The Department of Veterans Affairs is soliciting bids for the "Upgrade HVAC System Phase II" project at the Salem VA Medical Center in Virginia. This project involves the demolition, modification, and installation of a new HVAC system on the second floor of Building 143, with a contract value estimated between $5 million and $10 million. The work is critical for maintaining healthcare operations and ensuring compliance with safety and quality standards in a hospital environment. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit electronic bids by February 11, 2026, at 5 PM EST, with the bid opening scheduled for February 12, 2026, at 1:30 PM EST. For further inquiries, contact Contract Specialist Bryant L Guerrant at bryant.guerrant@va.gov.

Classification Codes

NAICS Code
238220
Plumbing, Heating, and Air-Conditioning Contractors
PSC Code
Z1DA
MAINTENANCE OF HOSPITALS AND INFIRMARIES

Solicitation Documents

20 Files
Salem VAMC MECH Drawings.pdf
PDF6533 KB1/22/2026
AI Summary
The
36C24625B0029_ Amendment A00002.pdf
PDF158 KB12/4/2025
AI Summary
Amendment 0001 to Solicitation 36C24625B0029, issued by the Department of Veterans Affairs, outlines the project to replace Building 16 HVAC at the Veterans Affairs Medical Center in Salem, Virginia. The amendment extends the site visit to December 11, 2025, and sets the bid opening for January 6, 2026. This invitation for bids (IFB) follows sealed bidding procedures, with electronic bids due by January 5, 2026. The project, valued between $500,000 and $1,000,000, falls under NAICS 236220. Key requirements include SAM registration, compliance with various federal regulations (EPLS, VETS-4212, E-Verify), mandatory OSHA safety training, VA Privacy Training, and annual influenza shots for all staff. RFIs are due by December 9, 2025.
Salem VAMC FP Drawings.pdf
PDF1393 KB1/22/2026
AI Summary
This government file outlines the scope of work for modifying an existing sprinkler system to support mechanical equipment upgrades. The project involves demolishing select sprinklers, installing new ones to meet NFPA 13 criteria, and re-routing existing sprinkler branch lines for new ductwork. The contractor is responsible for all shop documentation, permits, and hydraulic calculations, incorporating a minimum 10% safety factor. The work adheres to VA, NFPA, and International Building Codes. Key requirements include using UL or NRTL-listed components, specific piping materials and fitting types, seismic protection, and detailed installation procedures. The contractor must submit shop drawings, hydraulic calculations, and product data for approval, maintain accurate red-line drawings, and prepare as-built drawings. Strict protocols for sprinkler system shutdowns and notifications are in place, emphasizing safety and compliance throughout the project.
Salem VAMC ELECT Drawings.pdf
PDF3156 KB1/22/2026
AI Summary
The document outlines the electrical demolition and new work plans for a HVAC replacement project at a Department of Veterans Affairs facility in Roanoke, VA. The project, titled "DEPARTMENT OF VETERANS AFFAIRS - REPLACE HVAC PHASE II," involves multiple wings (H, J, J1) of Building 143. Key aspects include the removal of existing AHUs, fan coil units, humidifiers, exhaust fans, and associated electrical infrastructure, with some circuits and equipment salvaged for reuse or relocation. New work entails providing power connections for new AHUs, exhaust fans, steam-to-steam heat exchangers, Siemens DDC panels, and replacing panelboards. The project emphasizes adherence to all applicable laws, ordinances, and regulations, including those from local, state, NFPA, and public utilities. Contractors are required to visit the site, coordinate with all trades, and provide temporary services to minimize disruptions. The work is phased, with specific panelboard installations planned for Phase 1 and Phase 3. The document also includes a list of electrical symbols, abbreviations, and general notes outlining contractor responsibilities, safety protocols, and equipment standards.
P01 Upgrade HVAC Phase II - Drawings.pdf
PDF13651 KB1/22/2026
AI Summary
The
Replace HVAC Phase II _ Final Spec.pdf
PDF3869 KB1/22/2026
AI Summary
The "Salem VAMC, Building 143 – Replace HVAC, Phase II" project, led by Freedom Engineering for the Department of Veterans Affairs, outlines comprehensive requirements for replacing HVAC systems. The project emphasizes stringent safety, security, and quality control measures, including detailed construction schedules, waste management, and sustainable practices. Key aspects include extensive security protocols for personnel, vehicles, and sensitive documents, along with strict procedures for utility interruptions and alterations. The contractor is responsible for a thorough pre-construction survey, protection of existing infrastructure, and proper disposal of materials, including PCBs. A robust warranty management plan and a detailed testing and commissioning plan are required to ensure the longevity and functionality of the new systems. The project also mandates compliance with VA TRIRIGA CPMS for project management and coordination.
36C24626B0005_1.docx
Word106 KB1/22/2026
AI Summary
The Department of Veterans Affairs (VA) Network Contracting Office 6 is issuing Solicitation Number 36C24626B0005 for the "Upgrade HVAC System Phase II" project at the Salem VA Medical Center in Salem, Virginia. This 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract, valued between $5,000,000 and $10,000,000, requires the contractor to provide all labor, material, equipment, and supervision to demolish, modify, and install a new HVAC system on the second floor of Building 143. Key dates include a mandatory pre-bid conference on December 11, 2025, RFI questions due by December 18, 2025, and bids due by January 7, 2026, at 10:00 AM EST, with electronic bids required by January 6, 2026, at 5:00 PM EST. A bid guarantee of 20% of the bid price or $3 million (whichever is less) is required, along with performance and payment bonds post-award. The project has a 365-calendar-day performance period and is subject to various federal regulations, including SAM registration, Buy American Act, and specific security and safety training requirements.
36C24626B0005 0001.docx
Word18 KB1/22/2026
AI Summary
Amendment 0001 for Solicitation 36C24626B0005, Project Number 658-19-104, aims to clarify a previously incorrect amendment. The Department of Veterans Affairs, Network Contracting Office 6, is administering this modification for the "Upgrade HVAC system Phase II" project. All critical dates remain unchanged: the Pre-Bid Conference/Site Visit is on Thursday, December 11, 2025, at 9:30 AM EST in front of Building 74. The cut-off for RFI questions is Thursday, December 18, 2025, at 2:00 PM EST, with questions to be emailed to bryant.guerrant@va.gov. The Bid Due Date is Wednesday, January 7, 2026, at 10:00 AM EST, followed by a Bid Opening on MS Teams at 1:00 PM EST. Electronic bids must be submitted by Tuesday, January 6, 2026, before 5:00 PM EST. This amendment ensures all offerors have accurate information for the bidding process.
S04 Site Visit Upgrade HVAC Phase II.pdf
PDF289 KB1/22/2026
AI Summary
The document lists attendees for a site visit related to Solicitation# 36C24626B0005,
36C24626B0005 0002.docx
Word18 KB1/22/2026
AI Summary
Amendment 0002 to Solicitation #36C24626B0005 for the "Upgrade HVAC System Phase II" project at the Department of Veterans Affairs extends the offer receipt deadline to January 20, 2026, at 10 AM EST. This amendment provides updated requirements and a site visit sign-in sheet from December 11, 2025. All bids must be submitted electronically to bryant.guerrant@va.gov by the new deadline. The bid opening is scheduled for January 21, 2026, at 10 AM EST, via MS Teams. The cut-off for RFI questions is December 23, 2025, at 2 PM EST, with all questions to be emailed to bryant.guerrant@va.gov. This modification ensures all offerors have the latest information for their submissions.
36C24626B0005 0003.docx
Word17 KB1/16/2026
AI Summary
Amendment 0003 to Solicitation 36C24626B0005 for the "Upgrade HVAC system Phase II" project by the Department of Veterans Affairs extends the deadline for offers. The new closing date for electronic bids is February 11, 2026, at 5 PM EST, with bid opening on February 12, 2026, at 1:30 PM EST. All bids must be submitted electronically to Bryant.Guerrant@va.gov and Patrick.Stultz@va.gov. This amendment modifies the original solicitation's terms and conditions, specifically extending the offer receipt period.
S05 RFI_ Upgrade HVAC System Phase II pt.2.pdf
PDF83 KB1/22/2026
AI Summary
The document,
143- LS B143-2ND FL.pdf
PDF120 KB1/22/2026
AI Summary
The document is a detailed floor plan for Building 143, a hospital facility at VAMC Salem, dated December 16, 2019. Titled "LIFE SAFETY DRAWINGS," it outlines the second-floor layout with specific departments like Orthopedics, Neurology, and Surgical areas. The plan includes various scale indicators (three inches, one and a half inches, one inch, three-quarters inch, one-half inch, three-eighths inch, one-quarter inch, and one-eighth inch equals one foot), a legend for smoke barriers, fire ratings (1-hour, 2-hour, 3-hour), hazardous areas, and non-sleeping suites. The building is classified as "Healthcare/Business" occupancy with automatic sprinklers throughout. This document serves as a critical reference for facility management, safety planning, and potential renovation or construction projects, ensuring compliance with life safety standards and providing essential information for federal government RFPs related to healthcare infrastructure.
36C24626B0005 0005.docx
Word17 KB1/22/2026
AI Summary
Amendment 0005 to Solicitation Number 36C24626B0005, issued by the Department of Veterans Affairs, provides additional answers to RFI questions for the "Upgrade HVAC System Phase II" project. This amendment extends the deadline for electronic bids to February 11, 2026, at 5 PM EST, with bid opening on February 12, 2026, at 1:30 PM. Bids must be emailed to Bryant.Guerrant@va.gov and Patrick.Stultz@va.gov. Instructions for an MS Teams bid opening are also included. The amendment references attached documents, including "143- LS B143-2ND FL" and "S05 RFI_ Upgrade HVAC System Phase II pt.2." All other terms and conditions of the original solicitation remain unchanged.
S05 RFI_Salem VAMC HVAC Phase II Drawings.pdf
PDF9689 KB1/22/2026
AI Summary
The document outlines the
S05 RFI_Salem VAMC - Final CD Submission - Spec.pdf
PDF4969 KB1/22/2026
AI Summary
This government file outlines the general requirements for the Salem VAMC, Building 143 – Replace HVAC, Phase II project, managed by the Department of Veterans Affairs and engineered by Freedom Engineering. The document details administrative and technical specifications, including safety, security, waste management, and sustainable construction practices. Key aspects cover site preparation, demolition, material handling, utility services, and stringent security protocols for personnel, documents, and vehicles. It also mandates a comprehensive Critical Path Method (CPM) project schedule, a detailed warranty management plan, and the use of an internet-based electronic document submittal service (VA TRIRIGA CPMS). The project emphasizes maintaining continuous medical center operations, protecting existing infrastructure, and ensuring all alterations and new installations meet specified quality and safety standards. The document outlines responsibilities for contractors regarding alterations, disposal of materials (including PCBs), protection of vegetation, and adherence to various federal regulations.
S05 RFI_ Upgrade HVAC System Phase II.pdf
PDF331 KB1/22/2026
AI Summary
This document addresses 34 questions regarding the 'Upgrade HVAC System Phase II' project (Solicitation # 36C24626B0005). Key clarifications include: bid alternates listed on Sheet 143-MH1 are not required, and the solicitation is for a base bid only without deduct alternatives. Alternate manufacturers for AHUs and steam to clean steam heat exchangers will be considered if compliant. The project requires ICRA Level 2 for Phases I and III, with potential for Level 3 or 4 in Phase II. Buy American Waivers are not applicable, and the VA will not pay for engineering/design submittals or equipment deposits. A307 bolts are disallowed for steam and hot water systems, replaced by ASTM A193. The project is not sales tax-exempt. The VA’s Submittal Exchange software is required, and payment for stored materials needs Contracting Officer approval. The government aims to award within 90 days but cannot guarantee it due to staffing, and no Economic Price Adjustment Clause will be included. Superintendent, QCM, and SSHO roles cannot be fulfilled by the same individual, but scheduling can be handled in-house. Contractors must provide temporary office space and are solely responsible for fire watch personnel if fire alarm impairments exceed four hours. Existing drawings are diagrammatical, requiring contractors to field-verify dimensions. Architectural work is limited to in-kind replacement of ceiling tiles and grids. Electrical devices are to be removed/supported temporarily; no new ones will be provided.
36C24626B0005 0004.docx
Word18 KB1/22/2026
AI Summary
Amendment 0004 to Solicitation 36C24626B0005 for the "Upgrade HVAC system Phase II" project at the Department of Veterans Affairs, Network Contracting Office 6, addresses Offerors/Bidders. This amendment provides answers to RFI questions and includes updated drawings and specifications. All electronic bids are due by Wednesday, February 11, 2026, at 5 PM EST, with the bid opening on Thursday, February 12, 2026, at 1:30 PM. Bids must be emailed to Bryant.Guerrant@va.gov and Patrick.Stultz@va.gov. Instructions for the MS Teams bid opening are also provided. The amendment reinforces that all other terms and conditions of the original solicitation remain unchanged.
S06 36C24626B0005 0003.pdf
PDF92 KB1/22/2026
AI Summary
Amendment 0003 for Solicitation 36C24626B0005, Project Number 658-19-104, extends the deadline for offers to February 11, 2026, at 5:00 PM EST. The Department of Veterans Affairs, Network Contracting Office 6, is managing this solicitation for the "Upgrade HVAC system Phase II" project. All bids must be submitted electronically to Bryant.Guerrant@va.gov and Patrick.Stultz@va.gov by the new deadline. The bid opening will occur on February 12, 2026, at 1:30 PM EST. This amendment specifically modifies the original solicitation to adjust the offer receipt timeline.
36C24626B0005.docx
Word16 KB11/13/2025
AI Summary
The Department of Veterans Affairs in Salem, Virginia, has issued a presolicitation notice for Phase II of the HVAC System Upgrade project (Project Number: 658-19-104). This project requires a contractor to provide all labor, materials, and supervision for site preparation, demolition, removal of existing structures, and installation of a new HVAC system in Building 143, 2nd Floor, at the Salem VA Medical Center. The construction magnitude is estimated between $5,000,000 and $10,000,000. This solicitation is anticipated to be a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside, with a NAICS code of 238220 (Plumbing, Heating and Air-Conditioning Contractor). Solicitation materials are expected to be available around December 2, 2025, with bids due approximately 30 days later. Interested vendors must be registered and active in the System for Award Management (SAM) and Veteran Small Business Certification (VetCert) databases.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedNov 5, 2025
amendedAmendment #1· Description UpdatedDec 3, 2025
amendedAmendment #2· Description UpdatedDec 4, 2025
amendedAmendment #3· Description UpdatedDec 4, 2025
amendedAmendment #4· Description UpdatedDec 12, 2025
amendedAmendment #5· Description UpdatedJan 16, 2026
amendedAmendment #6· Description UpdatedJan 21, 2026
amendedLatest Amendment· Description UpdatedJan 22, 2026
deadlineResponse DeadlineFeb 11, 2026
expiryArchive DateMar 13, 2026

Agency Information

Department
DEPARTMENT OF VETERANS AFFAIRS
Sub-Tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
246-NETWORK CONTRACTING OFFICE 6 (36C246)

Point of Contact

Contract Specialist
Bryant L Guerrant

Official Sources