Z2DA--564-21-700 | Construct EHRM Infrastructure Upgrades | Fayetteville, AR
ID: 36C77625R0039Type: Presolicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OFPCAC (36C776)INDEPENDENCE, OH, 44131, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES (Z2DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Timeline
    Description

    The Department of Veterans Affairs is seeking qualified contractors for the EHRM Infrastructure Upgrades project at the Fayetteville Veterans Affairs Medical Center in Arkansas. This project, valued between $20 million and $50 million, focuses on renovating and expanding telecommunications rooms across multiple buildings to enhance functionality and compliance with applicable building codes, while ensuring minimal disruption to ongoing medical operations. The initiative underscores the importance of modernizing healthcare infrastructure to improve operational efficiency and safety within the VA system. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit proposals electronically by June 13, 2025, with all inquiries directed to Contract Specialist Mario Hairston at Mario.Hairston@va.gov or Scott Elias at scott.elias@va.gov.

    Point(s) of Contact
    Mario HairstonContract Specialist
    (216) 447-8300
    mario.hairston@va.gov
    Files
    Title
    Posted
    The EHRM Infrastructure Upgrades project at the Fayetteville VA Medical Center focuses on enhancing the Electronic Health Record Modernization (EHRM) infrastructure. This initiative involves general construction, site preparation, and the removal of existing structures to improve the facility's technological capabilities. Safety and security measures are paramount, requiring contractors to comply with VA regulations and undergo stringent site access protocols. Key phases include the construction of new telecommunication rooms, installation of a fiber backbone, and upgrades to electrical systems. The project emphasizes minimizing disruptions to ongoing medical operations, mandating that work in critical areas is conducted during non-peak hours whenever possible. Collaboration with VA staff is essential for planning the execution and phasing of construction to avoid affecting patient care. The project underscores the VA’s commitment to maintaining operational efficiency and modernizing its healthcare systems in line with federal standards. Overall, the document outlines comprehensive safety requirements, operational protocols, and a structured timeline for the project to ensure minimal interruption to services while achieving the upgrade objectives.
    The document outlines the commissioning requirements and specifications for fire suppression systems as part of the EHRM Infrastructure Upgrades project at the Fayetteville VAMC, Arkansas. It details mechanisms for the commissioning and inspection of fire suppression systems, underlining the Contractor's responsibility to ensure compliance with standards set forth in the General Commissioning Requirements. The project includes commissioning tasks such as construction inspections, completion of pre-functional checklists, contractor tests, and systems functional performance testing, all managed by a designated Commissioning Agent appointed by the VA. Additionally, specifications for wet-pipe sprinkler systems and clean agent fire suppression systems are provided, adhering to NFPA regulations. The requirements encompass design, installation, testing, and a commitment to quality assurance, emphasizing the need for qualified contractors and training of VA maintenance personnel. This comprehensive approach aims to ensure the effective implementation of fire safety measures within the facility while maintaining adherence to all applicable codes and standards. The document serves as a critical guideline in managing safety and operational efficiency during and post-construction phases.
    The document serves as an installation and owner’s manual for the DoorKing® Barrier Gate Operator, specifically for circuit board models 1601-010 Revision AK and higher. It emphasizes the critical importance of safety when installing and operating the barrier gate, warning that a moving arm can cause severe injury or death. The manual details safety instructions, installation requirements, and entrapment protection classifications as per UL 325 standards. It specifies that a trained technician must perform installation and that various external sensors and safety features should be utilized to prevent accidents. The document outlines key considerations for installation, including the need for a secure concrete pad, proper wiring per local codes, and the installation of safety components like photocells. It also details the specifications for the different models, including arm length options and power requirements. The importance of signage, such as warning labels, is highlighted to ensure safety around the gate operation area. Overall, the manual reinforces compliance with safety regulations and the necessity for professional installation to enhance operational standards and diminish risks associated with vehicular barrier gate operations.
    This document outlines the door schedule and general notes for a construction project overseeing the installation of doors and frames, specifically within a data center and various other building types. Key directives include the need for contractors to verify door sizes and wall thicknesses prior to ordering and to ensure door frames have a positive relief to existing walls. The specifications adhere to prescribed standards for fire ratings, hardware sets, and door types, with materials primarily being hollow metal (HM) and wood, finished with paint. The schedule details various door sizes, types, frame materials, and the fire ratings required for multiple locations, including new blast walls and existing walls (drywall and concrete). It specifies that fire ratings must comply with relevant authorities. The project is part of an upgrade initiative managed by the U.S. Department of Veterans Affairs, addressing infrastructure improvements crucial for operational effectiveness and safety in building environments. Overall, the document is critical for ensuring compliance and operational integrity in the context of federal construction projects.
    The document outlines extensive electrical and mechanical upgrades designed for the new data center at the Fayetteville, Arkansas Veterans Affairs facility, attributed to the EHRM Infrastructure Upgrades project. These upgrades encompass power distribution systems, lighting, HVAC, fire alarms, and grounding configurations. Emphasizing adherence to safety standards, the plans detail precise specifications, coordination tasks with various contractors, and protocols for installation. Key features include provisions for emergency shutdown controls, low-voltage transformer requirements, and robust grounding systems. The initiative focuses on enhancing the facility's operational resilience, energy efficiency, and compliance with federal and state guidelines. Overall, the upgrade project reflects the Veterans Affairs Department's commitment to modernizing infrastructure to meet the increasing demands of data management and ensure safety for both personnel and equipment.
    The document outlines technical specifications for mechanical systems as part of the EHRM Infrastructure Upgrades at the Fayetteville VA. It details various equipment schedules including energy recovery ventilators, fire and smoke dampers, fans, CRAC units, and ductless split cooling units, specifying their performance data, locations, and required configurations. The schedules emphasize key requirements such as airflow rates, electrical specifications, installation arrangements, and compliance with safety standards. Particularly, it highlights the expected performance of the energy recovery ventilators with efficient airflow transitions and smart electrical connections. Fire dampers are required to interconnect with fire alarms, ensuring safety protocols are met. Additionally, the cooling units must be equipped with controls that integrate with the Building Management System (BMS) for new installations, focusing on energy efficiency and operational redundancy. Overall, the document serves as a comprehensive guide for contractors and engineers, ensuring adherence to design standards and government regulations throughout the construction and upgrading processes in VA facilities, while reinforcing the commitment to enhanced mechanical systems and infrastructure resilience.
    Southern Environmental Management and Specialties (SEMS) conducted an asbestos and lead inspection at the VA Medical Center in Fayetteville, Arkansas, for Spees Design Build. The inspections took place from May 23 to 25, 2023, involving over 78 samples from various materials, utilizing Polarized Light Microscopy for asbestos and an X-Ray Fluorescence analyzer for lead detection. Results indicated that black mastic and white sealant contained 3-4% chrysotile asbestos, categorizing them as non-friable asbestos-containing materials, requiring licensed abatement before renovations. A total of 175 lead readings were collected, with 25 exceeding 1.0 mg/cm², all in good, intact condition; thus, no immediate remedial action was necessary, but periodic monitoring was recommended. The report concludes that SEMS cannot assure the absence of hazardous materials outside the inspected areas and outlines the need for licensed contractors for any future abatement activities. This assessment underscores the importance of health and safety standards in government facilities and the necessary adherence to environmental regulations during renovation projects.
    McClelland Consulting Engineers, Inc. submitted a Geotechnical Report for the proposed Veterans Affairs (VA) MCR Building in Fayetteville, Arkansas, outlining the subsurface conditions relevant for the project. The investigation consisted of four borings, revealing that the site primarily features topsoil, Lean Clay, and Clayey Sand, with no groundwater or auger refusal materials encountered. The report recommends a conventional shallow foundation system with specific bearing capacities for footings, alternative foundation solutions like rammed aggregate piers (RAP) and micropiles for deeper support if necessary. The site preparation should remove topsoil and organics to promote stability, and grading adjustments are advised to account for natural topography. Recommendations for pavement design cater to varying traffic loads, incorporating select fill materials for stability. All construction practices must integrate monitoring and special inspections for compliance with established engineering protocols. The report aims to ensure safe structural support and project success, emphasizing the importance of thorough geotechnical analysis in aligning with federal infrastructure project standards.
    The document outlines the specifications for roof specialties related to the EHRM Infrastructure Upgrades project at the Fayetteville Veterans Affairs Medical Center, aimed at improving the facility's roofing systems. It details the types of materials required, including aluminum and stainless steel, along with performance standards for weather resistance and thermal movement. The document emphasizes quality control, requiring products from established manufacturers and compliance with several ASTM standards and industry publications. Installation guidelines focus on sound substrate conditions, proper underlayment, and detailed procedures for fastening various components like coping, gravel stops, and expansion joints. The summary underscores the project's commitment to sustainability, with a stipulation for recycled content in materials. It reflects adherence to robust engineering practices, ensuring the roofing system's structural integrity and longevity, highlighting the government’s approach to maintaining and upgrading healthcare facilities effectively.
    The government file outlines specifications for the EHRM Infrastructure Upgrades project at the Fayetteville Veterans Affairs Medical Center, focusing on door hardware installation. It details requirements for various types of door hardware, including locks, hinges, closers, and safety systems, emphasizing compliance with the ABAAS, IBC, and NFPA standards. The document covers warranty terms, submission procedures, and maintenance manuals, detailing the need for pre-installation meetings and proper installation practices. Key points include requirements for hardware conformity to safety standards, appropriate installation procedures, and rigorous testing and compliance certifications. It specifies manufacturer preferences for uniformity in hardware sets and outlines quantities of keys and locks for security management. The document underscores the importance of coordination among contractors, architects, and hardware consultants to ensure effective project execution. Ultimately, the specifications demonstrate the federal government's commitment to enhancing facility security while maintaining compliance with safety regulations and standards.
    The EHRM Infrastructure Upgrades project at the Fayetteville VAMC focuses on enhancing low-voltage transformer installations. This document outlines specifications for the furnishing, installation, and testing of dry-type transformers, detailing a range of requirements categorized under general, product-specific, and execution guidelines. Key sections highlight essential related work, quality assurance measures, and comprehensive submittal processes which include shop drawings and maintenance manuals. The transformers must meet various standards from organizations such as NEMA, UL, and the International Building Code to ensure safety and performance. Additionally, the document stipulates installation protocols, seismic restraint compliance, and acceptance testing that must be conducted to verify that the transformers function effectively and are properly grounded. Ultimately, this project illustrates the government’s focus on upgrading infrastructure in healthcare facilities to enhance operational reliability and safety.
    The document outlines specifications for the installation of conduits and backboxes for communication systems as part of the EHRM Infrastructure Upgrades project at the Fayetteville VAMC in Arkansas. Key elements include detailed requirements for materials, sizes, and types of conduits, specifying rigid and flexible options made from galvanized steel, aluminum, and PVC. Essential installation guidelines focus on maintaining structural integrity and fire safety, necessitating correct sealing and support systems. The document also emphasizes the necessity of submittals, including layout and size of components, along with certification for compliance with construction documents. The purpose is to establish standards for contractors regarding the communication systems infrastructure, ensuring both functionality and safety. Compliance with local and federal safety regulations plays a significant role, aiming to enhance the hospital's communications infrastructure effectively. Overall, the document serves as a comprehensive guide for contractors involved in the project, detailing expectations to maintain high standards in infrastructure development and safety.
    The Department of Veterans Affairs (VA) is planning to issue a Request for Proposal (RFP) for the construction of Electronic Health Record Management (EHRM) Infrastructure Upgrades at the Fayetteville Veterans Administration Medical Center in Arkansas. This project entails comprehensive upgrades to the IT infrastructure, including new telecommunication rooms, fiber optics, renovations to the data center, and re-cabling with high-performance cabling standards. The contract will be structured as a single Firm-Fixed-Price award, limited to Service-Disabled Veteran-Owned Small Businesses (SDVOSB), and will be evaluated based on Lowest Priced Technically Acceptable (LPTA) criteria. The solicitation is expected to be published in late December 2024, with a performance period of approximately 548 days. The total construction cost is anticipated to range from $20 million to $50 million. For inquiries, all questions must be directed via email to the specified contracting officer.
    The document outlines a Request for Proposal (RFP) for the Project 564-21-700 EHRM Infrastructure Upgrades at the Fayetteville Veterans Administration Medical Center in Arkansas. The project, valued between $20 million and $50 million, is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and requires contractors to provide essential labor, materials, and equipment for infrastructure upgrades. The contractor must begin work within a specified timeframe and complete it within 548 calendar days following the notice to proceed. A site visit is scheduled, and proposals must be submitted electronically by the deadline given in the solicitation. The RFP stipulates that offers will be evaluated based on technical qualifications, key subcontractors, project execution, and price, with a "Lowest Price Technically Acceptable" methodology. Contractors are responsible for adhering to various federal regulations, and must be registered in the System for Award Management (SAM). The evaluation will prioritize compliance with safety standards and provide a clear project schedule. Overall, this RFP represents the government's commitment to enhancing VA facilities while ensuring opportunities for veteran-owned businesses to engage in substantial government contracts.
    The document outlines an amendment to a solicitation related to the EHRM Infrastructure Upgrades project administered by the Department of Veterans Affairs (VA). The amendment includes key updates such as the incorporation of the site visit sign-in roster and agenda, along with critical details regarding the bidding process for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns under NAICS Code 236220. The amendment emphasizes that only certified SDVOSBs can submit proposals, as offers from other businesses will be deemed ineligible. The solicitation closing date is set for June 2, 2025, with all technical questions to be submitted in writing by May 16, 2025. The document clarifies that proposals must be submitted electronically, with specific submission guidelines laid out in the solicitation. Furthermore, it states that a bid bond submission is now solely required in electronic format, eliminating the need for hard copies. The project's estimated cost is between $20 and $50 million, with a performance timeline of 548 calendar days upon receipt of the notice to proceed (NTP). Overall, the document serves to provide bidding information and updates relevant to interested contractors.
    The document serves as an amendment to a solicitation by the Department of Veterans Affairs (VA), specifically concerning contract number 36C77625R0039. The primary purpose of the amendment is to extend the proposal submission deadline to June 13, 2025, at 2:00 PM EDT. It also introduces additional specifications regarding project management and coordination, as detailed in Attachment A. The amendment explicitly states that all other terms and conditions of the original solicitation remain unchanged. Offerors are instructed to acknowledge receipt of the amendment in their submissions to ensure compliance with the extended deadline. This update is critical for contractors bidding on the project, reinforcing the VA's commitment to maintaining thorough oversight and management of the contracting process while ensuring all interested parties have adequate time to prepare their proposals.
    The EHRM Infrastructure Upgrades project in Fayetteville, AR, focuses on enhancing project management and coordination through mandated digital tools and collaboration among contractors. The project specifications outline the use of a web-based project management software, such as Procore or Oracle Primavera, which will facilitate communication and documentation during the project lifecycle. Key features of the software include data compilation of all project participants, customizable document workflow, tracking of communications like RFIs and change orders, and secure document management. Furthermore, the contractor is responsible for providing user licenses and training for all key stakeholders. At project completion, a digital archive in a secure, unmodifiable format will be delivered. This structured approach aims to streamline operations and ensure thorough documentation and accountability throughout the upgrade process, reflecting the project’s commitment to effective project management and compliance with federal and state standards.
    The document is an amendment to a solicitation issued by the Department of Veterans Affairs, specifically under Program Contracting Activity Central. It primarily serves to extend the proposal due date for submission to June 18, 2025, at 2:00 PM EDT. Additionally, it updates the wage determination, provides answers to requests for information (RFI), and publishes addendums to the original specifications and drawings. The document mentions that all other terms and conditions of the original solicitation remain unchanged, ensuring continuity in the contract process. Three attachments accompany the amendment: addendums, a revised wage determination, and the RFI response. This amendment reflects standard procedures in federal contracting, facilitating clear communication between the government and potential contractors while ensuring compliance with updated labor standards. Overall, the document emphasizes the VA's intent to manage its proposal processes effectively while maintaining transparency and thoroughness.
    This document presents Wage Determination AR20250035 for construction projects in Washington County, Arkansas, issued under the Davis-Bacon Act. It mandates that contracts entered into on or after January 30, 2022, adhere to a minimum wage of $17.75 per hour, while those awarded between January 1, 2015, and January 29, 2022, must ensure a minimum of $13.30, unless higher wage rates are specified. Various construction trades are covered, each with specified hourly rates and fringe benefits. Notably, this document includes various classifications such as boilermakers, carpenters, electricians, and laborers, detailing their respective wage requirements. The document emphasizes the application of Executive Orders 14026 and 13658 concerning minimum wage and provides information on worker protections, including paid sick leave provisions under Executive Order 13706. This summary outlines appeal processes for wage determination disputes, indicating that any grievances can be addressed through the Department of Labor's Wage and Hour Division. This wage determination underscores federal compliance regarding labor standards, worker pay, and protections in construction projects funded or undertaken by government entities.
    The EHRM Infrastructure Upgrades at Fayetteville VAMC involve addressing technical inquiries related to the project. The document details numerous questions submitted by contractors regarding project specifications, equipment installations, material types, and compliance with existing systems. Clarifications include the provision of network switches by the VA, the acceptable materials for ductwork, and specific requirements for telecommunications infrastructure. The responses emphasize the need for compatibility with current VA systems and the responsibilities of contractors for additional cable drops. Further, there are stipulations for regulatory compliance, safety measures during construction, and the management of existing infrastructure. The document illustrates the complexity of the project, requiring meticulous attention to detail and coordination between multiple contractors while adhering to federal procurement guidelines. This initiative reflects the government’s commitment to upgrading healthcare facilities and ensuring they meet modern operational standards.
    The document outlines wage determinations for residential construction projects in Washington County, Arkansas, under the Davis-Bacon Act. It delineates applicable minimum wage rates based on the contract award date and executive orders—Executive Order 14026 mandates a minimum of $17.75 per hour for new contracts post-January 30, 2022, while Executive Order 13658 applies minimum wages of $13.30 for contracts awarded between January 1, 2015, and January 29, 2022. Detailed wage rates for various construction roles such as cement masons, carpenters, electricians, and laborers are included. Adjustments to minimum wage rates will occur annually, and contractors must adhere to additional sick leave requirements as imposed by Executive Order 13706 for contracts awarded after January 1, 2017. The document also provides a comprehensive process for appealing wage determinations and emphasizes compliance with federal guidelines to protect workers' rights. This summary is essential for contractors, ensuring they remain informed about wage requirements and related labor standards for upcoming construction projects financed through federal channels.
    The document outlines the proposed EHRM Infrastructure Upgrades project at the Fayetteville Veterans Affairs facility, focusing on the renovation and expansion of telecommunications rooms within multiple medical and non-medical buildings in Fayetteville, Arkansas. Spees Design Build is the primary contractor, partnering with multiple consultants for specific engineering disciplines, including electrical and civil engineering. Key project components involve field verification of existing conditions, coordination with all construction documents, and strict adherence to health and safety regulations. General guidelines emphasize the need for high workmanship levels, necessary permits, and the protection of existing site conditions during construction. Contractors are responsible for damage mitigation and comprehensive environmental safety measures, including stormwater management and traffic control. This modernization effort reflects the government's commitment to enhancing facility infrastructure, ensuring compliance with local, state, and federal regulations while improving the operational capacity of the VA healthcare system.
    The EHRM Infrastructure Upgrades project at the Fayetteville VA aims to enhance and renovate telecommunication rooms across several buildings while adhering to federal and local regulations. The project involves the reconfiguration, expansion, and renovation of existing spaces, ensuring compliance with the International Building Code, National Fire Protection Agency standards, and VA-specific guidelines for infection control and safety. Various engineering disciplines, including mechanical, electrical, and plumbing, are involved, with the contractor responsible for maintaining high workmanship quality and safety standards throughout construction. The work schedule emphasizes minimal disruption to ongoing operations, particularly in active medical spaces, and requires close coordination with the VA's representatives. The document outlines essential notes for the contractor relating to project specifications, existing conditions, and the precise requirements for maintaining effective infection control measures. This comprehensive initiative underscores the VA's commitment to improving healthcare infrastructure while ensuring safety and compliance throughout the process.
    The document details the EHRM Infrastructure Upgrades project at the Fayetteville, Arkansas Veterans Affairs facility. Spees Design Build serves as the primary contractor, overseeing renovations across numerous buildings. The project aims to enhance telecommunication rooms by improving, reconfiguring, expanding, and renovating existing spaces while adhering to applicable building codes and VA standards. Emphasizing meticulous coordination among various engineering disciplines, including fire protection, plumbing, electrical, and mechanical, the project prioritizes high workmanship standards and comprehensive site assessments. Key aspects include the replacement of sprinkler systems, installation of HVAC units, and ensuring all work aligns with safety regulations, such as ICRA class requirements to mitigate infection risks during construction. The approach underscores the VA’s commitment to modernizing facilities while ensuring safety and compliance across all renovations.
    The document outlines the EHRM Infrastructure Upgrades project at the Veterans Affairs facility in Fayetteville, Arkansas, primarily conducted by Spees Design Build and WSP USA Solutions, Inc. This initiative focuses on renovating and expanding telecommunications rooms across several buildings to enhance functionality and compliance with applicable building codes. Key elements include comprehensive mechanical, electrical, plumbing, and structural work, demanding coordination with various subcontractors and adherence to high workmanship standards. Contractors are required to thoroughly familiarize themselves with existing conditions before commencing work, ensuring compliance with project specifications. Safety measures, including infection control during construction, are emphasized due to the facility's nature as a healthcare environment. The document serves as a guide for contractors and stakeholders, detailing general notes, specific requirements, and drawing indices to facilitate the project's effective execution. Overall, the project demonstrates a commitment to improving infrastructure within the VA while prioritizing operational efficiency and safety.
    The document outlines the EHRM Infrastructure Upgrades project for the U.S. Department of Veterans Affairs in Fayetteville, Arkansas. The primary objective is to improve, reconfigure, and expand existing spaces for new telecommunications rooms across various buildings (01, 02, 03, etc.) within the facility. The project involves collaboration between multiple engineering disciplines, including structural, electrical, mechanical, and plumbing, all managed by Spees Design Build and WSP USA Solutions. Key considerations include thorough coordination with existing conditions, adherence to architectural specifications, and compliance with ICRA requirements for infection control. Contractors are required to verify existing site conditions prior to commencing work, ensuring high workmanship standards throughout the project. Detailed telecommunication plans for each building level are provided, with a focus on safety measures to remain compliant with federal standards. The scope emphasizes the installation and management of telecommunication pathways, equipment labeling, and documentation of as-built conditions, ensuring that all systems meet design and operational requirements. This initiative represents the VA's commitment to enhancing facility infrastructure to better serve veterans' needs while maintaining rigorous safety and regulatory standards.
    The RFP 36C77625R0039 pertains to the construction of the EHRM facility in Fayetteville, Arkansas, under the Veterans Affairs (VA) guidelines. This document emphasizes compliance with subcontracting limitations, mandating that contractors must not pay more than 85% of government payments to non-certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) or Veteran-Owned Small Businesses (VOSBs). Contractors must act in good faith and are subject to verification by the VA regarding their compliance. The certified offeror must submit a formal certification confirming adherence to these limitations as part of their bid package; failure to comply may result in exclusion from contract considerations. The RFP also includes penalties for providing false information, such as legal consequences under Title 18 of the U.S. Code. Contractors are required to maintain documentation that supports their compliance and must cooperate with the VA's requests for such records throughout the contract period. This RFP highlights the VA's commitment to ensure partnerships with veteran-owned businesses while promoting transparency and accountability in federal contracting processes.
    Similar Opportunities
    Y1DA--516-21-106 EHRM Infrastructure Upgrades Construction - Bay Pines VAMC
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the EHRM Infrastructure Upgrades Construction project at the Bay Pines VA Medical Center in Florida. This procurement, identified by solicitation number 36C77625B0023, involves construction services aimed at enhancing the electronic health record management infrastructure, with a total estimated contract value of approximately $34,888,000. The project is particularly significant as it supports the modernization of healthcare facilities for veterans, ensuring improved service delivery. Interested parties, especially Service-Disabled Veteran-Owned Small Businesses, should direct inquiries to Contract Specialist Thomas Council at Thomas.Council@va.gov, with bids having been opened on November 12, 2025, following the issuance of the solicitation on July 2, 2025.
    Z1DA--648-24-701 EHRM Infrastructure Upgrades Phase 2 Construction - Portland, OR
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is preparing to solicit bids for the Design-Bid-Build EHRM Infrastructure Upgrades Phase 2 project at the Portland VA Health Care System, which encompasses significant construction and infrastructure enhancements in Portland, OR, and Vancouver, WA. The project requires contractors to assess existing conditions, perform demolition, and provide comprehensive labor, materials, and supervision across various disciplines, including civil, plumbing, mechanical, electrical, and electronic work. This initiative is crucial for upgrading the facility's infrastructure, including fiber optic installations, HVAC systems, and fire safety measures, ensuring improved operational efficiency and safety for veterans. The solicitation, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), will be issued as an Invitation for Bid (IFB) in late October 2025, with an estimated construction value between $5 million and $10 million and a performance period of approximately 365 days. Interested parties can direct inquiries to Contract Specialist Sierra Tate at Sierra.Tate@va.gov or by phone at 216-447-8300.
    Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Springs
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the EHRM Tier 2 Data Center Construction project located at the West Texas VA Health Care System in Big Spring, Texas. This procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, requiring contractors to provide all necessary tools, equipment, materials, labor, and supervision to complete the renovation within 225 calendar days. The project is crucial for enhancing the data management capabilities of the VA, with an estimated cost between $5,000,000 and $10,000,000. Interested bidders must submit their proposals electronically by January 8, 2026, at 12:00 PM EST, and can direct inquiries to Contract Specialist Devin M. Russell at devin.russell@va.gov.
    Y1BG--Brooklyn EHRM Infrastructure Upgrades Construction VA Medical Center Brooklyn, NY 630A4-22-700
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking bids for a firm-fixed-price contract for the EHRM Infrastructure Upgrades construction project at the Brooklyn VA Medical Center in New York. The project entails comprehensive site preparation, including demolition and removal of existing structures, and the provision of labor and materials for various infrastructure upgrades, such as electrical systems, HVAC, communication infrastructure, and physical security enhancements. This initiative is critical for modernizing the facility's capabilities and ensuring efficient operations within the healthcare system. The solicitation, set to be issued in January 2026, is designated as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with an estimated construction magnitude between $20 million and $50 million. Interested parties should direct inquiries in writing to Kara Evert at kara.evert@va.gov, as phone calls will not be accepted.
    Y1DA--Project 549A4-21-703 EHRM Training and Admin build
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the EHRM Training and Admin Support Space project (Project Number 549A4-21-703) at the Sam Rayburn Memorial Veterans Center in Bonham, Texas. This project involves the renovation of four rooms to create temporary EHRM classrooms and an office, including asbestos abatement, interior demolition, and installation of new HVAC equipment and finishes. The procurement is set aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSBC) under NAICS code 236220, with a contract value estimated between $500,000 and $1 million. Interested contractors must submit their proposals by January 15, 2026, and can contact Contract Specialist Jose Reveles at jose.reveles@va.gov for further information.
    Z1DA-- Renovate OR for Hybrid Installation
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the renovation of operating rooms for a hybrid installation at the VA Northern California Healthcare System in Mather, California. This project involves the comprehensive renovation of approximately 12,500 square feet of existing operating room space, including the upgrade of four operating rooms and the addition of a fifth hybrid operating room, with a focus on adhering to current VHA Design Guides. The renovation is crucial for enhancing surgical capabilities and ensuring compliance with modern healthcare standards. Interested contractors, particularly those classified as Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit their proposals by January 29, 2026, following a mandatory site visit on December 11, 2025. For further inquiries, contractors can contact Contract Specialist Charee Harris at charee.harris@va.gov or by phone at 775-788-5511. The estimated project value ranges between $10 million and $20 million.
    Y1DZ--EHRM Infrastructure Upgrades Tier 1 Construction 695-21-700 Milwaukee
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking proposals for the EHRM Infrastructure Upgrades Tier 1 Construction project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. This project involves a single firm-fixed-price contract for design-bid-build infrastructure improvements, including electrical upgrades, HVAC assessments, communication infrastructure enhancements, and physical security upgrades across multiple buildings on the campus. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and is anticipated to be issued in early to mid-January 2026, with a performance period of approximately 1,460 calendar days and an estimated construction magnitude between $50 million and $100 million. Interested parties should direct all inquiries to Contract Specialist Bailey Donato at bailey.donato@va.gov.
    Z1DA--Upgrade HVAC System Phase II
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the "Upgrade HVAC System Phase II" project at the Salem VA Medical Center in Salem, Virginia. This project involves the demolition, modification, and installation of a new HVAC system on the second floor of Building 143, with a contract value estimated between $5,000,000 and $10,000,000, specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The successful contractor will be responsible for adhering to strict safety, security, and quality control measures throughout the project, which has a performance period of 365 calendar days. Interested parties must submit electronic bids by January 6, 2026, at 5:00 PM EST, with a mandatory pre-bid conference scheduled for December 11, 2025, and all inquiries directed to Contract Specialist Bryant L Guerrant at bryant.guerrant@va.gov.
    Z2DA--Replace MRI 1.5T
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors to undertake the project titled "Replace MRI 1.5T" at the Durham VA Health Care System in North Carolina. The project involves comprehensive construction services, including the removal of an outdated MRI machine and the installation of a new 1.5T MRI, while addressing critical deficiencies such as RF shielding, fire sprinkler systems, HVAC, and electrical outlets. This initiative is vital for modernizing imaging services for veterans, ensuring compliance with stringent safety and operational standards. Interested contractors should note that this is a Total SDVOSB Set-Aside opportunity, with a project magnitude between $500,000 and $1,000,000, and sealed bids are due by January 6, 2026, at 11:00 AM EST. For further inquiries, contact Contract Specialist Michael R Proctor at Michael.Proctor2@va.gov.
    Z2DA--Replace Auxiliary Chiller
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the replacement of a 120-ton auxiliary chiller and two 250 gpm pumps at Building 3 of the Fayetteville VAMC, under project number 565-24-113. The contractor will be responsible for removing the existing chiller, installing a new one of the same capacity, and ensuring integration with the existing Building Automation System, while adhering to all applicable safety and regulatory standards. This project is crucial for maintaining chilled water redundancy for the facility, ensuring continuous operation and safety for its medical services. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit their bids by January 26, 2026, and can direct inquiries to Contract Specialist Michael R Proctor at Michael.Proctor2@va.gov. The estimated construction magnitude is between $250,000 and $500,000.