C--Multiple Award Task Order Contract for design-build
ID: 140P2025R0030Type: Sources Sought
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEDSC CONTRACTING SERVICES DIVISIONDENVER, CO, 80225, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

ARCHITECT AND ENGINEERING- CONSTRUCTION: FAMILY HOUSING FACILITIES (C1FA)
Timeline
    Description

    The Department of the Interior, specifically the National Park Service, is seeking qualified contractors for a Multiple Award Task Order Contract (MATOC) focused on design-build services for employee housing within national parks. The procurement aims to enhance housing solutions through construction, maintenance, and alterations, utilizing standard designs from the Prototype Housing Design Catalog while ensuring compliance with federal accessibility and building codes. This initiative is crucial for providing adequate living accommodations for National Park employees, with a projected contract ceiling between $150 million and $300 million, and task order sizes ranging from $5 million to $30 million. Interested firms must submit their qualifications, including relevant experience and bonding capacity, by December 12, 2024, to John Kotchian at john_kotchian@nps.gov or by phone at 720-390-0238.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines the construction specifications for a residential building project, detailing substructures, superstructures, interior finishes, and equipment connections. It categorizes essential structural components such as standard foundations, special foundation requirements, floor and roof constructions, stair constructions, exterior wall materials, and internal partitions. Each component is labeled with a status identifier, indicating if it is a baseline requirement or an optional selection. Key highlights include the categorization of options for windows and doors, roof coverings, and internal hardware, ensuring compliance with regulatory standards. The electrical and mechanical aspects are carefully specified, including load calculations for various appliances and lighting systems, as well as necessary electrical protections and configurations. This comprehensive specification serves as the foundation for contractors, ensuring adherence to building codes while promoting effective project execution. Through ensuring consistency with the guidelines outlined by federal and state building regulations, this document is integral to both RFP processes and grant funding considerations, emphasizing the importance of tangible and practical execution of construction standards to achieve project goals.
    The document outlines the construction and electrical specifications for a project that incorporates detailed designs for various structural components and mechanical equipment. It categorizes elements such as substructures, superstructures, exterior closures, and interior finishes, specifying baseline and optional statuses for each. The document emphasizes the installation of standard foundations, unique foundation requirements, roof coverings, wall construction, and interior systems, which include kitchen appliances and electrical fixtures. The specifications are precise, including material types, dimensions, methods of construction, and necessary equipment. It also highlights connectivity needs and load calculations for electrical systems within residential units, ensuring compliance with current electrical codes. The intent is to guide project execution, harmonizing various construction elements while maintaining safety and regulatory standards. This structured approach ensures that contractors understand design expectations essential for bidding in response to government-funded RFPs and grants, enhancing project clarity and facilitating compliance throughout the construction process.
    The document details specifications for a building project, focusing on the construction and design elements compliant with code and regulations. It outlines various construction categories, including substructure and superstructure components, interior and exterior finishes, plumbing fixtures, HVAC systems, and electrical configurations. Each category presents keynotes, statuses, and options, classifying them into baseline and optional elements, which guide the material and construction methods to be used. The information stresses the importance of using specific materials, such as concrete caissons and TJI engineered wood, ensuring structural integrity while allowing flexibility in design choices. Additionally, appliances and fixtures, including kitchen appliances and plumbing fixtures, are specified, emphasizing standardization to maintain quality across the project. The document further outlines electrical connection schedules, safety requirements, and compliance with energy efficiency standards. Overall, this extensive guideline showcases the federal and local government's emphasis on structured planning, standardization, and compliance in public construction projects, ensuring safety and functionality in the built environment, while allowing for adaptabilities in design choices. The clear categorization of building components reflects the document's priority in guiding contractors and architects through the construction process.
    The document outlines the detailed specifications for a building construction project, categorizing various elements of the structure including substructure, superstructure, exterior closure, roofing, interior construction, equipment, and plumbing systems. Each section lists standard and optional materials and systems, indicating baseline choices and alternatives for different construction components like foundations, wall materials, flooring finishes, and HVAC systems. Particular attention is given to energy efficiency, durability, and compliance with code regulations. The document serves as a framework for contractors to prepare bids in response to government RFPs for construction projects. The structured format supports clarity, allowing stakeholders to easily identify requirements and make informed decisions while adhering to federal and local guidelines. By specifying baseline and optional materials, the document facilitates budget considerations and resource allocation in construction planning, ensuring that the project meets functional and aesthetic goals while being cost-effective.
    The National Park Service (NPS) is initiating a project to Update Housing Prototypes under a Design-Bid-Build (DBB) approach, dated August 28, 2020. The prototype aims to enhance cost-effective housing solutions in national parks, ensuring compliance with necessary regulations and construction standards. The findings indicate no non-typical contract items or government-furnished permits are required for the current vertical housing scope, although permit needs will arise when applying prototypes to specific sites. The anticipated contract length is approximately 12 months, reliant on seasonal conditions. Critical planning considerations include identifying special inspections, construction logistics, potential impacts on park operations, and safety measures for the public. Resource protection and compliance measures are necessary for successful implementation. While site-specific evaluations will determine access restrictions, material and equipment availability, and any neighboring project overlaps, a focus on environmental compliance will be paramount. The project will apply value engineering concepts during its lifecycle to ensure efficiency. Continuous assessments will take place as the prototype package aligns with site-specific applications, ensuring all aspects are addressed adequately for successful housing development within national parks.
    The document outlines the specifications for the design and construction of a housing prototype at a specified park, overseen by the National Park Service (NPS). It identifies the roles of various professionals, including architects and engineers, responsible for different aspects of the project, which aims to meet certain environmental standards like LEED certification. The text outlines detailed contract procedures, indicating expectations for modifications, coordination among contractors, and the necessity for compliance with federal regulations. Key sections detail the phases of work, contractor responsibilities regarding site management, the need for various safety and environmental protections, and procedures for project documentation and reporting via an NPS-managed website. Contractors are to submit requests for information (RFIs) systematically to ensure compliance with project specifications, while public safety and minimal disruption during construction are emphasized. Portions of the contract define the parameters for financial overhead, detailing what can and cannot be billed to the government, emphasizing transparency and reasonable pricing. This document is essential for ensuring that all stakeholders understand their obligations and the operational procedures necessary to complete the project effectively, ensuring safety, efficiency, and compliance with environmental standards throughout the construction process.
    This document is the Statement of Structural Tests and Special Inspections (STSI) submitted by the Denver Service Center of the National Park Service, adhering to Chapter 17 of the 2009 International Building Code (IBC-09). It outlines seismic and wind resistance requirements, as well as the qualifications necessary for inspectors and testing technicians involved in the structural testing and inspection process. The Construction Contractor's Quality Control Supervisor is tasked with providing inspection reports to the Contracting Officer, who will require remediation of any deficiencies identified. Seismic and wind-force-resisting systems subject to special inspections are specified, along with instructions for recording required tests. A comprehensive list of required structural tests and inspections illustrates the specific compliance measures needed in concrete and wood constructions, including continuous and periodic inspections. The qualifications for inspectors are detailed, covering professional engineering licenses, certifications from various bodies (like ACI, AWS, and ICC), and their relevance to structural integrity and safety. This document serves as a guideline to ensure that all construction meets safety standards and code requirements, emphasizing the importance of qualified reporting and remediation protocols in federally supported projects.
    The NPS Project Sustainability Checklist outlines the requirements for a new building project under the National Park Service, emphasizing sustainability and adherence to LEED 2009 standards. The checklist details various categories including Sustainable Sites, Water Efficiency, Energy & Atmosphere, Materials & Resources, and Indoor Environmental Quality, identifying both prerequisites and credits achievable at different design milestones (predesign, schematic design, etc.). Key features include assessments of site selection, construction waste management, energy performance optimization, and low-emitting materials usage. Notably, certain prerequisites were missed, leading to an overall non-certified status under LEED guidelines. The document serves as a framework to ensure that new constructions meet federal sustainability regulations and enhance environmental stewardship, showing the NPS’s commitment to integrating sustainable development in national parks. This summary highlights the project's aim to implement sustainable construction practices while noting specific sustainability metrics and areas lacking compliance. The comprehensive checklist illustrates the government’s effort to support environmentally responsible projects through structural guidelines and criteria.
    The U.S. National Park Service (NPS) is seeking information and sources for a Multiple Award Task Order Contract (MATOC) focused on the design-build, construction, maintenance, and alteration of employee housing. This Request for Information (RFI) aims to assess the capabilities of small businesses with relevant experience and bonding capacity, gathering insights to shape a future procurement strategy. The project intends to utilize standard designs from the Prototype Housing Design Catalog, ensuring compliance with federal accessibility requirements and building codes. Typical tasks involve minimal design services, construction, renovations, and infrastructure work (HVAC, plumbing, electrical). Notably, a portion of the units must be accessible for individuals with disabilities. The NPS forecasts a project ceiling between $150 million and $300 million, with task order sizes ranging from $5 million to $30 million. Contracts will likely be firm-fixed-price and cover a range of U.S. locations, including territories. Interested firms are asked to respond with qualifications by December 12, 2024, detailing their experience, bonding limits, and project capabilities. This initiative reflects a targeted effort to engage the design-build sector for vital NPS housing projects, enhancing overall service delivery to National Park employees.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Z--Sierra/Mojave Multiple Award Task Order Contract (MATOC)
    Active
    Interior, Department Of The
    The National Park Service (NPS) is seeking qualified small business firms for the Sierra/Mojave Multiple Award Task Order Contract (MATOC), aimed at providing construction services across various national parks in the Pacific West Region. This procurement will involve an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for a range of projects, including new construction, repairs, and site improvements, with a total contract value not exceeding $45 million over five years. Interested contractors must submit their qualifications, including a capabilities statement and past project experience, by November 29, 2024, at 4:00 PM PST, to Juan Roman at juanroman@nps.gov.
    Y--Source Sought Notice
    Active
    Interior, Department Of The
    The National Park Service (NPS) is seeking proposals for the rehabilitation of the Painted Desert Community Complex at Petrified Forest National Park, with an estimated construction cost exceeding $10 million. The project aims to address structural deficiencies, restore historical features, and upgrade facilities to meet current standards while ensuring compliance with federal regulations and historic preservation mandates. This initiative reflects the federal government's commitment to maintaining and enhancing national landmarks, promoting visitor engagement, and ensuring the integrity of the park's infrastructure. Interested contractors must submit their proposals by November 18, 2024, at 12:00 PM MST, and can direct inquiries to James Waller at jameswaller@nps.gov or by phone at 303-969-2488.
    Y--WEAR 232479 - New Temporary Garage
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service (NPS), is seeking market research input for the construction of a new temporary garage at the Western Arctic National Parklands in Nome, Alaska. The project involves constructing garage structures sized between 12x20 and 20x20 feet, designed to withstand snow loads and accommodate personal belongings, with an anticipated cost between $250,000 and $500,000. This initiative is crucial for maintaining operational efficiency while minimizing disruption to existing housing units during construction, which is expected to be completed by summer 2025. Interested businesses must submit their qualifications, bonding capacity, and relevant experience by October 16, 2024, and can direct inquiries to Tony Jasper at tonyjasper@nps.gov or by phone at 303-969-2789.
    Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC)
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is announcing a forthcoming solicitation for a Multiple Award Task Order Contract (MATOC) focused on construction work in Idaho, Montana, and surrounding areas. The opportunity includes a sample project for the rehabilitation of the parking area at the Glacier National Park Headquarters, designated as MT NP GLAC P HQ(3), which will be evaluated based solely on pricing, although it will not be awarded or constructed. This initiative underscores the government's commitment to enhancing infrastructure within national parks while adhering to federal and state guidelines for construction projects. Interested contractors are encouraged to visit the project site in West Glacier, Montana, before winter conditions limit access, and should direct technical inquiries via email to the provided address. The MATOC solicitation documents are expected to be available during the winter of 2024/2025, with updates accessible on the SAM site.
    MABI 32684 - MBRNHP KIOSK MANSION ACCESS SHUTTLE
    Active
    Interior, Department Of The
    The Department of the Interior's National Park Service is seeking qualified contractors for the MABI 32684 project, which involves enhancements at the Marsh-Billings-Rockefeller National Historical Park in Woodstock, Vermont. The project includes the removal and reconstruction of pathways to the Mansion and Platt Garden, the construction of an information kiosk at the park's main entrance, and the establishment of a shuttle shed for an electric vehicle, all while ensuring minimal disruption to visitors and preserving the site's historic integrity. The anticipated construction budget ranges from $500,000 to $1,000,000, with a project completion timeline of 120 calendar days and proposals expected to be solicited in Summer 2025. Interested parties must submit their qualifications and experience by November 22, 2024, to Rachel Dyer at racheldyer@nps.gov.
    Y--ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service (NPS), is soliciting proposals for the construction of a universally accessible trail at El Malpais National Monument in Grants, New Mexico. The project aims to enhance public access and includes the construction of a 0.75-mile trail, an amphitheater, and various infrastructure improvements, with a total project value estimated between $1 million and $5 million. This initiative underscores the government's commitment to improving visitor experiences in national parks while adhering to accessibility standards and environmental regulations. Interested small businesses must submit their sealed bids by December 4, 2024, with the contract performance period set from January 6, 2025, to October 3, 2025. For further inquiries, potential bidders can contact Brian Dankmeyer at BrianDankmeyer@nps.gov or by phone at 202-573-5697.
    UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service, Rocky Mountain Region 2, is seeking qualified contractors for road and bridge construction services through a Multiple Award Task Order Contract (MATOC). The procurement involves an Indefinite Delivery-Indefinite Quantity (IDIQ) contract for various construction projects, including the replacement of bridges and culverts, roadway reconditioning, and related services across USFS Region 2. This initiative is crucial for maintaining and enhancing infrastructure within national forests, ensuring safe access for both public and forestry operations. Interested vendors must register in the System for Award Management (SAM.gov) and are encouraged to attend scheduled site visits for seed projects, with the full solicitation anticipated to be available in late July 2024. For inquiries, contact Paul Larsen at paul.larsen@usda.gov.
    UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The United States Department of Agriculture's Forest Service is seeking qualified contractors for the Road and Bridge Construction Services Multiple Award Task Order Contract (MATOC) in the Intermountain Region 4, specifically focused on road and bridge construction and related services. The procurement includes a range of activities such as the repair and construction of various types of roads, bridges, culverts, and aquatic passages, with a total small business set-aside and a minimum of ten contracts anticipated to be awarded. This initiative is crucial for maintaining and enhancing infrastructure within national forests, ensuring both public accessibility and environmental stewardship. Interested vendors are encouraged to participate in scheduled site visits from October 9 to October 17, 2024, to familiarize themselves with the project locations, and must direct inquiries to Paul Larsen at paul.larsen@usda.gov. The full solicitation is expected to be available in fall 2024, with task orders ranging from $2,000 to $3,000,000 and a shared ceiling limit of $50,000,000 for all orders.
    GLCA 210865 Replace Wahweep Government Dock
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified firms for the replacement of the Wahweep Government Dock at Lake Powell, identified as project GLCA 210865. This procurement involves the design and construction of a new dock structure to replace the existing dock, which is over 40 years old and has suffered from environmental degradation. The project is significant for maintaining safe and functional access to the lake, with an estimated cost ranging from $7 million to $12 million and a performance period from February 2025 to February 2026. Interested parties must demonstrate relevant experience in design-build projects, submit responses by November 18, 2024, and ensure registration in SAM.gov; contact Zaira Lupidi at zairalupidi@nps.gov for further inquiries.
    Y--DEVA 335272 - TITUS CANYON ROAD CONSTRUCTION
    Active
    Interior, Department Of The
    The National Park Service (NPS) is seeking qualified contractors for the Titus Canyon Road Construction project located in Death Valley National Park, California and Nevada. This project involves repairing 13.5 miles of road that has been severely damaged by storms in 2022 and 2023, rendering it impassable for all vehicles larger than a bicycle. The roadway is a historic cultural resource, and the construction will require protective measures to preserve its historical aspects while addressing significant erosion and washout issues caused by extreme weather events. Interested businesses are invited to submit their qualifications and bonding capacity by November 22, 2024, with anticipated construction costs ranging from $1,000,000 to $5,000,000 and a project completion timeline of 200 calendar days, factoring in potential weather-related delays. For further inquiries, contact Rachel Dyer at racheldyer@nps.gov.