil@army.mil or Yesica M. Valladares at yesica.m.valladares.ln@mail.mil for further information.