FDC Rigging Services
ID: RFP-LBNF-361672-BFType: Solicitation
Overview

Buyer

ENERGY, DEPARTMENT OFENERGY, DEPARTMENT OFFERMILAB - DOE CONTRACTORBatavia, IL, 60510, USA

NAICS

Other Building Equipment Contractors (238290)

PSC

RIGGING AND RIGGING GEAR (2020)
Timeline
    Description

    The Department of Energy, through the Fermi National Accelerator Laboratory, is soliciting proposals for rigging services to support the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE-US) project in South Dakota. The selected subcontractor will be responsible for providing all necessary rigging personnel, equipment, tools, and materials to ensure the safe and efficient movement of materials for the installation of cryostats and related infrastructure within the Sanford Underground Research Facility. This project is critical for advancing scientific research and requires compliance with rigorous safety and environmental standards. Proposals are due by June 27, 2025, with an anticipated award date of November 1, 2025. Interested parties should contact Bridget Fugett at bridget@fnal.gov or 815-245-9847 for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines a Request for Proposal (RFP) for rigging services associated with the LBNF South Dakota project at the Fermi National Accelerator Laboratory. It specifies essential requirements for proposal submissions, including pricing lists, various safety and environmental certifications, and mandatory documents such as the Small Business Subcontracting Plan. The RFP emphasizes compliance with specific technical and safety standards, including the attendance at a pre-proposal conference. Key evaluation criteria include a proven track record in rigging projects, documentation of training and certification processes, and adherence to Environmental Safety and Health (ESH) standards. The firm's annual revenue must exceed $1 million for the last five years and demonstrate compliance as a potential subcontractor. Overall, the RFP aims to solicit qualified service providers who can meet rigorous quality and safety standards necessary for successful project completion, reflecting the government’s commitment to maintaining operational excellence in federally funded initiatives.
    The document serves as an amendment to the request for proposal (RFP) for rigging services related to the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment in South Dakota. It details the Mandatory Pre-Proposal Meeting scheduled for May 21, 2025, and specifies that all participants must complete a badging process to gain access. To ensure compliance with REAL ID requirements, attendees must present REAL ID-compliant identification. The meeting agenda includes presentations on procurement, technical aspects, environmental health and safety, and quality assurance, followed by underground training and tours at the Sandford Underground Research Facility (SURF). Participants are required to wear long-sleeve shirts and steel-toe safety boots, while additional personal protective equipment will be provided. This meeting emphasizes the importance of safety protocols and is crucial for interested contractors to prepare their proposals adequately.
    The government document is an amendment to the solicitation for Request for Proposal (RFP) number LBNF-361672-BF, dated May 16, 2025. It concerns the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment South Dakota Rigging Services project. With a proposal due date of June 27, 2025, the amendment includes a crucial attachment: the 01 Proposal Checklist. This checklist assists Offerors in ensuring they include all necessary documents and comply with the mandatory technical requirements outlined in section L of the solicitation. The contact for procurement-related inquiries is Bridget Fugett from the Fermi Forward Discovery Group, LLC, located in Lead, South Dakota. This amendment underscores the importance of thorough preparation and adherence to contractual requirements in government procurement processes.
    The document serves as an amendment to the solicitation RFP LBNF-361672-BF, issued for the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment project in South Dakota, focusing specifically on rigging services. Key points arising from a preproposal meeting include the separation of bids for bridge cranes and rigging subcontract work, equipment storage requirements, and staffing estimates for riggers. The preproposal clarified operational logistics, such as shift schedules, equipment handling protocols, and onboarding processes for environmental, safety, and health (ESH) compliance. It outlines the need for customized rigging plans in certain scenarios and specifies that Fermi Forward Discovery Group, LLC will provide certain lifting fixtures while confirming that no other FFDG equipment will be involved in the rigging operations. Additionally, contractors are informed regarding parking arrangements and ESH training duration. This document primarily aims to ensure interested bidders have clear guidelines and requirements prior to submitting proposals, ultimately facilitating a successful selection process for rigging services related to the project.
    The amendment to the solicitation for the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (RFP LBNF-361672-BF) outlines changes to the project management and staffing requirements for South Dakota Rigging Services. The key focus is on the necessity for a Lead Rigger to be present daily on-site, while higher-level subcontractor management can be coordinated remotely, with only occasional on-site visits required. The Lead Rigger will supervise daily activities and maintain communication with FermiForward representatives to ensure that project schedules are met. The subcontractor's representative, although involved in management discussions, will not incur compensation for their consultation time, as this will be absorbed into existing subcontract administration. The document emphasizes the operational structure allowing for efficient management and oversight within the parameters of federal project guidelines.
    The document details an amendment to the Request for Proposal (RFP) number LBNF-361672-BF, issued for the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment in South Dakota. Dated June 20, 2025, the amendment addresses the addition of the missing Attachment J-7, which outlines the requirements for a small business subcontracting plan that must be adhered to by large businesses. The deadline for proposal submissions is set for June 27, 2025. Bridget Fugett, the LBNF Procurement Specialist, is the point of contact for any inquiries regarding the RFP. This amendment highlights the government's efforts to ensure compliance with small business participation in federal contracts, reflecting the importance of subcontracting opportunities for smaller enterprises within larger projects.
    The document outlines a pricing structure for rigging services provided by South Dakota Rigging Services, focusing on a Time and Material (T&M) proposal. It includes comprehensive cost estimations segmented by labor shifts—day and night—detailing estimated annual quantities, unit costs, personnel costs, and travel/per diem costs for various job titles (Riggers and Lead Riggers) over base and option years. The proposal specifies that all costs are currently set to $0.00 and emphasizes the necessity for accurate calculations with a total subcontract cost that should be double-checked. Travel reimbursement applies only for travel exceeding 50 miles from the work site, necessitating a rationale for any travel costs submitted by contractors. The pricing narrative section is mandated to provide justification for travel pricing decisions. Overall, the document serves as a foundational proposal for rigging services to align with government contracts, ensuring compliance with Special Instructions regarding costs and subcontract administration. This includes a request for clarity on any additional direct costs not listed in the main structure, supporting transparency and thorough assessment during the procurement process.
    The document outlines the requirements for a Small Business Subcontracting Plan applicable to subcontractors involved in government contracts, particularly the Federal Railroad Administration (FRA). It establishes guidelines for subcontractors to include specific goals for engaging small businesses, including various categories such as veteran-owned and women-owned businesses. Key components of the plan include defining the types of businesses to be subcontracted with, detailing the total dollars planned for each category of small business, and providing methods for developing sub-subcontracting goals. The plan emphasizes the importance of maintaining accurate records and ensuring equitable opportunities for participation in subcontracting. The subcontractor must report on subcontracting performance using the Electronic Subcontracting Reporting System (eSRS), demonstrating compliance with established goals, and cooperating in assessments of subcontracting efforts. There are provisions addressing the necessity of maintaining a single plan for each subcontract and the conditions under which a commercial plan may be utilized. Overall, this document is pivotal in facilitating the inclusion of small and disadvantaged businesses in federal contracting opportunities, aligning with broader government objectives to promote diversity and economic empowerment through strategic subcontracting practices.
    The Fermi Forward Discovery Group LLC (FFDG) has issued Request for Proposal (RFP) No. LBNF-361672-BF for rigging services to support the Long-Baseline Neutrino Facility and Deep Underground Neutrino Experiment (LBNF/DUNE-US) in South Dakota. The proposals are due by June 27, 2025, with an anticipated award date of November 1, 2025. The contract will cover a base year (2025-2026) and options for two more years. The selected subcontractor will be responsible for safely moving materials essential for installing cryostats at the Sanford Underground Research Facility, including managing personnel and equipment. Proposals must meet mandatory requirements and will undergo evaluation based on technical merits and cost-effectiveness. A mandatory Pre-Proposal Conference will occur from May 20 to 22, 2025. This RFP, which is part of a larger federal initiative, underscores the importance of rigorous standards in safety and performance in executing complex scientific projects. Subcontractors must also demonstrate compliance with environmental safety standards and provide thorough documentation. This initiative reflects the government’s commitment to advancing scientific research while ensuring operational integrity and safety.
    Lifecycle
    Title
    Type
    FDC Rigging Services
    Currently viewing
    Solicitation
    Similar Opportunities
    HD Coldboxes Fabrication
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is seeking proposals for the fabrication of two high-density (HD) coldbox structures, with an option for a third unit, to support the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (DUNE-US) project. The procurement involves detailed specifications for stainless steel (SS 304) coldboxes designed to house active detectors for cold testing in cryogenic conditions, with strict adherence to quality control measures and compliance with national standards. Proposals must be submitted by 5 PM Central on December 19, 2025, and should include completed SARC and PUR-466 forms for proposals exceeding $10,000. Interested parties can direct inquiries to Spencer Keske at skeske@fnal.gov.
    LBNF/DUNE-US Cryostat Temporary Ventilation
    Energy, Department Of
    The Department of Energy, through Fermilab, is seeking proposals for the LBNF/DUNE-US Cryostat Temporary Ventilation project, which involves the procurement of an air handling unit to support the installation of cryostat components at the Sanford Underground Research Facility in Lead, South Dakota. This temporary ventilation system is crucial for providing conditioned air during the installation of the cryostat membrane, insulation, and detector components, ensuring a safe and efficient working environment. Proposals are due by February 9, 2026, with a mandatory pre-proposal conference scheduled for January 15, 2026, and the contract is expected to be awarded on April 1, 2026, with a performance period extending until June 26, 2026. Interested parties can contact Bridget Fugett at bridget@fnal.gov or Jeremy Duncan at jeremyd@fnal.gov for further information.
    Request for Information: Supply of Liquid Argon to Long-Baseline Neutrino Facility (Lead, South Dakota)
    Energy, Department Of
    The Department of Energy, through Fermilab, is seeking information from vendors regarding the supply of significant quantities of Liquid Argon (LAr) for the Long-Baseline Neutrino Facility (LBNF) project in Lead, South Dakota. The procurement aims to secure approximately 797 million standard cubic feet (scf) of LAr for initial neutrino detectors, with an optional supply of an additional 801 million scf for future detectors, totaling around 1.6 billion scf required between Q1 2029 and Q2 2035. This supply is critical for the LBNF/DUNE project, which plays a vital role in advancing neutrino research. Interested vendors should respond to the Request for Information by January 30, 2026, providing details on supply capability, purity, delivery logistics, and cost estimates to Jeremy R. Duncan at jeremyd@fnal.gov.
    Main Ring Electrical P-F3 to P-F4 15KV Cable Installation, FESS Project 3-7-103B
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the installation of 15KV electrical cables as part of the Main Ring Electrical P-F3 to P-F4 project (FESS Project 3-7-103B) in Batavia, Illinois. The selected subcontractor will be responsible for providing all necessary labor, materials, equipment, and oversight to complete the installation of approximately 15,000 feet of 15KV medium voltage power cables and associated communication cables, adhering to strict safety and quality standards. This project is critical for enhancing the electrical infrastructure at Fermilab, ensuring reliable power distribution for ongoing scientific research. Proposals are due by December 17, 2025, at 4:00 PM CT, and interested parties should contact Chris Daley at cdaley@fnal.gov for further information.
    Ferrite Fabrications
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for the procurement of 700 Fast Kicker Magnet Assembly Side Pieces and 320 Fast Kicker Magnet Assembly Top Pieces, specifically made from ferrite materials. This Request for Proposal (RFP 375377swk) aims to secure firm-fixed price proposals for a total of 1,020 units, which will be delivered to Fermilab's Receiving Warehouse 2 in Batavia, Illinois. The components are critical for the operation of scientific apparatus at Fermilab, contributing to ongoing research and development in particle physics. Proposals are due by 5 PM Central on January 5, 2026, and must include necessary certifications and documentation, including the SARC and PUR-466 forms. Interested parties should direct any inquiries to Spencer Keske at skeske@fnal.gov.
    PIP-II Laserwire Magnets
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for the procurement of Laserwire Magnets as part of the Proton Improvement Plan II (PIP-II) project. This acquisition involves a built-to-print package that includes the fabrication, quality control, testing, and delivery of the magnets, which are critical for enhancing Fermilab's particle accelerator capabilities. The PIP-II particle accelerator will serve as a key facility for particle physics experiments, ensuring Fermilab's continued leadership in the field. Proposals are due by 2:00 P.M. CST on January 20, 2026, with inquiries directed to Seth Fryar at sfryar@fnal.gov or by phone at 630-840-3665.
    DUNE WIB Front Panel Materials (No Substitutes)
    Energy, Department Of
    The Department of Energy, through Brookhaven National Laboratory, is soliciting quotes for the procurement of DUNE WIB front panel materials, specifically under a Firm Fixed Price (FFP) contract designated as a Total Small Business Set-Aside. Vendors are required to submit their best price quotes, including freight and handling fees, along with a published price list for price justification and proof of registration in the System for Award Management (SAM). These materials are critical for the laboratory's research and development operations, emphasizing the importance of compliance with federal contracting standards as outlined in the attached terms and conditions. Interested small businesses must provide their quotes by the specified deadline to Alysha Benincase at abenincas@bnl.gov, ensuring that all submissions remain valid for 60 days.
    Fermilab-Construction Services for IERC CCD Space Humidificaion-372698
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for construction services related to the Integrated Engineering and Research Center (IERC) CCD Space Humidification project. The selected subcontractor will be responsible for providing all necessary supervision, labor, materials, tools, and associated costs to install two humidification units, which are critical for maintaining precise humidity control in the lab environment. This project is particularly important for the manufacturing of sensitive experimental components, ensuring compliance with safety and quality standards throughout the construction process. Interested small businesses must submit their proposals by January 7, 2026, including a technical and business management section, following a mandatory pre-proposal meeting on December 18, 2025. For further inquiries, contact Dasia Guthrie at dguthrie@fnal.gov or call 630-840-2494.
    Giese Road Substation Feeder 24 Backfeed
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for the Giese Road Substation Feeder 24 Backfeed project, which involves electrical medium voltage work in Batavia, Illinois. The project requires the installation of overhead feeders, underground duct banks, and the pulling and termination of 15kV power cables, with all work to be completed by February 1, 2026. This opportunity is set aside for small businesses under NAICS code 238210, emphasizing the importance of compliance with safety and quality standards, including the Davis-Bacon Act wage rates and Buy American requirements. Interested parties must submit their proposals by 10:30 AM CST on December 24, 2025, and can direct inquiries to Gina M. Kern at ginakern@fnal.gov.
    Electrical Steel Coils
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the procurement of Non-Grain Oriented Electrical Steel (NGOES) Coils, specifically requiring a total of 35,175 pounds of this material. The NGOES is critical for the fabrication of PIP-II ORBUMP magnet cores, necessitating compliance with stringent specifications regarding chemical and magnetic properties, as outlined in the associated technical documents. Proposals must be submitted by December 23, 2025, at 1:00 PM CT, with the contract period extending through December 1, 2026. Interested vendors should direct inquiries to Sharon Duchaj at sduchaj@fnal.gov or call 630-840-8693 for further details.