US Forest Svc, Ozark NF, Spring Lake Dam (SLD) Pedestrian Walkway Improvements
ID: 12445124B0020Type: Presolicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA-FS, CSA EAST 11Atlanta, GA, 303092449, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

REPAIR OR ALTERATION OF DAMS (Z2KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of Agriculture, through the Forest Service, is soliciting bids for the Spring Lake Dam Pedestrian Walkway Improvements project located in Paris, Arkansas. The project aims to replace the existing concrete walkway, enhance safety features such as handrails, rehabilitate the dam's stone masonry piers, and replace an existing potable waterline, all in accordance with provided specifications and drawings. This initiative is crucial for maintaining the safety and functionality of the recreational area, which has historical significance dating back to its original construction in 1938. Interested small businesses must submit their bids electronically by September 18, 2024, with a project budget estimated between $250,000 and $500,000, and a performance period of 270 days. For further inquiries, bidders can contact Steven J. Alves at steven.alves@usda.gov or Cynthia Granderson at cynthia.granderson@usda.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The document serves as an attendance log for a site visit related to a Request for Proposal (RFP) by the United States Department of Agriculture (USDA) and the US Forest Service. It lists attendees, their companies, and contact details, showcasing a diverse group of participants from various construction and land management businesses, along with USDA representatives. Noteworthy attendees include personnel from Grazie Construction, Mid-continental, Thompson Construction Services, and several USDA employees. The site visit appears part of a broader initiative aimed at improving or managing specific forest resources or infrastructure. The attendance log reflects engagement from both federal and private sectors, indicating collaborative efforts in addressing USDA project requirements and objectives. The context underscores the importance of stakeholder involvement in federal- and state-level RFPs for efficient project execution.
    This government document constitutes an amendment to solicitation number 12445124B0020, issued by USDA-FS CSA East 11 in Atlanta, GA, with modifications due by July 25, 2024. The amendment dictates that offers must acknowledge receipt by specified methods, which is crucial for proper record-keeping and compliance. The primary purpose of this amendment is to integrate the clause 52.223-23, detailing requirements for Sustainable Products and Services, into any resulting contract. The sustainable products include biobased products, materials recovered from waste, and energy- and water-efficient products certified by EPA or USDA. This amendment stresses the importance of procuring these sustainable goods and ensures they meet applicable statutory mandates. Contractors are obliged to deliver or use these products in government projects, emphasizing compliance with standards set forth as of October 2023. Furthermore, resources for guidance on sustainable procurement are identified, directing contractors to review the Green Procurement Compilation for comprehensive requirements. This amendment underscores the government’s commitment to sustainability in procurement practices.
    The document outlines the Request for Proposal (RFP) No. 12445124B0020 for the Spring Lake Dam Pedestrian Walkway Improvements project issued by the USDA Forest Service. This Invitation for Bid aims to secure a firm-fixed price contract focused on replacing the existing concrete walkway, enhancing safety features, and rehabilitating the dam's stone masonry piers in a recreation area near Belleville, Arkansas. The project budget is estimated between $250,000 and $500,000, with a completion deadline of May 30, 2024. Offerors must submit bids electronically by September 18, 2024, adhering to various federal regulations, including the Federal Acquisition Regulations (FAR), and must be registered in the System for Award Management (SAM). Key components include ensuring compliance with safety standards, providing insurance and performance bonds, and considering small business certifications based on the applicable NAICS code (237990). The document includes specific instructions for bid submission, a project timeline, and reporting requirements, emphasizing the importance of acknowledging all amendments. Overall, the RFP reflects the government's effort to improve infrastructure while ensuring compliance with federal contracting guidelines.
    The document serves as a comments matrix for the USDA Forest Service (USDA-FS) regarding the issuance of a Request for Proposal (RFP) related to Walkway project 12445124B0020. It records a series of inquiries from bidders along with responses and resolutions provided by project officials. Key inquiries addressed included the on-site engineering requirements, cleaning methods for mortar joints, load-bearing specifications, and availability of boat ramps. Resolutions indicated that an engineer is not required on-site, specific cleaning solutions aren't mandated, and that various processes, such as repointing and the use of power tools, should follow stipulated guidelines. The document emphasizes the importance of operational plans and compliance with feasibility studies for material submissions. Several inquiries also highlight the need for clear communication around construction processes and environmental considerations, particularly about the integrity and safety of existing structures. This comments matrix facilitates transparent communication between government officials and contractors, ensuring that all bids align with project expectations and requirements, which is essential in the context of federal RFPs and grants.
    The document is a comments matrix related to the USDA Forest Service's RFP for Walkway project 12445124B0020. It compiles bidder inquiries and government responses, addressing project-specific requirements. Key topics include the on-site engineer's presence, workload specifications for piers and edge beams, cleaning methodologies for mortar joints, and project timelines. Notably, the contractor is not required to provide an engineer on-site and can use hand tools for certain tasks. The matrix also clarifies that the entire walkway will be removed, unless otherwise specified, and manages inquiries regarding existing structures and their maintenance. Concerns about insurance coverage are mentioned, with emphasis on the need for contractor discretion in securing necessary insurance, particularly for marine operations. Finally, it notes that a bid bond is required, set at 20% of the bid amount, not exceeding $3 million. This document serves to ensure clarity and resolve uncertainties for bidders, facilitating a smoother contracting process in alignment with federal grant protocols and regulatory compliance for construction projects on federal lands.
    The document outlines the detailed engineering plans for the Spring Lake Dam, identified as job number 226b, under the supervision of the Resettlement Administration’s Division of Land Utilization from February 2, 1937. Key highlights include various elevations, detailed structural elements like the spillway level at elevation 518, and the proposed designs for both foot-bridge construction and sluice gate operations. It features critical measurements and specifications for components such as radius curves and theoretical water flow profiles during maximum flood conditions. The drawings emphasize proper scaling and detail necessary for effective implementation, crucial for ensuring the dam's functionality and safety. This file serves as a foundational framework for potential RFPs or grants related to water management and infrastructure development at federal, state, or local levels.
    The Spring Lake Dam Pedestrian Walkway Feasibility Study, conducted by Kleinfelder for the United States Forest Service, evaluates the condition and necessary repairs for a 15-span pedestrian walkway over Spring Lake Dam in Arkansas. The existing walkway, built around 1937, shows significant structural deficiencies, particularly in its concrete superstructure, which is deemed to be in poor condition. Five alternatives for addressing these deficiencies are presented: No Action, Closure of the Walkway, Superstructure Rehabilitation, Spanning Deck Replacement, and Superstructure Replacement. The recommended approach is the Spanning Deck Replacement, which is cost-effective at an estimated $290,000, restores full load capacity, minimizes impacts on the existing historic structure, and increases longevity. Environmental impacts are expected to be minimal, and necessary construction schedules are outlined, ensuring pedestrian safety during repairs. The study highlights crucial considerations such as cultural resource impacts, utility management, and traffic control measures during construction. Overall, this study guides future actions to ensure the safety and maintain the structural integrity of the walkway.
    The report documents a comprehensive visual inspection of the Spring Lake Dam Pedestrian Walkway, conducted by the Kleinfelder NBIS Bridge Inspection Team on November 18, 2020, on behalf of the United States Forest Service. The 15-span pedestrian bridge, supported by stone and mortar piers on the Spring Lake Dam, was assessed for structural integrity and condition. The inspection revealed that the overall substructure is in fair condition, with minor mortar cracking and staining present. In contrast, the deck and superstructure were deemed in poor condition, exhibiting significant concrete scaling, cracking, and leaks, particularly in spans 10 and 15 where severe deterioration was noted. The pedestrian railing was found to be in good condition despite some surface rust. The findings emphasize the need for repairs to ensure safety and functionality, highlighting concerns over the bridge's integrity due to the noted defects. This inspection will guide future maintenance efforts for the bridge under the management of the USFS, aligning with federal standards for infrastructure safety.
    Similar Opportunities
    Russellville, Arkansas, Prairie Creek Small Flood Risk Management Project, Pope County, Arkansas
    Dept Of Defense
    The Department of the Army, through the U.S. Army Corps of Engineers, Little Rock District, is soliciting construction services for the Prairie Creek Small Flood Risk Management Project in Russellville, Arkansas. This Design-Bid-Build procurement involves channel widening and straightening of approximately 0.9 miles of Prairie Creek, along with the removal and replacement of bridges, demolition of existing structures, and relocation of electrical utilities. The project is crucial for enhancing flood risk management in the area, with a total small business set-aside under the NAICS code 237990, which has a size standard of $45 million. Interested contractors should contact Deborah Oswalt at Deborah.Oswalt@usace.army.mil or Marcus Mitchell at MARCUS.D.MITCHELL@USACE.ARMY.MIL for further details, and proposals are due by the specified deadline, with the anticipated Notice to Proceed date revised to May 21, 2025.
    Folsom Right Wing Dam Ditch Bypass Modifications
    Interior, Department Of The
    The U.S. Department of the Interior, Bureau of Reclamation, is soliciting bids for the Folsom Right Wing Dam North Fork Ditch Bypass Modification project in Folsom, California. This project involves critical modifications to improve dam operations, including the removal of existing conduit, concrete headwall, and the installation of a seepage stability berm and toe drain inspection wells. The estimated project cost ranges from $5 million to $10 million, and it is designated as a Total Small Business set-aside, emphasizing the importance of small business participation in federal contracting. Interested contractors must submit sealed offers by the specified deadline, with work expected to commence shortly after award notification, and the performance period extending from April 25, 2025, to April 30, 2026. For further inquiries, potential bidders can contact Ronald Gamo at rgamo@usbr.gov or by phone at 916-978-4304.
    GAOA Palmetto Trail Enoree Passage Rehab
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is soliciting proposals for the GAOA Palmetto Trail Enoree Passage Rehabilitation project located in Whitmire, South Carolina. This project aims to rehabilitate and enhance trail infrastructure within the Enoree Ranger District of the Sumter National Forest, focusing on the construction and maintenance of various trail structures, including boardwalks and bridges, while adhering to strict safety and environmental standards. The initiative underscores the government's commitment to improving public access to recreational areas and maintaining ecological integrity. Interested contractors must submit their bids by January 20, 2025, by 5 PM EST, and can direct inquiries to Penny Zortman at penny.zortman@usda.gov.
    ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALL PROJECT
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is soliciting proposals for the Rough River Dam Safety Modification Phase II project, which involves the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. The procurement aims to enhance the safety and structural integrity of the dam, addressing critical geological and hydrological challenges identified in previous assessments. This project is vital for maintaining the dam's operational capacity and ensuring compliance with federal safety regulations. Interested contractors must submit their proposals electronically by March 20, 2025, with the total contract value estimated between $250 million and $500 million. For further inquiries, contact Adyson Medley at adyson.medley@usace.army.mil or call 502-315-6211.
    Z--Lincoln Home NHS - ADA Concrete Curb Ramps
    Interior, Department Of The
    The National Park Service, under the Department of the Interior, is seeking qualified contractors for the installation of ADA-compliant concrete curb ramps at the Lincoln Home National Historic Site in Springfield, Illinois. The project involves the demolition of unsafe boardwalks and the construction of approximately 100 linear feet of new concrete ramps, with a total project cost estimated between $25,000 and $100,000. This initiative is part of the federal government's commitment to enhancing accessibility at historic sites while adhering to safety and environmental regulations. Interested small businesses must submit their proposals by January 31, 2025, following a mandatory site visit on January 7, 2025, and can direct inquiries to Matthew Frank at MatthewFrank@nps.gov or by phone at 501-762-9927.
    Timber Stop Logs
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, St. Paul District, is soliciting proposals for the procurement of finished structural-grade Douglas Fir timbers for use at the Upper Mississippi River Locks and Dams. The procurement requires the delivery of specific quantities of timbers in various dimensions to Lock and Dam 5A in Fountain City, Wisconsin, by April 1, 2025, with detailed specifications regarding structural grade, size, and preservative treatments outlined in the solicitation. This initiative is crucial for maintaining infrastructure integrity and reflects the Corps' commitment to responsible sourcing and compliance with federal regulations. Interested small businesses must submit their bids electronically by January 28, 2025, at 4:00 PM local time, and can contact Ben Knutson or Sharon Frank-Scheierl for further information.
    Davidson River Campground Reconstruction
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking contractors for the reconstruction of the Davidson River Campground located in Pisgah Forest, North Carolina. The project entails the demolition of 11 existing bathhouses, site preparation, utility work including water, wastewater, and electrical services, and the construction of 10 new bathhouses, along with asphalt concrete paving. This initiative aims to enhance the camping experience while ensuring compliance with safety and environmental standards, with public access to the campground expected to be closed from November 1, 2025, to April 30, 2026, to facilitate construction. Interested parties can contact Penny Zortman at penny.zortman@usda.gov for further details, with the contract performance expected to commence upon issuance of a Notice to Proceed and concluding no later than May 31, 2026.
    FRL Intake Structure and Dam Rehab
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, Huntington District, is seeking contractors for the rehabilitation of the intake structure and dam at Fishtrap Lake in Shelbiana, KY. The project entails a firm-fixed price construction contract that includes the provision of all necessary materials, equipment, labor, and supervision to complete the work in accordance with industry standards and contract specifications. This procurement is critical for maintaining the integrity and functionality of the dam and associated structures, ensuring safety and operational efficiency. Interested parties should note that the response deadline has been extended to January 22, 2025, and can reach out to Brittani Stowers at brittani.l.stowers@usace.army.mil or Philip Davis at Philip.S.Davis@usace.army.mil for further inquiries.
    Saylorville Lake roads, trails, and infrastructure Repair IDIQ FY25
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the Saylorville Lake Roads, Trails, and Infrastructure Repair project, an Indefinite Delivery/Indefinite Quantity (IDIQ) contract. This project involves extensive construction activities including the removal and preparation of existing materials, asphalt and concrete pavement work, installation of guardrails and sidewalks, and site restoration, with a total estimated value exceeding $10 million. The initiative underscores the government's commitment to maintaining and enhancing infrastructure while adhering to federal safety and environmental standards. Interested contractors must submit their bids by January 30, 2025, and can direct inquiries to Stanley L. Bolton or Ryan R. Larrison via their respective email addresses.
    MOF FR911 Holcombe Creek Deck Replacement and Superstructure Painting.
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is soliciting bids for the MOF FR911 Holcombe Creek Deck Replacement and Superstructure Painting project located in the Monongahela National Forest, West Virginia. The project involves comprehensive construction tasks including the removal and replacement of the existing bridge deck, superstructure cleaning and painting, and various site preparations such as mowing, grading, and erosion control. This initiative is crucial for maintaining forest infrastructure and ensuring the bridge remains safe and usable for public access. Interested contractors must submit their quotes by January 31, 2025, and are required to be registered in SAM.gov to be eligible for award; for further inquiries, contact Kevin Brown at kevin.brown2@usda.gov.