ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALL PROJECT
ID: W912QR25R0016Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW072 ENDIST LOUISVILLELOUISVILLE, KY, 40202-2230, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

CONSTRUCTION OF DAMS (Y1KA)
Timeline
    Description

    The Department of Defense, specifically the U.S. Army Corps of Engineers, is soliciting proposals for the Rough River Dam Safety Modification Phase II project, which involves the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. The procurement aims to enhance the dam's safety and operational efficiency through comprehensive modifications, including the demolition of existing structures and the installation of new systems to mitigate internal erosion risks. This project is critical for maintaining infrastructure resilience and ensuring compliance with federal safety standards, with an estimated contract value between $250 million and $500 million. Interested contractors must submit their proposals electronically by October 23, 2025, and can direct inquiries to Adyson Medley at adyson.medley@usace.army.mil.

    Point(s) of Contact
    Files
    Title
    Posted
    This document is a Site Visit Sign-In Sheet for W912QR25R0016 – Rough River, dated February 13, 2025. It records the attendance of various individuals from different companies and organizations. Attendees include Seth Rowney and Tyler Mathis from Thalle Construction Company, Eric Barbour from Kokosing Industrial, and Robert Wheeler and Steven Shifflett from USACE. This sign-in sheet suggests an official site visit related to a government solicitation or contract, likely for a federal project given the involvement of USACE (U.S. Army Corps of Engineers) and the RFP number format.
    The document is a sign-in sheet from a site visit related to the Rough River project, specifically under the RFP W912QR25R0016, attending on February 13, 2025. It lists participants from various companies, including Thalle Construction and Kokosing Industrial, alongside representatives from the U.S. Army Corps of Engineers (USACE). The sheet details names, company affiliations, and contact numbers of attendees, indicating their involvement in potentially bidding or collaborating on this government project. This site visit suggests a preliminary step in the procurement process, allowing participants to familiarize themselves with the project and assess its requirements before formal proposals are submitted. The presence of both contracting companies and government representatives underscores the collaborative nature of federal projects and the importance of stakeholder engagement in the RFP process.
    This document is a participant list for the Rough River Cutoff Wall and Outlet Works Virtual Industry Day on October 23, 2024. It details companies and individuals interested in prime contracting and subcontracting opportunities related to the project. Participants include a mix of small and large businesses, with many expressing interest in specific subcontracting trades such as geotechnical engineering, blasting, specialty drilling and grouting, cutoff wall/grouting, earthwork, excavation, concrete, rough carpentry, deep foundations, crane and rigging, and deep soil mixing cutoff walls. Several companies like Nicholson Construction, Soletanche Bachy International, Drill Tech Drilling & Shoring, Bauer Foundation Corp, Treviicos South, and Malcolm Drilling explicitly state their interest in prime contracting or specific self-performed work like cutoff walls.
    The document serves as a compilation of responses from various contractors regarding their interest in subcontracting opportunities associated with federal and state/local RFPs. It identifies companies, including small businesses and large contractors, alongside their specialties in engineering and construction services. Multiple contractors express their desire to engage in subcontracting, particularly in areas like geotechnical engineering, blasting, and various construction-related activities, highlighting both small and large firm capabilities. Key firms include MRCE, Bauer Foundation Corp, and Nicholson Construction, among others. Each entry features names, email contacts, company size, and areas of interest, underscoring the document's focus on fostering partnerships and subcontracting relationships within the industry. The aim aligns with government initiatives to encourage competition and inclusion, particularly among small businesses, in projects facilitated through federal and state funding mechanisms. This document thus reflects strategic outreach efforts to streamline collaboration and resource allocation among contractors vying for government-related projects.
    Amendment 0001 to Solicitation W912QR25R0016 for the Rough River Dam Modification project outlines significant changes to the original RFP. Key updates include revisions and replacements of several specification sections, an extension of the offer acceptance period from 90 to 120 days, and a change in the ProjNet system for government responses from 15 business days to 15 calendar days. Updated wage rates (KY20250038, KY20250041, KY20250061) are also included. Additionally, the site visit information for Clause 52.236-27 has been updated, scheduling organized visits to the existing control tower for February 4th, 6th, or 11th, 2025, by appointment only, with specific contact details provided. The Price Breakout Schedule, organized into five Contract Line Item Numbers (CLINs) covering Outlet Works and General Site Work, Permanent Facilities Work, Grout Curtain, Cutoff Wall, and State Road Relocation, is detailed with corresponding item notes. Technical inquiries are to be submitted via ProjNet, with specific instructions for access and usage. The document emphasizes that government responses in ProjNet are not binding unless a formal amendment is issued.
    This document, part of the Rough River Dam Safety Modification Phase II, outlines extensive plans for the Cutoff Wall (CTW) and State Road Relocation (STR) components, including detailed reference drawings, demolition, erosion control, instrumentation, and concrete placements. It describes the sequence of work for abandoning the existing outlet works in Critical Area A, including emergency bulkhead installation, conduit cleaning, and concrete placement procedures for various bid options. The document also details the relocation of State Highway 79, covering grading, paving, drainage, guardrail, and instrumentation plans, with specific notes on elevations, centerline locations, and material specifications. The overall scope encompasses structural, electrical, and general site details necessary for comprehensive dam safety modifications.
    The document outlines the "Rough River Dam Safety Modification Phase II" project, initiated by the U.S. Army Corps of Engineers (USACE) in Falls of Rough, Kentucky. It details the comprehensive engineering and design efforts aimed at enhancing the dam's safety and structural integrity. A series of plans and drawings encompass traffic control, geotechnical evaluations, excavation procedures, and erosion control measures critical for the implementation of the modifications. The document lists various phases and components, including boring logs, access routes, demolition plans, and grading plans, indicating the meticulous planning necessary for the project's execution. Also included are utility plans and environmental considerations to mitigate risks associated with construction and ensure compliance with regulations. The overarching aim is to address safety concerns while ensuring that all civil engineering standards are met throughout the modification phase. By doing so, the USACE reaffirms its commitment to the protection of public safety and infrastructure resilience in the region.
    The U.S. Army Corps of Engineers is initiating the second phase of the Dam Safety Modification Project for the Rough River Dam, located in Falls of Rough, Kentucky. This phase entails constructing new outlet works (OTW) to enhance the dam's safety and operational efficiency. The document includes a comprehensive index of drawings and plans, detailing various aspects of the project, such as geotechnical boring logs, traffic control plans, and erosion control measures across different project phases. The project emphasizes the importance of careful planning regarding site access, erosion control, and demolition of existing structures. Drawing references encompass a wide range of needs, including utility installation and traffic management for construction zones. Each technical sheet contributes to the project’s overarching goal of improving dam safety and compliance with federal guidelines. The culmination of these plans illustrates the meticulous preparation required to ensure a successful implementation of the modifications aimed at preserving public safety and infrastructure integrity.
    The document pertains to the Rough River Dam Safety Modification Phase II project managed by the U.S. Army Corps of Engineers located in Falls of Rough, Kentucky. It serves as an index for the project’s drawings and includes various plans and details related to outlet works, traffic control, erosion control measures, and site plans. The aim of this project is to enhance dam safety, ensuring compliance with federal regulations through a series of engineering modifications. The document outlines specific phases of construction, including detailed boring logs for geotechnical evaluation and various demolition, grading, and erosion control plans, emphasizing best practices in environmental management. Schedules detail the drawings related to the service bridge, control tower, and utilities, elaborating on safety measures and construction methodologies essential to the project. This summary conveys the core purpose of the documentation: to organize and provide access to crucial engineering plans necessary for the execution of dam safety upgrades. The structured presentation ensures that stakeholders can effectively navigate the various components of the project while maintaining adherence to safety and environmental standards. The detailed drawings and plans reflect the commitment of the Army Corps to infrastructure resilience and safety.
    The document outlines the final certified plans for the Rough River Dam's State Road Relocation (STR) and Dam Safety Modification Phase II in Falls of Rough, Kentucky. It presents an extensive set of engineering drawings and specifications concerning various aspects such as geotechnical assessments, traffic control plans, excavation details, and utility plans. Specifically, the file includes detailed boring logs and site plans necessary for evaluating the structural integrity of the dam and information regarding demolition plans and erosion control. The scope encompasses multiple phases of construction and essential infrastructure modifications aimed at enhancing safety and effectiveness of the dam operations. This large-scale project reflects the U.S. Army Corps of Engineers' commitment to improving water resource management while ensuring compliance with federal guidelines. It illustrates the complexity and interdependence of engineering strategies required for infrastructure projects, ensuring thorough planning and execution. In alignment with federal RFPs and grants, this document serves as a vital resource for contractors and stakeholders engaging in the development process.
    This government file outlines the Erosion Control Plan for the Rough River Dam Safety Modification Phase II project in Falls of Rough, Kentucky, specifically for Bid Option 2, focusing on the Cutoff Wall. The plan, prepared by the U.S. Army Corps of Engineers, Louisville District, details erosion and sediment control (ESC) measures, including riprap drainage, silt fences, stone check dams, and basket inlet protection. Key requirements for the contractor include developing a Storm Water Pollution Prevention Plan (SWPPP), notifying the contracting officer seven days before land-disturbing activity, and ensuring all runoff is directed to sediment control measures. The plan emphasizes continuous maintenance of controls, proper grading to prevent standing water, and stabilization of disturbed areas with sod, seed, or erosion control matting. It also specifies that outlet control protection is required where the work platform drainage exits onto the dam's surface.
    The Environmental Assessment (EA) for the Rough River Lake Dam Rehabilitation in Falls of Rough, Kentucky, addresses safety improvements necessary for flood risk management at the dam. Conducted by the U.S. Army Corps of Engineers, the EA explored alternatives to mitigate internal erosion issues while evaluating impacts on environmental and socioeconomic resources. The recommended National Economic Development (NED) Plan includes constructing a cutoff wall and new intake structures. The assessment details four alternatives, including a no-action option. The recommended alternative seeks to install a concrete diaphragm cutoff wall, ensuring the dam's safe operation. Potential adverse effects on endangered species, water quality, and cultural resources were considered, with mitigation strategies outlined. No significant environmental impacts were identified that would necessitate an Environmental Impact Statement. Public review concluded on December 6, 2019, incorporating feedback from multiple stakeholders. The proposed action is crucial in addressing existing risks of dam failure, maintaining the structure's integrity, and ensuring compliance with federal regulations. Overall, the document reflects a comprehensive effort to enhance flood control capabilities while minimizing negative environmental consequences.
    The document outlines the contractor work limits and project details for the Rough River Dam Safety Modification Phase II in Falls of Rough, Kentucky. It specifies the geographical layout with coordinates and describes various access points from Highway 79, including utility management responsibilities and environmental control measures. Public access to certain areas, including maintaining safe pedestrian pathways for operation and maintenance staff, is emphasized throughout the construction period. The file includes general notes for construction practices, highlighting adherence to specifications regarding erosion control, spoil area restoration, and maintaining public access to state parks. Details include required permits, and temporary construction facilities designed to meet government standards. The necessity for documentation and monitoring of construction activities, particularly concerning existing channel fills and access roads, is also addressed, ensuring project compliance with environmental regulations and local guidelines. Overall, the document serves as a framework for managing the modifications at the dam, focusing on safety, access, and regulatory compliance during construction.
    The document outlines specifications for the Rough River Dam Safety Modification Phase II, focusing on the construction of fire-rated partitions and other structural elements. Key elements include various partition types categorized by fire ratings, framing methods, and modifiers for sound attenuation and impact resistance. Additionally, it emphasizes the need for proper construction practices, such as achieving tight sealings for fire-rated partitions, ensuring moisture resistance, and incorporating control joints in gypsum wall systems. General instructions point out the importance of adhering to safety standards during construction and maintaining compliance with architectural guidelines. Thorough coordination is required for the installation of various elements, such as steel handrails and concrete slabs, with a focus on ensuring structural integrity and longevity. The document emphasizes the critical nature of these modifications to enhance the dam's capacity and safety, showcasing a commitment to federal standards and local regulations in infrastructure development. Overall, the document serves as a comprehensive guide for contractors and engineers involved in this significant federal project, highlighting crucial elements of fire safety, structural integrity, and environmental considerations in engineering practices.
    The document outlines the structural specifications and design criteria for a service bridge associated with the Rough River Dam Safety Modification Phase II project in Falls of Rough, Kentucky. Key components include dimensions and materials for bridge elements such as reinforced concrete decks, steel girders, and drainage systems, along with references to applicable standards like AASHTO LRFD Bridge Design Specifications. Notable details highlight the contractor's responsibility for structural integrity during construction, specific requirements for concrete types, and seismic and wind load considerations. The document emphasizes the need for stamped engineering analyses and compliance with federal regulations, including specified materials for steel fabrication and welding practices. The project aims to enhance bridge safety and longevity while meeting environmental and engineering standards, demonstrating the government's commitment to infrastructure improvement.
    The document is an Amendment to Solicitation W912QR25R0016 for the Rough River Dam Modification, issued by the U.S. Army Engineer District, Louisville. It outlines specific changes to various specification sections, including revisions to pricing schedules, subsurface investigation information, and construction facility protocols. Significant changes include extending the government acceptance period from 90 to 120 days and updating ProjNet response timelines. Updated wage rates are provided according to Kentucky standards, ensuring compliance with the Davis-Bacon Act and relevant Executive Orders. An organized site visit is scheduled for interested contractors, demonstrating the importance placed on understanding project specifics firsthand. The document emphasizes compliance, detailed cost breakdowns across multiple line items, and a structured approach to labor classifications and wage determinations. The summary indicates a focus on regulatory adherence as contractors prepare bids for the significant construction project intended to enhance the safety and structural integrity of the dam facilities, reflecting the government's commitment to modern infrastructure development.
    The document is an amendment to the solicitation for the Rough River Dam Modification project, issued by the U.S. Army Engineer District in Louisville, Kentucky. This amendment outlines several key updates, including an extension of the quote submission deadline from March 20, 2025, to April 18, 2025. It details revisions to several specification sections related to government facilities, mass excavation, underwater blasting, and cutoff wall construction. The amendment also includes updates on wage rates compliant with the Davis-Bacon Act, reflecting current rates required for various skilled labor classifications in Kentucky. Significantly, the contractor is required to provide a government field office and joint conference space, specifying dimensions, amenities, and compliance features, including ADA access. Detailed requirements for utilities and waste management are included, emphasizing the contractor's responsibility to manage connections and maintenance. Furthermore, the amendment preserves earlier solicitations while introducing these modifications, underscoring administrative necessities for compliance and procedural updates in construction work. This document exemplifies the structured approach in government procurements for construction projects, focusing on clarity in contractor expectations and adherence to federal regulations.
    The document serves as an amendment to the solicitation W912QR25R0016 for the Rough River Dam Modification, specifically concerning modifications and specifications related to concrete for the cutoff wall construction. Key changes include revisions to various specification sections and plans, such as the introduction of a new memorandum for concrete materials testing. The amendment emphasizes the quality and specific requirements for concrete mixtures, including provisions for anti-washout admixtures, mixture proportions, and environmental considerations necessary during the placement of concrete underwater using tremie methods. The contractor is obligated to ensure that all concrete meets the stringent requirements for strength and permeability, and protocols for addressing unacceptable concrete must be adhered to, including reporting and remediation procedures. This amendment reflects the commitment to high standards in construction practices and the importance of thorough documentation and compliance with engineering specifications to ensure dam safety.
    The document is an amendment for the solicitation regarding the Rough River Dam Modification project, specifically focused on the New Outlet Works and Cutoff Wall. It announces changes to the original solicitation including the extension of the offer receipt deadline and updates to several specification sections and plans, which have been replaced in their entirety. The amendment outlines revised price breakout schedules for different components of the project, categorized under various Contract Line Item Numbers (CLIN), detailing specific work items, quantities, and associated costs. Wage rates for workers in Kentucky participating in this project are also updated, in accordance with applicable labor regulations such as the Davis-Bacon Act and related executive orders. The amendment emphasizes the necessity for contractors to acknowledge receipt prior to the set deadline and provides guidance on compliance with updated labor standards. This document serves an essential role in ensuring the successful bidding and execution of contracts related to federally funded construction projects, ensuring compliance with federal and state labor laws while clarifying project specifications.
    The document is an amendment to solicitation W912QR25R0016, concerning the Rough River Dam Modification project, issued by the U.S. Army Engineer District, Louisville. This amendment introduces changes to the project specifications, including revisions to laboratory testing facilities and concrete requirements essential for quality control and assurance during construction. Key updates include the requirement for the contractor to establish two mobile laboratory testing facilities—one for their use and one for government validation—ahead of the project start date. Additionally, various specifications related to concrete construction, such as general concrete requirements, cut-off wall construction, and associated environmental assessments, have been revised and clarified to meet regulatory standards. The amendment emphasizes the importance of compliance with ASTM and USACE testing standards to ensure material quality and the proper execution of construction procedures. Responsibilities for lab validation, maintenance, and coordination with USACE's Material Testing Center are outlined to guarantee the integrity of construction activities. Overall, the document reflects the government's commitment to maintaining high construction standards while providing a framework for contractor compliance within the context of federal contracting protocols.
    The document serves as an amendment to the solicitation W912QR25R0016 for the Rough River Dam Modification project issued by the U.S. Army Engineer District, Louisville. It details changes, including revisions to specification sections, an extension of the proposal submission deadline from May 7, 2025, to August 1, 2025, and compliance updates related to a Class Deviation. It also outlines a Project Labor Agreement requirement and updates the wage determination for labor classifications under the Davis-Bacon Act. The solicitation targets the selection of one contractor through a Best Value Trade-off Process for a firm fixed-price contract, with a target award ceiling of $325 million. Offerors must submit comprehensive proposals addressing technical approach, past performance, small business participation, and price. Past performance must demonstrate relevant experience with similar projects, while technical approaches will undergo evaluation based on clarity, safety, and compliance with documented plans. Ultimately, the changes emphasize adherence to labor regulations, enhance the proposal evaluation criteria, and stress the importance of integrating small businesses in the contracting process. The amendment aims to ensure that contractors can deliver quality and compliance while managing labor efficiently during the project's execution.
    Amendment 0008 to Solicitation W912QR25R0016 for the Rough River Dam Modification project extends the offer due date from August 1, 2025, to October 7, 2025, at 10:00 AM. This amendment includes comprehensive revisions to specification sections and plans, particularly for the New Outlet Works and Cutoff Wall Phase 2. Key changes involve updated price breakout schedules, temporary construction facilities, environmental controls, earthwork, instrumentation, excavation (mass, underwater blasting), slurry control drilling, grouting, cutoff wall construction, and hot mix asphalt for roads. Numerous plans across three volumes, detailing various aspects from erosion control to site, grading, demolition, and utility plans, have also been revised. Additionally, the amendment incorporates updated wage determinations for Highway, Building, and Heavy construction, and adds Clause 52.217-7,
    Amendment 0009 to solicitation W912QR25R0016 for the Rough River Dam Modification, Phase 2, outlines significant changes to the project. Key revisions include updated specification sections for the price breakout schedule, special provisions, slurry control drilling and grouting, and cutoff wall construction. Several plans, such as the Index of Drawings and critical area sequences of work, have also been replaced. The due date for offers is extended from October 7, 2025, to October 23, 2025, at 10:00 AM. Various clauses have been deleted and added, with specific amendments to clauses concerning annual representations and certifications, apprentices and trainees, sustainable products and services, subcontracts for commercial products, and evaluation of options. The document also details the price breakout schedule for base bid items and optional bid items related to outlet works, permanent facilities, grout curtains, underwater blasting, slurry control drilling, and cutoff wall construction, along with comprehensive item notes clarifying the scope of work for each item. The amendment includes detailed requirements for the Outlet Works Demonstration and Acceptance process, encompassing pre-operational and post-operational inspections and a 30-day operability demonstration.
    This government file, P2 145870, details the Dam Safety Modification Phase II for the Rough River Dam in Falls of Rough, Kentucky, issued by the U.S. Army Corps of Engineers, Louisville District. The document is an extensive index of drawings across three volumes, encompassing various aspects of the project. Key categories include Geotechnical data (boring logs, USCS data, boring location plans), Traffic Control plans (Phases 1-4, overall and specific plans, general notes), Survey information (contractor work limits, control points, historical property plans, site photographs), and General information (excavation sequencing, standard symbols, general notes, aerial photographs, location maps, and indices of drawings). The file also includes detailed Civil works such as general site plans (cofferdam, spoil areas, access roads, dewatering), erosion control plans and details, demolition plans (overall and specific outlet works plans), and various grading and site plans. Additionally, it contains profiles and cross-sections for outlet works, stilling basins, access roads, and cutoff walls, along with utility plans and electrical details. Reference drawings for existing conditions, historical data (reservoir pool, tailwater, rainfall), and specific construction details are also included, with revisions noted per amendment 0008.
    This government file, part of the Rough River Dam Safety Modification Phase II project (P2 145870) in Falls of Rough, Kentucky, details the demolition plan for the Outlet Works. The project includes a 14-foot diameter tunnel and a cutoff wall, with specific coordinates and measurements provided for key infrastructure points. The demolition plan outlines the removal of various existing structures and utilities, such as chainlink fences, asphalt pavement, concrete walks, restrooms, shelter facilities, waterlines, fire hydrants, and monitoring equipment. The plan also specifies the abandonment of piezometers and relief wells, and the relocation of playground equipment. Key general notes emphasize adherence to specifications for earthwork, clearing, grubbing, and tree removal. Contractor work limits and restricted work limits are defined, along with guidelines for maintaining public access, utility services, and vehicular/pedestrian access to USACE and KY Parks Department facilities throughout the project. The document highlights the removal of existing infrastructure in preparation for new outlet works, including a new picnic shelter, restroom facility, stilling basin, tunnel, control tower, and retreat channel.
    The Rough River Dam Safety Modification Project, Phase II, focuses on constructing new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. The estimated contract value is between $250 million and $500 million, and it is open to all vendors with a stipulation for 10% price evaluation for HUBZone businesses. The solicitation includes a comprehensive set of requirements for design and construction, emphasizing rigorous evaluation criteria, mainly technical approach, past performance, and small business participation. Proposals must be submitted electronically by March 20, 2025, with stringent guidelines on format, organization, and content to ensure fair evaluation. The proposal process involves a Best Value Tradeoff Process, considering multiple non-cost factors alongside pricing to determine the contractor that offers the best value to the government. The solicitation highlights the importance of relevant past experience, technical capability, and compliance with small business objectives in awarding the contract, underscoring the government’s commitment to enhancing dam safety through effective procurement strategies.
    The solicitation for the Rough River Dam Safety Modification Project Phase II outlines the requirements for constructing new outlet works and a cutoff wall at Rough River Reservoir in Falls of Rough, Kentucky. This design-bid-build project emphasizes contractor responsibilities, quality assurance, and safety protocols, with no separate payment for certain tasks as mentioned in the specifications. Detailed technical specifications include various divisions covering procurement and contracting requirements, existing conditions, construction materials such as concrete and structural steel, and environmental controls. Key considerations for contractors include adherence to performance-based specifications for post-installed concrete anchors, elastomeric bearing pads, and ensuring compliance with standards from organizations like ASTM, AISC, and AASHTO. The document requires rigorous quality assurance through inspections, certifications, and the use of approved materials. Emphasis is placed on the safety qualifications of personnel and adherence to environmental guidelines. Overall, this project highlights the commitment to maintaining dam safety and operational integrity while adhering to government standards and protocols.
    The Rough River Dam Safety Modification project, Phase II, involves significant construction efforts at Rough River Reservoir in Falls of Rough, Kentucky, focusing on creating new outlet works and a cutoff wall. The project requires a comprehensive design-bid-build approach, documented thoroughly in the specifications. Key components include earthwork, concrete construction, and environmental controls, all while adhering to specific safety and operational protocols. The scope involves various divisions addressing procurement, engineering requirements, technical specifications, and contractor obligations, ensuring high standards in material quality, drainage management, and geotechnical oversight. Contractors must submit detailed plans for work platforms and ensure effective site management, including adequate drainage and environmental impact considerations. The project aims to restore and enhance the dam's structural integrity, address safety issues, and ensure compliance with federal and local regulations. Overall, it exemplifies the government's commitment to maintaining and improving critical infrastructure while prioritizing public safety and environmental stewardship.
    The U.S. Army Corps of Engineers, Louisville District, issued a memorandum regarding the 2024 Rough River Dam Phase 2 Design Update for concrete materials. The update addresses the industry shift from Type I/II cement to Type IL cement. Testing conducted in 2024 showed similar results for concrete mixtures using Type IL cement compared to previous tests with Type I/II cement, indicating no changes are needed for the original concrete mixture designs. The memorandum also details updates to several specifications based on new ASTM standards and the inclusion of Type IL cement requirements, along with a change in the water/cement ratio for the cutoff wall concrete.
    The U.S. Army Corps of Engineers has issued a memorandum regarding the 2024 design update for the Rough River Dam Phase 2, focusing on concrete materials due to the shift from Type I/II to Type IL cement in the industry. Recent laboratory tests conducted in 2024 confirmed that concrete mixtures designed between 2019 and 2022 can proceed without modification, as the performance of Type IL cement closely aligns with previous test results using Type I/II cement. Key tests included compressive strength, alkali-silica reactivity, freeze-thaw durability, and temperature rise, indicating that the structural integrity remains intact. Furthermore, current certifications for supplementary materials such as fly ash, slag, and silica fume were found consistent with earlier certifications. Adjustments to specifications were also made to reflect updated standards and requirements, such as changing references from fly ash to coal ash. This memorandum highlights the Corps' ongoing commitment to ensure material quality and compliance with updated regulations for government projects.
    The Rough River Dam Safety Modification Project, Phase II, focuses on upgrading the outlet works and cutoff wall at the Rough River Reservoir in Falls of Rough, KY. The project employs a Design-Bid-Build approach, with specifications emphasizing data management and visualization through an advanced Geographic Information System (GIS). The implementation involves an interactive web viewer containing 2D and 3D GIS views, allowing users to navigate and filter relevant data effortlessly. Central features include components related to excavation, concrete work, geotechnical monitoring, and progress tracking, integrated into a user-friendly interface for both technical and non-technical stakeholders. The document outlines specific requirements for data visualization, reporting formats, and various aspects of dam safety monitoring, including piezometer data and blasting procedures. The project's purpose is to enhance dam safety and operational efficiencies while providing a comprehensive framework for real-time data management and accountability throughout the construction process. This initiative reflects a commitment to maintaining the integrity of critical infrastructure and ensuring compliance with federal and local regulations.
    The Joint Instrumentation and Monitoring Plan (JIMP) for the Rough River Dam Safety Modification Project Phase II outlines a comprehensive framework for monitoring and evaluating dam performance during the construction of new outlet works and cutoff walls. Issued by the Louisville District Corps of Engineers, the plan establishes procedures for data collection, roles and responsibilities, and notification processes related to instrument readings. Key components include continuous monitoring of various instrumentation during critical construction activities, data sharing protocols between the contractor and the Corps of Engineers, and alert levels for threshold exceedances. The plan emphasizes the importance of timely communication and collaborative decision-making should any risks to dam safety arise. Specific sections pertain to monitoring frequencies, incident response actions, and reporting requirements, ensuring that safety measures are deeply integrated into the construction process. This document plays a critical role in federal project management, compliance with safety standards, and safeguarding public infrastructure by ensuring rigorous oversight of activities that could impact the integrity of the dam.
    The document outlines the Rough River Dam Safety Modification Project Phase II, focusing on new outlet works and the construction of a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. It serves as the Tunnel Geotechnical Baseline Report (GBR) Appendix A, certifying various geotechnical findings related to the project design. Key elements include figures illustrating the project's location, layout, and various geological characteristics, such as stratigraphy and karst features. The report presents data from numerous core samples and borings, emphasizing rock conditions, grout hole locations, and tunnel alignment details crucial for construction. Additionally, the GBR provides rock support and ground support recommendations from established engineering manuals, ensuring compliance with engineering standards. This document serves as a critical reference for contractors engaged in the design-bid-build project, facilitating informed decisions based on comprehensive geotechnical analysis necessary for the dam's safety and structural integrity.
    The U.S. Army Corps of Engineers has issued a Geotechnical Baseline Report (GBR) for the Rough River Dam's Phase II construction project in Kentucky, focusing on the new outlet works and tunnel construction. The report outlines the geotechnical baseline conditions expected during construction, including subsurface conditions related to the proposed 1,000-foot tunnel within the Big Clifty Sandstone. The GBR provides essential data to contractors for bid preparation and identifies potential construction challenges. Key aspects include the dam's location, existing structures, geological setting, and the specific materials involved. Subsurface investigations conducted since 1941 inform the GBR, with analyses of soil and rock conditions to ensure safe construction practices. Specific parameters, such as unit weight, compressive strength, and groundwater behavior, are detailed, offering crucial guidance on material behavior and engineering challenges. Overall, the document serves to support the bidding process, ensuring contractors understand the subsurface framework and conditions alongside contractual baselines. This clear communication of geotechnical conditions is vital for risk management, cost estimation, and effective planning within the context of federal construction projects.
    The Rough River Dam Safety Modification Project Phase II focuses on enhancing the dam's infrastructure through the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This document, part of the design-bid-build process, presents the Tunnel Geotechnical Data Report (GDR), specifically Volume 5, which contains exploratory data related to the project's first phase. It includes critical geotechnical information obtained from boring samples, emphasizing the depths and geological conditions encountered. The report aims to provide necessary insights for contractors and engineers in their planning and execution phases, ensuring compliance with safety and engineering standards. The data collected and documented here will support the project's objectives, demonstrating the government's commitment to dam safety and infrastructure stability. The formal certification of this volume indicates its significance in guiding subsequent project activities while adhering to federal regulations and local oversight.
    The Rough River Dam Safety Modification Project, specifically Phase II, focuses on the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This document, a Tunnel Geotechnical Data Report (GDR), details exploratory data relevant to the project, specifically addressing the geological conditions through Subappendix A10 regarding Boring 1807. The report is part of a Design-Bid-Build strategy and is certified as final, suggesting a comprehensive evaluation of the site prior to the construction phase. It provides insight into the geotechnical characteristics, such as soil and rock types, relevant for engineering considerations in dam safety modifications. The document serves as an essential resource for contractors involved in the bidding process by providing rigorous geotechnical information necessary for designing the project's infrastructure. Its systematic structure includes detailed geological logs and observations, reinforcing this project’s commitment to ensuring the safety and feasibility of the dam modifications under the federal and state engineering guidelines.
    The document is a certified geotechnical data report (GDR) for the Rough River Dam Safety Modification Project, specifically detailing Phase II which involves new outlet works and the construction of a cutoff wall at Rough River Reservoir in Falls of Rough, Kentucky. The report, produced by the Louisville District of the U.S. Army Corps of Engineers, includes both exploratory data and findings from various geotechnical investigations conducted in support of the project. Essential components include the description of boring logs, elevation measurements, fluid levels in holes, and soil descriptions pertinent to tunnel construction. This information is vital for engineers to assess the geological conditions and design appropriate structural modifications to ensure dam safety and operational efficiency. The data serves as a foundation for planned construction activities and must adhere to regulatory compliance and safety standards. Overall, the document encapsulates critical geotechnical assessment data that inform the engineering design processes for infrastructure safety modifications, reflecting the government's dedication to maintaining structural integrity in vital public works.
    The Rough River Dam Safety Modification Project Phase II seeks to enhance the outlet works and construct a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This document, Volume 5 of the Tunnel Geotechnical Data Report, provides essential geological and geotechnical data from borings 1809 and 1810, conducted by Stantec. It details the various soil types and conditions encountered during drilling, including descriptions of clay, sand, and gravel layers, moisture contents, and observations of groundwater levels. The report is integral to understanding site conditions, which will inform the design and safety modifications of the dam. This filing represents a crucial step in the U.S. Army Corps of Engineers' efforts to ensure the structural integrity and safety of the dam by addressing safety concerns identified in previous assessments. The data collected serve to guide the engineering and construction processes while adhering to mandated safety and regulatory standards. With a certified final status dated December 20, 2024, it underscores the commitment to thorough investigation and meticulous design in facilitating the safe operation of the project.
    The document outlines the solicitation for the Rough River Dam Safety Modification Project Phase II, which focuses on constructing new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This project is categorized under the Design-Bid-Build methodology and includes a Geotechnical Data Report (GDR) detailing rock mechanics and borehole data relevant for the tunnel construction. The report provides critical geotechnical information to inform the construction process, emphasizing the importance of understanding the geological conditions to ensure the project's safety and integrity. It is classified for official use only and is designated for permanent disposition, indicating its significance in maintaining dam safety standards. The structured GDR serves as a foundational reference for contractors and engineers involved in the project, underlining the necessity of thorough geological assessment in large-scale infrastructure projects of this nature. Overall, the document highlights the federal government's commitment to improving dam safety through diligent planning and informed engineering practices.
    The document outlines the Rough River Dam Safety Modification Project Phase II, specifically addressing the geotechnical data gathered for the tunnel construction associated with the new outlet works and cutoff wall project at Rough River Reservoir in Falls of Rough, KY. It contains certified final reports and detailed subappendices concerning exploratory data, boring logs, and rock testing. The exploratory drilling data covers various borings (1901-1911) with information on soil types, moisture levels, and recovery percentages. The report mandates strict control measures due to its classification as "For Official Use Only," indicating sensitive information that might be exempt from public disclosure. The findings stress the need for cautious and compliant handling during the construction phase, serving as a critical guide for engineers and contractors involved in the project to ensure safety and regulatory adherence. In summary, this document forms an essential resource for executing the environmental safety and structural integrity aspects of the dam modification efforts, demonstrating the U.S. Army Corps of Engineers' commitment to infrastructure reliability and safety standards.
    The document pertains to the Rough River Dam Safety Modification Project Phase II, focusing on new outlet works and cutoff wall construction at Rough River Reservoir in Falls of Rough, KY. It outlines a Geotechnical Data Report (GDR) involving detailed boring logs for exploratory data relevant to tunnel construction operations. The report identifies soil and rock types encountered during drilling, providing stratigraphic details, moisture content, recovery rates, and observations of geological features such as fractures and stringers. Geotechnical assessments were performed using various drilling methods, with water levels recorded and casing installed for stability during the coring process. The report emphasizes the complexity of the geological conditions, including lean clay, sandstone, and shale formations, which are critical for understanding site behavior during construction. The documentation is a crucial resource for future phases of the project, ensuring compliance with safety and engineering standards. This project illustrates the federal government's commitment to infrastructure safety and environmental stewardship in water resource management.
    The Rough River Dam Safety Modification Project Phase II involves significant engineering work to install new outlet works and a cutoff wall at the Rough River reservoir in Falls of Rough, Kentucky. This document includes a Geotechnical Data Report that outlines exploratory boring activities conducted between 2019 and 2020 to assess subsurface conditions for tunnel construction. The report provides detailed data regarding soil and rock layers, moisture content, plasticity indices, and testing results essential for the design and construction phases. The testing involved various techniques, including Standard Penetration Tests (SPT) and hydraulic conductivity measurements, facilitating a comprehensive understanding of the geotechnical characteristics that will inform the project's engineering solutions. This project aims to enhance the dam's safety features, ensuring compliance with federal and state regulations while mitigating potential risks to surrounding areas. The documentation reflects the meticulous data collection and analysis necessary for major infrastructure projects, underscoring the federal commitment to reinforcing critical safety measures.
    The Rough River Dam Safety Modification Project, specifically Phase II, includes the construction of new outlet works and a cutoff wall at Rough River Reservoir in Falls of Rough, Kentucky. This document compiles the Tunnel Geotechnical Data Report (GDR), Volume 5, focusing on exploratory rock testing data essential for the project's design and construction. The report outlines various tests conducted on rock core specimens, detailing elastic moduli, moisture conditions, and unconfined compressive strength for materials including sandstone and shale. Key results include Young's modulus, Poisson's ratio, and observed shear failures, alongside detailed descriptions of testing methodologies and parameters. The objective of this project is to enhance the structural integrity and safety of the dam, aligning with federal and state regulations for water infrastructure. The report is crucial for informing stakeholders about the geotechnical conditions and supporting effective decision-making regarding engineering practices and safety improvements overall.
    The document outlines the solicitation for the Rough River Dam Safety Modification Project Phase II, focusing on the geotechnical data required for tunnel construction at the Rough River Reservoir, Falls of Rough, Kentucky. Specifically, it details the findings from the 2012 geotechnical explorations, including rock testing data and boring logs that encapsulate various geological materials such as clay, sandstone, and shale, as well as their respective characteristics such as density and hardness. The report emphasizes the need for thorough assessment and understanding of subsurface conditions to ensure safe construction practices as part of the dam's safety enhancements. Furthermore, it outlines the processes undertaken during the geological investigations, including core drilling and various testing methods. The document maintains a strict compliance focus, indicating it contains sensitive information not for public distribution, emphasizing regulatory adherence within the project framework, typical of government RFPs and grants. Overall, it illustrates the critical groundwork necessary for executing infrastructure improvements while adhering to safety and environmental regulations. This documentation serves as a foundational resource for contractors and stakeholders engaged in the project.
    The Geotechnical Data Report for the Rough River Dam Safety Modification Project Phase II provides essential data and analysis pertaining to the geological conditions for the construction of a new tunnel. This report serves as a foundational document for the Geotechnical Baseline Report (GBR) and outlines the methodologies employed during exploratory investigations conducted in 2018 and 2019, as well as previous geotechnical explorations from 2012 to 2017. Key sections include the comprehensive description of drilling operations, laboratory testing methodologies for rock strength, and moisture retention assessments, alongside detailed records of core sampling and pressure testing. The testing results vary for different rock formations, and highlights include the Unconfined Compressive Strength tests, which demonstrated strong material stability in the Big Clifty Sandstone. The report is structured to correlate field methods with contract specifications, ensuring that data gathered supports the design and safety measures set forth for the Rough River Dam project. Overall, this document is critical for evaluating structural integrity and guiding the construction of new outlet works, showcasing the U.S. Army Corps of Engineers' commitment to dam safety and infrastructure resilience.
    The document is a solicitation for the Rough River Dam Safety Modification Project Phase II, focusing on new outlet works and a cutoff wall at Rough River Reservoir in Falls of Rough, Kentucky. It includes a Tunnel Geotechnical Data Report (Volume 5), specifically detailing geotechnical investigations conducted from 2015 to 2017 along the left abutment grout holes. The report encompasses information on borehole data, such as geological layers, material classifications, and core recovery statistics, necessary for tunnel construction feasibility. Key sections include logs of upstream and downstream grout holes, verification holes, and detailed drilling logs that highlight various materials encountered, including asphalt, clay, sandstone, limestone, and shale. The findings document the physical properties and geological conditions affecting construction, and emphasize the controlled handling of the report content due to its classified nature (FOR OFFICIAL USE ONLY). The report serves essential functions in assessing the structural safety and integrity of the dam, guiding engineering decisions for the ongoing modifications, and ensuring compliance with federal safety standards.
    The Rough River Dam Safety Modification Project focuses on the construction of new outlet works and a cutoff wall at Rough River Reservoir, Falls of Rough, KY. The document includes the Tunnel Geotechnical Data Report (GDR) Volume 5, detailing subsurface investigations crucial for assessing ground conditions for the proposed tunnel construction. It includes detailed bore logs and classifications of soil and rock encountered during exploratory drilling, such as various layers of lean clay, gravel roadbase, and limestone. The findings indicate the presence of cohesive overburden and weathered materials, which are essential for understanding the dam's structural integrity. The report also discusses drilling conditions, recovery rates, and physical characteristics of the materials encountered, emphasizing the challenges presented by karst features in the area. This GDR is part of a broader effort to ensure the dam's safety and functionality while meeting local and federal guidelines. Overall, the document serves as a vital resource for engineers and contract bidders interested in the project, aligning with the government's objectives for infrastructure improvement and public safety through federal grants and requests for proposals (RFPs).
    The document details the Rough River Dam Safety Modification Project Phase II, focusing on the construction of new outlet works and a cutoff wall at Rough River Reservoir, Kentucky. It provides a comprehensive geotechnical data report related to tunnel construction activities from 2015 to 2017. The report includes specifics on the composition of the geological materials identified during drilling operations, such as different types of clays, gravel, limestone, and shale, along with the depths they were found and their respective properties. This data underpins the planning and engineering processes essential for ensuring the structural integrity and safety of the dam. The report is structured in a organized manner, presenting drilling logs, borehole characteristics, and a summary of field tests conducted during the project. It reflects adherence to regulatory protocols, emphasizing the importance of geological assessments in informing engineering decisions. This project aligns with broader federal efforts to enhance infrastructure resilience, demonstrating a commitment to safety and compliance within government-funded initiatives.
    The document outlines the Geotechnical Data Report (GDR) for Phase II of the Rough River Dam Safety Modification Project, focusing on new outlet works and cutoff wall installations at the Rough River Reservoir in Falls of Rough, Kentucky. It encompasses comprehensive drilling logs and geological evaluations conducted between 2015 and 2017, detailing the soil and rock stratigraphy sampled at specific depths, including a variety of clay, limestone, and sandstone layers. Key observations include the characterization of materials, including lean clay, varying degrees of limestone, and shale, alongside necessary drilling and testing methodologies. The report highlights drilling techniques, core recovery percentages, and the identification of potential weathered zones and fractures. These analyses serve as critical data for the ongoing project, emphasizing the importance of understanding the site geology for structural stability and safety. The document reflects governmental structure and protocols associated with federal grants and RFPs for infrastructure projects, underlining the commitment to maintaining structural integrity at the Rough River Dam.
    The document outlines the Rough River Dam Safety Modification Project Phase II, specifically focusing on the Tunnel Geotechnical Data Report, which includes detailed geological assessments from the Rough River Reservoir in Falls of Rough, Kentucky. This report serves as a vital part of the project's design-bid-build phase, documenting the drilling and geotechnical tests performed from 2015 to 2017. Key materials identified in the geological profile include various types of clay and limestone, indicating the ground conditions necessary for future construction activities. The data collected provides insights into soil stability, moisture content, and the presence of voids, which are critical for ensuring the safety and structural integrity of the dam. The information also contributes to compliance with federal regulations and standards applicable to dam safety modifications. This structured report represents an essential element of the overall project documentation, ensuring that project planners and engineers can make informed decisions based on comprehensive geotechnical evaluations.
    The document details the solicitation for Phase II of the Rough River Dam Safety Modification Project in Falls of Rough, Kentucky, focusing on the design-bid-build approach. Specifically, it presents the Tunnel Geotechnical Data Report (GDR) encompassing exploratory drilling, geological analysis, and material classifications pertinent to the tunnel construction. The data, collected between 2015 and 2017, involves multiple drilling logs and detailed descriptions of the subsurface conditions, inclusive of various soil types such as lean clay and sandy clay as well as rock formations like sandstone and limestone. The report aims to provide essential geotechnical information to ensure safety and compliance with federal regulations during the construction of new outlet works and cutoff walls at the dam site. With significant emphasis on material properties, hole specifications, and geological characteristics, this documentation supports sound engineering practices essential for project success. The comprehensive assessment outlined in the report serves as a guide for contractors, engineers, and government agencies involved in the project, reflecting the government’s commitment to infrastructure safety and environmental stewardship.
    The Rough River Dam Safety Modification Project Phase II focuses on developing new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This document presents the Tunnel Geotechnical Data Report (Volume 5, Subappendix D7), detailing findings from explorations conducted between 2015 and 2017. The drilling logs contain information about various soil layers, including asphalt, poorly graded gravel, lean clay, and limestone, along with their depths and physical characteristics. Notable information includes drilling times, geological descriptions, and core recovery statistics for several boreholes across the site. The document is critical for engineering assessments, guiding the design and construction phases of the dam's safety modifications by providing critical soil and rock data that influences project specifications and safety considerations. This data will assist in mitigating risks associated with the construction, ensuring compliance with safety regulations during the project. The document reflects a thorough investigation and underscores the government’s commitment to infrastructure safety and environmental stewardship.
    The document outlines the Rough River Dam Safety Modification Project Phase II, specifically focusing on the geotechnical data related to tunnel construction at the Rough River Reservoir in Falls of Rough, Kentucky. It includes a detailed drilling log from investigations carried out between 2015 and 2017, documenting soil and rock characteristics encountered during exploratory drilling. The log records various depths and materials, including asphalt, gravel, lean clay, limestone, and shale, with corresponding physical and chemical properties. Key insights include identifying fracture zones and bedding plane separations indicative of geological instability, which are crucial for designing effective outlet works and a cutoff wall. The report serves as a foundational resource for engineers and contractors participating in the federal RFP process, ensuring compliance with safety standards and supporting decisions on construction methodologies to fortify the dam and enhance its safety.
    The document is a Geotechnical Data Report for Tunnel Construction associated with the Rough River Dam Safety Modification Project Phase II, located in Falls of Rough, Kentucky. It provides detailed analyses of groundwater data and the geological conditions relevant to tunnel construction. Key sections of the report include piezometer plots which depict water pressures at various locations, Lugeon values demonstrating rock permeability, and comprehensive permeability tables that were determined from borehole pressure tests. Significant findings include piezometric data indicating groundwater levels and Lugeon test results suggesting varying permeability across different geological formations. The report emphasizes the importance of understanding groundwater behavior for dam safety modifications and outlines procedures for managing water during construction activities. This document, controlled as For Official Use Only (FOUO), reflects the critical nature of ensuring safety and compliance with environmental regulations while undertaking infrastructure projects, particularly in sensitive areas like the Rough River reservoir. The collected data will aid engineers in making informed design decisions as part of the larger scope of safety improvements and environmental stewardship commitments.
    The Rough River Dam Safety Modification Project Phase II focuses on upgrading the dam's infrastructure through the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This document, designated as the Tunnel Geotechnical Data Report (GDR), provides detailed information on the exploratory drilling conducted in Phase I, specifically focusing on boring data, geological conditions, and subsurface exploration relevant to the tunnel construction. The report identifies drilling locations, along with various geotechnical aspects such as fluid levels, bedding, and fracturing observed during the drilling process. Specified as "FOR OFFICIAL USE ONLY," the document is protected under the Freedom of Information Act, ensuring that sensitive data is only shared with authorized personnel. Overall, the report serves to inform engineers and contractors about the subsurface conditions critical for safely and effectively designing the outlet works and cutoff wall while complying with safety regulations and standards set forth by the U.S. Army Corps of Engineers (USACE).
    The Rough River Dam Safety Modification Project, Phase II, focuses on the design and construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This document is a Tunnel Geotechnical Data Report (GDR) intended for a Design-Bid-Build project under solicitation ID W912QR25R0016. The certified report provides essential exploratory data relevant to tunneling activities, specifically within Appendix A for Phase I. Key information includes geotechnical findings from boring tests and logging data pivotal for understanding subsurface conditions, which will guide construction methodologies. The report outlines measurements essential for tunneling, such as elevation and casing details, offering vital insights into rock formations and groundwater levels. This comprehensive geotechnical data serves as a critical resource for contractors responding to the Request for Proposals (RFP), ensuring that construction approaches align with safety standards and operational requirements. The report's goal is to assist in mitigating risks associated with the dam's structural integrity and the surrounding environment during the construction phase.
    The document outlines the solicitation for the Rough River Dam Safety Modification Project Phase II, which involves the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. It includes the Tunnel Geotechnical Data Report (GDR) Volume 5, detailing exploratory data related to tunnel construction. The report serves as an essential reference for the design and construction phases, ensuring that the relevant geotechnical information is available for contractors and engineers. The Indiana-based Louisville District of the U.S. Army Corps of Engineers is responsible for managing this project, which is structured under the Design-Bid-Build contracting method. This documentation not only provides technical specifications but also includes detailed logs of drilling and testing conducted at the site, which are critical for assessing soil conditions and potential hazards during construction. The GDR is a pivotal part of the project’s preparation, ensuring compliance with safety and engineering standards required for dam modification projects of this magnitude. This solicitation is integral to advancing the safety and operational efficacy of the dam, aligning with federal initiatives aimed at infrastructure integrity and public safety.
    The document outlines the Rough River Dam Safety Modification Project, specifically Phase II, which involves the design and construction of new outlet works and a cutoff wall at Rough River Reservoir in Falls of Rough, Kentucky. It is categorized as a Design-Bid-Build project and comprises a Geotechnical Data Report (GDR), particularly Volume 5, which contains essential exploratory data related to tunnel construction, focusing on boring data. The report is part of a series aimed at ensuring the dam's integrity and safety through engineering enhancements. The solicitation highlights the project’s context within federal grants and RFPs, indicating the need for detailed technical evaluations to facilitate effective construction planning, mitigate risks, and comply with safety standards. The document is certified and marked for permanent disposition, underscoring its significance for both current infrastructure projects and future engineering assessments related to dam safety modifications.
    The document outlines the solicitation for the Rough River Dam Safety Modification Project, Phase II, specifically focusing on the new outlet works and cutoff wall at Rough River Reservoir in Falls of Rough, Kentucky. This report, identified as Vol. 5 of the Geotechnical Data Report (GDR), includes exploratory data from Phase I related to tunnel construction, with a particular emphasis on Boring 1804-2. The document is certified final as of December 20, 2024, and is part of a larger design-bid-build initiative aimed at ensuring the structural integrity and safety of the dam through substantial geotechnical and engineering assessments. The GDR features detailed geotechnical data crucial for guiding contractors and engineers during the construction phase, and it is categorized under the jurisdiction of the Louisville District, LRD Division. The report ensures compliance with safety regulations by providing in-depth data on the geological and hydrological conditions of the project site, thus facilitating informed decision-making in the planning and execution of the modification works. Overall, this document is essential both for fulfilling federal project requirements and for maintaining the operational safety of the Rough River Dam.
    The Rough River Dam Safety Modification Project Phase II focuses on essential upgrades to the outlet works and construction of a cutoff wall at the Rough River Reservoir located in Falls of Rough, Kentucky. This document primarily deals with the Geotechnical Data Report (GDR) specific to tunnel construction, presented in Volume 5 as part of a design-bid-build solicitation under reference W912QR25R0016. It emphasizes the necessity of thorough exploratory investigations conducted during Phase I to inform the design and execution of the tunnel excavation. The GDR includes detailed findings from exploratory borings, critical for assessing soil conditions and potential challenges in construction. The document is classified as certified final and is designated as permanent under the federal archives and records management system. Summarizing the data contained in this report is vital for ensuring the construction meets safety standards and project specifications. This initiative aligns with the U.S. government's commitment to infrastructure safety and modernization, seeking to enhance the reliability of dam operations and surrounding ecosystems.
    The document is a Solicitation for the Rough River Dam Safety Modification Project Phase II, which focuses on the design and construction of new outlet works and a cutoff wall for the Rough River Reservoir in Falls of Rough, Kentucky. It includes a Tunnel Geotechnical Data Report (GDR), specifically Volume 5, detailing exploration data relevant to the tunnel construction. The report provides a summary of geotechnical exploration activities, logging data, and necessary geophysical assessments, recorded by the Stantec engineering team. Key information includes boring data, depth measurements, and locational specifics necessary for planning and executing the construction. The project is mandated to ensure the safety and structural integrity of the dam, underlining the U.S. government’s commitment to infrastructure maintenance and compliance with safety regulations. This authority underscores the significance of thorough geological assessments to inform construction methodologies and mitigate risks associated with geotechnical conditions during the modification phase.
    This document outlines the Rough River Dam Safety Modification Project Phase II, focusing on the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, KY. It is classified as a Design-Bid-Build project and contains critical geotechnical data relevant to the tunnel construction phase, as specified in the Tunnel Geotechnical Data Report (GDR), Volume 5, Subappendix A8. This volume includes detailed exploratory data from Borings, specifically Boring 1806-1. The GDR is a certified final document intended for permanent disposal, underscoring its significance for the project's planning and execution stages. The findings from the geotechnical investigations are essential for ensuring the structural integrity and safety of the dam modifications. These modifications aim to enhance dam safety operations and comply with regulatory requirements. The document serves as a key reference for contractors and stakeholders involved in the bidding and construction processes, emphasizing the government's commitment to infrastructure safety and reliability through detailed planning and thorough analysis of engineering data.
    The document, W912QR25R0016, details the "Rough River Dam Safety Modification Project Phase II: New Outlet Works and Cutoff Wall," focusing on geotechnical data from Phase IB downstream boring logs (Volume 6 of 3). It presents drilling logs for boreholes DXP 926, DXP 946, DXP 966, and DXP 986, located at Rough River, Falls of Rough, KY. These logs provide detailed field classifications of materials encountered, including asphalt, gravel, lean clay, sandstone, shale, and limestone, along with their depths, descriptions, and drilling remarks. The primary purpose is to provide essential subsurface information for the design and construction of the new outlet works and cutoff wall, ensuring dam safety modifications are based on comprehensive geological understanding.
    The document, part of a federal government RFP (W912QR25R0016), details the "Rough River Dam Safety Modification Project Phase II - New Outlet Works and Cutoff Wall" in Falls of Rough, KY. Specifically, it presents Volume 6 (3 of 3) of the Phase IB Verification Boring Logs, which contains geotechnical data for tunnel construction. The logs, certified final on December 20, 2024, provide a detailed account of subsurface materials encountered during drilling at two boreholes: DVP-980 and UVP-1055. These logs describe various soil and rock formations, including asphalt, gravel, clay, sandstone, shale, and limestone, along with observations of grout, fractures, and bedding plane separations. The data includes material classifications, depths, elevations, drill times, and geological formations (e.g., Hardensburg, Haney, Big Clifty Shale, Beech Creek, Elwren, and Reelsville Formations). The primary purpose of this document is to provide essential geotechnical information for the design-bid-build project, ensuring dam safety modifications are based on thorough subsurface analysis.
    The document is a certified final completion report, volume 6 of 20, for the Rough River Dam Safety Modification Project, Phase I, focusing on New Outlet Works and Cutoff Wall. It details drilling logs and laboratory results for investigative grout holes DXP 1886, DXT 1891, DXS 1896, and DXT 1901. The logs provide comprehensive field classifications of materials encountered, including various types of lean clay, silty clay, shale, limestone (Beech Creek and Reelsville formations), and sandstone (Sample formation), along with asphalt and gravel layers near the surface. Each boring log specifies depth, elevation, material description, field tests, and drilling remarks, including drill times and reactions to HCl. The report is crucial for understanding the geological and material composition of the project site, informing the design-bid-build construction phase of the dam safety modifications.
    This government file details a solicitation for the Rough River Dam Safety Modification Project, Phase I – New Outlet Works and Cutoff Wall, in Falls of Rough, KY. It specifically focuses on the Construction Materials and Foundation Completion Report, Vol. 6 (11 of 20) Appendix C4 (4 of 5), dated December 20, 2024 (W912QR25R0016). The document provides extensive drilling logs and geological classifications for several boreholes (DXT2237, DP2242X, DXP2242) at the Rough River Phase 1B Investigative Grout Holes site. It includes detailed descriptions of soil and rock strata encountered, such as plastic clay, silty clay, sandstone, shale, and limestone, along with their physical properties, depths, and drilling times. The logs also present data from field tests like pocket penetrometer and shear tests, rock core recovery percentages (Rec%), and Rock Quality Designation (RQD%). Additionally, the file contains optical and acoustic images, travel time and amplitude logs, and polar projections/Schmidt plots to illustrate bedding and fracture planes within the rock formations, particularly for the Big Clifty and Beech Creek formations. The overall purpose of this file is to provide comprehensive geotechnical data crucial for the design and construction phases of the dam safety modification project.
    This government file is a completion report detailing the construction materials and foundation for Phase I of the Rough River Dam Safety Modification Project in Falls of Rough, KY. The report includes drilling logs for two boreholes, UVP-2070 and UVP-2092, providing detailed geological classifications from the surface down to approximately 256 feet and 236 feet respectively. The logs describe various layers including asphalt, poorly graded sand and gravel, lean clay, silty clay, clayey gravel with sand, shale, limestone, and sandstone. Formations identified include Granular Overburden, Embankment Fill, Cohesive Overburden, Elwren, Reelsville, Sample, and Beaver Bend. The reports note material consistency, color, moisture, reaction to HCl, and presence of fractures, bedding plane separations, and other geological features, along with drilling remarks and core recovery data. The purpose is to document subsurface conditions for the dam modification project.
    This government file details the Rough River Dam Safety Modification Project, Phase IA – Highway 79 Relocation. It includes critical as-built construction materials and foundation reports, alongside comprehensive design, bid, and build documentation. The project, managed by the US Army Corps of Engineers, Louisville District, focuses on enhancing dam safety by relocating Highway 79 in Falls of Rough, Kentucky. The document provides general notes for utilities, construction, and traffic maintenance, emphasizing safety, erosion control, and coordination. It also includes an index of drawings, location and area maps, an aerial photograph of the dam, and standard symbols for various architectural, electrical, and topographic elements. Key survey control points and their coordinates are provided for project implementation. This detailed report serves as a crucial reference for the ongoing dam safety modification and infrastructure improvements.
    The document, part of the Rough River Dam Safety Modification Project in Falls of Rough, KY, details Phase I – New Outlet Works and Cutoff Wall, specifically focusing on the Phase IA Highway 79 Relocation. This volume (6 of 20) presents certified final as-built cross-sections of the relocated KY Highway 79 from station 115+50 to 126+00. The plans, dated January 2014 and certified December 20, 2024, by the U.S. Army Corps of Engineers, Louisville District, show various elevations, slopes, and design elements, including details for typical benching requirements, existing communication duct banks, barrier walls, and concrete structures. Revisions include a “Toe Trench Revision” from June 2014. The document also notes the removal of an existing 2-inch waterline and outlines superelevation transitions for the roadway.
    This government file, part of federal RFPs (W912QR25R0016), details the "Rough River Dam Safety Modification Project, Phase I - New Outlet Works and Cutoff Wall" in Falls of Rough, KY. The document is the "Construction Materials and Foundation Completion Report - Final As-Builts Vol. 6 (15 of 20) Appendix D3 (3 of 4) Certified Final" and includes the Geotechnical Data Report for Tunnel Construction, specifically for Phase IB Drilling and Grouting Contractor Completion Report, Appendix 5 - As-Built Drawings (9 of 9). It presents detailed as-built drawings and geological profiles, including borehole layouts, drilling progress, water test results (Lugeon values), and total grout injected (gallons) for both U1 and D1 lines. The geological profiles show overburden, limestone, shale, and sandstone layers. The report provides critical geotechnical data and construction details for the dam safety modification project.
    The Rough River Dam Safety Modification Project, Phase I, focuses on new outlet works and a cutoff wall at Rough River Reservoir, Falls of Rough, KY. This federal government solicitation (W912QR25R0016) outlines a Design-Bid-Build approach for construction materials and foundation work, with a certified final report due December 20, 2024. The project includes exploratory drilling and grouting (Phase IB) to enhance dam safety. The Louisville District of the U.S. Army Corps of Engineers is overseeing the project, which emphasizes erosion and sediment control (ESC) through a Storm Water Pollution Prevention Plan (SWPPP) and strict contractor responsibilities for environmental protection and permits. General notes detail survey controls, utility coordination, and the disposition of spoil materials in designated disposal areas. The document includes detailed maps, aerial photographs, and plans for demolition, contractor work limits, and disposal areas, all supported by comprehensive general and survey notes.
    This government file, part of the Rough River Dam Safety Modification Project Phase I, details construction materials and foundation completion, specifically focusing on Karst Summaries (Vol. 6). The document, dated December 20, 2024, outlines extensive drilling, grouting, and water pressure testing activities conducted in 2015 and 2016 at various boreholes (e.g., UXP1716, UXP1736, UXP1756, UXP1796, UXP1816, UXP1836, UXT1851, UXP1876). Key activities include first 15' rock grouting, full-depth grouting, and water pressure testing of overburden and bedrock. The file also notes rock socket depths, core drilling details with recovery and loss percentages, and observations of clay infill and fractures in geological formations like Beech Creek Limestone, Elwren Shale, and Reelsville Formation. Piezometer reactions during drilling and grouting are consistently monitored, providing crucial data for the dam safety modification. The detailed records highlight the thoroughness of the investigation into the geological conditions and the measures taken to enhance the dam's structural integrity.
    The document, part of a federal government RFP (W912QR25R0016), details the "Rough River Dam Safety Modification Project, Phase I - New Outlet Works and Cutoff Wall" in Falls of Rough, KY. It specifically presents the Construction Materials and Foundation Completion Report – Karst Summaries, Volume 6 (18 of 20), Appendix E2 (2 of 4), certified final on December 20, 2024. The report provides extensive drilling, grouting, and water pressure testing data, focusing on various geological formations like Big Clifty Sandstone, Beech Creek Limestone, Elwren Shale, and Reelsville Limestone. It highlights the discovery of a dynamic, interconnected karst network in the dam foundation (Stations 21+37 to 22+62) and describes specific grouting activities, including the use of different grout mixes (A, B, C, D, E) and observed reactions in piezometers. Key findings include fluid loss, rod drops, and the presence of clay infill and weathered materials, indicating complex geological conditions requiring targeted grouting strategies.
    The Rough River Dam Safety Modification Project, Phase I, focuses on new outlet works and a cutoff wall at Rough River Reservoir, KY. This report, Volume 6 of 20, specifically details karstic features, including solution chimneys and underdrain systems in the left abutment. Investigations revealed voids, intensely weathered limestone, and a highly connected subsurface. Evidence from drilling logs, core samples, and OATV images confirm the presence of these features, with some areas exhibiting significant grout takes from previous construction. The underdrain system is identified at the interface of the Haney Limestone and Big Clifty Formation. Data analysis indicates complex flow patterns, with features spanning upstream and downstream lines, draining towards the dam centerline. The report emphasizes the need for further treatment of potentially untreated pathways along the centerline and highlights data resolution differences between upstream and downstream investigations.
    This document is Volume 6 of 20 of the Construction Materials and Foundation Completion Report for the Rough River Dam Safety Modification Project, Phase I, in Falls of Rough, KY. The project aims to reduce dam failure risks due to internal erosion by modifying the dam foundation. Phase 1A involved relocating Highway 79 and modifying the upstream slope. Phase 1B included extensive exploratory drilling and grouting to understand subsurface conditions and to implement slurry control in advance of Phase 2. Significant findings from Phase 1 activities include the relocation of the state highway, identification of critical grouting areas, confirmation of a continuous defect pathway in the dam foundation, detection of grout above bedrock, and the presence of untreated karstic areas near the outlet conduit. The project also encountered embankment cracks, large solution features, alluvial and gas deposits, and oil-bearing sandstone. In total, Phase 1B installed 328 grout holes, injecting over 212,000 gallons of grout, with Phase 2 planning a new outlet works and a full-length cutoff wall.
    This government file, part of the Rough River Dam Safety Modification Project Phase I, details the Construction Materials and Foundation Completion Report for the New Outlet Works and Cutoff Wall in Falls of Rough, KY. Dated December 20, 2024, the report focuses on Karst Summaries, specifically the Reelsville Limestone. It includes data from downstream and upstream drilling, grouting, and water pressure testing from 2015 profiles. The document provides detailed grout stages and intake volumes for various boreholes (DXP1982, UXP1982, DXP2002, UXP2002, DXP2022, UXP2056, DXP2062, UXP2096, DXP2102, UXP2116), noting geological formations like Elwren Shale and Reelsville Formation, and instances of fluid loss, rod drops, and communication between boreholes. Daily field notes from January 9, 2016, describe drilling progress and grouting operations for multiple locations, including details on grout mixes (A, B, C, D, E) and volumes used. A significant event highlighted is the grouting of DXP2022's water loss zone on January 27, where 2457 gallons of various grout mixes were pumped.
    This government file, part of the Rough River Dam Safety Modification Project, Phase I, details daily and weekly construction activities from October 26 to December 13, 2015. The primary focus is on drilling, grouting, and material testing for new outlet works and a cutoff wall. Key activities include extensive grout mix testing (A, B, C, D, and sanded E mixes), installation and grouting of sleeveport pipes and annulus bags, and rock coring and drilling in various boreholes (e.g., DP2502, DP2462, DXP2262). Challenges encountered include drill rod breakages, stuck drill strings, leakage during grouting, and issues with packer setting. The document also highlights the importance of deviation surveys due to concerns about drilling angles near the conduit and the need for a revised QC plan for drilling 20-degree holes. Weekly summaries emphasize discussions during PDT meetings regarding completed work and arising issues, as well as the documentation of daily field reports by geologists.
    This document, part of a federal RFP (W912QR25R0016) for the Rough River Dam Safety Modification Project, presents a Foundation Report focusing on instrumentation evaluation (Appendix B-Instrumentation Evaluation, Volume 6). It details the performance of multiple piezometers (PZ-2, PZ-4, PZ-5, PZ-6, PZ-7A, PZ-8A, PZ-9, PZ-10, PZ-11, PZ-12, PZ-13A, PZ-18B, PZ-19, PZ-20, PZ-21, PZ-22, PZ-23, PZ-24) installed at various locations within the dam and its foundation. Each piezometer's installation, historical performance, and reactions to pool and tailwater variations, as well as the impact of Phase 1 drilling and grouting operations, are described. The report indicates that while some piezometers showed no significant change or only temporary reactions to the grouting, others exhibited notable shifts in behavior, such as altered normal ranges or increased pressure levels, often attributed to the grout curtain's installation. The document emphasizes the need for continued monitoring to fully understand long-term effects.
    This government file, part of the Rough River Dam Safety Modification Project, Phase I, details piezometer data collected during various drilling, grouting, and water testing operations for boreholes UXT1091, DXS1096, UXP1096, DXT1101, and UXT1101. The data, spanning from January 2016 to March 2017, includes water elevation (ft msl) and precipitation (in) readings, along with specific piezometer identifications (PZ46, PZ48, PZ49, PZ60, PZ62, PZ63, PZ64A, PZ64B, PZ65A, PZ65B) located within 200 feet of each borehole. The file, identified as W912QR25R0016_CERT_Final_Vol6_PH1B_DrillFMCR_4of20_B2-0000, is a certified final completion report for construction materials and foundation instrumentation evaluation, indicating a focus on dam safety and structural integrity through continuous monitoring and analysis of subsurface conditions.
    This government file, part of the Rough River Dam Safety Modification Project (Phase I), is a completion report detailing piezometer data collected during drilling and grouting operations for new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, KY. Dated December 20, 2024, and identified by solicitation number W912QR25R0016, the document provides extensive records of water elevation and precipitation data from numerous piezometers (e.g., PZ44, PZ45, PZ47, PZ52, PZ53, PZ54, PZ66A-C, PZ67A-C, PZ68A-C, PZ69A-C, PZ70A-C, PZ71A-C, PZ73A-D, PZ75A-C). The data is presented for specific boreholes (UXP1476, DXP1486, UXP1496, DXP1506, UXP1516, UXP1518, DXP1526) during various construction phases, including initial drilling (Overburden and Rock), initial grouting (Cased and Uncased), re-grouting, and water testing. The report is crucial for evaluating the effectiveness of the construction materials and foundation work, ensuring the safety and integrity of the dam modification project.
    This government file, part of the Rough River Dam Safety Modification Project Phase I, presents a comprehensive collection of piezometer data for various boreholes (UXP2056, UXT2061, DXP2062, UXP2062, DXP2066, UXS2066, VP2070, UXP2076, DXP2082, UXP2082). The data, collected between 2015 and 2017, includes water elevation (ft msl) and precipitation (in) measurements during different construction activities such as initial drilling (OB, Rock, Core), initial grouting (Cased, Uncased, OS), re-grouting (Uncased, Final), and initial water testing (Uncased). Each data set lists numerous piezometers within 200 feet of the respective borehole. This certified final report, dated December 20, 2024, is crucial for evaluating construction materials and foundations, ensuring the safety and integrity of the dam modification project.
    This government file, part of the Rough River Dam Safety Modification Project, Phase I, presents detailed piezometer data for boreholes DXP2460, DXP2462, DXP2462Y, UXP2462, DXP2482, and UXP2482. The data covers various stages of the project including initial drilling (Overburden and Rock), initial grouting (Cased and Uncased), re-grouting (Uncased), initial water testing, and final grouting. The readings, typically in feet mean sea level (msl), along with precipitation in inches, were collected between December 2015 and November 2016. The purpose of this data is to evaluate construction materials and foundations, ensuring the safety and integrity of the new outlet works and cutoff wall at the Rough River Reservoir in Falls of Rough, KY. This report is a crucial component of the Design-Bid-Build project, contributing to the overall completion report and instrumentation evaluation.
    This government file, part of the Rough River Dam Safety Modification Project in Falls of Rough, KY, contains a Construction Materials and Foundation Completion Report. Specifically, it details Boring Logs and Labs for boreholes PZ-62, PZ-63, PZ-64, PZ-65, PZ-66, and PZ-67. These logs provide a detailed geological profile of the project site, documenting various strata such as clay, sandstone, shale, and limestone, along with observations on their weathering, fracturing, and other characteristics. The report also includes drilling methods, depths, and casing information, essential for understanding the subsurface conditions for the new outlet works and cutoff wall. This information is crucial for the design-bid-build phase of the project, ensuring appropriate material selection and foundation stability.
    This government file details a solicitation for the Rough River Dam Safety Modification Project, Phase I – New Outlet Works and Cutoff Wall, in Falls of Rough, KY (W912QR25R0016). The document comprises comprehensive drilling logs and laboratory results for boreholes UXP2022, UXP2036, and UXP2042. These logs provide detailed field classifications of materials encountered, including various types of lean clay, sandy silt, poorly graded gravel, shale, limestone, and sandstone, along with their physical properties, reactions to HCl, and drilling remarks. The project uses a Design-Bid-Build approach for construction materials and foundation. The information is critical for understanding the subsurface conditions at the dam site, informing the design and construction of the new outlet works and cutoff wall, and ensuring the safety and stability of the Rough River Dam.
    This Final Report details the Foundation Drilling and Grouting Phase 1B of the Rough River Dam Safety Modification Project in Falls of Rough, KY. Awarded to Advanced Construction Techniques Inc. (ACT) in April 2015, the project aimed to explore subsurface conditions, determine pre-treatment needs, and establish remediation methods for a future cutoff wall. Key activities included drilling 307 production grout holes and 20 verification holes, using rotary sonic, rock coring, and percussion methods. The project involved installing upstream and downstream grout lines, performing optical and acoustic televiewer surveying, pressure testing, and pressure grouting with balanced stable grouts, all monitored by an Automated Grouting Monitoring and Data Collection System. The report outlines work performed, equipment used, drilling methodologies, production rates, and deviations from the original contract, such as the relocation of upstream grout holes and the elimination of certain inclined holes. The project ultimately involved 32,422 linear feet of overburden/embankment drilling, 7,477 linear feet of rock coring, 26,058 linear feet of percussion rock drilling, and 212,763 gallons of grout injected.
    The document is a Geotechnical Data Report for Tunnel Construction, specifically Appendix 2A, focusing on Grouting Trend Plots for the Rough River Dam Safety Modification Project Phase IB Drilling & Grouting Contractor Completion Report. It details casing grout operations for various boreholes (e.g., DXP1982, DXP2002, DXP2022, DXP2042, DXP2062, DXP2082, DXP2102, DXP2122, DXP2142, DXP2162, DXP2182, DXP2242-A, DXP2242, DXP2262, DXP2262X, DXP2282, DXP2302, DXP2322, DXP2342, DXP2362, DXP2382, DXP2402, DXP2422, DXP2442). For each borehole, the report provides a log of activities, including barrier bag inflation, casing annular space grouting (first and second stages), and
    The document, part of the Rough River Dam Safety Modification Project Phase II, details the Phase IB Drilling & Grouting Contractor Completion Report, specifically Appendix 2B – Grouting Trend Plots. It records extensive grouting operations conducted at various Stage IDs (UXP1996, UXP2016, UXP2036, UXP2056, UXP2076, UXP2096, UXP2116, UXP2162, UXP2182, UXP2242-1) in Falls of Rough, KY, between February and July 2016. Each entry provides a timestamp, comments on the operation (e.g., pressure refusal, grout to surface, gravity grouting, interface grouting), formation type (bedrock or overburden), mix legend (A-Mix = 1.4, C-Mix = 1.63), grouting time, top and bottom depths and elevations, accumulated grout take in US gallons, and water Lugeon value. The report consistently notes 'Pressure Refusal' as a stage completion criterion and frequently mentions 'Water Test not Performed' or 'Backfill, no WT performed.' The data indicates varying grout takes, from minimal to over 2500 US gallons, over different timeframes and depths, contributing to the geotechnical data for tunnel construction.
    This government file, part of the Rough River Dam Safety Modification Project Phase II, details the Phase IB Drilling & Grouting Contractor Completion Report, specifically Appendix 2C, which contains grouting trend plots. The report covers various drilling stages (DXP2046, DXP2066, DXP2086, DXP2106, DXS1056, DXS1076) at Rough River Reservoir, Falls of Rough, KY. Each entry provides a Stage ID, timestamps, comments, formation type (Bedrock or Overburden), mix legend (A-Mix = 1.4, D-Mix = 1.66), grouting time, top and bottom depths and elevations, accumulated grout take in US gallons, and water Lugeon value. The data indicates instances of pressure refusal, gravity grouting, interface treatment, tremie grouting, and hole backfill operations, with several stages noting that water tests were not performed and apparent Lugeon values would be derived from grouting trends. The project, identified as W912QR25R0016, is a Design-Bid-Build undertaking by the Louisville District, LRD Division, with a certified final report date of 20 December 2024.
    This government file, part of the Rough River Dam Safety Modification Project Phase IB, is a completion report appendix from Advanced Construction Techniques Inc. It contains monthly progress photos from July to November 2015 for the exploratory drilling and grouting work. The photos document various aspects of the project, including the installation of silt fences at disposal and staging areas, project signs, contractor staging areas, gravel entrances, waste collection tanks, contractor and USACE project offices, temporary power facilities, contractor crew trailers, views of the dam, waste utility line installations, work platform construction, the relocated HWY 79, core storage facilities, water distribution plants, wastewater settling tanks, Cubex rock drills, cement and bentonite silos, batch plant shelters and installations, mobile grout carts, hole washing machines, Deckmate grout plants, flush joint PVC standpipes, rotary core drills, grout waste containment bins, employee parking, traffic barriers, multiple port sleeve pipes, and sonic drill rigs. The document provides a visual record of the infrastructure and equipment used during this phase of the dam safety modification.
    This government file, identified as W912QR25R0016, is a Solicitation for the Rough River Dam Safety Modification Project, Phase II. It specifically focuses on the "Phase IB Drilling & Grouting Contractor Completion Report Vol. 6 (6 of 9) Appendix 4A," dated December 20, 2024. The document is certified final and pertains to new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, KY. It details the geotechnical data report for tunnel construction, specifically presenting "Overburden and Rock Core Photos" within Appendix 4A. This file is part of a larger Design-Bid-Build project overseen by the Louisville District, LRD Division, and is considered a permanent record under ARIMS: 1200.
    This government file, identified as Solicitation W912QR25R0016, is a certified final completion report from December 20, 2024, for Phase IB of the Rough River Dam Safety Modification Project in Falls of Rough, KY. Specifically, this volume (6 of 9), Appendix 4B, focuses on the Geotechnical Data Report for Tunnel Construction, presenting soil and rock core photos. This Design-Bid-Build project involves new outlet works and a cutoff wall, indicating a significant infrastructure upgrade related to dam safety. The report's disposition is permanent, highlighting its importance for future reference and project continuity.
    The document is a certified final report, Volume 6 (8 of 9) Appendix 4C, for the Rough River Dam Safety Modification Project Phase II. This specific volume, dated December 20, 2024, is titled "Phase IB Drilling & Grouting Contractor Completion Report Vol. 6 (8 of 9) Appendix 4C" and focuses on "Soil and Rock Core Photos" related to the "Geotechnical Data Report for Tunnel Construction." The project, identified by Solicitation Number W912QR25R0016, involves new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, KY, utilizing a Design-Bid-Build approach. The report was prepared by the Louisville District, LRD Division, and is designated for permanent disposition in the ARIMS system.
    This government file, part of the Rough River Dam Safety Modification Project Phase II, specifically Volume 6, Appendix 5, presents certified final as-built drawings and geotechnical data for the Phase IB Drilling & Grouting Contractor Completion Report. The document, dated December 20, 2024, includes detailed plan and profile views of drilling, water test, and grouting activities along the U1 and D1 lines of the dam. It illustrates borehole layouts, geological formations (shale, sandstone, limestone, overburden), hole characteristics (water loss, blockage), and various drilling and grouting parameters. The figures provide specific data on casing grout injected (gallons) and Lugeon values from water tests, crucial for assessing the effectiveness of the dam safety modifications.
    This government file, part of federal RFPs, details the "Rough River Dam Safety Modification Project Phase II: New Outlet Works and Cutoff Wall" in Falls of Rough, KY. Specifically, it presents Volume 6 of the "Phase IB Upstream Boring Logs," providing certified final geotechnical data reports for tunnel construction. The document includes drilling logs for several boreholes (UXP916, UXP936, UXP956, UXP976, UXP996), outlining the various geological layers encountered, such as asphalt, roadbase, lean clay, sandstone, shale, and limestone. Each boring log details the depth, elevation, material classification, field tests, and rock core recovery, noting features like weathered zones, fractures, and grout seams. The project, managed by the Louisville District, LRD Division, focuses on exploratory drilling and grouting to inform the dam safety modification efforts.
    The document, part of a federal government RFP (W912QR25R0016) for the Rough River Dam Safety Modification Project Phase II, provides a Geotechnical Information Report (GIR) specifically Volume 6, Appendix C2a. This appendix details rock testing and analyses from various investigations conducted between 2003 and 2019, focusing on the Rough River Dam in Falls of Rough, KY. Key data includes statistical analyses of core recoveries and rock quality designations (RQD) for Hardinsburg Sandstone, Uppermost Haney Limestone, and Massive Haney Limestone formations. It also presents laboratory test results for rock, including moisture content and rock permeability derived from borehole pressure testing across multiple boreholes (ADC-701, -702, -703, -706, -707, -709, -712, -713, -714, -716). The purpose of these tests is to characterize the rock formations and their properties, which are crucial for the design and construction of the new outlet works and cutoff wall as part of the dam safety modification project.
    This government file, part of the Rough River Dam Safety Modification Project Phase II, details geotechnical investigations and laboratory testing of rock core samples. The document, specifically Appendix C2b of the Geotechnical Information Report (GIR) Volume 6, presents splitting tensile strength and slake durability index test results for various rock types, including sandstone, limestone, and shale. It also includes anchor pull-out test data for sandstone. The tests were conducted by Stantec Consulting Services Inc. and MTC Laboratory, providing crucial data on the mechanical properties and durability of the rock formations at the Rough River Dam site in Falls of Rough, KY. These findings are essential for the design and construction of the new outlet works and cutoff wall, ensuring dam safety and structural integrity.
    This document, "Geotechnical Information Report (GIR) Vol. 6 (11 of 16) Appendix D," is part of a solicitation for the Rough River Dam Safety Modification Project Phase II. Specifically, it addresses the New Outlet Works and Cutoff Wall at the Rough River Reservoir in Falls of Rough, KY. The document, identified as W912QR25R0016, is a certified final report dated December 20, 2024. Appendix D, titled "Instrumentation and Monitoring," directs the reader to Volume 5 SPECS, Joint Instrumentation and Monitoring Plan (JIMP) for detailed information on instrumentation. This GIR provides supporting geotechnical data for the design-bid-build project, ensuring that potential contractors have access to critical site-specific information for the dam safety modification.
    This document, part of a solicitation for the Rough River Dam Safety Modification Project Phase II, focuses on the Geotechnical Information Report (GIR) Volume 6, Appendix E, which details analyses of the upstream filter and dewatering. The report confirms the filter compatibility between the Clay Fill of the embankment and the proposed KYTC Concrete Sand filter, meeting particle retention and 'no erosion' criteria. It also addresses dewatering for the control tower excavation, outlining maintenance dewatering strategies and the need for high-volume pumps for flood removal. Due to suction lift limitations of centrifugal pumps, a combined centrifugal/submersible pump system is recommended for effective dewatering of the 80-foot deep excavation. The contractor will be responsible for designing and selecting the exact equipment to meet performance-based requirements for maintaining a dry working environment.
    The document, part of the Rough River Dam Safety Modification Project Phase II, details the Geotechnical Information Report (GIR) for the new outlet works and cutoff wall. Specifically, it focuses on Appendix F, which provides an analysis of the downstream cofferdam and dewatering systems. Key aspects include the design intent of the sheet pile wall to limit seepage and provide flood protection, estimations of flow through and beneath the wall using analytical and SEEP/W computer modeling, and the determination of soil and rock hydraulic conductivities. The report evaluates different sealant types for interlocks and the impact of potential gaps below the wall. It recommends a lower-permeability sealant and emphasizes quality control during installation to minimize seepage. Additionally, the document outlines the design for dewatering wellpoints and a seepage collection system with sumps, crucial for maintaining safe groundwater levels during excavation. Monitoring groundwater levels with piezometers is also recommended to assess the system's effectiveness.
    The document, titled "Rough River Dam Safety Modification Project Phase II," is a Geotechnical Information Report (GIR), specifically Volume 6, Appendix G, focusing on the analysis of the downstream filter for stilling basin abandonment. It details the design-bid-build project at Rough River Reservoir in Falls of Rough, KY, under solicitation W912QR25R0016. The report, prepared by the Louisville District, LRD Division, outlines the methodology and results for ensuring filter layers meet particle migration and perviousness requirements. It describes the use of graded materials, including C33 concrete sand, KYTC No. 57 stone, KYTC No. 23 stone, and engineered fill. Calculations based on d85 and d15 values confirm that the proposed filter materials pass both perviousness and migration criteria as per USACE and FEMA standards, ensuring the safety and stability of the abandoned stilling basin.
    The document details a re-evaluation of the slope stability for a temporary work platform at the Rough River Dam Safety Modification Project in Falls of Rough, KY. This platform is necessary for installing a new cutoff wall and must support two hydromil cranes, a concrete slab, and general construction loads. The analysis, conducted by LRN and LRL geotechnical engineers, investigates two support options: a sheet pile wall and a rock slope (2H:1V), for both 65-foot and 90-foot platform widths. Both support types for both platform widths were found to meet the required Factor of Safety (FOS) values as per the USACE Engineering Manual, EM 1110-2-1902. The document includes detailed soil and rock parameters, loading parameters for the cranes and concrete pad, and the results of seepage and slope stability analyses performed using GeoStudio 2019 Seep/W and Slope/W programs. The conclusion indicates that since both options are safe, the final selection should be based on the most economical approach.
    This government file, part of the Rough River Dam Safety Modification Project Phase II, is the Geotechnical Information Report (GIR) Volume 6, Appendix I. It details analyses of the Upland Disposal Area and Archery Berm at Rough River Reservoir, Falls of Rough, KY. The Upland Disposal Area, for excavated rock and soil, underwent global stability analysis using GeoStudio Slope/W 2019, considering drained, undrained, and spillway event conditions. All calculated factors of safety met or exceeded required minimums. The Archery Berm, to be constructed from engineered fill, also underwent slope stability analysis, with results indicating sufficient safety factors for rapid drawdown conditions, despite the conservative assumptions. The report includes soil and rock parameters, boring logs, and laboratory test data to support these analyses, ensuring the stability and safety of these project components.
    This government file, a Geotechnical Information Report (GIR) for the Rough River Dam Safety Modification Project Phase II, details the subsurface conditions, project history, and planned rehabilitation efforts for the Rough River Dam in Kentucky. The project, authorized by the Flood Control Act of 1938, addresses unacceptable risks from internal erosion-related failure modes in the dam's foundation, leading to a Dam Safety Action Classification (DSAC) 2 (High Urgency) ranking. Key rehabilitation components include constructing a new outlet works with a control tower and tunnel, a stilling basin, a retreat channel, and a new concrete cutoff wall. The report emphasizes the complex groundwater conditions, karstic rock formations, and the history of dam safety modifications, including prior grouting efforts and the relocation of a state highway. The new outlet works and cutoff wall design aims to replace the structurally inadequate existing conduit and mitigate risks associated with potential dam failure.
    This government file, part of federal RFP W912QR25R0016, details the construction history, modifications, and performance of the Rough River Dam Safety Modification Project Phase II. It covers early investigations, embankment construction, and foundation treatments for the right abutment, valley center, and left abutment. The document also describes the outlet works and spillway, noting various issues and repairs over time, including sinkholes, stilling basin erosion, and seepage. Key events include the 2011 record pool, which caused significant damage to the stilling basin wall and erosion in the spillway. The file emphasizes ongoing inspections and major modifications to address dam safety risks.
    This government file, part of the Rough River Dam Safety Modification Project Phase II, is a Geotechnical Information Report (GIR) for the New Outlet Works and Cutoff Wall. Specifically, it is Volume 6, Subappendix B1, focusing on Boring Location Plans and Boring Logs for various areas of the project site in Falls of Rough, KY. The report outlines the methodology for presenting boring information, categorizing it by sub-area with localized plans and logs, including televiewer logs and rock core photos where available. It also references historical subsurface data from earlier design memorandums. The document details specific boring logs, such as A-1924, A-1922, A-1923, A-1925, A-1715, A-1716, A-1717, A-1718, and AC-1201, providing information on soil and rock classifications, depths, moisture content, and other geotechnical properties. This GIR serves as a critical resource for understanding the subsurface conditions at the dam site for the ongoing modification project.
    The document, part of a federal RFP (W912QR25R0016) for the Rough River Dam Safety Modification Project Phase II, provides detailed geotechnical information for the new outlet works and cutoff wall. It includes Geotechnical Information Report (GIR) Volume 6, Subappendix B2, specifically focusing on boring logs and an optical televiewer log for boreholes ADC-1801 and ADC-1802 in Area 7. The logs detail soil and rock classifications (e.g., Haney Limestone, Big Clifty Shale, Big Clifty Sandstone, Beech Creek Limestone, Elwren Shale), depths, recovery percentages, RQD, and remarks on geological features such as fractures, shale partings, and weathering. It also presents pressure test results and material property tests (YM, PR, STS, PO, SDI, CAI). Geophysical surveys were performed, and boreholes were grouted after completion. This report is critical for understanding subsurface conditions for the dam's outlet works and cutoff wall construction.
    The document, part of a federal RFP (W912QR25R0016), details the Geotechnical Information Report (GIR) for the Rough River Dam Safety Modification Project Phase II in Falls of Rough, KY. Specifically, this sub-appendix (B3) focuses on Boring Log ADC-1920R, providing a comprehensive geological analysis of the site. The boring, drilled by Stantec, reached a total depth of 135.6 feet, encountering various geological formations including topsoil, Haney Limestone, Big Clifty Upper Shale, Big Clifty Sandstone, Big Clifty Lower Shale, and Elwren Shale. The log meticulously records material classifications, depths, recovery percentages, RQD percentages, and observations of weathering, fractures, infills (clay, sand, broken), stylolites, and broken/void zones. Significant findings include a void and water loss observed between 35.1' and 38.9', preventing further optical and acoustic imaging below this depth. The boring was completed in December 2019 and later grouted. This detailed geotechnical data is critical for the design-bid-build project of the new outlet works and cutoff wall, providing essential information on subsurface conditions for construction planning and risk assessment.
    This government file, part of federal RFP W912QR25R0016, details the Geotechnical Information Report (GIR) for the Rough River Dam Safety Modification Project Phase II. It includes detailed boring logs and geophysical survey data for the new outlet works and cutoff wall at Rough River Reservoir, Falls of Rough, KY. The report covers Areas 8, 9, and 10, presenting soil and rock classifications (e.g., Silty lean CLAY, Big Clifty Sandstone, Beech Creek Limestone, Elwren Shale), core recovery percentages, RQD values, and various laboratory and field test results such as liquid limit, plasticity index, unconfined compressive strength, hydraulic conductivity, Young's Modulus, and Poisson's Ratio. It also includes information on drilling methods, dates, and inspector details for each boring (TP-1927, TP-1929, TP-1930, TP-1931, TP-1932, TP-1933, ADC-1918, ADC-1809), along with geophysical log data for ADC-1918 and ADC-1809.
    This government file, part of federal RFPs, details the “Rough River Dam Safety Modification Project Phase II – New Outlet Works and Cutoff Wall” in Falls of Rough, KY. Specifically, it is Volume 6 (7 of 16) Subappendix B5 of the Geotechnical Information Report (GIR), certified final on December 20, 2024 (W912QR25R0016). The document provides extensive geotechnical data for tunnel construction, including boring location plans and logs for Areas 12 through 17. It features detailed boring logs (AD-1901, ADC-1902, AD-1902A, AD-1902B, ADC-1903, ADC-1904) with information on drilling agencies, drillers, depths, elevations, soil and rock classifications (e.g., Fat Clay, Lean Clay, Silty Sand, Sandstone, Shale, Limestone), moisture content, and recovery rates. Geophysical survey data, including optical and acoustic televiewer logs, natural gamma, fluid conductivity, and temperature, are also included for select borings. The report emphasizes the geological composition and conditions encountered, which are critical for the design-bid-build project phase.
    The document, part of a federal RFP (W912QR25R0016) for the Rough River Dam Safety Modification Project Phase II, presents a Geotechnical Information Report (GIR), Volume 6, Subappendix B6. This section details boring location plans and logs from Area 17, specifically for boreholes ADC-702, ADC-703, and ADC-704, located in Falls of Rough, KY. Each boring log provides comprehensive geotechnical data, including material classification (e.g., Sandy Lean Clay, Sandy Elastic Silt, Clayey Sand with Gravel, Sandstone, Shale, Limestone), depth, elevation, moisture content, penetration resistance (HP and SPT blows), recovery, and RQD values. Key observations include the presence of gravel zones, sand lenses, wet zones, weathered rock, and fractured areas. The report is critical for understanding subsurface conditions for the Design-Bid-Build project, particularly for the new outlet works and cutoff wall, providing essential data for engineering design and construction planning.
    This government file, part of the Rough River Dam Safety Modification Project Phase II, is a Geotechnical Information Report (GIR) specifically Volume 6, Appendix C1a, focusing on Soil Laboratory Test Results for the New Outlet Works and Cutoff Wall at Rough River Reservoir, Falls of Rough, KY. The document, identified by W912QR25R0016, provides detailed geotechnical data crucial for the design-bid-build project. It includes a synopsis of construction history, boring location plans, soil and rock testing, instrumentation, and analyses of various dam components such as filters, cofferdams, and cutoff walls. The appendix presents laboratory test results and analyses for both soil and rock, temporally organized by investigation and operation/maintenance activities. Key data points include gradation summaries for embankment and foundation soils, permeability summaries for embankment and foundation materials (lean clay, sandy clay), and detailed rock permeability data from borehole pressure testing across multiple locations (FC-243, DC-245, C-246, C-247, C-248). It also provides statistical analyses of liquid limits, plasticity indices, and moisture contents from a 1996 Phase I Special Study, covering various soil types and elevations. This report is essential for understanding the geological and hydrological conditions impacting the dam safety modification project.
    The document, identified as W912QR25R0016_CERT_Final_Vol6_ ProjGIR_9bof16_C1b-0000, is a Geotechnical Information Report (GIR) for Phase II of the Rough River Dam Safety Modification Project. This phase specifically focuses on the New Outlet Works and Cutoff Wall at Rough River Reservoir in Falls of Rough, KY. Dated December 20, 2024, the report is Volume 6 (9b of 16) and contains Appendix C1b, which details Soil Laboratory Test Results for tunnel construction. The project is managed by the Louisville District, LRD Division, and is categorized as Design-Bid-Build. This file is critical for understanding the geological conditions and soil properties relevant to the construction of the new outlet works and cutoff wall, providing essential geotechnical data for the dam safety modification.
    The Rough River Dam Safety Modification Project Phase II involves the construction of new outlet works and a cutoff wall at Rough River Reservoir, located in Falls of Rough, Kentucky. This document includes geotechnical drilling and boring logs essential for assessing site conditions related to the construction. It details the results of multiple exploratory borings, highlighting various geological materials encountered, such as asphalt, gravel, clay, sandstone, and shale. The logs document drilling times, depths, and the composition of layers at specific intervals, along with recovery percentages and bear shear strengths. The information is crucial for informing future design and construction efforts, ensuring safety and compliance in the modification process. This project aligns with federal regulations for dam safety enhancement and management, structured to secure federal funding and facilitate collaboration between governmental agencies and contractors throughout the project lifecycle.
    The government file pertains to the Rough River Dam Safety Modification Project Phase II, focusing on the exploration of subsurface conditions through verification boring logs related to new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. The document, certified on December 20, 2024, presents geotechnical data from borings conducted to assess soil and rock properties necessary for dam safety modifications. Various depths reveal soil compositions including asphalt, poorly graded gravel, lean clay, sandstone, limestone, and fracture zones, with varying degrees of weathering and hardness, indicated through rock core recovery rates and detailed geological descriptions. Observations emphasize the presence of grout, fracture zones, and mechanical breaks, crucial for informing construction practices and ensuring structural integrity. This documentation serves as a critical resource for project stakeholders, outlining essential geological considerations vital for compliance with safety and engineering standards in federally funded infrastructure projects.
    The Rough River Dam Safety Modification Project aims to enhance the dam's safety through the construction of new outlet works and a cutoff wall at Rough River Reservoir in Falls of Rough, Kentucky. The document primarily consists of drilling and material classification logs from an exploratory drilling program, detailing the geological conditions encountered at various depths. Key findings include the prevalence of lean clay, varying in moisture and stiffness, as well as layers of shale and limestone which exhibit varying degrees of weathering and reaction to hydrochloric acid. The logs provide comprehensive drilling data, including the duration of drilling, material classifications, and physical properties of the samples taken. This information is essential for evaluating the subsurface conditions and developing appropriate engineering solutions for the dam's safety modifications. The report underlines the project's focus on ensuring the structural integrity and safety of the dam while adhering to federal regulations governing dam safety activities.
    The Rough River Dam Safety Modification Project involves an extensive evaluation and modification of the dam's outlet works and cutoff wall in Falls of Rough, Kentucky. The document focuses on the drilling and materials analysis conducted during Phase I, referencing certified reports from boring logs and laboratory tests. It provides detailed descriptions of soil and rock layers encountered at various depths, including plastic clay, silty clay, sandstone, and limestone, as well as drilling times and recovery data. Additionally, the document includes specific geological assessments and classifications that are vital for understanding site conditions. This thorough investigation supports the project's objectives to enhance dam safety and stability, aligning with federal safety regulations. The analysis denotes careful planning and execution required to ensure the integrity of the dam and surrounding environment, essential for compliance with governmental standards.
    The document outlines the Rough River Dam Safety Modification Project, specifically focusing on Phase I related to the New Outlet Works and Cutoff Wall at the Rough River Reservoir in Falls of Rough, Kentucky. It is a detailed construction report containing data from drilling operations, including borehole logs and soil classifications encountered throughout the project. The analysis presents various geological formations such as poorly graded sands, clayey materials, shale, and limestone, along with their properties like consistency, moisture levels, reaction to hydrochloric acid, and the presence of fractures and bedding plane separations. Significant findings include the identification of materials' characteristics at varying depths, emphasizing the need for careful monitoring and potential grouting to ensure structural integrity. This document serves as a vital record for ongoing assessment and safety measures as part of the federal RFPs supporting infrastructure improvements. The information supports compliance with engineering standards and environmental regulations for the successful completion of the dam safety initiative.
    The Rough River Dam Safety Modification Project focuses on constructing new outlet works and a cutoff wall at the Rough River Reservoir, located in Falls of Rough, Kentucky. This project is divided into multiple phases, with Phase IA specifically addressing the relocation of Highway 79. The documentation contains detailed construction materials and foundation completion reports, including certified final as-built documents and engineering drawings. Key objectives include adhering to safety protocols and implementing value engineering principles throughout the construction process. The contractor is responsible for maintaining site conditions and repairing any damage caused during construction activities. Additionally, existing utility locations and other essential infrastructure require careful consideration to avoid conflicts during construction. The project is designed by the U.S. Army Corps of Engineers, with all plans and documentation prepared to meet rigorous governmental standards. This initiative signifies a commitment to ensuring public safety and enhancing infrastructure resilience in the region, ultimately contributing to disaster risk reduction efforts associated with dam safety.
    The Rough River Dam Safety Modification Project focuses on the construction of new outlet works and a cutoff wall within the Rough River Reservoir in Falls of Rough, Kentucky. The project is part of a comprehensive Design-Bid-Build approach aimed at enhancing the safety and integrity of the dam structure. The final report includes As-Built documentation for Phase 1A, detailing the relocation of Highway 79 and the associated construction activities. Key components include engineering assessments, barrier wall installations, and the requirements for drainage and structural modifications. The documentation emphasizes safety protocols and the importance of value engineering throughout the project's lifecycle. With certifications from the U.S. Army Corps of Engineers, this initiative demonstrates a commitment to long-term dam safety while adhering to federal and local guidelines. The final disposition of the project documentation is permanent, ensuring compliance and future reference for ongoing maintenance and operations. Overall, the project illustrates a proactive approach to infrastructure safety in government operations.
    The Rough River Dam Safety Modification Project, located in Falls of Rough, Kentucky, is in Phase I, focusing on the new outlet works and the construction of a cutoff wall. This solicitation outlines the completion report for the geotechnical aspects of tunnel construction, incorporating extensive drilling and grouting activities. The document comprises detailed as-built drawings and geotechnical data that elaborate on borehole layouts, geological profiles, and the characteristics of various soil and rock types encountered during drilling. In addition, quantitative assessments of grout injections and water loss incidents during drilling are provided, with attached profiles summarizing geological formations such as shale and limestone. With a completion date set for December 20, 2024, the report is designated for permanent disposition and is crucial for ensuring dam safety and compliance with federal regulations. The structured documentation underlines the project's commitment to maintaining structural integrity while addressing any geological and hydrological concerns associated with the dam's operational safety.
    The Rough River Dam Safety Modification Project, specifically Phase I - New Outlet Works and Cutoff Wall, aims to enhance safety measures at the Rough River Reservoir in Falls of Rough, Kentucky. This initiative involves various activities, including exploratory drilling, grouting, and erosion sediment control, which are designed to ensure the integrity and safety of the dam structure. The contractor is responsible for implementing a Storm Water Pollution Prevention Plan and maintaining effective erosion control throughout the construction process. Key requirements include notifying the contracting officer of any construction activities, maintaining positive drainage, and ensuring compliance with environmental regulations. The project also emphasizes the importance of preserving existing structures and utilities while providing required access to USACE and Kentucky Parks Department facilities. Overall, this project reflects the federal commitment to infrastructure safety and environmental protection, coordinating extensive engineering efforts to modernize and secure dam facilities in the region.
    The Rough River Dam Safety Modification Project, Phase I, focuses on the design, construction, and safety enhancements of the Rough River Reservoir in Falls of Rough, Kentucky. This document presents a comprehensive Construction Materials and Foundation Completion Report detailing drilling and grouting activities undertaken to ensure dam integrity, especially in karst geological conditions. It includes extensive records of grouting efforts across various drill holes, including the volume of grout used and pressure testing results, which reflect adherence to required engineering standards and practices. The document emphasizes thorough preparations for grouting, inspections of piezometer responses, and the management of potential connectivity between drilled holes to prevent water loss. These site activities represent critical steps towards ensuring the dam meets safety regulations and operational effectiveness. Overall, the project aims to enhance dam safety while addressing geological challenges, indicating the government’s commitment to maintaining infrastructure reliability.
    The Rough River Dam Safety Modification Project in Falls of Rough, Kentucky, is focused on the Phase I construction of new outlet works and a cutoff wall, as outlined in the solicitation document. This comprehensive report details the completion of construction materials and foundation assessments, emphasizing the dynamic karst network existing within the dam's foundation, identified during the 2015 and 2017 drilling profiles. The document provides extensive grouting summaries and profiles for various drilling locations, highlighting grout take data and the pressures observed during testing. Findings reveal crucial geological layers including Beech Creek Limestone and Big Clifty Sandstone, with associated clay seams, which impact construction strategies and modifications necessary for dam safety. The project emphasizes thorough drilling and grouting operations critical for addressing safety protocols and meets federal guidelines, ensuring an infrastructure improvement aligned with state and federal requirements. This work underscores the commitment to maintaining the structural integrity of essential water management systems while addressing geotechnical concerns central to the project.
    The document outlines the Rough River Dam Safety Modification Project in Falls of Rough, KY, focusing on Phase I, which includes the construction of new outlet works and a cutoff wall. It presents findings from a detailed construction materials and foundation completion report, emphasizing the identification of subsurface voids and solution features within the dam's geology. Key elements involve the formation of solution chimneys and underdrain systems influenced by geological formations like the Haney Limestone and Big Clifty Formation. Evidence of void presence is documented, including drill rod drops and abnormal drilling responses, indicating pathways that contribute to structural stability concerns. The project employs a comprehensive assessment of potential voids and underdrain functionality, highlighting the intricate connectivity between upstream and downstream infrastructure. The analysis underscores the importance of thorough geological investigation and proactive measures to ensure dam safety, reflecting the project's alignment with federal regulations and responsiveness to community safety needs.
    The Rough River Dam Safety Modification Project encompasses a series of contracts aimed at addressing foundation stability risks identified in a 2012 Dam Safety Modification Report (DSMR). This report highlighted internal erosion as a critical risk factor for dam failure. The project involves multiple phases, with Phase 1A relocating Highway 79 to facilitate construction, and Phase 1B focusing on exploratory drilling and grouting to assess subsurface conditions and prepare for future cutoff wall installation. Findings from Phase 1 activities indicate critical issues, including observed grout issues downstream, significant karstic features in the left abutment, and various embankment cracks that suggest distress. The Phase 1B endeavors successfully managed to explore and establish grouting lines for mitigating risk, documenting a comprehensive understanding of geologic conditions that influence dam integrity. This modification effort aligns with the U.S. Army Corps of Engineers’ (USACE) ongoing mission to maintain and enhance the safety of dam infrastructures. The report is critical for guiding future actions to ensure the Rough River Dam meets safety standards and continues to serve its public safety purpose efficiently. The collaboration between government entities and contractors illustrates a systematic approach towards addressing infrastructural vulnerabilities.
    The Rough River Dam Safety Modification Project's Phase I involves significant upgrades, including the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. The document serves as the Certified Final Construction Materials and Foundation Completion Report and provides comprehensive summaries regarding karst geology and drilling profiles from 2015. It details the drilling and grouting activities, including various grout stages, geology encountered, and the total grout volumes used in different boreholes. Notable findings include water pressure testing results and geological interpretations of Reelsville Formation. The project's completion is critical for ensuring the dam's structural integrity and safety. This report exemplifies the rigorous documentation required in federal projects to maintain transparency and accountability within government-funded initiatives, aligning with the protocols governing public infrastructure improvements.
    The Rough River Dam Safety Modification Project focuses on the Phase I work at the Rough River Reservoir in Falls of Rough, KY. This document outlines daily and weekly progress reports for drilling and grouting operations conducted from October to December 2015. Key activities included grout mix testing, drilling of specific holes, installation of sleeveport pipes, and the grouting of annular spaces. Each week is summarized with completed tasks, detailing issues encountered, such as mechanical problems and adjustments made by the crews. Noteworthy updates reflect the complexities and challenges faced during drilling and grouting, including the need for maintenance and changes in procedures based on site conditions. The document serves as a record for project management and compliance with federal guidelines, emphasizing the importance of safety and proper material handling in dam construction and modification efforts.
    The Rough River Dam Safety Modification Project focuses on the design and construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, KY. This document presents a comprehensive final instrumentation evaluation, specifically detailing the performance of numerous piezometers installed to monitor the dam’s foundation and surrounding geological conditions. Key findings include numerous piezometer responses to pool and tailwater fluctuations, highlighting the instruments' influences before, during, and after grouting activities. Several piezometers demonstrated consistent pressure values with no significant changes post-grouting, indicating their reliability in detecting shifts in the reservoir's hydraulic conditions. The report underscores the project’s extensive evaluation methods to ensure dam safety and functional integrity, critical for compliance with federal regulations and standards in infrastructure management. Overall, this evaluation provides a detailed analysis of the piezometers installed, their operational history, and the implications for future monitoring efforts in maintaining the dam's safety and structural stability.
    The Rough River Dam Safety Modification Project involves a comprehensive analysis of the structure's safety through extensive piezometer data collection. This report, part of Phase I - New Outlet Works and Cutoff Wall, encompasses several instrumentation evaluations and drilling data from various locations around the Rough River Reservoir in Falls of Rough, Kentucky. The key focus is on monitoring water elevation and precipitation levels over multiple dates throughout 2016 and 2017 using piezometers placed within 200 feet of boreholes to assess geological stability and hydrological conditions. Specific drilling activities include core sampling, rock assessments, and grout testing to evaluate the effectiveness of modifications aimed at enhancing dam safety. The document emphasizes the importance of precise instrumentation and data collection to inform future engineering decisions and ensure compliance with federal safety standards. This data is crucial to mitigate risks and enhance the infrastructure's resilience, aligning with federal infrastructure improvement initiatives.
    The solicitation pertains to the Rough River Dam Safety Modification Project, specifically focusing on Phase I for the development of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. The document serves as a comprehensive report detailing the final instrumentation evaluation and construction materials and foundation completion. It includes extensive piezometer data collected over multiple dates in 2016, tracking variables such as water elevation and precipitation to monitor the structural integrity and safety of the dam. The primary objective of this project is to enhance dam safety features to mitigate risks associated with water elevation fluctuations, thereby ensuring compliance with federal standards. The gathered data support ongoing assessments necessary for effective planning and execution of the construction modifications. The permanent disposition of the report underscores its importance in documenting the project's status and facilitating future evaluations and governmental audits related to environmental and structural safety regulations.
    The solicitation for the Rough River Dam Safety Modification Project in Falls of Rough, KY, focuses on Phase I, specifically the design and construction of new outlet works and a cutoff wall at the Rough River Reservoir. This document includes detailed piezometer data from various test phases, including drilling and grouting activities conducted between 2015 and 2024. Data includes water elevation readings and precipitation measurements from multiple boreholes, which are critical for assessing the dam’s hydrological conditions. The report's systematic collection and analysis of this data serve as a final instrumentation evaluation for the safety measures being implemented. The findings are essential for ensuring adherence to safety standards and supporting further modifications or repairs needed at the site, reflecting a commitment to maintaining the structural integrity and safety of the dam. Overall, this document is integral to the project's compliance and future development strategies.
    The Rough River Dam Safety Modification Project aims to enhance the safety and structural integrity of the dam through the installation of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This document serves as the final instrumentation evaluation report, detailing various piezometer data collected during the project phases, including grouting operations performed from 2016 to 2024. The report includes water elevation measurements and precipitation data relevant to specific piezometer locations throughout the testing periods. Key findings focus on water levels and grouting effectiveness assessed through continuous monitoring. This project is a component of federally funded infrastructure initiatives, ensuring compliance with safety regulations while addressing critical structural updates. Such assessments underscore the importance of maintaining dam safety and preventing potential failures, thereby safeguarding both human and environmental interests. The meticulous collection and analysis of data, as outlined in this report, contribute to reliable and efficient project outcomes and long-term maintenance strategies for the dam infrastructure.
    The document pertains to the Rough River Dam Safety Modification Project, specifically the Phase I construction of new outlet works and a cutoff wall in Falls of Rough, Kentucky. It includes detailed geological boring logs and laboratory tests, outlining the outcomes of subsurface investigations essential for the design and construction of the dam's safety modifications. The report encompasses various soil types identified during drilling, including clays, sandstones, and limestones, with key metrics such as moisture levels, recovery percentages, and the depths at which various materials were encountered outlined in the logs. These detailed logs serve to guide engineers and contractors in assessing the foundation conditions before commencing construction. The data indicates potential challenges and conditions that may affect the project’s stability and safety. This document illustrates the government's emphasis on thorough geological investigations to ensure the resilience of infrastructure projects, especially in critical areas like dam safety. The data is intended for permanent record and will support subsequent phases of the project moving forward.
    The "Rough River Dam Safety Modification Project" pertains to the construction and safety enhancements at the Rough River Reservoir in Falls of Rough, KY, focusing on Phase I, which includes the implementation of new outlet works and a cutoff wall. The document primarily consists of drilling logs and laboratory analysis results from soil borings, detailing the geological layers encountered during exploratory drilling, such as lean clay, sandy silt, and various grades of limestone. Specific classifications and physical characteristics of materials are provided for depths ranging from 0 to 255 feet, including their plasticity, moisture content, and reaction to hydrochloric acid. These geological surveys and analyses are foundational for determining the safety and reliability of the dam structure. As the project falls under federal oversight, it emphasizes adherence to engineering and safety standards, essential within the context of RFPs and grants aimed at infrastructure improvement, ensuring not only structural integrity but also compliance with environmental and regulatory frameworks. The findings will direct further design and construction methodologies essential for improving dam safety and functionality.
    The Rough River Dam Safety Modification Project Phase II entails explorative drilling and grouting to assess and improve the dam's foundation stability. Executed under the USACE contract (W912QR-15-C-0008) by Advanced Construction Techniques Inc., the project sought to evaluate subsurface conditions and prepare for future construction of a cutoff wall. Key operations included drilling upstream and downstream grout holes, performing extensive rock coring, and utilizing automated grouting and water pressure testing systems. The report outlines the project's scope, including infrastructure construction, mobilization, equipment used, and waste management practices. A total of 307 production grout holes and 20 verification holes were installed, requiring significant drilling and grouting efforts. Various methods, such as rotary sonic and percussion drilling, were employed to achieve optimal results. Data collection and monitoring were enhanced through the IntelliSystem, which allowed for real-time tracking of grouting operations and drilling activities. The report also discusses compliance with contract specifications, production rates, and the challenges encountered throughout the project. Overall, the findings establish groundwork for continued improvements to dam safety and integrity, reinforcing the project's importance in federal infrastructure maintenance and environmental safety.
    The Rough River Dam Safety Modification Project Phase II encompasses critical geotechnical operations related to new outlet works and a cutoff wall at the Rough River Reservoir, Falls of Rough, KY. This document serves as an appendix in the Phase IB Drilling and Grouting Contractor Completion Report, detailing extensive drilling and grouting activities. The report contains comprehensive trend plots, timestamped comments on various stages of the grouting process for multiple boreholes, and highlights crucial operations such as barrier bag inflation, pressure refusals, and cumulative grout take measurements. It illustrates the protocol for managing mechanical challenges and pauses during injection, reflecting meticulous engineering practices during grouting operations. By documenting each stage's specifics—timestamp, grouting time, depths, and accumulated grout volumes—the report provides transparency and clarity related to the project's intricate workings. The focus on safety, quality, and exact measurements ensures compliance with federal standards for infrastructure improvements, contributing to the dam's long-term stability and safety. Overall, the document underscores the government's commitment to rehabilitating vital infrastructure while adhering to rigorous technical standards.
    The Rough River Dam Safety Modification Project, Phase II focuses on implementing new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, KY. This Phase IB report, dated December 20, 2024, outlines the drilling and grouting operations carried out as part of the geotechnical analysis for the project. The detailed completion report includes various stages of grouting, specifying parameters such as pressure refusal data, grouting times, depths, and the accumulated grout take at different intervals. Measurements suggest that formations primarily consist of bedrock, with a mix ratio specified as A-Mix = 1.4. The report is structured with timestamped entries documenting the work processes and results—totaling 3 of 9 appendices in this volume. The findings are intended to support adherence to safety standards and ensure the structural integrity of the dam. This project reflects the commitment to enhancing infrastructure resilience, particularly important in the context of fulfilling government grant obligations and responding to federal RFP requirements for dam safety modifications.
    The Rough River Dam Safety Modification Project, Phase II, pertains to the construction of new outlet works and the installation of a cutoff wall at Rough River Reservoir in Falls of Rough, Kentucky. This document entails the Phase IB Drilling and Grouting Contractor Completion Report, specifically Volume 6's Appendix 2C, which contains certified final data on grouting trends. It documents various drilling stages, including pressure refusals, grouting times, accumulated grout takes, and water lugeon values, emphasizing operations carried out from November 2016 to February 2017. The report showcases technical details on bedrock and overburden formations, the specific mixes utilized (e.g., A-Mix and D-Mix), and results from gravity and interface grouting operations. The data serves as critical documentation for evaluating the efficacy and safety of drilling and grouting methods implemented. Overall, this report underscores the rigorous geotechnical assessments required to enhance the dam's safety, aligning with federal standards for infrastructure projects.
    The Rough River Dam Safety Modification Project Phase II focuses on developing new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This document serves as an appendix to the Phase IB Drilling and Grouting Contractor Completion Report, featuring various project photographs captured by Advanced Construction Techniques Inc. These images, spanning from 2015 to 2019, illustrate the progress made in exploratory drilling and grouting, contractor staging areas, waste collection systems, and the installation of essential infrastructure components. Key highlights include the implementation of environmental protective measures, such as silt fencing, as well as critical infrastructure elements like wastewater settling tanks and gravel entrances. The report ensures compliance with guidelines established by the U.S. Army Corps of Engineers and provides vital documentation for future phases of the project. The series of progress photos documents the ongoing construction efforts, emphasizing the overarching aim of improving dam safety and environmental stewardship throughout the project lifecycle.
    The document outlines the completion report for Phase IB of the Rough River Dam Safety Modification Project in Falls of Rough, Kentucky, which focuses on the design-bid-build approach for constructing new outlet works and a cutoff wall. This report, Volume 6 of the completion report series, specifically details the geotechnical data collected during drilling and grouting operations. Included in Appendix 4A are images of soil and rock core samples that were analyzed throughout the project. The report highlights the significance of this geotechnical investigation, which is essential for ensuring the structural integrity and safety of the dam. The overall aim of the project is to enhance dam safety compliance with federal standards while improving the reservoir's operational capabilities. This report is a vital part of the official record, indicating the thorough investigation conducted by the Louisville District of the U.S. Army Corps of Engineers and fulfilling the permanent documentation requirements for federal projects.
    The document pertains to the Rough River Dam Safety Modification Project Phase II, which involves the design and construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. Specifically, it details the completion report of Phase IB, highlighting drilling and grouting activities conducted to support tunnel construction. This report, which falls under a Design-Bid-Build contractual structure, is classified as permanent and includes vital geotechnical data accompanied by soil and rock core photos. The completion report, presented on December 20, 2024, is part of documentation for ensuring safety modifications at the dam and complies with federal monitoring and reporting requirements. The emphasis is on thorough documentation of the drilling and grouting contractor's tasks to affirm the integrity of dam safety measures, aligning with the federal standards and local regulations expected in government-funded infrastructure projects.
    The document outlines the completion report for the Phase IB Drilling and Grouting Contractor for the Rough River Dam Safety Modification Project in Falls of Rough, Kentucky. This project, under the jurisdiction of the Louisville District, aims to enhance the safety features of the Rough River Dam by implementing new outlet works and a cutoff wall. The report, categorized as Volume 6 (8 of 9) of the contractor's completion documentation, includes appendices detailing geotechnical data necessary for tunnel construction, specifically presenting soil and rock core photos. The submission emphasizes the importance of this geotechnical data in assessing site conditions, ensuring structural integrity, and fulfilling regulatory requirements. The completion report serves as a permanent record aimed at supporting ongoing safety advancements and maintaining compliance with federal standards, reflecting the government's commitment to infrastructure safety and environmental stewardship.
    The document outlines the completion report for the Drilling and Grouting Contractor associated with the Rough River Dam Safety Modification Project Phase II in Falls of Rough, Kentucky. It includes extensive geotechnical data, as-built drawings, and profiles from drilling and grouting operations performed to enhance the dam's safety. Key elements of the report consist of borehole layouts, geological profiles showing the distribution of various rock and soil types, and results from water tests and grouting operations. The data highlights the geotechnical challenges encountered and the techniques employed to mitigate these risks, including grout injection details. The findings inform ongoing maintenance and safety measures for the dam infrastructure, aligning with federal regulations for dam safety. Overall, the report serves as a permanent record for rigorous safety compliance and project assessment within the broader context of federal and state government engineering practices.
    The Rough River Dam Safety Modification Project Phase II focuses on the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This segment, identified as Phase IB, provides comprehensive geotechnical data from upstream boring logs critical for evaluating site conditions. The logs detail the geological profile encountered during exploratory drilling, including various soil and rock types, their moisture conditions, and hardness. Key findings include layers of asphalt, gravel roadbase, lean clay, sandstone, shale, and limestone, highlighting the site's complex stratigraphy. Specific attention is given to the characteristics of each material, such as their weathering state, fracture spacing, and the presence of historical grout seams. The data aims to inform subsequent design and construction phases by ensuring that engineers understand the geotechnical parameters essential for securing the dam's safety and structural integrity. This effort demonstrates the federal government's commitment to maintaining infrastructure resilience while adhering to safety regulations. Overall, the extensive documentation emphasizes the necessity for careful evaluation and oversight of engineering projects involving significant geological considerations.
    The document details the Rough River Dam Safety Modification Project Phase II in Falls of Rough, Kentucky, specifically focusing on the Geotechnical Information Report (GIR) for tunnel construction. It encompasses various laboratory test results, statistical analyses of rock qualities, and geotechnical evaluations conducted from 2003 to 2019. Key findings include core recovery statistics and rock quality designations related to different formations such as Hardinsburg Sandstone and Haney Limestone. The document emphasizes the importance of geological data in ensuring the integrity and safety of the dam structure during redesign efforts. Detailed statistics demonstrate rock performance variances, delineating minimum and maximum core recovery percentages alongside average rock quality designations which guide engineering decisions. The rigorous testing and evaluation processes outlined are crucial for compliance with federal safety standards, ultimately aimed at securing the dam against potential hazards. This document serves as a vital component in the overarching proposal for funding and regulatory approval needed to proceed with the safety modifications.
    The Rough River Dam Safety Modification Project Phase II focuses on the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This document, part of a series of geotechnical information reports, details various investigations into rock strength and material properties essential for ensuring the project's structural integrity. It includes data from geological tests, such as splitting tensile strength assessments of rock cores representing different lithologies, including sandstone and shale. The report encompasses information gathered from multiple test sites, each analyzing rock samples for moisture content, density, and other physical characteristics under controlled conditions. The findings are crucial for engineering and design purposes, as they inform construction risk assessments, material selection, and engineering calculations. Overall, the report concludes with critical insights into the geological conditions at the project site, offering guidelines for safe and effective construction practices that align with federal regulations for dam safety. The data provided supports the project's objectives of enhancing dam resilience and ensuring ongoing operational safety.
    The solicitation pertains to the Rough River Dam Safety Modification Project Phase II, focusing on new outlet works and a cutoff wall for the Rough River Reservoir in Falls of Rough, Kentucky. This Design-Bid-Build project entails a thorough Geotechnical Information Report (GIR) presented in Volume 6, with Appendix D detailing instrumentation and monitoring. It emphasizes adherence to a Joint Instrumentation and Monitoring Plan (JIMP), referenced in Volume 5 specifications. The project's certification is finalized as of December 20, 2024, under solicitation number W912QR25R0016. The documentation will be permanently retained, indicating the importance and long-term relevance of the information provided for safety and compliance in dam management.
    The document outlines the solicitation for the Rough River Dam Safety Modification Project Phase II, focusing on the New Outlet Works and Cutoff Wall at the Rough River Reservoir in Kentucky. It provides a detailed Geotechnical Information Report (GIR), highlighting the investigation of various geotechnical and construction elements essential for the project's success. Key components include historical construction performance, boring location plans, soil and rock testing, and analyses for filter compatibility and dewatering strategies. The report emphasizes the compatibility of materials to ensure no erosion conditions per FEMA standards. Additionally, it discusses methods for excavation dewatering, addressing potential flooding scenarios in the control tower area. The recommended solution involves using a combination of centrifugal and submersible pumps, enhancing effectiveness in managing water removal despite depth challenges. Overall, this report serves as a comprehensive guide for contractors to understand project requirements, material compatibility, and water management strategies aligned with engineering standards, facilitating informed bidding and execution.
    The solicitation outlines the Rough River Dam Safety Modification Project Phase II, focusing on the construction of new outlet works and a cutoff wall in Falls of Rough, KY. The document presents a comprehensive Geotechnical Information Report, detailing soil and rock testing, instrumentation, and analyses related to construction safety and effectiveness, particularly emphasizing excavation dewatering strategies. The design intent is to employ a sheet pile cofferdam to mitigate seepage and flooding risks while ensuring the integrity of downstream structures. Detailed calculations estimate hydraulic conductivities and potential seepage reduction through various sealing strategies, suggesting the use of lower-permeability sealants based on their superior performance. The report also recommends wellpoint systems for initial groundwater drawdown, followed by sump and seepage collection systems during excavation, ensuring stability in sandy soils. Overall, this document serves to guide contractors in implementing effective dewatering and seepage control measures while maintaining safety and compliance with federal standards in infrastructure projects.
    The Rough River Dam Safety Modification Project Phase II in Falls of Rough, KY, focuses on designing and constructing new outlet works and a cutoff wall, as highlighted in the Geotechnical Information Report (GIR). This document, part of a series identifying design specifications, analyzes the geotechnical aspects critical to the project's success. Key sections include a history of construction performance, boring location plans, soil and rock testing results, and instrumentation monitoring. Particularly notable are analyses concerning downstream filter materials, including a variety of stone and sand gradations, ensuring compliance with perviousness and migration requirements outlined by USACE and FEMA. Each analysis confirms that the materials meet necessary criteria, suggesting a well-considered approach to manage soil and water filtration within the dam structure. Overall, the report emphasizes thorough preparation, rigorous testing, and adherence to established engineering standards to enhance dam safety and operational efficiency during the project's ongoing modifications.
    The document presents the Geotechnical Information Report for the Rough River Dam Safety Modification Project Phase II, focused on constructing a new outlet works and cutoff wall at Rough River Reservoir in Falls of Rough, Kentucky. It addresses the design-bid-build approach and details key elements of the geotechnical analysis, including slope stability assessments for a temporary work platform. Critical considerations involve comparing sheet pile wall and rock slope support designs, factoring in loading conditions from construction equipment, particularly hydromil cranes. The analysis incorporates historical construction performance, soil testing results, and structural integrity evaluations. The findings suggest both support methods meet safety standards, yet the project must select the most economical option. Overall, the report underscores the importance of detailed geological assessments in ensuring structural stability and safety during the dam modification process, aligning with US Army Corps of Engineers' guidelines.
    The government document titled "Geotechnical Information Report for Rough River Dam Safety Modification Project Phase II" outlines the findings and analyses related to the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. It details the geotechnical data essential for design and construction, including the assessment of an upland disposal area for excavated materials and an archery berm. The report includes a synopsis of construction history, boring location plans, and extensive soil and rock testing results. Key analyses evaluate slope stability conditions for the disposal area, ensuring compliance with safety factors and stability under various conditions including spillway events. The report emphasizes the importance of proper geotechnical considerations in mitigating risks associated with the dam's structure, ultimately contributing to safer operational conditions. This document plays a vital role in informing stakeholders involved in federal grants and RFPs concerning civil engineering projects, ensuring that detailed, scientifically-backed assessments shape the construction and safety protocols of federal infrastructure projects.
    The Geotechnical Interpretive Report (GIR) for the Rough River Dam Safety Modification Project Phase II outlines critical subsurface data required for the design of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. The report consolidates findings from several field investigations and historical reports, detailing existing dam conditions, risks related to internal erosion, and construction considerations. The project aims to reduce risks associated with potential dam failures, which could significantly impact the city of Falls of Rough and surrounding areas. The dam has been assessed under various safety classifications, revealing high urgency concerns related to erosion along karstic formations. The GIR presents a comprehensive overview of risks, existing conditions, and proposed remedial features, such as a cut-off wall to address these hazards. Key sections include project authorization history, geologic profiles, site-specific soil properties, work area descriptions, and construction methodologies for the outlet works and cutoff wall. The report serves as a vital resource for ongoing project assessments, ensuring that design and construction align with federal safety standards and engineering best practices in light of evolving risks at the dam site.
    The Rough River Dam Safety Modification Project focuses on Phase II, which involves constructing new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. The document provides an extensive Geotechnical Information Report detailing the dam's construction history and performance assessments starting from its initial contracts awarded in the mid-1950s through to current operational evaluations. Key sections include analyses of embankment design, foundation treatments, and the functionality of outlet operations, with references to geological assessments, soil testing, and historical data of structural modifications. It highlights the dam's design as a homogeneous earth fill structure, emphasizing modifications performed to enhance its resilience against hydrological demands, particularly post-high water events. Findings illustrate performance monitoring protocols, noting issues such as sinkholes and erosion, alongside the implementation of mitigation measures like filter barriers. The report is structured with detailed appendices covering boring logs, analyses of soil and rock conditions, as well as maintenance recommendations originating from ongoing inspections. Overall, it outlines the project’s objective to ensure operational safety and structural integrity, thereby reinforcing flood control capabilities in the region.
    The Rough River Dam Safety Modification Project Phase II entails upgrades to the dam's outlet works and construction of a cutoff wall at the Rough River Reservoir, located in Falls of Rough, Kentucky. This document serves as a Geotechnical Information Report Volume 6, detailing boring location plans, logs, and sub-surface data collected through various engineering investigations. It includes certified records of past borings and soil analysis that are essential for the design and safety of the dam infrastructure. The report is segmented into multiple appendices, covering construction history, boring logs, site exploration data, and analyses of components related to the construction process. Throughout the project, soil stratification, moisture content, and types of materials encountered during drilling are documented to assist in the evaluation of the site for future construction activities. Compliance with governmental standards is emphasized, showcasing federal oversight in ensuring dam safety. The comprehensive data provided aims to support engineering decisions and project planning, highlighting the importance of thorough geotechnical evaluations in large infrastructure projects. This work underscores the commitment to maintaining the integrity and safety of critical water management systems within the region.
    The document serves as a Geotechnical Information Report (GIR) for the Rough River Dam Safety Modification Project Phase II, focusing on design and construction considerations for new outlet works and a cutoff wall at Rough River Reservoir, located in Falls of Rough, Kentucky. It details geotechnical assessments conducted through core borings, specifically identifying soil and rock types, moisture content, and structural features at various depths. Key findings include a predominance of Haney Limestone and Big Clifty Sandstone, characterized by fossiliferous materials and significant weathering, as well as multiple horizontal and vertical fractures, which may impact the structural integrity of the dam. The report emphasizes rigorous testing, including pressures tests and shear tests, to evaluate material properties such as Young's Modulus and Poisson's Ratio, which are crucial for ensuring the safety and stability of the dam structure. This geotechnical data will inform the design and construction phases, assisting in mitigating risks associated with soil erosion, groundwater flow, and seismic effects. Overall, the GIR lays the groundwork for safe and compliant engineering practices in the ongoing effort to enhance the Rough River Dam's safety features.
    The Rough River Dam Safety Modification Project, Phase II, focuses on constructing new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This government document includes a Geotechnical Information Report detailing the findings from various core borings conducted at multiple depths to assess subsurface conditions. Key findings include the encounter of various geological materials, such as highly weathered limestone, shale, and sandstone, along with detailed sample descriptions, classifications, moisture contents, and fractures observed during drilling processes. The project demands a rigorous assessment of geotechnical data to inform design and construction practices, ensuring structural integrity and safety. Data includes specific depths, boring logs, and geological characteristics, which document potential voids and fractures encountered, offering insights into the subsurface behavior during the proposed engineering works. The summary of this information is crucial for the planning phase and serves as a foundation for bidding and grant applications associated with the project, indicating a thorough understanding of site conditions and potential challenges for contractors involved in the engineering and construction process.
    The document outlines the Geotechnical Information Report (GIR) for the Rough River Dam Safety Modification Project Phase II, focusing on the design and construction of new outlet works and a cutoff wall in Falls of Rough, Kentucky. It includes detailed boring logs and geotechnical data critical for assessing the subsurface conditions encountered during drilling operations related to the dam. Key findings highlight various soil compositions, such as silty lean clay and well-graded gravel, with analyses of material properties including moisture content, plasticity index, and recovery rates. Specific entries detail the depths, moisture levels, and classifications of materials found in each boring, alongside completion dates and drilling methods. The report serves as essential documentation verifying the geological data collected to inform the engineering and construction strategies for enhancing the dam's safety. This project demonstrates the federal commitment to infrastructure integrity and public safety, reflecting the analytical rigor expected in responses to government Requests for Proposals (RFPs) and associated grant applications for critical infrastructure projects.
    The Rough River Dam Safety Modification Project Phase II involves the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, KY. This document is a Geotechnical Information Report (GIR) detailing the findings from various borehole investigations conducted in the area. The report includes data on boring locations, logs, and soil classifications from several boreholes (AD-1901 to AD-1904) that reveal complex subsurface conditions, including saturated clays, silty sands, and variably weathered sandstone and limestone formations. The geotechnical analysis aims to inform the design and construction processes for the dam modifications, ensuring structural integrity and resistance to potential failure. Key findings emphasize the presence of soft to moderately weathered materials, groundwater levels, and potential challenges due to loose sediments. The detailed assessment of soil properties, along with the recommendations for drilling methodologies, forms a vital part of the project's planning and risk management strategies. This effort reflects a federal initiative to enhance dam safety standards and environmental compliance within the local infrastructure framework.
    The document outlines the Rough River Dam Safety Modification Project, specifically focusing on Phase II involving the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. It contains the Geotechnical Information Report (GIR), Volume 6, detailing geological assessments necessary for the project's execution. Essential data includes boring logs, material classifications, and groundwater levels from various boreholes, contributing to crucial infrastructure decisions. The report provides insights into soil composition such as sandy lean clay and silty lean clay, and their moisture characteristics, which are vital for design stability and safety considerations. Certified final reports aim for permanent records to guide construction and ensure adherence to engineering standards. This submission harmonizes with federal RFP guidelines, emphasizing a commitment to safety and infrastructure integrity during the modification of critical water management facilities.
    The Rough River Dam Safety Modification Project Phase II focuses on the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This Geotechnical Information Report (GIR), specifically Volume 6, Appendix C1a, provides detailed laboratory test results for soil analysis across multiple evaluations conducted over several years, including historical borings and geotechnical explorations from 1996 to 2021. It systematically organizes results by investigation phases, correlating boring identifications to specific sub-areas. Key components include the assessment of soil properties—such as permeability and liquid limits—alongside moisture content analyses. The findings will inform construction practices, ensuring the dam's structural integrity and responsiveness to safety standards. The data outlines the significance of soil testing in the context of engineering and environmental safety, emphasizing thorough preparation before major dam reconstruction efforts. This project underscores the commitment to implementing enhancements that prioritize public safety while complying with federal regulations concerning dam safety management.
    The document outlines the solicitation for the Rough River Dam Safety Modification Project Phase II, specifically focusing on the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This project will employ a Design-Bid-Build approach and includes a Geotechnical Information Report (GIR), providing essential soil laboratory test results crucial for the tunnel construction phase. Certified as the Final Version on December 20, 2024, this report is a critical component for contractors preparing to bid, ensuring they have comprehensive data about the site conditions. The report is organized into multiple volumes with Appendix C1b specifically detailing the soil test results pertinent to the geotechnical data, reinforcing the necessity for careful planning in foundation design and construction processes. The underlying aim of this project is to enhance dam safety and meet federal and state regulations, reflecting a commitment to infrastructure resilience and public safety.
    The document outlines the Solicitation for the Rough River Dam Safety Modification Project Phase II, aimed at upgrading the outlet works and constructing a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This federally funded initiative is structured as a design-bid-build construction project, following a detailed geological assessment conducted in 1941, which examines the geological conditions relevant to the dam site and its surrounding areas. Key findings indicate that the geological composition includes a range of rock types and soil stability concerns, essential for ensuring the dam's structural integrity and flood control effectiveness. The report emphasizes the importance of thorough engineering studies to mitigate risks associated with geological features and to enhance the safety and reliability of the dam. This project is significant for maintaining infrastructure resilience against flooding while supporting potential recreational and ecological benefits associated with the reservoir. Overall, the solicitation represents a critical step in advancing federal efforts toward dam safety and infrastructure improvements.
    The document pertains to the Rough River Dam Safety Modification Project Phase II, specifically focused on the development of new outlet works and a cutoff wall at the Rough River Reservoir, located in Falls of Rough, Kentucky. Classified under Design-Bid-Build methodology, it follows guidelines from the Certified Final Design Memorandum issued on December 20, 2024. The overall aim of this project is to enhance the safety and functionality of the dam infrastructure, which is essential for effective water management and flood control in the region. The document includes numerous references to design memoranda, indicating a thorough and systematic approach to the project. By addressing potential risks and ensuring compliance with safety standards, the initiative reflects the government’s commitment to infrastructure improvement and public safety. The permanent disposition of the project documentation underscores its significance in the context of state and local regulatory frameworks. This undertaking is an integral part of broader federal efforts to maintain and upgrade dam safety across the United States.
    The government document outlines the Request for Proposal (RFP) for the Rough River Dam Safety Modification Project Phase II, which involves the design and construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This project aims to enhance dam safety by replacing components that may be outdated or insufficient. The proposal follows a design-bid-build format, emphasizing a structured approach to contracting. The document includes a certified final design memorandum from 1953, which serves as a foundational reference for current modifications. The timeline indicates a completion target of December 20, 2024, suggesting an urgency for addressing safety improvements. The document's thoroughness in reference handling signifies a commitment to transparency, with a permanent disposition intended for critical findings and directives. Overall, this RFP reflects the federal government's initiative to invest in infrastructure resilience and safety, addressing potential vulnerabilities in dam operations while engaging contractors through a rigorous bidding process.
    The Rough River Dam Safety Modification Project Phase II focuses on the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. This initiative follows a 1956 design memorandum and involves a Design-Bid-Build procurement approach. The project aims to enhance the dam's safety and operational capacity, addressing identified issues through a structured engineering solution. The document is certified final as of December 20, 2024, and emphasizes permanence in the project's scope and objectives. The repeated references to the design memorandum highlight a commitment to historical design standards and the intent to integrate contemporary safety measures. This solicitation reflects broader government efforts to maintain and improve critical infrastructure while ensuring environmental and public safety.
    The document outlines the solicitation for the Rough River Dam Safety Modification Project Phase II in Kentucky, focusing on the design-bid-build approach and safety modifications including new outlet works and cutoff wall construction. Key tasks involve the demolition of existing structures, construction of a temporary coffer dam, and installation of various systems to enhance the stilling basin and surrounding infrastructure. Specific tasks include dewatering the work area, excavating for a stilling basin extension, creating a maintenance access apron, and constructing features such as an ADA-accessible ramp and expanded parking. Optional components for contractors include the resurfacing of access routes. The extensive documentation provides comprehensive details, including an index of drawings and symbols, ensuring clarity in the project's execution. This project is significant for maintaining dam safety standards and improving public access while contributing to federal and local efforts to enhance infrastructure resilience.
    The document is an amendment to solicitation W912QR25R0016 for the Rough River Dam Modification, issued by the U.S. Army Engineer District in Louisville. The main change outlined in the amendment is the extension of the response deadline for bids from April 18, 2025, at 10:00 AM to May 7, 2025, at the same time. This document serves to modify existing contract terms while maintaining all other conditions intact. Contractors are required to acknowledge receipt of this amendment to ensure their offers are considered valid. The information is structured using standard federal formatting, displaying identification codes, signatures, and administrative details relevant to contractors and the solicitation process. The amendment highlights the importance of timely acknowledgment for compliance within the federal bidding framework, enabling better organization and service provision in federal projects.
    The document is an amendment to solicitation W912QR25R0016 for the Rough River Dam Modification project. It outlines key changes made to the solicitation, including revisions to certain specification sections, an extension of the offer acceptance period from 90 to 120 days, updates to ProjNet inquiry response guidelines, and revised wage rates. An organized site visit is scheduled for potential contractors, with limited participation due to space constraints. The bid involves various construction tasks categorized into Contract Line Item Numbers (CLINs), covering site work, structural concrete, foundation preparation, and relocation efforts. Pricing for multiple construction activities is detailed, emphasizing the contractor's accountability for ensuring compliance with specific requirements and updated wage standards, such as those under Executive Orders. Overall, this amendment provides essential information for bidders to adjust their proposals in accordance with the changes and ensures compliance with federal contracting expectations.
    Similar Opportunities
    FTC CSO DoDEA Roof and RTU Replacement
    Buyer not available
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is soliciting proposals for the FTC CSO DoDEA Roof and RTU Replacement project at Fort Campbell, Kentucky. This project involves the design and construction of roof and rooftop unit (RTU) replacements, with a base bid and several optional enhancements, including new HVAC controls and a lightning protection system. The work is part of the National Roofing Program and is crucial for maintaining the integrity and functionality of military facilities. Proposals are due by December 12, 2025, at 1:00 PM ET, and interested contractors should direct inquiries to Thomas Nauert or Joshua Westgate via email. The estimated project cost ranges from $1,000,000 to $5,000,000, with awards based on the lowest total price.
    Paducah Levees Reconstruction Phase 3
    Buyer not available
    The Department of Defense, specifically the Department of the Army, is soliciting bids for the Paducah Levees Reconstruction Phase 3 project, which is set aside exclusively for small businesses. This procurement involves the reconstruction of levees in Paducah, Kentucky, and is categorized under the NAICS code 237990, focusing on other heavy and civil engineering construction. The project is critical for flood risk management and infrastructure resilience in the region. Interested contractors can find more details by logging into the Procurement Integrated Enterprise Environment (PIEE) and searching for solicitation number W912QR52370251. For inquiries, potential bidders may contact Ethan Phillips at ethan.s.phillips@usace.army.mil or call 502-315-6545.
    MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE) Portland District, is soliciting proposals for the Mount Saint Helens Sediment Retention Structure Crest Raise project located in Toutle, Washington. The project aims to construct an enhanced sediment retention structure to increase storage capacity and manage river flows, involving tasks such as mobilization, river diversion, rock excavation, and the placement of roller-compacted concrete. This initiative is crucial for maintaining the structural integrity of the sediment retention system and mitigating potential flooding risks in the area. Interested contractors should note that the project is valued between $25 million and $100 million, with proposals due by December 19, 2025, at 11:00 AM PST, and a mandatory site visit scheduled for December 1, 2025. For further inquiries, contact Andrew Sprys at andrew.j.sprys@usace.army.mil or Nicole Adams at Nicole.A.Adams@usace.army.mil.
    Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers, is seeking bids for the construction of flood control projects in the Amite River and Comite River Basin, specifically the Comite River Diversion Project at the Bayou Baton Rouge Rock Chute in East Baton Rouge Parish, Louisiana. The project involves a range of construction activities, including the clearing and grubbing of land, the construction of diversion channels and pump stations, roadway modifications, and the installation of various infrastructure components, with an estimated contract value between $25 million and $100 million. This initiative is crucial for enhancing flood management and infrastructure resilience in the region, ensuring compliance with federal and state regulations throughout the construction process. Interested contractors must register with the System for Award Management (SAM) and submit their bids by February 6, 2025, with inquiries directed to Lauren A. Gandolfi at lauren.a.gandolfi@usace.army.mil or by phone at 504-862-2466.
    Z--FODO 253278 - Fort Donelson VC Rehabilitation
    Buyer not available
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of the Visitor Center at Fort Donelson National Battlefield in Dover, Tennessee. The project encompasses a comprehensive renovation, including the addition of a three-story glass and steel structure with an elevator, restoration of historical details, and upgrades to infrastructure systems, all while ensuring compliance with various safety and accessibility standards. This significant undertaking, with an estimated construction value between $1,000,000 and $5,000,000, is crucial for enhancing visitor facilities and preserving the site's historical integrity. Interested contractors must submit their proposals by December 17, 2025, and can direct inquiries to John Babcock at johnbabcock@nps.gov or by phone at 303-969-2626.
    Comprehensive Everglades Restoration Plan, Broward County Water Preserve Areas, Contract 2, C-11 Impoundment and Mitigation Area A, Broward County, Florida
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the Comprehensive Everglades Restoration Plan (CERP) in Broward County, Florida, specifically for Contract 2, C-11 Impoundment and Mitigation Area A. This large-scale construction project, valued at over $500 million, aims to enhance stormwater management, groundwater recharge, and environmental sustainability by constructing a significant earthen reservoir, embankments, and water control structures. The solicitation is open to all offerors and requires registration in the System for Award Management (SAM) to be eligible for contract award. Proposals are due by January 9, 2026, with a pre-proposal conference and site visit having already taken place, and interested parties can contact Ligaya Lowe at ligaya.m.lowe@usace.army.mil or Manuela Voicu at manuela.d.voicu@usace.army.mil for further information.
    Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025
    Buyer not available
    The Department of Defense, through the Army Corps of Engineers, is seeking contractors for the Mississippi River, New Orleans Harbor, and various bar channels Cutterhead Dredge No. 5-2025 project. The procurement involves furnishing a fully crewed and equipped hydraulic pipeline cutterhead dredge to perform dredging work in specified areas, including the New Orleans Harbor reach of the Mississippi River and adjacent waterways. This project is crucial for maintaining navigability and ensuring the operational efficiency of these vital waterways. The estimated construction cost ranges between $10 million and $25 million, with the solicitation expected to be issued around May 6, 2025. Interested vendors should register on beta.SAM.gov and are encouraged to contact Cori A. Caimi at Cori.A.Caimi@usace.army.mil or Fermon Davis at Fermon.L.Davis@usace.army.mil for further information.
    LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP) - Sources Sought, Request for Information, Industry Day and Interviews
    Buyer not available
    The U.S. Army Corps of Engineers (USACE), St. Louis District, is seeking businesses capable of constructing a new 1,200 ft Lock for Lock and Dam 25, located in Winfield, Missouri. This project is part of the Navigation and Ecosystem Sustainability Program (NESP) and aims to enhance navigation and ecological sustainability along the river system. The procurement process includes a series of amendments and opportunities for industry engagement, including an Industry Day and one-on-one interviews, with key deadlines for registration and responses set for June 2024. Interested parties should contact Whitney Dee at whitney.r.dee@usace.army.mil for further details and to access the necessary documents.
    Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 2-2025. Specification No. OM25136
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the Mississippi River Saltwater Barrier Sill Cutterhead Dredge Contract No. 2-2025, which involves the construction of a saltwater barrier sill along the Mississippi River in Louisiana. The project requires the contractor to utilize dredging equipment to place hydraulically dredged materials sourced from designated borrow areas, with an estimated construction cost ranging from $10 million to $25 million. This initiative is crucial for maintaining navigable channels and ensuring environmental protection in the region. Interested bidders must register with the System for Award Management (SAM) and can direct inquiries to contract specialists Cori A. Caimi at 504-862-1352 or Bambi Raja at 504-862-1499, with a bid opening date to be announced in a future amendment.
    THE DALLES OIL ACCOUNTABILITY MEASURES
    Buyer not available
    The U.S. Army Corps of Engineers (USACE) Portland District is soliciting proposals for a firm-fixed-price contract titled "The Dalles Oil Accountability Measures," aimed at enhancing oil monitoring systems at The Dalles Dam in Oregon. The project focuses on implementing automated oil accountability measures to minimize potential oil releases into the Columbia River, thereby improving environmental compliance and operational efficiency. This initiative is critical for managing approximately 400,000 gallons of oil at the dam and fulfilling obligations under a settlement agreement with Columbia Riverkeepers. Proposals are due by December 15, 2025, at 11:00 AM PST, with a construction budget estimated between $1,000,000 and $5,000,000. Interested parties should contact Andrew Sprys at andrew.j.sprys@usace.army.mil or Cory Pfenning at cory.r.pfenning@usace.army.mil for further details.