RFP SC-25-658 Legacy Card Reader Upgrade
ID: RFP-SC-25-658Type: Solicitation
Overview

Buyer

ENERGY, DEPARTMENT OFENERGY, DEPARTMENT OFAMES LABORATORY - DOE CONTRACTORAmes, IA, 50011, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF GOVERNMENT-OWNED CONTRACTOR-OPERATED (GOCO) R&D FACILITIES (Y1HA)
Timeline
    Description

    The Department of Energy, through the Ames Laboratory, is seeking proposals for the Legacy Card Reader Upgrade project, aimed at enhancing the security system at its facility in Ames, Iowa. This procurement involves the replacement of outdated card readers to meet current security standards, with detailed specifications and project requirements outlined in the accompanying documents. The project is significant for ensuring the laboratory's access control systems are modernized and compliant with federal safety and construction regulations. Interested firms must submit their proposals by the specified deadlines, and for further inquiries, they can contact Andrew Saxton at saxton@ameslab.gov or Nicole Howe at nhowe@ameslab.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines the Terms and Conditions for Fixed-Price Construction Services at the Ames National Laboratory, managed by Iowa State University for the U.S. Department of Energy. It defines essential terms, specifies acceptance protocols, and establishes the order of precedence for contractual documents. Key provisions include requirements for bonds and insurance, detailed payment procedures, and grounds for dispute resolution, emphasizing negotiation and alternative dispute resolution (ADR). It mandates compliance with environmental protection laws and reporting obligations. The subcontractor is held responsible for patent indemnity and general liability, ensuring materials and supplies meet quality standards. Additionally, limits on governmental liability are stipulated, alongside clear policies for termination, assignment, export controls, and site access for non-U.S. nationals. These comprehensive guidelines aim to ensure rigorous compliance, safety, and accountability, highlighting the government’s emphasis on quality and legal adherence in public contracts.
    This document outlines the Environment, Safety and Health (ESH) requirements for subcontractors performing fixed-price construction services at Ames National Laboratory, operated by Iowa State University for the U.S. Department of Energy. It establishes the subcontractor's obligations to protect health, safety, and the environment, mandating compliance with various regulations including OSHA standards and protocols related to electrical safety, hazardous materials, and job safety analysis. Key provisions include the responsibilities of subcontractors for employee safety, notification protocols for accidents or violations, and requirements for personal protective equipment (PPE). It also details procedures for inspection, waste disposal, and emergency response while emphasizing cooperation with investigations following any incidents. The document stresses the importance of maintaining a drug-free workplace and outlines disciplinary measures for safety violations, including a structured approach for addressing infractions. Overall, this guidance serves to ensure a safe working environment consistent with applicable laws and DOE directives, while also emphasizing the importance of training and communication among subcontractors and their teams.
    The document outlines the Request for Proposal (RFP) for Access Control Upgrades – Phase 2 at Ames National Laboratory in Iowa, specifically focusing on the upgrade of the legacy card reader system. The RFP was issued on December 18, 2024, with a pre-proposal conference set for January 9, 2025. The project involves detailed procurement and contracting requirements, including provisions for project execution, payments, responsibilities of the contractor and subcontractors, and guidelines for compliance with safety and building standards. Key sections cover administrative responsibilities, changes in work scope, project scheduling, and the owner-contractor relationship. Emphasis is placed on the importance of adherence to Iowa construction laws, the necessity of quality control procedures, and the management of subcontractors for efficient project execution. This RFP serves to enhance security measures at the laboratory while ensuring compliance with regulatory requirements and proper project management practices.
    The document is an information questionnaire for contractors related to safety and quality assurance for the Ames Laboratory, part of a Request for Proposals (RFP). It requests critical safety and injury data from contractors, focusing on their Experience Modification Rate (EMR) over the past three years, details of workplace injuries and accidents reported in the OSHA No. 300 logs, and information regarding safety policies and training practices. Contractors must provide records on accident reporting frequencies, safety program management, and the structure of safety training for new hires and foremen. Additionally, it assesses the quality assurance levels of contractors' programs, offering four classifications from documented programs to those lacking one entirely. The questionnaire also outlines various areas of construction work, detailing both the tasks to be performed and whether they will be executed by the contractor or subcontractors. This thorough solicitation emphasizes the government's concern for contractor safety protocols and quality assurance before awarding contracts for construction projects within the laboratory setting.
    The document outlines the Intellectual Property Provisions (IPP) relevant to construction contracts that require data delivery. It includes various articles detailing authorization and consent for patent use, reporting obligations for patent and copyright infringement, royalty refund processes, and the scope of patent indemnity. The Government grants unlimited rights to data produced under the contract, with specific rules regarding copyright claims and the release of proprietary data. Additionally, stringent requirements for royalty payments and reporting are detailed, along with rights to proposal data submitted for contract consideration. This framework is essential for ensuring compliance with legal obligations related to intellectual property within federal and state/local RFPs and grants, safeguards the Government's interests, and clarifies the responsibilities and liabilities of contractors in relation to intellectual property created during contract performance. Overall, it serves to provide clarity on rights, responsibilities, and legal protections concerning intellectual property in government contracts.
    The Legacy Card Reader Project Appendix E outlines critical safety requirements and deliverables for contractors and subcontractors at Ames Laboratory. Contractors must comply with the DOE Worker Protection Plan and demonstrate adherence to ACGIH TLVs through industrial hygiene monitoring. Documentation, including training records and chemical safety data sheets (SDS), must be readily available. Specific safety concerns include potential exposure to mercury, beryllium, and asbestos, with appropriate evaluations and mitigation measures mandated prior to any work. Only qualified personnel may conduct electrical work, under strict safety protocols, including lockout/tagout procedures. Ladder safety and personal protective equipment (PPE) guidelines must be followed to ensure worker safety in hazardous environments. Noise levels exceeding 85 dBA require additional protections as per ACGIH standards. The document emphasizes the importance of adherence to safety protocols to prevent serious injuries or fatalities, marking it as a key framework for maintaining health and safety standards throughout the project's duration.
    The document outlines the affirmation and certification of environment, safety, and health (ESH) requirements related to the Legacy Card Reader Project at Ames National Laboratory, operated by Iowa State University for the U.S. Department of Energy. It specifies that the subcontractor must review and understand ESH requirements, affirming compliance with related clauses. These clauses encompass laws, regulations, and DOE directives, employee conduct, and safety protocols as established by Ames Lab. The subcontractor is required to communicate these obligations to all involved parties and provide documentation when requested by laboratory representatives. A legally authorized signatory from the subcontractor must complete and sign the form, certifying that the provided information is accurate and complete, thereby ensuring accountability under law. This document serves as a crucial compliance mechanism, essential for maintaining safety and regulatory adherence within the scope of government contracting.
    The document outlines the Representations and Certifications Supplemental required for suppliers and subcontractors working with Iowa State University (ISU), which operates Ames National Laboratory under a Department of Energy contract. Participation in contracts valued at $10,000 or more necessitates registration in the U.S. Government System for Award Management (SAM) and completion of designated sections in the form. Key sections address entity information, business size, compliance with export controls, certification of domestic product content, and assurances against contingent fees and segregation. Suppliers must certify compliance with nonsegregated facilities standards and report any use of radioactive materials. The form emphasizes the importance of accurate representations in the procurement process and specifies that all submissions must be signed by a person authorized to commit the organization legally. This protocol supports transparency, regulatory adherence, and ethical practices within government contracting, ensuring that procurements are carried out efficiently and lawfully.
    This document outlines the wage determination for building construction projects in Story County, Iowa, under the Davis-Bacon Act. Effective from October 4, 2024, it specifies minimum wage rates based on two Executive Orders: EO 14026 for contracts awarded on or after January 30, 2022, requiring at least $17.20 per hour, and EO 13658 for contracts awarded between January 1, 2015, and January 29, 2022, mandating at least $12.90 per hour. The file details wage rates and fringe benefits for various construction classifications including boilermakers, tile setters, ironworkers, and electricians, along with their corresponding wages and benefits. Additionally, the document emphasizes contractor responsibilities, including the submission of wage conformance requests if classifications are absent from the determination. It also discusses labor protections such as paid sick leave entitlements under EO 13706. The appeal process for wage determination decisions is elaborated on, including avenues for reconsideration and potential appeals to the Wage and Hour Administrator and the Administrative Review Board. This file is crucial for ensuring compliance in federal and state-funded construction projects while protecting worker rights and fair compensation.
    The document is a Statement and Acknowledgment form related to a subcontract under a prime contract, specifically focusing on compliance with labor standards and safety regulations. It outlines the roles of the prime contractor and subcontractor, including necessary information like names, addresses, and the nature of work performed. The prime contract does or does not contain clauses pertinent to the Contract Work Hours and Safety Standards Act. The section for the subcontractor includes acknowledgment of compliance with various labor-related requirements, ensuring adherence to regulations such as payrolls and basic records, withholding of funds, and wage rates. Additionally, it notes any intermediate subcontractors involved in the project. The specific subcontract pertains to replacing legacy card readers at Ames Laboratory, Iowa State University, aimed at upgrading the security system to meet current standards. The form is structured for authorized reproduction and contains important identifiers including the contract number and signing authority. This document plays a critical role in confirming project adherence to federal mandates, ensuring proper labor standards are met in government contracts.
    The document outlines a Request for Proposal (RFP) from Ames National Laboratory, part of the U.S. Department of Energy, for the project "Access Controls Upgrades – Phase 2 – Legacy Card Reader Update." Offerors are required to submit proposals that include a fixed price for labor, materials, and supervision necessary to complete the project in accordance with provided specifications and terms. Key components of the proposal include identifying key personnel, agreeing to comply with the construction schedule, providing a cost breakdown with margins, and acknowledging receipt of any addenda related to the RFP. Furthermore, Ames Lab retains the right to accept or reject offers within 30 days of bid opening, along with the discretion to seek clarifications or correct errors in the submitted proposals. This RFP represents the laboratory's initiative to enhance its security measures and modernize access control systems, emphasizing clarity in the bid submission process, which is vital for accountability and transparency in federal contracting.
    The Ames Laboratory, operated by Iowa State University for the U.S. Department of Energy, has issued a Request for Proposal (RFP) No. SC-25-658 for a Legacy Card Reader Upgrade. This RFP invites firms to submit proposals for specific goods and services outlined in the accompanying project specifications. The procurement process emphasizes open competition, encouraging participation from small and minority businesses, while adhering to federal acquisition standards. Key aspects include eligibility for educational discounts, authorization to purchase from government sources, and requirements for technical and price proposals to be submitted separately. Potential contractors must demonstrate their capabilities, past performance, and financial stability to determine their eligibility, with strict adherence to specified guidelines for proposal preparation and submission. Notably, the RFP includes a mandatory pre-proposal conference, and proposals will undergo a Lowest Price, Technically Acceptable (LPTA) evaluation process. Contractors are also informed of the necessity for bonds and insurance, compliance with construction wage rates under the Department of Labor, and adherence to the Buy American Act. Overall, the RFP outlines a structured and competitive process aimed at ensuring quality and value in the acquisition of goods and services for the laboratory's upgrade project.
    Lifecycle
    Title
    Type
    Solicitation
    Similar Opportunities
    RFP SC-25-637 Ames Infrastructure Modernization Project with RFP Addendums
    Active
    Energy, Department Of
    The Department of Energy, through the Ames Laboratory, is seeking proposals for General Construction Services as part of the Ames Infrastructure Modernization Project (RFP SC-25-637). The project aims to enhance the infrastructure of the Ames National Laboratory located in Ames, Iowa, and requires contractors to provide comprehensive construction services as outlined in the specifications and drawings dated September 26, 2024. This initiative is critical for modernizing laboratory facilities to ensure operational efficiency and safety, reflecting the government's commitment to maintaining high standards in federal contracting. Proposals are due by January 3, 2025, at 4:00 p.m. CST, and interested parties can contact Andrew Saxton at saxton@ameslab.gov or Nicole Howe at nhowe@ameslab.gov for further information.
    Integrated Biorefinery Facility North High Bay Revitalization Custom Equipment
    Active
    Energy, Department Of
    The Department of Energy, through the National Renewable Energy Laboratory (NREL), is soliciting proposals for the "Integrated Biorefinery Facility North High Bay Revitalization Custom Equipment" project. The objective is to design, build, and commission process equipment that will facilitate scale-up piloting experiments aimed at advancing renewable technologies for commercial deployment. This initiative is critical for enhancing biomass conversion and waste carbon utilization capabilities, ultimately supporting the U.S. government's commitment to sustainable energy solutions. Interested parties must submit their proposals electronically by February 7, 2025, with an estimated budget ranging from $9 million to $12 million, and can direct inquiries to Todd Labosky at Todd.Labosky@nrel.gov.
    Storage Ring ID Transition Chambers for the ALS-U
    Active
    Energy, Department Of
    The Department of Energy, through the Lawrence Berkeley National Laboratory (LBNL), is soliciting proposals for the procurement of Storage Ring ID Transition Chambers as part of the Advanced Light Source Upgrade (ALS-U) project. The procurement aims to enhance the capabilities of the ALS by acquiring 31 custom ID Transition chambers, which are critical for particle accelerator applications, ensuring compliance with stringent quality assurance and engineering specifications. Proposals must be submitted by January 10, 2025, and interested vendors can direct inquiries to Arielle Anoop at aanoop@lbl.gov or by phone at 510-486-5519. Additional documentation and specifications can be accessed via the provided Google Drive link.
    Semiconductor Parameter Analyzer
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance, LLC, is seeking proposals for a Semiconductor Parameter Analyzer to support research at the Fermi National Accelerator Laboratory in Batavia, Illinois. The procurement aims to acquire a commercial product that includes an analyzer mainframe, medium-power source measurement units, a pulse measurement unit, and a capacitance-voltage unit, all essential for advanced semiconductor testing and analysis. This equipment is critical for enhancing research capabilities in energy-related projects, ensuring compliance with federal regulations and standards. Interested vendors must submit their quotes, including completed certifications (SARC and PUR-466), by January 27, 2025, and can direct inquiries to Cathleen Stadler at cstadler@fnal.gov or by phone at 630-840-2763.
    Leak Detectors
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for the procurement of leak detectors, with a focus on enhancing leak detection capabilities. The request includes specific equipment such as remote control units, pumps, and sniffer probes, which are critical for ensuring precision and reliability in leak detection operations. This procurement is vital for Fermilab's scientific and operational missions, emphasizing compliance with federal regulations and quality assurance. Interested vendors must submit their proposals by December 30, 2024, at 4 PM CT, and can direct inquiries to Sharon Duchaj at sduchaj@fnal.gov or by phone at 630-840-8693.
    R--Site Security Services for the Department of Energ
    Active
    Energy, Department Of
    The Department of Energy (DOE) is soliciting proposals for site security services at its National Energy Technology Laboratory (NETL) facilities located in Morgantown, West Virginia; Pittsburgh, Pennsylvania; and Albany, Oregon. This opportunity is specifically set aside for 8(a) small businesses, aiming to enhance the physical security and badging services at these critical locations. The procurement is vital for ensuring the safety and security of DOE operations and assets, reflecting the importance of robust security measures in federal facilities. Interested parties should direct inquiries to Stefanie Page at stefanie.page@netl.doe.gov, with the solicitation deadline extended as per Amendment 0002, which also includes responses to questions submitted by potential bidders.
    EIC HSR BPM Button Assembly
    Active
    Energy, Department Of
    The Department of Energy, through Brookhaven National Laboratory, is soliciting proposals for the design and fabrication of the EIC HSR BPM Button Assembly, with the potential for awarding up to three subcontracts for both preproduction and production components. The procurement aims to support the Electron-Ion Collider project, which is critical for advancing research in nuclear physics by providing essential components that operate within ultra-high vacuum environments. Interested vendors must submit their proposals electronically by January 17, 2025, with all communications directed to Kevin Kirkendall at kkirkenda@bnl.gov. The project emphasizes compliance with stringent technical specifications and quality assurance standards, reflecting the government's commitment to scientific advancement and rigorous procurement processes.
    Fire House Generator and ATS Replacement
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the replacement of a generator and an automatic transfer switch (ATS) at the Fire House located in Batavia, Illinois. The project requires the selected contractor to provide all necessary supervision, labor, materials, and equipment to complete the work as outlined in the technical specifications and drawings, ensuring compliance with safety and regulatory standards. This procurement is critical for maintaining operational safety and infrastructure at Fermilab, reflecting the federal government's commitment to modernizing essential facilities. Proposals are due by January 13, 2025, at 5 PM CT, and interested parties can contact Danielle Amico at damico@fnal.gov or 630-840-3207 for further information.
    APS-U Repurposing of Shielded Transport for Beamline 34-ID
    Active
    Energy, Department Of
    The Department of Energy, through UChicago Argonne, LLC, is soliciting proposals for the fabrication and installation of shielded transports for X-ray delivery at the Advanced Photon Source's Beamline 34-ID in Lemont, Illinois. The project involves modifying an existing transport section, constructing support pedestals, and making necessary enclosure modifications, all in accordance with specified requirements. This work is crucial for the effective transport of hard X-ray beams between shielded experimental enclosures, enhancing the capabilities of the synchrotron beamlines. Proposals are due electronically by January 10, 2025, following a pre-proposal meeting on December 18, 2024, with contract awards expected around January 31, 2025, and project completion by April 30, 2025. Interested bidders should contact Robert K Kman at kman@anl.gov or 630-252-6488 for further details and access to the proposal documents.
    Facility Gates Semi Annual Preventative Maintenance Inspection
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Agricultural Research Service (ARS), is seeking proposals for a Facility Gates Semi-Annual Preventative Maintenance Inspection at their facility in Ames, Iowa. The contract requires the contractor to perform two inspections per year, scheduled for April and October, ensuring the optimal functionality of 24 security slide gates, including tasks such as lubrication, power supply checks, and safety inspections. This procurement is crucial for maintaining the security infrastructure at federal facilities, reflecting the government's commitment to safety standards. Interested small businesses must submit their proposals, including a completed SF1449 form, by 23:00 PM ET on December 23, 2025, and can direct inquiries to Tiffany Reval at tiffany.reval@usda.gov or by phone at 580-318-0321.