JOFI EXHIBIT FABRICATION
ID: 140P2125R0008Type: Combined Synopsis/Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEWASHINGTON CONTRACTING OFFICELAKEWOOD, CO, 80225, USA

NAICS

Custom Architectural Woodwork and Millwork Manufacturing (337212)

PSC

CONSTRUCTION OF EXHIBIT DESIGN (NON-BUILDING) (Y1PB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of the Interior, specifically the National Park Service, is seeking qualified contractors for the fabrication of exhibits at the John Fitzgerald Kennedy National Historic Site in Brookline, MA. The project aims to enhance visitor engagement through the design and installation of new interpretive exhibits that commemorate President John F. Kennedy's life and legacy, with a focus on accessibility and educational outreach. This initiative is part of a broader effort to preserve American heritage and provide an enriching experience for visitors, aligning with federal guidelines for cultural preservation. Interested small businesses are encouraged to contact Robert Adamson at robert_adamson@nps.gov or call 301-502-0076 for further details, with a project budget estimated between $75,000 and $80,000 and proposals due by the specified deadlines.

    Point(s) of Contact
    Files
    Title
    Posted
    The National Park Service's Harpers Ferry Center provides specifications for exhibit planning, design, and fabrication. The document outlines a comprehensive process structured into defined phases, ensuring effective project management and adherence to federal standards. Key tasks include pre-design, schematic design, design development, production design, and installation. The focus on project management emphasizes communication between contractors and the NPS, with requirements for reporting, quality control, and compliance with accessibility standards. Accessibility considerations are integrated throughout the exhibit planning process, requiring compliance with the Architectural Barriers Act Accessibility Standards. Additionally, each phase involves detailed assessments of project goals, including resource packages, cost estimates, and technical specifications for all exhibit elements. The document serves as a robust framework for acquiring federal grants and engaging in state or local RFPs by standardizing procedures, ensuring quality, and facilitating collaboration among stakeholders. Its systematic approach aims to deliver cohesive and interactive exhibits that enhance visitor experiences while preserving historical resources.
    The iBeacons and Audio Streaming Installation Guide details the implementation of Bluetooth beacon technology and audio description streaming in visitor centers as part of the Descriptive Exhibit Tour (DET) Interior Exhibit Module (IEM) App. It outlines the necessary installation processes for both beacons and audio hardware, emphasizing the importance of careful planning and coordination to ensure effective audio descriptions can be delivered to visitors. Key steps include pre-installation planning, such as reviewing the floorplan for beacon placement and configuring settings before arrival at the site. On-site activities involve testing beacon responsiveness and adjusting placements to optimize performance. Detailed instructions are provided for setting up audio streaming with the Audio Everywhere system, including router configuration and inputting channel information into the system spreadsheets. Finally, the guide specifies required equipment, including portable media devices and accessories, and emphasizes the documentation of beacon placements and battery replacement procedures to aid maintenance. This document serves as a comprehensive resource for contractors and park staff to ensure accurate and effective installation of audio and beacon technologies in support of enhanced visitor experiences.
    The National Park Service's "Exhibit Conservation Guidelines" provides a comprehensive framework for integrating conservation practices into the planning, design, and production of exhibits. The guidelines emphasize the importance of preserving exhibit objects through a meticulous process involving the selection of materials, environmental controls, and security measures. Key components include checklists for conservation involvement, contributions from team members such as conservators, curators, designers, and preparators, along with conservation criteria forms. Specific features for exhibit area and case preservation are delineated across varying levels of protection, addressing factors like security, fire safety, biological pest protection, and environmental stability. The guidelines further detail the use of silica gel for humidity control, mechanical systems for climate management, and lighting strategies to mitigate damage from UV radiation and heat. By following these comprehensive approaches, the guidelines aim to safeguard cultural and historical artifacts within exhibits, while providing practical recommendations for professionals involved in exhibition planning and maintenance. This document serves as a critical resource within the context of government RFPs and grants for museum and cultural institutions, ensuring that preservation remains a priority in exhibit design and execution.
    The Architectural Barriers Act (ABA) Standards (2015) mandate accessibility requirements for buildings and facilities constructed, altered, or leased with federal funding. This edition includes new provisions for outdoor areas and emergency transportable housing, adopted by the Department of Defense (DOD), General Services Administration (GSA), and U.S. Postal Service (USPS), while HUD's adoption is pending. The document outlines scoping and technical requirements aimed at ensuring accessibility for individuals with disabilities. Key sections address application, existing facilities, and general exceptions, including provisions involving modifications and defined terms. Accessibility requirements cover numerous aspects, from parking spaces and accessible routes to restroom provisions and defined areas such as assembly spaces and recreational facilities. Federal agencies are required to document exceptions for accessible routes on trails and beach areas, and alterations to existing buildings must comply with updated standards unless deemed technically infeasible. The regulations emphasize that accessibility must be prioritized in all new constructions and significant alterations, ensuring comprehensive inclusion without compromising the usability of facilities. Overall, these standards encapsulate the government's commitment to fostering an inclusive environment through systematic accessibility measures across federal infrastructure initiatives.
    The document outlines the Programmatic Accessibility Guidelines for National Park Service Interpretive Media, emphasizing the importance of providing equal access to interpretive media for visitors with disabilities. It serves as a resource for National Park Service employees and contractors involved in the development of interpretive media, including publications, exhibits, and audiovisual programs. Key principles focus on compliance with federal laws, the application of Universal Design practices, and the implementation of specific accessibility features. The guidelines detail standards for various media, covering aspects such as captioning for audiovisual programs, tactile and interactive exhibits, and the importance of integrating accessibility measures from the inception of planning and design processes. Evaluation methods, including front-end and formative evaluations, are recommended to ensure the effectiveness of interpretive media. Appendices provide further insights into relevant laws, best practices, and resources for improving accessibility for diverse audiences. Ultimately, these guidelines aim to enhance visitors' experiences by ensuring that all interpretive media in national parks are accessible, thereby promoting inclusivity and equal access to information for all individuals, regardless of their abilities.
    The National Park Service (NPS) document outlines the Standard Specifications for the planning, design, production, and installation of electronic programs, emphasizing audiovisual (AV) as well as digital interactive formats. It details project management requirements, including the roles of project managers and the importance of communication with the Contracting Officer’s Representative (COR). The document specifies the production process, which is divided into pre-production, production, and post-production phases, each requiring various submittals and reviews. Key components include strict adherence to accessibility standards, as mandated by federal laws, ensuring that content is usable by individuals with disabilities. The document mandates open captioning, audio description, and assistive listening measures for all audiovisual content. Additionally, it stresses the importance of securing rights for all materials used, ensuring that acquisitions meet specified use rights. Overall, the document serves as a comprehensive guide for contractors engaged in the creation of NPS electronic programs, detailing policies, processes, and expectations to enhance visitor engagement and accessibility while maintaining compliance with federal regulations on accessibility and copyright. This ensures that all NPS programs effectively educate and welcome diverse audiences.
    The document outlines the inventory and cost considerations for interpretive media assets within the Valor in the Pacific National Monument at Pearl Harbor, Hawaii. It includes forms for the Component Inventory Schedule, detailing categories like project management costs, fabrication expenses, and installation costs—all of which are currently represented as zero. The report systematically categorizes different exhibition areas and various exhibit types, including wayside exhibits, 2-D and 3-D elements, audiovisual systems, and exhibit lighting, while emphasizing the need for tracking and assessing these assets. Additionally, it highlights compliance requirements related to accessibility and ecological considerations for exhibit designs. This thorough inventory serves as a structured approach to assess potential future costs for each component and ensure that the exhibits meet safety and regulatory standards. The context indicates the document’s relevance to federal grants and RFP processes, emphasizing meticulous documentation for state and local funding initiatives aimed at historical preservation and educational outreach.
    The document outlines the Interpretive Media Asset Inventory and Cost Summary for the Valor in the Pacific National Monument, specifically at the Pearl Harbor Historic Sites in Hawaii. The total project budget is $3,734,900, divided among various categories including project management, fabrication costs, and installation. Specific exhibit areas are detailed, indicating the costs for structures, graphics, audiovisual systems, and other elements aimed at enhancing visitor experiences. Each component provides a breakdown of expenses related to materials and installation, along with information on the types of exhibits and their locations within the visitor center. The project seeks to create engaging educational displays that commemorate historical events, adhering to compliance requirements for accessibility and environmental exposure. This succinct inventory is designed to ensure transparency and accountability in federal funding while emphasizing the cultural significance of the exhibits at Pearl Harbor.
    This document outlines the completion report template for audiovisual production under the National Park Service (NPS). Key sections include the title of the program, total running time, client site, completion date, and master formats delivered, including accessibility features. It mandates documentation of the program's overall theme along with distribution restrictions and rights regarding source materials, music, narration, and talent used, detailing any necessary licenses and restrictions. The document specifies attachments required for compliance, such as licenses for all production elements, a source material list organized by timecode, credits, final scripts, sequence information, and detailed logs of original recordings. This comprehensive approach ensures that all media elements are accounted for, optimizing transparency and legal compliance. In the context of government RFPs, grants, and local contracts, this completion report is essential for ensuring accountability and systematic documentation in federal projects involving audiovisual content. It emphasizes regulatory adherence and establishes clear guidelines for use and distribution, thus supporting the integrity and educational value of NPS media projects.
    The Art Documentation Form is a comprehensive template used by the U.S. Department of the Interior, specifically the National Park Service's Art Resources Management Office, to systematically record and manage details about artworks commissioned or acquired for projects. Each piece of art requires a separate form, detailing aspects such as the artist's name, contract price, size, medium, documentation status (including transparency and digital files), and any copyright restrictions. This form is vital for ensuring accountability and facilitating future retrieval of artworks. Additionally, the form assists in maintaining a centralized database within the HFC Image Management System, preventing acceptance of artworks without complete documentation. Upon issuing property related to the artworks, a receipt is also generated, outlining equipment descriptions and the issuing individual's responsibilities, thereby reinforcing accountability for loss, theft, or damage. This process demonstrates the federal commitment to preserving artistic works and managing cultural resources effectively.
    The document outlines the planning and design process for new interpretive exhibits at the John Fitzgerald Kennedy National Historic Site, focusing on enhancing the visitor experience. EDX was contracted by the National Park Service to create exhibits that commemorate JFK's birthplace and childhood, accommodating improved accessibility in a new visitor center. The project has a budget between $75,000-$80,000, encompassing exhibit elements, related fabrication costs, and original artwork. Key goals target increasing diversity among visitors and enhancing educational resources. The interpretive framework emphasizes themes such as family influences, the significance of the Brookline community, JFK's enduring legacy, and the aspect of memory associated with his family's history. Accessible design features are planned to cater to a broad audience, including tactile elements for visually impaired visitors. The document also details the project's schedule, graphic styles, and content layout for various display areas. Overall, it serves as a comprehensive guide for stakeholders to review design updates, ensuring alignment with visitor engagement goals while preserving historical integrity.
    The document outlines the production specifications for the visitor center exhibits at the John F. Kennedy National Historic Site as of November 13, 2023. It includes an index of drawings and design details, emphasizing the need for precise adherence to written dimensions and safety compliance during fabrication. Key sections entail plans, elevation drawings, material specifications, and graphical displays for various exhibit components. Crucial notes instruct fabricators to verify dimensions on-site, ensure structural stability, and follow National Park Service standards. The document features a detailed materials schedule outlining types of materials, their finishes, and intended uses in the exhibits, such as hardwoods and high-pressure laminates. Additionally, it provides specific requirements for exhibit elements including reader rails and graphic displays, ensuring they align with both design intent and practical application for visitor interaction. This production set serves as a guide for contractors engaged in the installation, ensuring all aspects are executed according to outlined specifications, thus preserving the integrity of the historic site while enhancing visitor experience.
    This document outlines a collection of images related to John F. Kennedy and the Kennedy family, sourced from the JFK Presidential Library and the John F. Kennedy Institute (JOFI) collection. It includes detailed descriptions of various photographs, their dimensions, resolution requirements, acquisition status, and associated links for accessing the images. Key highlights include iconic images of JFK in the Oval Office and candid family moments, with several images pending responses for high-resolution access. The collection also contains baby photos and health cards of family members. The file serves as a resource guide for various RFP submissions related to historical preservation, providing necessary documentation for federal and state grant applications focused on Kennedy's legacy and historical significance. Overall, the document emphasizes efforts to preserve and curate significant historical images while detailing their current status in terms of accessibility and rights management.
    This document outlines the content design and informational panels for the John Fitzgerald Kennedy National Historic Site, focusing on the life and influence of President John F. Kennedy and his family. Highlights include a welcome panel discussing Kennedy's vision for America as a young leader, a historical overview of the home and its significance after his assassination, and insights into the upbringing and values instilled by his parents, Rose and Joseph P. Kennedy. Key components also explore the family’s culture of public service, education, and political engagement. The narrative reflects on Rose Kennedy’s efforts to recreate the family home as a tribute to her son, alongside notable quotes and imagery that evoke memory and history. This structure serves to enrich visitor experience and understanding of the Kennedy legacy, emphasizing civic engagement and historical significance, fitting within federal grant and state RFP contexts aimed at preserving American heritage.
    The document is a comprehensive list detailing the elements required for the production design at the John Fitzgerald Kennedy National Historic Site. It categorizes components into three main groups: Entry and Desk, Foundation Wall, and Mural Wall, each containing specifications such as component numbers, descriptions, materials, dimensions, and notes on placement or usage. Key items include various panels and quotes crafted in matte vinyl or high-pressure laminate, as well as a mural depicting the Kennedy family. The inclusion of structural elements such as reading rails and reproduction items adds depth to the installations. This detailed inventory underscores the government's effort to enhance historical understanding and visitor experience at the site through thoughtfully designed graphics and artifacts, coordinating aesthetic and informational objectives. The overall aim aligns with federal initiatives promoting cultural heritage preservation and educational outreach through grants and requests for proposals.
    The referenced document, "Attachment F - JOFI Exhibit: Fabrication Estimate Form," outlines a comprehensive budget estimate for the fabrication of exhibits, detailing labor and materials across various categories essential to project execution. Key sections include project management, fabrication drawings, custom elements, electrical work, graphics, conservation, installation, and shipping, all of which are categorized but currently reflect a total cost of $0.00, indicating that no actual expenses have been determined or incurred at this stage. Each category itemizes potential labor hours, rates, and materials needed, emphasizing the structured approach to budget planning for government projects. The overall purpose of this estimate form is to facilitate organized financial planning and ensure compliance with federal and state grant requirements for RFPs. By clearly defining anticipated costs in each phase of the exhibit fabrication process, the form underscores the importance of detailed projections in managing public resources effectively. This documentation serves as a preliminary tool to prepare for future funding requests and operational expenses associated with the project.
    The document outlines a federal Request for Proposal (RFP) for exhibit fabrication and installation services at the John Fitzgerald Kennedy National Historic Site in Brookline, MA. It emphasizes that although funds are currently unavailable for award, there’s an expectation for future funding. The project involves creating new exhibits for the visitor center, requiring contractors to provide all necessary services, materials, and labor while adhering to specified standards. The contractor must coordinate with park officials, ensuring compliance with design and accessibility regulations throughout the project phases, which include planning, fabrication, installation, and closeout. Key deadlines for proposal submissions and project milestones are detailed, alongside requirements for quality control and communication between stakeholders. The RFP is specifically set aside for small businesses under the NAICS code 337212, ensuring equal opportunity for eligible contractors. This document reflects standard government procurement protocols, highlighting the focus on compliance with federal guidelines and the importance of delivering high-quality exhibits that enhance visitor experience at a historic site.
    Lifecycle
    Title
    Type
    JOFI EXHIBIT FABRICATION
    Currently viewing
    Combined Synopsis/Solicitation
    Similar Opportunities
    Y--HAFC LINC EXHIBIT FABRICATION
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the fabrication of exhibits and audiovisual (AV) production services for the rehabilitation of the Lincoln Memorial's Undercroft in Washington, DC. The project aims to enhance visitor experiences by creating new exhibits and integrating AV installations, requiring extensive coordination among contractors, National Park Service representatives, and stakeholders to meet accessibility standards and design specifications. This initiative is crucial for preserving national heritage while improving public engagement through innovative exhibit design and technology. Proposals must be submitted by the specified deadlines, with the project completion date set for July 4, 2026, coinciding with the 250th Anniversary Celebrations of the United States. Interested parties can contact Shelia Bender at DeeDeeBender@nps.gov or by phone at 304-535-6227 for further information.
    Exhibit Planning & Design Services for Exterior Ex
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is soliciting proposals for Exhibit Planning and Design Services for Exterior Exhibits at Golden Spike National Park. The objective is to create new, museum-quality interpretive exhibits that enhance visitor experiences and complement existing displays at the Visitor Center, focusing on themes related to the transcontinental railroad and its historical significance. This project is crucial for improving public engagement and education about the park's history, with a total budget estimated between $510,000 and $525,000. Proposals are due by 10:00 AM ET on December 13, 2024, and interested contractors should direct inquiries to Sheila Spring at SheilaSpring@nps.gov or call 304-535-6239.
    INDE WAYSIDE PROJECT
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is seeking contractor services for the INDE Wayside Project at Independence National Historical Park. The objective is to plan, design, and fabricate updated wayside exhibit panels by June 1, 2026, in preparation for the 250th anniversary of the Declaration of Independence, enhancing outdoor interpretation to meet accessibility standards and NPS design guidelines. This project is significant for improving visitor engagement and education regarding the historical context of the park, which includes notable sites like Christ Church and Independence Hall. Interested vendors, particularly small businesses in the sign manufacturing industry, must submit their quotes electronically to Gabriel Zambrano at gabrielzambrano@nps.gov by the specified deadlines, with evaluations based on relevant work samples, past experience, and adherence to project timelines.
    MABI 32684 - MBRNHP KIOSK MANSION ACCESS SHUTTLE
    Active
    Interior, Department Of The
    The Department of the Interior's National Park Service is seeking qualified contractors for the MABI 32684 project, which involves enhancements at the Marsh-Billings-Rockefeller National Historical Park in Woodstock, Vermont. The project includes the removal and reconstruction of pathways to the Mansion and Platt Garden, the construction of an information kiosk at the park's main entrance, and the establishment of a shuttle shed for an electric vehicle, all while ensuring minimal disruption to visitors and preserving the site's historic integrity. The anticipated construction budget ranges from $500,000 to $1,000,000, with a project completion timeline of 120 calendar days and proposals expected to be solicited in Summer 2025. Interested parties must submit their qualifications and experience by November 22, 2024, to Rachel Dyer at racheldyer@nps.gov.
    KEMO 258734 - Redesign Kennesaw MT Road to Improve Visitor Experience
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking information for the redesign of Kennesaw Mountain Road at Kennesaw Mountain National Park Battlefield to enhance visitor safety and experience. The project aims to address safety concerns related to the current roadway conditions, which include steep grades and narrow widths, while also accommodating shuttle bus transportation and improving accessibility. This initiative is part of the NPS's commitment to enhancing visitor access and safety in national parks, with an anticipated construction cost between $500,000 and $1,000,000 and a project timeline of 120 days. Interested businesses are encouraged to submit their qualifications by November 18, 2024, to Brenda Smith at brendasmith@nps.gov or by phone at 720-315-2035, as a competitive bidding process is expected to commence in winter 2024.
    Y--MALU 293291 Rehabilitate the Visitor Center and
    Active
    Interior, Department Of The
    The Department of the Interior, National Park Service, is soliciting proposals for the rehabilitation of the Visitor Center and Headquarters at the Martin Luther King Jr. National Historical Park in Atlanta, Georgia. The project aims to enhance the facility through comprehensive renovations, including interior remodels, roof repairs, HVAC and electrical updates, and site improvements, all while ensuring compliance with safety and environmental standards. This initiative reflects the government's commitment to preserving national historic sites and improving visitor experiences. Interested contractors must submit their proposals by December 18, 2024, at 15:00 ET, and are encouraged to contact John Babcock at johnbabcock@nps.gov or 303-969-2626 for further details.
    Y--Source Sought Notice
    Active
    Interior, Department Of The
    The National Park Service (NPS) is seeking proposals for the rehabilitation of the Painted Desert Community Complex at Petrified Forest National Park, with an estimated construction cost exceeding $10 million. The project aims to address structural deficiencies, restore historical features, and upgrade facilities to meet current standards while ensuring compliance with federal regulations and historic preservation mandates. This initiative reflects the federal government's commitment to maintaining and enhancing national landmarks, promoting visitor engagement, and ensuring the integrity of the park's infrastructure. Interested contractors must submit their proposals by November 18, 2024, at 12:00 PM MST, and can direct inquiries to James Waller at jameswaller@nps.gov or by phone at 303-969-2488.
    C--Multiple Award Task Order Contract for design-build
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is seeking qualified contractors for a Multiple Award Task Order Contract (MATOC) focused on design-build services for employee housing within national parks. The procurement aims to enhance housing solutions through construction, maintenance, and alterations, utilizing standard designs from the Prototype Housing Design Catalog while ensuring compliance with federal accessibility and building codes. This initiative is crucial for providing adequate living accommodations for National Park employees, with a projected contract ceiling between $150 million and $300 million, and task order sizes ranging from $5 million to $30 million. Interested firms must submit their qualifications, including relevant experience and bonding capacity, by December 12, 2024, to John Kotchian at johnkotchian@nps.gov or by phone at 720-390-0238.
    Y--KNRI PMIS 257081KNIFE RIVER ELBEE BEND BANK STABIL
    Active
    Interior, Department Of The
    The National Park Service (NPS) is conducting a Sources Sought Notice for the stabilization of the Elbee Bend site along the Knife River Indian Villages National Historic Site in North Dakota. The project aims to protect significant archaeological resources and infrastructure from erosion, with an estimated construction magnitude between $5 million and $10 million. This initiative is critical for preserving the cultural heritage of the area and enhancing visitor access, as it will also create recreational opportunities along the river. Interested businesses, both large and small, are encouraged to submit their qualifications by noon Mountain Time on November 19, 2024, to Jason Longshore at JasonLongshore@nps.gov.
    Y--ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service (NPS), is soliciting proposals for the construction of a universally accessible trail at El Malpais National Monument in Grants, New Mexico. The project aims to enhance public access and includes the construction of a 0.75-mile trail, an amphitheater, and various infrastructure improvements, with a total project value estimated between $1 million and $5 million. This initiative underscores the government's commitment to improving visitor experiences in national parks while adhering to accessibility standards and environmental regulations. Interested small businesses must submit their sealed bids by December 4, 2024, with the contract performance period set from January 6, 2025, to October 3, 2025. For further inquiries, potential bidders can contact Brian Dankmeyer at BrianDankmeyer@nps.gov or by phone at 202-573-5697.