Z1DA--578-18-024 SCI Recreation Area Outdoor Construction
ID: 36C25224B0013Type: Solicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF252-NETWORK CONTRACT OFFICE 12 (36C252)MILWAUKEE, WI, 53214, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

MAINTENANCE OF HOSPITALS AND INFIRMARIES (Z1DA)
Timeline
    Description

    The Department of Veterans Affairs is soliciting proposals for the construction of a multi-sport recreational area at the Edward Hines Jr. VA Hospital in Hines, Illinois, under project number 578-18-024. The project aims to enhance outdoor recreational therapy for veterans, particularly those with spinal cord injuries, by providing facilities for various sports, including basketball and bocce ball, while ensuring compliance with safety and environmental standards. The total estimated project cost ranges from $1,000,000 to $2,000,000, with bids due by October 15, 2024, at 11:00 a.m. CST. Interested contractors should direct inquiries to Donita Grace at donita.grace@va.gov and ensure all amendments to the solicitation are acknowledged in their proposals.

    Point(s) of Contact
    Donita L GraceContractor
    donita.grace@va.gov
    Files
    Title
    Posted
    The document outlines a Request for Proposal (RFP) issued by the Department of Veterans Affairs for the construction of a multi-sport recreational court located between Building 221 and Building 1 at the Edward Hines Jr. VA Hospital, Hines, IL. The total project cost is estimated to be between $1,000,000.00 and $2,000,000.00, specifically designated for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms. Bids are due by 12:00 PM CDT on October 2, 2024, with a performance period of 240 calendar days following the award. Key requirements outlined in the RFP include performance and payment bonds, verifications of measurements, and compliance with federal wage rate determinations for construction. Offerors must respond to inquiries by a specified deadline and are encouraged to attend a site visit scheduled for September 10, 2024. The document emphasizes that all proposals must be submitted in hard copy, with clear labeling of the solicitation number and bid opening details. Additionally, contractors’ previous safety records and environmental compliance must be evaluated, and the bids will be assessed based on responsiveness and responsibility criteria. The solicitation also incorporates provisions adhering to the Buy American Act, requiring materials used in the project to comply with specified regulations.
    The Department of Veterans Affairs has issued a presolicitation notice for the construction project designated 578-18-024, focused on creating an outdoor multi-sport recreational court at the Edward Hines Jr. VA Hospital in Hines, IL. This facility aims to support spinal cord injury patients with a court suitable for various sports, including Boccia Ball, Basketball, Pickleball, and Shuffleboard. The total estimated cost for the project is between $1 million and $2 million, with a performance timeline of 240 days following the Notice to Proceed. The procurement is specifically set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms, ensuring that potential bidders verify their status as SDVOSB vendors and small business concerns under the relevant NAICS code, 236220. The solicitation will be available on the SAM.gov website by August 29, 2024, with a pre-bid conference scheduled for the week of September 9, 2024. All interested parties are encouraged to engage in this opportunity to enhance recreational facilities for veterans, reflecting the agency’s commitment to veteran care and support through infrastructure improvements.
    The document is an amendment to the Request for Proposals (RFP) for the SCI Recreation Area Construction project at the Edward Hines VA Hospital, identified by Project Number 578-18-024. Issued on September 11, 2024, this amendment (A0001) provides crucial updates to the solicitation. Key highlights include the scheduling of a second site visit for potential bidders, set for September 17, 2024, at 10:00 AM, at Building 2 (Clock Tower) of the hospital. The deadline for proposal submissions is established as October 2, 2024, at 12:00 PM CST. Contractors are reminded to acknowledge all amendments on the specified form and are advised to direct any questions regarding the solicitation to Donita Grace at the provided email. The amendment's issuance underscores the federal procurement process's structured approach, ensuring potential vendors are fully informed about changes while adhering to specified guidelines. It plays a critical role in maintaining clarity and transparency in federal contract opportunities, reflecting the government's commitment to fair competition.
    The document serves as an amendment to a solicitation for a project managed by the Department of Veterans Affairs (VA), specifically regarding the SCI Recreational Area project (Project No. 578-18-024). It primarily announces an extension of the deadline for bids from the original date to October 10, 2024, at 1:00 PM CST, allowing potential bidders additional time to prepare their offers. The amendment outlines the process for acknowledging receipt of this change, including options such as returning copies of the amendment or acknowledging it within submitted bids. All other terms of the solicitation remain unchanged. The contracting officer responsible for this amendment is Roniece Ambrose, based in Milwaukee, WI. This document reflects the procedural compliance required in government RFPs, ensuring transparency and fair opportunity within the bidding process.
    The document pertains to Amendment A0003 of Solicitation 36C25224B0013, which involves construction for the SCI Recreation Area at the Edward Hines VA Hospital. Issued by the Department of Veterans Affairs, this amendment updates the solicitation by incorporating a revised Statement of Work (SOW) that includes bid alternates and performance requirements for designated personnel. It also replaces an existing bid schedule and provides details about a recent site visit, including attendance records. The proposal submission deadline is set for October 10, 2024, at 1:00 p.m. CST. Additionally, all inquiries related to the solicitation should be directed to specified contacts, and bidders are responsible for staying informed about any updates via the official Contract Opportunities website. The amendment emphasizes the importance of acknowledging all modifications to ensure compliance and participation in the bidding process.
    The document details Amendment A0004 for Solicitation 36C25224B0013, related to the SCI Recreational Area project at the Edward Hines Jr. VA Hospital. It outlines responses to contractor inquiries regarding project specifications, including requirements for electrical installations, staffing roles, project timelines, and material approvals. Specifically, it clarifies that the Quality Control Manager (QCM) and Site Safety & Health Officer (SSHO) cannot be the same individual, a decision anticipated to add costs to contractor bids. The amendment also confirms that various aspects like off-hours work and subcontractor roles will adhere to specific regulations, ensuring project transparency and adherence to safety protocols. The proposal submission deadline is set for October 10, 2024, with further communication directed to designated VA officials. The responses aim to guide contractors in preparing their bids while ensuring compliance with federal regulations and VA standards, showcasing the project's complexity and the importance of clear communication in the government contracting process.
    This document is an amendment (A0005) to solicitation 36C25224B0013 for a project at the Edward Hines Jr. VA Hospital, specifically addressing the SCI Recreational Area (project number 578-18-024). The amendment extends the bid submission deadline to October 15, 2024, at 11:00 a.m. CST, providing details regarding responses to contractor inquiries about roles such as the Quality Control Manager (QCM) and Site Safety & Health Officer (SSHO). It clarifies that the Superintendent can assume either role without necessitating a dedicated personnel for each, confirming that no tuberculosis testing is required for contractors and providing guidelines for Infection Control Barriers during construction. Other responses include confirming expected elevation differences in storm drainage systems and emphasizing environmental protection measures for trees and other site features. This document reflects on procedural adjustments, project requirements, and facilitation of contractor understanding within the federal procurement context, ensuring compliance with government standards while addressing logistical and planning concerns relevant to the construction project.
    The document is a detailed building directory for the Hines VA Hospital campus in Illinois, designed to provide a comprehensive layout of the facility and its various components. It lists numerous buildings and services, including outpatient clinics, administrative offices, engineering shops, and recreational facilities. Key features such as emergency generators, patient services, storage tanks, and several departments including human resources and housekeeping are indicated. The campus map, dated October 17, 2015, outlines both the operational and recreational structures on the property, highlighting the extensive resources allocated to veteran care. This organized presentation aims to assist staff, visitors, and contractors in navigating the facilities efficiently, reflecting the VA's commitment to maintaining well-structured environments for healthcare delivery and support services.
    The VHA Infection Control Risk Assessment (ICRA) guidelines establish a comprehensive framework for assessing infection control risks associated with construction, renovation, and maintenance activities in VA facilities. The document identifies four activity categories (A to D) based on the scope and duration of work, ranging from minor inspections to large-scale renovations. Each category outlines specific operational criteria, including required precautions based on patient risk categories—ranging from low to highest risk areas. Facilities are instructed to use customized templates to detail affected areas and identify potential patient risk, which informs necessary infection prevention measures. The ICRA mandates specific infection control precautions, such as controlling dust, maintaining negative air pressure during work, and ensuring thorough cleaning post-activity. A structured permit system ensures that the appropriate infection prevention measures are enforced based on the assessed risk level. Overall, the document reflects the VA’s commitment to minimizing infection risks during construction activities to safeguard patient health and safety while undertaking vital facility upgrades.
    This document serves as a resource for applicants seeking to obtain a Department of Veterans Affairs (VA) ID Badge, which is essential for accessing VA facilities and systems. It outlines necessary steps, including a checklist to ensure applicants have two forms of identification that match and are valid. Applicants must also confirm they are sponsored within the VA system and schedule an appointment with a badge office. The ID issuance process involves completing a Special Agreement Check (SAC) and background investigations, with details varying based on employment length and type of access required. Responsibilities as a badge holder are emphasized, requiring an understanding of training provided by the VA. The document contains specific sections for submitting personal details, sponsor verification, and background check information, highlighting the importance of thorough verification of identity to maintain security. It underscores the impact of failing to provide required information, potentially hindering access to necessary facilities for employment or contractual duties. Overall, the document is structured systematically to guide applicants through the ID badge acquisition process while ensuring compliance with security regulations important for governmental operations.
    The document addresses the procurement process related to contractor parking arrangements for government projects. It outlines the essential requirements and guidelines for bidders to submit proposals, emphasizing the need for adequate parking facilities for contractors during project execution. Key points include the expected number of parking spaces, location accessibility, compliance with safety regulations, and measures to minimize disruption to regular traffic patterns. The document also stresses the importance of timely communication and coordination with local authorities to ensure smooth operations. Overall, the purpose is to facilitate a streamlined contracting process while ensuring that adequate parking solutions are in place to support government projects effectively.
    The Edward Hines Jr. VA Hospital document outlines the requirements for the installation and renovation of data and voice communication systems on its campus. This project encompasses the management, design, materials, labor, and equipment necessary to implement various connection jacks, cabling, and structural features essential for communication lines. Key requirements include installation standards following Systimax specifications, obtaining certifications for contractors, and ensuring comprehensive warranty coverage for installed systems. Critical steps involve proper labeling, cable management, and adherence to safety protocols, including fire ratings and infection control measures. Additionally, the document stipulates the importance of collaboration with the Hines Office of Information Technology (OIT) throughout all project phases. By setting high standards and utilizing approved materials and skilled personnel, the VA aims to enhance its communication infrastructure while ensuring compliance with regulations and safety protocols. This initiative reflects the VA's commitment to maintaining a modern and safe healthcare environment.
    The Hines VA Medical Center in Hines, Illinois, seeks contractors for its SCI Recreational Activity Area Project (#578-18-024) with bid documents issued on August 9, 2024. The project encompasses the demolition and construction necessary to prepare the site for new operations, with an emphasis on safety, quality control, and compliance with VA regulations. Key elements include general construction tasks, utility systems management, and the deployment of engineers and architects for oversight. The project requires a comprehensive logistics plan to manage site operations effectively, ensuring minimal disruption to the Medical Center's ongoing functions. Security protocols must be strictly adhered to by all personnel, with provisions for site access and equipment management clearly defined. The contract stipulates detailed responsibilities for the contractor regarding the handling of government-furnished equipment and compliance with environmental standards during construction. Overall, this initiative underscores the VA's commitment to maintaining and enhancing healthcare facilities while prioritizing safety and operational stability during project execution.
    The Hines VA Medical Center, located at 5000 5th Ave, Hines, IL, seeks to construct an outdoor sports court tailored for Spinal Cord Injury inpatients. This facility will accommodate multiple sports, including Boccia Ball, Basketball, Pickleball, and Shuffleboard. The project involves civil, structural, electrical, and plumbing engineering aspects, with particular attention to design codes and site conditions. Key features include a multisport court enclosed by a fence, shade structures to regulate temperatures, and a storage area within the facility's landscape. A new stormwater management system comprising rain gardens and an underground detention system will direct runoff appropriately. The electrical setup includes weatherproof outlets, enhanced site lighting, and a drinking fountain, requiring coordination with existing utilities. The estimated total construction cost is approximately $1,372,883, excluding contingencies and soft costs. The project represents a commitment to improving recreational activities and well-being for patients, emphasizing physical rehabilitation through sports engagement. This initiative aligns with the VA's broader goal of enhancing care environments for veterans.
    The document outlines a renovation project at the Hines VA Medical Center, specifically within the SCI Recreation Activity Area. It details the roles and responsibilities of stakeholders, including various engineers and designers involved, such as Guidon Design, Inc. and MES Group, Inc. The project involves extensive civil engineering work, including demolition, grading, and utility installation, underlining the necessity for compliance with local and federal regulations. Key highlights include the need for accurate utility location verification prior to construction, adherence to environmental protection standards, and specific requirements for erosion control and drainage during the construction process. The plans emphasize maintaining traffic flow during activities and protecting existing trees while ensuring the project aligns with the Americans with Disabilities Act (ADA) standards. The document serves as an informative resource for contractors and regulatory bodies about the project's scope, emphasizing construction safety, ecological considerations, and compliance with VA standards. Its integration highlights the government's commitment to improving facilities that serve veterans, showcasing a detailed approach to facility management and development.
    The document outlines the construction bid documents for a project at the Hines VA - SCI Recreation Activity Area in Illinois, under the U.S. Department of Veterans Affairs. The project focuses on the installation of a fabric canopy and includes detailed engineering plans and specifications for structural and electrical work. Key details include project descriptions, drawings, erosion control plans, and necessary construction practices aligned with safety and regulatory standards. The contractor must coordinate existing structures, verify site dimensions, and adhere to specific material and structural requirements. Emphasis is placed on the contractors' responsibilities for design integrity, material specifications, and safety measures throughout the construction process. The document serves as a guide for compliance and effective execution of the construction project, ensuring minimal disruption and adherence to federal guidelines.
    The document presents a concise representation of a government initiative related to RFPs, federal grants, and state/local funding opportunities. While the specific content appears to be obscure or non-standard (indicated by "5 = புழு"), it seems to suggest a focus on allocation processes for public funding or procurement methods. The context implies that agencies are seeking proposals or applications that meet defined criteria, possibly emphasizing transparency and efficiency in public resource management. Such documents typically outline objectives, eligible applicants, submission guidelines, and evaluation metrics crucial for assessing proposals. Overall, the document signifies the government's structured approach in engaging with community organizations or private sectors to fulfill public service obligations through financial support or projects aimed at societal improvement.
    This document serves as a utility legend for the identification of different types of buried utilities and infrastructure components relevant in civil engineering, transportation, environmental planning, and utility engineering/locating contexts. It categorizes various utilities with abbreviations that include buried electric (UE), buried telephone (BT), fiber optic cable (FOC), gas lines, water (W), steam (STM), and more. Additionally, it lists elements like electric pedestals, meters, storm inlets, and various manholes that are critical for infrastructure projects. The purpose of this legend is to facilitate communication and understanding among professionals involved in government RFPs, federal grants, and state/local RFPs by providing a standardized reference for locating utility lines and infrastructure. This is essential for planning construction projects, ensuring safety, and complying with regulations related to utility management and environmental impact. Such documentation plays a crucial role in project design, risk assessment, and execution, helping to streamline processes across governmental and engineering disciplines.
    The Preconstruction Checklist outlines the authority and responsibilities for a government project overseen by the Contracting Officer and the VA Project Manager. The Contracting Officer is the exclusive representative authorized to bind the U.S. Government, while the VA Project Manager handles technical supervision and inspections but cannot alter the contract. Contractors must submit a detailed progress schedule and a cost schedule within ten days of receiving the Notice to Proceed, which includes anticipated project timelines and work performance by their workforce. Payment requests will be made monthly, adhering to the Prompt Payment Act. Contractors are required to keep daily logs for verification of payrolls and ensure the safety and protection of the surrounding area during work. Changes to the contract can only be made by the Contracting Officer, with a structured process for proposals and change orders. A list of subcontractors must be submitted for approval, along with compliance to labor standards and wages. All correspondence related to the contract must include specific identifying information. This document serves as a guideline for the proper execution of federally funded projects, ensuring adherence to legal and regulatory requirements.
    The VA Hospital Policy Memorandum 578-12-138A-076 (R-2) outlines the updated protocols ensuring safety and health during construction activities at the Edward Hines Jr. VA Hospital. This document emphasizes the importance of protecting patients, staff, and visitors from potential hazards associated with construction operations. Key revisions include changes in responsible personnel and duties, such as designating titles within engineering services and stipulating mandatory construction safety training requirements. The policy mandates the formation of a multi-disciplinary Construction Safety Committee to oversee compliance with safety regulations, infection control measures, and environmental standards. Responsibilities are delineated across various roles including the Hospital Director, Engineering Service, Contracting Officer, and Construction Safety Officers, each tasked with specific oversight and training obligations. Additionally, the memorandum incorporates guidelines for risk assessments, addressing noise, air quality, and utility outages associated with construction. Enhanced procedures for waste management and environmental impacts are mandated, detailing compliance with federal and state regulations. This comprehensive directive reflects the VA's commitment to ensuring construction safety, mitigating risks, and maintaining the welfare of all individuals in and around VA facilities during construction projects.
    The VA Hospital’s Policy Memorandum 578-03-001-089 outlines safety protocols for cutting, welding, and other hot work within its facilities. The purpose of this policy is to minimize fire hazards during such operations, particularly in non-designated areas. Designated areas for hot work include specific service shops, while cutting and welding are prohibited in areas with explosive atmospheres or where sprinkler systems are impaired. Permits must be obtained at least 1-2 days prior to work in non-designated areas, and all operations must be supervised, especially for outside contractors during off hours. The Safety Section is responsible for oversight and authorization, while the Chief of Facilities Management ensures compliance and training for staff. Precautionary measures include removing combustible materials, maintaining a fire watch, and conducting inspections post-operation. The memorandum also references standards set by NFPA 51B and OSHA regulations. Overall, this policy emphasizes the importance of safety and regulatory compliance in hot work operations within the hospital to protect personnel and property.
    The Engineering Service Standard Operating Procedure (SOP) for the Dig Permit Program at the Edward Hines VA Hospital outlines the procedures and responsibilities for excavating work to prevent damage to underground utilities and infrastructure. The document identifies key roles, including the Engineering Service Chief, Project Planning Chief, and Dig Permit Program Manager, each responsible for overseeing compliance with the permit process. The SOP delineates the requirements for obtaining a Dig Permit, including contacting the Program Manager, preparing excavation sketches, hiring utility locators, and submitting the completed Hines Form 1532 for inspection and approval. The Program Manager is tasked with ensuring thorough checks of utility markings and maintaining records of permits for a minimum of two years post-excavation. The SOP emphasizes hazard mitigation and adherence to safety regulations, referencing relevant OSHA guidelines and VA documentation. This structured approach aims to facilitate safe excavation operations while safeguarding essential services at the hospital.
    The VA Hospital's Policy Memorandum 578-12-138A-079 establishes procedures for managing above ceiling entry and wall construction to ensure safety and infection control in the Hines, IL facility. Key requirements include obtaining permits prior to any construction activity, conducting thorough infection control risk assessments, and implementing mobile containment systems to prevent contamination in direct patient care areas. The document delineates responsibilities for Facilities Management Service (FMS) staff, contractors, and service managers to ensure compliance with safety standards, including maintenance of fire and smoke barriers. It emphasizes adherence to established infection control protocols during construction to protect patients from airborne contaminants and outlines necessary training and inspections to uphold these policies. By following this guidance, the VA seeks to maintain a secure environment while conducting essential construction work. The policy also notes that it will be recertified periodically to ensure continued relevance and adherence to evolving safety standards.
    The VHA Pre-Construction Risk Assessment (PCRA) template outlines the necessary steps and guidelines for assessing safety risks related to construction, renovation, and maintenance activities within healthcare facilities. It emphasizes the importance of categorizing activity types and associated risks to implement appropriate safety measures aimed at protecting patients, staff, and contractors. The assessment requires detailed planning, communication with affected areas, and customization to site-specific needs. The document specifies control measures corresponding to various activity types, such as inspection/upkeep, small-scale, and large-scale projects, which outline the necessary precautions, including site visits, hazard communication, and adherence to Occupational Safety and Health Administration (OSHA) regulations. It also necessitates coordination with adjacent areas to minimize disruption to ongoing operations, particularly in sensitive settings like patient care zones. Lastly, the PCRA stresses the need for an Infection Control Risk Assessment (ICRA) if applicable, ensuring comprehensive safety strategies that address infection risks alongside construction activities. In essence, the PCRA serves to establish a structured approach for maintaining safety and regulatory compliance during facility modifications while prioritizing patient and staff welfare.
    The VA Hospital's Policy Memorandum 578-02-001-088(R-3) establishes procedures for implementing Interim Life Safety Measures (ILSM) necessary during construction projects to mitigate life safety risks. The memorandum outlines responsibilities for various leadership roles, ensuring compliance with fire safety protocols and communications regarding construction impacts. The policy mandates that ILSM assessments occur prior to project initiation, with necessary documentation submitted and maintained throughout the project lifecycle. Specific ILSMs, such as maintaining unobstructed exits, accessibility for emergency services, and the functionality of fire protection systems, are prescribed to manage hazards effectively. The Safety Section oversees the implementation and enforcement of these measures, conducting inspections and training as warranted. Overall, this memorandum emphasizes the importance of safety in healthcare construction environments, ensuring compliance with established codes and protecting both personnel and patients from potential risks associated with construction activities.
    The document outlines the General Decision Number IL20240009, pertaining to construction wage determinations in Cook County, Illinois, effective from July 26, 2024. It summarizes requirements under the Davis-Bacon Act, emphasizing the necessity of adhering to minimum wage rates as mandated by Executive Orders 14026 and 13658, based on contract initiation and renewal dates. The wage rates and fringe benefits are detailed for various labor classifications in building, residential, heavy, and highway projects, including updated figures for skilled trades such as asbestos workers, electricians, and laborers. Specific guidelines for classifications that may not appear on the wage determination are included, stressing the importance of conformance requests. Additionally, the document highlights the appeals process for wage determinations, underscoring the responsibilities of contractors to provide paid sick leave and compliance with federal labor laws. This document serves a critical role in ensuring fair labor practices and wage compliance in federally funded construction projects.
    The Statement of Work outlines the construction of a multi-sport recreational area at the Edward Hines Veterans Affairs Hospital. This project aims to enhance outdoor recreational therapy for Spinal Cord Injury veterans, addressing the deteriorating conditions of existing facilities. The scope includes site preparation, demolition of existing structures, and the construction of a new court, all while ensuring minimal disruption to hospital operations and patient care. The document details various attachments, including safety protocols, environmental assessments, and construction specifications. Key objectives include completing the project in one uninterrupted phase, adhering to infection control measures, and coordinating with hospital staff to maintain operations during construction. Contractor requirements include obtaining necessary permits, submitting pre-construction plans, and ensuring all activities align with VA guidelines. The project is expected to be completed within 240 calendar days, with specific performance monitoring by government representatives to ensure compliance with safety and quality standards. Overall, this initiative reflects the VA's commitment to improving the quality of life for veterans through structured recreational opportunities.
    The U.S. Department of Veterans Affairs is launching a project to develop a multi-sport recreation area at the Hines VA Hospital in Illinois, designated as project number 578-18-024. The initiative aims to create facilities that support various sports activities, including basketball, bocce ball, shuffleboard, and pickleball, while ensuring accessibility for individuals with disabilities. The proposed designs include a concrete court surface, adjustable basketball goals, and synthetic surfaces for shuffleboard, alongside necessary infrastructure such as accessible parking, signage, and landscaping elements. The project details specify engineering and construction requirements, including the use of durable materials and compliance with local codes and accessibility standards. Other details involve ecological considerations like a rain garden for stormwater management and adequate site layout for landscaping. The project emphasizes enhancing recreational opportunities for veterans and ensuring projects adhere to required safety, operational, and maintenance standards. This initiative showcases the VA's commitment to improving recreational spaces for veterans within its healthcare system, enhancing their quality of life through active engagement in sports and outdoor activities.
    The Statement of Work outlines the construction of a multi-sport recreational activities area at the Edward Hines Jr. VA Hospital. This project aims to enhance outdoor recreational therapy for spinal cord injury veterans, recognizing its importance for their rehabilitation. The work will involve demolishing existing structures and building a new recreational court, while ensuring minimal disruption to hospital operations. Key requirements include adherence to safety measures, environmental assessments, and coordination with hospital staff to maintain access during construction. The project will take place between Buildings 221 and 001, requiring temporary barriers and careful management of utility shutdowns and site conditions. The contractor is responsible for providing detailed plans and certifications throughout the construction process. Overall, the project reflects the VA's commitment to supporting the health and well-being of veterans, emphasizing the need for safe construction practices and proactive risk management. Completion is expected within 240 calendar days from the notice to proceed, validating the project's urgency and significance to the VA community.
    The solicitation 36C25224B0013 pertains to the construction of a multi-sport recreational court at the Edward Hines Jr. VA Hospital in Hines, IL. The project requires all necessary labor, management, equipment, supplies, and materials, with an estimated completion of 240 days following the Notice to Proceed. Contractors must provide a lump sum bid not exceeding available funds. Additionally, an alternate bid for the removal of a structural canopy over an accessibility ramp is requested, requiring completion within 226 days. Award selection will prioritize the lowest responsive bid and will adhere to a single award process. Work cannot commence until all submissions are approved and a Critical Path Method (CPM) construction schedule is sanctioned by the Contracting Officer. This document highlights the necessary conditions for bidding, submission approvals, and project timelines, reflecting standard practices for federal contracting and compliance requirements in government RFPs.
    The document outlines a site visit for the construction of a Recreation Area at the Edward Hines, Jr. VA Hospital, identified as project number 578-18-024. The meeting took place on September 10, 2024, with key participants including Aaron Walsh, the Project Manager, and various representatives from involved companies such as Richard Group and B3 Solutions. The attendees list includes contact information for project personnel, ensuring effective communication among stakeholders. The primary goal is to facilitate the development of the SCI Recreation Area, aiming to enhance facilities in line with VA standards. Coordination among contractors, project managers, and facility management is emphasized, highlighting the requirement for efficient project execution. The document serves as a logistical reference for those involved in the RFP process, ensuring all parties are informed and engaged in the project’s progress. Overall, it reflects a structured approach to managing federal projects, particularly in the healthcare sector for veterans.
    The document outlines the bid documents for a construction project at the Hines VA Spinal Cord Injury (SCI) Recreation Courts, located at 5000 5th Ave, Hines, IL, under project number 578-18-024. Issued on January 12, 2024, by the U.S. Department of Veterans Affairs, it provides detailed architectural and engineering plans for various recreational facilities, including multiple sports courts, parking provisions, and landscaping features designed for accessibility. The summary includes specifications for construction materials, dimensions, layout designs for sports courts such as basketball and pickleball, and requirements for ADA-compliant elements like van-accessible parking. Additionally, there are directives for environmental considerations, particularly regarding drainage systems and erosion control measures. The overall aim is to enhance the recreational spaces available to veterans, ensuring they are safe, functional, and accessible according to federal guidelines and regulations. This document emphasizes the VA's commitment to improving facilities that support veterans' health and well-being through active recreation.
    The document pertains to a site visit for the construction of a SCI Recreation Area at the Edward Hines, Jr. VA Hospital, linked to project number 578-18-024. Conducted on September 10, 2024, the meeting included key personnel such as Aaron Walsh (Project Manager) and various representatives from involved contracting firms, including Richard Group and TL Services. The primary purpose of the site visit is to facilitate collaboration among contractors, assess the site for the upcoming construction, and ensure alignment with project requirements. Specific individuals listed include project managers, superintendents, and company presidents, each with provided contact information. This document showcases the coordination efforts related to federal grants and RFPs, emphasizing practical engagement for effective project execution within the VA facilities management framework. The collaborative nature of the site visit underlines the importance of effective communication and planning in public sector construction projects.
    The solicitation 36C25224B0013 details a project for constructing a multi-sport recreational court at the Edward Hines Jr. VA Hospital in Hines, IL. The scope includes all labor, materials, and equipment needed, with approximate measurements that the contractor must verify. The base bid mandates project completion within 240 calendar days of the notice to proceed, with a lump sum price required. An alternate bid is also outlined, focusing on the removal of a new structural canopy over an existing ramp, with a completion timeline of 226 days. Only one award will be granted to the lowest responsible bidder, with considerations for available funding. Bidders must ensure all required submittals are approved by the Contracting Officer before commencing work, including an approved cost-loaded Critical Path Method (CPM) construction schedule. This project showcases the VA's commitment to enhancing recreational infrastructure for veterans while adhering to strict governmental bidding and contracting guidelines.
    Similar Opportunities
    Z2DA--657A5-23-110, Renovate 3B for Patient Privacy and Intensive Care Unit, (VA-25-00018450)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for a construction contract to renovate Patient Ward 3B at the Marion VA Medical Center in Illinois, focusing on enhancing patient privacy and establishing an Intensive Care Unit. The project, designated as a Service-Disabled Veteran Owned Small Business set-aside, requires comprehensive renovations including demolition, mechanical system updates, and adherence to safety and quality standards, with an estimated construction cost between $2 million and $5 million. Proposals must be submitted by January 14, 2025, following a mandatory site visit on December 18, 2024, and the performance period is set for 550 calendar days post-award. Interested contractors should contact Contract Specialist Maria G. Hoover at maria.hoover@va.gov for further details.
    Hines Janitorial Re-Solicitation (2/1/25-1/31/26)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for janitorial services at the Edward Hines Jr. VA Hospital in Hines, Illinois, for the period from February 1, 2025, to January 31, 2026. The contractor will be responsible for providing all necessary labor, management, and supervision to ensure comprehensive custodial services, adhering to specific performance standards and compliance with the Service Contract Labor Standards. This contract, valued at approximately $22 million, is crucial for maintaining a clean and safe healthcare environment, supporting the hospital's mission of delivering outstanding patient care. Interested vendors must submit their proposals by December 23, 2024, at 3:00 PM Central Time, and can direct inquiries to Dustin Biermann at Dustin.Biermann@va.gov or by phone at 414-844-4861.
    Hines VA Hospital Janitorial Services (2/1/25-1/31/26
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for janitorial services at the Edward Hines Jr. VA Hospital in Hines, Illinois, for the period from February 1, 2025, to January 31, 2026. The contract will require compliance with labor standards and healthcare cleaning protocols, emphasizing infection control and the maintenance of cleanliness in various hospital areas. This procurement is particularly significant as it is set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) companies, reflecting the government's commitment to supporting veteran entrepreneurs. Interested parties should submit their quotes by November 15, 2024, at 3:00 p.m. Central Time, and may direct inquiries to Contract Specialist Dustin Biermann at Dustin.Biermann@va.gov.
    Z2DA--675-22-706A EHRM Infrastructure Upgrades Construction Viera VA Clinic
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the EHRM Infrastructure Upgrades Construction project at the Viera VA Medical Center in Florida, with an estimated contract value between $2 million and $5 million. This project, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), aims to enhance the electronic health record management infrastructure by addressing deficiencies in telecommunication and utility systems, while ensuring compliance with safety and operational standards. Interested bidders must provide all necessary tools, labor, and materials, adhere to strict project timelines, and participate in a mandatory site visit scheduled for January 11, 2025. For further inquiries, potential contractors can contact Contract Specialist Shawn A Tavernia at shawn.tavernia@va.gov.
    Y1DZ--FY25: NRM (PROJ: 548-CSI-144) DB Replace Fisher House - Site Prep
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for a Design-Build (DB) project to prepare a site for the construction of a Fisher House at the West Palm Beach VA Medical Clinic, designated as project number 548-CSI-144. The contractor will be responsible for all labor, materials, and necessary permits for site preparation covering approximately 0.5 acres, including the design and installation of temporary and permanent utilities. This project is crucial for enhancing accommodations for veterans and their families, reflecting the government's commitment to veteran affairs. The estimated budget for this construction project ranges between $1 million and $5 million, with proposals due by January 17, 2025. Interested contractors, particularly those who are Service-Disabled Veteran-Owned Small Businesses (SDVOSB), should contact Contracting Officer Stacy Figlinski at Stacy.Figlinski@va.gov or (813) 940-2788 for further details.
    Y1DA | 580-20-106 | INSTALL SALLY PORT
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the installation of a sally port and renovation of the Mental Health Department at the Michael E. DeBakey Veterans Affairs Medical Center in Houston, Texas. This project is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), requiring them to perform at least 15% of the work and be certified by the SBA at the time of bidding. The estimated budget for this construction project ranges from $500,000 to $1 million, emphasizing the importance of enhancing safety and operational integrity within a healthcare environment. Interested contractors must submit their proposals electronically by January 14, 2025, with a site visit scheduled for November 5, 2024, and can direct inquiries to Lisa Peace at Lisa.Peace@va.gov.
    Amendment 0001-RFQ (36C25225Q0068)-Automatic Door Repair and Preventative Maintenance Services at Hines VA Medical Center
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for Automatic Door Repair and Preventative Maintenance Services at the Hines VA Medical Center in Illinois. The procurement aims to establish a contract for ongoing maintenance and repair of automatic doors, ensuring compliance with Service Contract Labor Standards while outlining necessary preventive maintenance tasks. This service is crucial for maintaining the functionality and safety of hospital facilities, as prior repairs were conducted on an as-needed basis without an incumbent contractor. Interested vendors can direct inquiries to William McQuade at William.McQuade@va.gov, with the solicitation details remaining unchanged and no extension to the submission deadline.
    RFQ (36C25225Q0068)-Automatic Door Repair and Preventative Maintenance Services at Hines VA Medical Center
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors to provide Automatic Door Repair and Preventative Maintenance Services at the Hines VA Medical Center in Hines, Illinois. The procurement aims to ensure that all automatic doors within the facility are operational according to manufacturer specifications, with services including initial inspections and quarterly maintenance over a five-year period. This initiative is crucial for maintaining a safe and accessible environment for veteran patients and staff, reflecting the VA's commitment to high operational standards. Interested small businesses must submit their quotes by December 30, 2024, at 3:00 p.m. Central Time, and can contact Contract Specialist William McQuade at William.McQuade@va.gov for further information.
    Z1DA--NRM-CONST 528A6-20-633 RENOVATE BUILDING 9
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the complete renovation of Building 9 at the Bath VA Medical Center, transforming it into a temporary police station. The project entails extensive interior and exterior renovations, including demolition, structural repairs, and the installation of new mechanical, electrical, and plumbing systems, all while adhering to safety and environmental regulations, particularly concerning hazardous materials like asbestos and lead. This renovation is crucial for modernizing facilities to better serve veterans and ensure compliance with federal standards. Interested bidders, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit their proposals by 10:00 AM EST on January 8, 2025, following a pre-bid site visit on December 4, 2024, and can contact Contract Specialist Devan Bertch at Devan.Bertch@va.gov for further information.
    Y1DA--CON - Upgrade A Wing & D Wing Elevators - 583-22-101
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the upgrade of elevators in the A and D Wings of the Richard L. Roudebush VA Medical Center in Indianapolis, IN, under project number 583-22-101. This federal contract, estimated to cost between $2,000,000 and $5,000,000, is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and requires comprehensive construction services, including labor, materials, and equipment, to ensure compliance with current safety codes and standards. The project is critical for enhancing patient safety and operational efficiency within the medical facility, with a completion timeline of 690 calendar days from the notice to proceed. Interested contractors must submit proposals via email by the extended deadline of January 7, 2025, and can direct inquiries to Contract Specialist Tiffany A Rausch at Tiffany.Rausch@va.gov.