Z1DA--578-17-012 Replace AHU Air Handling Units in Building 45 (VA-25-00004335)
ID: 36C25224B0014Type: Solicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF252-NETWORK CONTRACT OFFICE 12 (36C252)MILWAUKEE, WI, 53214, USA

NAICS

Plumbing, Heating, and Air-Conditioning Contractors (238220)

PSC

MAINTENANCE OF HOSPITALS AND INFIRMARIES (Z1DA)
Timeline
    Description

    The Department of Veterans Affairs is soliciting bids for the replacement of Air Handling Units (AHUs) in Building 45 at the Edward Hines Jr. VA Hospital in Hines, Illinois, under Project Number 578-17-012. The procurement requires contractors to provide labor, materials, and equipment for the HVAC system replacement and associated renovations, with a performance period of 420 calendar days following the Notice to Proceed. This project is crucial for enhancing the hospital's infrastructure, ensuring improved air quality and operational efficiency for veteran healthcare services. Interested contractors, particularly verified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit their bids by November 14, 2024, and are encouraged to attend a mandatory site visit on October 8, 2024. For further inquiries, contact Andrew Humulock at Andrew.Humulock@va.gov or call 414.384.2000.

    Point(s) of Contact
    Andrew HumulockContract Specialist
    (414) 384-2000
    Andrew.Humulock@va.gov
    Files
    Title
    Posted
    The document is a solicitation for bids on a construction project titled "Replace AHU Bldg 45" at the Edward Hines Jr. VA Hospital in Hines, Illinois, issued by the Department of Veterans Affairs. It details the requirements for contractors to provide labor, materials, and equipment for the replacement of the HVAC system and associated renovations, including acoustical ceilings and lighting, within a performance period of 420 calendar days after receiving a Notice to Proceed (NTP). The contract value is estimated between $2 million and $5 million and is exclusively for verified Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors. Key submission details include a mandatory site visit on October 8, 2024, a bid opening date set for October 29, 2024, and specific bonding and certification requirements for bidders. The solicitation includes various standard provisions for bidding, compliance with minority and female participation goals, and adherence to the Buy American Act for construction materials. It highlights critical contract compliance measures, especially regarding timely communication and acknowledgement of amendments. Overall, the document serves to stimulate competitive bids while ensuring regulatory compliance and supporting veteran-owned businesses in federal contracting.
    The document outlines a presolicitation notice for the replacement of air handling units at Building 45 of the Edward Hines, Jr. VA Hospital in Hines, Illinois. The solicitation number is 36C25224B0014, with a response deadline set for October 25, 2024. This project is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and requires contractors to provide all necessary tools, materials, labor, and supervision, adhering to federal, state, and local regulations. The anticipated project completion time frame is 420 days following a Notice to Proceed, with a budget between $2 million and $5 million. The relevant NAICS code is 238220, which pertains to plumbing, heating, and air-conditioning contractors. The contractors must be registered and current on SAM.gov and verify their SDVOSB status with the SBA. A pre-bid site visit will be held, encouraging prospective bidders to attend for further information. This presolicitation serves planning purposes only and does not solicit bids at this stage, emphasizing compliance with VA codes and safety policies as critical to the project’s execution.
    This document serves as Amendment 0001 to solicitation number 36C25224B0014, which pertains to the replacement of air handling units at the Edward Hines Jr. VA Hospital in Hines, IL. The primary purpose of this amendment is to extend the deadline for submitting bids from the original date to November 14, 2024, at 1:00 PM local time. It outlines the methods by which contractors can acknowledge receipt of this amendment and reminds them of the importance of timing in their submissions to avoid rejection. Additionally, it notes that responses to requests for information (RFIs) from the government will be provided in subsequent amendments. The document is issued by the Great Lakes Acquisition Center of the Department of Veterans Affairs, with Roniece Ambrose identified as the contracting officer. Overall, this amendment reflects procedural changes in the solicitation process to ensure effective communication and compliance with submission requirements among contractors.
    The document is a detailed building directory for the Veterans Affairs Hospital in Hines, Illinois, which outlines the various facilities and departments within the campus. It includes a list of outpatient clinics, administrative offices, maintenance facilities, and recreational buildings, alongside specialized centers like the Spinal Cord Injury and Disorders Center. The layout indicates a comprehensive infrastructure aimed at supporting veteran healthcare services, showcasing diverse functions including engineering, human resources, and emergency services. The directory highlights key facilities such as the main hospital, community living center, and emergency generators, reflecting the VA's commitment to providing comprehensive care and support to veterans. The document serves as a vital resource for navigating the campus and identifying specific locations related to federal grants, healthcare services, and other governmental support initiatives.
    The document outlines the Standard Operating Procedure (SOP) for Interim Life Safety Measures (ILSM) at Edward Hines Jr. VA Hospital in Hines, IL. It details the procedures to be followed to mitigate risks associated with Life Safety Code deficiencies during construction projects. Eleven specific ILSMs are identified, including maintaining clear exits, ensuring operational fire safety systems, and conducting fire drills. Responsibilities are assigned to various personnel, from the Safety Section overseeing the ILSM policy to service chiefs managing construction projects. Assessment protocols are established to evaluate when ILSMs apply, including the timely submission of evaluation worksheets to the Safety Section. Additionally, enhanced oversight through daily inspections and mandatory training is mandated for affected personnel. The SOP establishes ongoing liability for compliance with fire and safety codes, encourages frequent communication before and during construction, and ensures documentation of all evaluations and inspections. This comprehensive approach fosters a culture of safety and regulatory adherence in healthcare environments, aiming to protect both occupants and emergency response teams during construction activities. The document is set to be recertified by October 2025, in accordance with federal and national safety standards.
    The VHA Infection Control Risk Assessment (ICRA) template serves as a foundational document for assessing infection control risks associated with construction, renovation, and maintenance activities within Veterans Health Administration (VHA) facilities. The template outlines a systematic approach for categorizing various activities, determining patient risk levels, and implementing necessary infection control precautions. The assessment process consists of four key steps: identifying the activity category, affected areas, patient risk category, and required infection prevention measures. Activities are classified into four categories (A to D), based on factors such as duration and potential to create dust or debris. Patient risk categories, which range from low to highest, guide the requisite infection control level, which may range from Level I to Level IV, dictating specific control measures based on the inherent risks of the activity and environment. The document emphasizes the importance of maintaining strict infection control standards throughout the construction process to safeguard patient health, particularly in sensitive areas. Completing the assessment validates proactive measures in minimizing infection risks, ultimately reflecting the VHA's commitment to essential health safety protocols during facility improvements.
    The document outlines the installation and operational specifics of a Dwyer DigiMag manometer, key to monitoring room pressure in environmental control settings, likely within healthcare or research environments. It emphasizes that the poly tubing is connected to the positive side to ensure accurate measurement of room pressure, a crucial factor for maintaining proper airflow and preventing contamination. Additionally, it notes the operational requirement that a HEPA filter machine must be expelling air from the room, indicating a commitment to maintaining high air quality standards. The document includes acronyms such as ICRA (Infection Control Risk Assessment), PCRA (Post-Construction Risk Assessment), and ILSM (Interim Life Safety Measures), suggesting that it is meant for compliance with federal or state guidelines on health and safety protocols in controlled environments. Overall, this document serves as a technical guideline for ensuring effective air pressure control in environments that require stringent infection control and air quality measures.
    The Department of Veterans Affairs is seeking to replace an Air Handling Unit (AHU) at the Edward Hines Jr. VA Hospital under Project Number 578-17-012. The specifications detail comprehensive requirements for the project, encompassing diverse aspects from demolition to construction and installation of mechanical systems. It stipulates necessary safety, security, logistical, and operational protocols, ensuring minimal disruption to hospital operations, which run continuously. The document elaborates on specific guidelines for contractor responsibilities, including the development of a project schedule, submission of compliance documentation, and adherence to local regulations regarding hazardous materials like asbestos and lead-based paint. It also emphasizes the importance of maintaining existing services, protecting facilities and grounds, conducting thorough inspections, and providing accurate record-keeping throughout the construction process. This RFP reflects the government's commitment to enhancing Veterans' facilities while prioritizing safety, sustainability, and operational efficiency in the execution of infrastructure improvements.
    The document outlines the construction project for replacing air handling units at the Edward Hines, Jr. Veterans Affairs Hospital, focusing on compliance with federal, state, and local codes and regulations. The project will involve demolition and installation processes, demanding coordination among various trades, emphasizing careful planning and execution. Key drawings and proposals detail structural, mechanical, architectural, and electrical designs, ensuring all work aligns with the project specifications outlined in the contract. Specific guidelines are given to the contractor regarding site conditions, safety measures, and material specifications, including concrete and reinforcing steel requirements. The document serves as a comprehensive guide for contractors, detailing expectations for construction practices, material integrity, and communication protocols with the Veterans Health Administration’s representatives. This effort reflects the VA's commitment to maintaining and improving the infrastructure supporting veterans’ healthcare needs through detailed and regulated construction projects.
    The document serves as a utility legend, outlining various types of buried utilities and related engineering features relevant to infrastructure projects. It categorizes utilities such as electric, telephone, fiber optic, and gas, along with water and sewer systems, indicating their significance in civil and environmental engineering projects. Additionally, items like electric pedestals, storm inlets, and various types of manholes and vaults are also identified. The clarity and organization of the utility legend is crucial for professionals involved in planning and executing utility engineering or locating tasks as part of federal and local requests for proposals (RFPs). This classification aids in effective project planning, compliance with regulations, and safety measures by ensuring that essential utilities are recognized and properly managed throughout the infrastructure development process. The document highlights the collaborative nature of utility management in civil engineering endeavors while supporting the overall goal of efficient and safe utility integration into projects.
    The VA Hospital's Policy Memorandum 578-03-001-089 outlines protocols for cutting, welding, and other hot work to prevent fire hazards in non-designated areas. It emphasizes the need for a permit from the Safety Section prior to any hot work, ensuring compliance with safety measures. Designated areas for such operations include various Facilities Management Service shops, while work is prohibited in areas with explosive atmospheres or sprinkler malfunctions. Responsibilities related to safety are distributed among the Safety Section, Facilities Management, and contractors, emphasizing training and supervision, especially during off-hours. Essential precautions require clearance of the work area of combustibles, maintaining fire safety measures, and conducting post-operation inspections. The memorandum references NFPA standards and mandates re-certification every three years. This policy ensures that cutting and welding operations are managed safely and effectively, aligning with federal safety regulations and promoting a secure working environment within the VA Hospital complex.
    The VA Hospital's Policy Memorandum 578-12-138A-079 (R-2) outlines procedures for obtaining permits for above ceiling entry and wall construction in Hines, IL, emphasizing infection control and life safety in patient care areas. It mandates that Facilities Management Service (FMS) and non-FMS personnel adhere to guidelines that include issuing permits, conducting risk assessments for potential contamination, and employing mobile containment systems during construction. Precise definitions are provided for terms such as "above ceiling entries" and "infection control hazards." The responsibility is shared among FMS, service chiefs, contractors, and safety officers to maintain compliance with both infection control and fire safety standards. It details the necessary actions required before, during, and after construction, ensuring appropriate cleaning, sealing of penetrations, and final inspections. The policy also references several related hospital policies and Joint Commission standards for further guidance. This memorandum reflects the VA's dedication to ensuring a safe and sterile environment during construction activities, safeguarding patient care quality.
    The Dig Permit Program Standard Operating Procedure (SOP) at Edward Hines VA Hospital outlines the process for obtaining permission to excavate or penetrate ground surfaces within hospital jurisdiction. Its primary aim is to minimize risks associated with damaging critical underground utilities during construction or maintenance work. Key responsibilities are designated to various roles, including the Engineering Service Chief, Project Planning Chief, and Dig Permit Program Manager, each tasked with oversight, reporting violations, and ensuring adherence to the permit requirements. The process for acquiring a Dig Permit involves contacting the Program Manager, completing Hines Form 1532, securing a professional utility locator, and following inspection protocols for underground utilities. The Program Manager retains documentation for two years post-excavation and oversees the overall permit compliance. Additionally, the SOP references relevant safety regulations and emphasizes coordination among involved parties to prevent accidents and maintain project efficiency. The completion and management of the Dig Permit aim to facilitate safe construction activities while ensuring minimal disruption to existing infrastructure. This systematic approach is critical not only for operational safety but also for regulatory compliance in government-related projects.
    The document details the existing conditions related to the replacement of air handling units in Building 45, supported by a series of photographs. Key areas highlighted include the HVAC penthouse, rooftop units, exhaust fans, and multiple storage and mechanical rooms, all of which are critical components of the building's ventilation system. The photographs illustrate the current state of these facilities, providing visual context for the necessary upgrades. This project falls under a federal RFP for improving HVAC systems, aimed at enhancing air quality and operational efficiency within the building. The significance of documenting the existing conditions underscores the need for a detailed assessment prior to the replacement process. Ultimately, it reflects the government's commitment to maintaining optimal facility standards, ensuring that the necessary infrastructure improvements are thoroughly understood and executed.
    The document titled "Contractor Parking" addresses the requirements and guidelines for parking arrangements for contractors engaged in federal and state projects. It outlines the designated parking areas, the protocols for obtaining parking permits, and the responsibilities of contractors in managing their parking needs to ensure minimal disruption to government operations and infrastructure. Key components include the identification of specific zones allocated for contractors, conditions under which parking permits must be applied for, and the operational hours during which contractors may utilize these designated parking areas. The document emphasizes compliance with local regulations and the need for contractors to coordinate with onsite administration regarding parking logistics. Additionally, it highlights the importance of maintaining clear access for emergency services and minimizing congestion during working hours. The overarching goal of the document is to facilitate a smooth and organized parking experience for contractors while ensuring the safety and efficiency of federal and state operations. In summary, the "Contractor Parking" document serves as a critical guideline to streamline parking practices for contractors, promote regulatory adherence, and enhance operational efficiency in government-related projects.
    The Scope of Work (SOW) outlines requirements for the A/C Shop at the Edward Hines Jr. VAMC regarding the installation of a new Building Automation System (BAS) utilizing Johnson Controls’ FX platform. Key specifications include the prohibition of METASYS and N2 communication, the requirement for Wi-Fi capability for JACE controllers, and a mandate for control device management via an on-site supervisor to ensure proper device instance ID allocation and operational oversight. Additionally, the document details the need for display features in zone controllers, emphasizing user access limitations to prevent unauthorized modifications. The installation criteria also cover freeze protection devices, control actuators, variable frequency drives (VFDs), and outdoor electronics requirements, such as NEMA-rated enclosures. In terms of environmental protection, cooling towers must resist biofilm growth and be protected against freezing through specified fluid mixtures or heat tracing. Overall, the SOW emphasizes compliance, safety, and efficiency in managing and operating HVAC systems within federal facilities.
    The document serves as a comprehensive guide for individuals seeking a VA ID Badge, required for access to VA facilities or information systems. It outlines essential steps, including the requirement to have two forms of identification, verification of employment status with the VA, and scheduling an appointment with a badge office. Information is provided regarding various credential types, including PIV (Personal Identity Verification) and non-PIV cards, along with the necessary background checks like the Special Agreement Check (SAC) and National Agency Check with Written Inquiries (NACI). The document emphasizes the importance of understanding responsibilities as a badge holder and details the procedures for verification of identity through proper documentation. Designed for applicants, sponsors, and registrars, it includes sections for applicant information, verification by sponsors, and acceptance of the issued ID card, aligning with privacy regulations under the Privacy Act. The main purpose is to ensure a secure and efficient process for individuals requiring ID badges within the VA system, reinforcing compliance and operational security standards.
    The document serves as an Emergency Contact List for the project titled "Replace Air Handling Units in Building 45," identified by Project Number 578-17-012. It includes crucial contact information for local authorities, including the Hines VA Police, Fire Department, and Safety Office. The contractor details and the primary contacts for the project team are listed, including the Superintendent, Alternate Superintendent, Project Manager, Safety Manager, and the Hines VA Contracting Officer's Representative (COR), Martin Pint, along with a backup contact, Ernie Wright. The list ensures that essential personnel can be reached quickly in case of emergencies or issues related to the project. This document is primarily intended to aid in effective communication and response during the execution of the air handling unit replacement, reflecting compliance with safety protocols in federal procurement processes.
    The Edward Hines Jr. VA Hospital is implementing a new smoking policy effective October 1, 2019, to promote a safe and healthy environment for all individuals on its campus. The updated policy prohibits all forms of smoking and the use of tobacco products, including cigarettes, cigars, pipes, chewing tobacco, and electronic smoking devices. Non-compliance may result in Federal citations. Visitors are advised to leave tobacco products at home and may need to store items in specific areas due to fire risks associated with oxygen and other gases on-site. The hospital offers assistance for Veterans seeking to quit tobacco use, encouraging them to contact their Primary Care Team for support. Through this initiative, the VA aims to enhance the health and safety of its community, acknowledging the service of Veterans and committing to their well-being.
    The document outlines specifications for the installation and renovation of voice and data communication lines at the Edward Hines Jr. VA Hospital. It details the contractor's responsibilities, which include managing design, materials, labor, and equipment necessary for the project. Key requirements involve installing and relocating connection jacks, pulling cables, and ensuring compliance with building codes and VA specifications. A minimum 25-year transferable warranty on materials is mandated, and all installations must adhere to standards by Systimax or approved alternatives. The contractor must ensure proper grounding, labeling, and cleaning upon job completion, as well as provide documentation such as test results and as-built drawings. The focus on using certified professionals and standardized components highlights the project's prioritization of quality and safety. This document serves to guide contractors in functioning within VA systems, supporting compliance with strict regulations during the installation process.
    The VA Hospital's Policy Memorandum 578-12-138A-076 (R-2) outlines procedures to ensure safety and health during construction activities at the Edward Hines Jr. VA Hospital. The policy updates various responsibilities, training requirements, and organizational roles to better protect patients, staff, and visitors from construction-related hazards. Significant changes include the inclusion of specific engineering titles and a revision of training obligations, requiring contractors and VA staff to complete a comprehensive 30-hour Construction Safety Training followed by ongoing training every two years. The policy emphasizes the importance of a Construction Safety Committee, responsible for overseeing compliance with OSHA regulations, infection control, and environmental considerations. It details responsibilities for various roles, from the Hospital Director to the Construction Safety Officer, ensuring rigorous monitoring and safety protocols. The document also highlights guidelines for risk assessments and mandates that any construction undertaken must prioritize minimizing environmental impact and adhering to local, state, and federal safety laws. Overall, this memorandum aims to establish a systematic approach to manage construction projects while prioritizing the safety of all stakeholders involved, thus reflecting the VA's commitment to providing a safe environment during renovation and construction activities.
    The Pre-Construction Checklist outlines critical procedures and responsibilities for contractors engaged in a U.S. government project, particularly by the Veterans Affairs (VA) agency. The Contracting Officer holds exclusive authority to bind the U.S. Government, with a designated VA Project Manager serving as the representative for technical supervision. Contractors must submit detailed schedules of cost and progress charts promptly after starting the project, with payments being made monthly based on completed work. The checklist emphasizes the importance of safety and establishes procedures for handling changes and subcontractors, requiring detailed proposals for any significant modifications. Additionally, labor standards must be observed, including wage postings and adherence to apprenticeship regulations. The document concludes with space for signatures, signifying agreement and acknowledgment of the outlined processes. Overall, this checklist serves as a comprehensive guide to ensure compliance and streamline project execution in accordance with federal guidelines.
    The VHA Pre-Construction Risk Assessment (PCRA) template is a guideline for evaluating safety risks associated with construction, renovation, and maintenance activities within Veterans Affairs facilities. It identifies various activity types—inspection, small-scale, and large-scale work—and outlines corresponding control measures necessary to prevent disruptions and ensure safety for patients, employees, and contractors. Key precautions include hazard communication, site-specific safety plans, and coordination with adjacent areas impacted by the activities. This document also emphasizes the importance of infection control assessments in conjunction with the PCRA, ensuring comprehensive management of potential health risks. Specific requirements, such as maintaining communication plans and conducting regular site inspections, are outlined for all activity types. A permit section is included to be posted at the project site, detailing project management information and requirements. The overarching aim of the PCRA is to facilitate safe and effective construction activities in healthcare environments, supporting the VA's commitment to patient health and safety while upgrading its facilities. Through meticulous planning and adherence to the outlined control measures, the VHA seeks to minimize risks associated with physical alterations to their facilities.
    Similar Opportunities
    Z1DA--Project 550-24-103 (CON) Replace Air Handler Units B98
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the replacement of air handler units in Building 98 at the VA Illiana Health Care System in Danville, Illinois, under project number 550-24-103. This project aims to enhance the facility's HVAC systems, ensuring compliance with local, state, and federal codes, while maintaining safety and operational continuity during construction. The work is critical for improving healthcare infrastructure and patient safety, with a budget estimated between $1,000,000 and $2,000,000, and a completion timeline of 365 days from the notice to proceed. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSB) must submit sealed bids by 12:00 PM CST on November 21, 2024, and can direct inquiries to Contract Specialist Thomas E Stevens at Thomas.Stevens2@va.gov.
    Z1DA--NRM-CONST 528A7-18-725 REPLACE AHUs 2, 7, 11
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is preparing to issue an invitation for bid (IFB) numbered 36C242-25-B-0001 for the Upgrade Air Handler Equipment project at the Syracuse VA Medical Center. This project involves the replacement of Air Handling Units (AHUs) 02, 07, and 11, along with additional work such as relocating cooling water systems and infection control fans, all while ensuring continuous air supply through temporary equipment. The procurement is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), requiring bidders to self-perform at least 25% of the work, with an estimated project magnitude between $5 million and $10 million. Interested parties should note that proposals must include a 20% bid bond, and all bidders must be registered in the System for Award Management (SAM) under NAICS code 238220. The contracting period is expected to last 730 days from the notice to proceed, with the project anticipated to commence around November 22, 2024. For further inquiries, contact Sandra L Fisher at sandra.fisher3@va.gov or (315) 425-4694.
    Z2DA--537-17-115: SPS Construction Phase 2, 3 &4
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the "SPS Construction Phase 2, 3 & 4" project at the Jesse Brown VA Medical Center in Chicago, Illinois. The project involves comprehensive renovations in the SPS Department, including air handling unit replacements, demolition, air system installations, duct modifications, and electrical revisions, with an estimated completion time of 371 calendar days following the issuance of a Notice to Proceed. This solicitation is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), emphasizing the importance of supporting veteran-owned enterprises in federal contracting. Interested parties must register with the System for Award Management (SAM) and submit their letters of interest by September 9, 2024, with the solicitation details expected to be posted on September 30, 2024, and the bid opening scheduled for November 22, 2024. For further inquiries, contact Joshua K. Jackson, Contract Specialist, at Joshua.Jackson4@va.gov or call 414-844-4800.
    Z2JZ--504-22-107 Replace CLC Air Handling Equipment and Upgrade Controls, Bldg. 29
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the replacement of air handling equipment and the upgrade of controls in Building 29 at the Amarillo VA Medical Center. The project aims to enhance the facility's HVAC systems, ensuring compliance with federal standards while maintaining uninterrupted healthcare services during construction. This initiative reflects the VA's commitment to modernizing its infrastructure to better serve veterans. Bids are due by November 12, 2024, at 11:00 AM CST, with a virtual bid opening scheduled for the same day at 3:00 PM CST. Interested contractors can contact Contract Specialist Nicholas L. Smith at Nicholas.Smith21@va.gov for further information.
    Hines VA Hospital Janitorial Services (2/1/25-1/31/26
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for janitorial services at the Edward Hines Jr. VA Hospital in Hines, Illinois, for the period from February 1, 2025, to January 31, 2026. The contract will require compliance with labor standards and healthcare cleaning protocols, emphasizing infection control and the maintenance of cleanliness in various hospital areas. This procurement is particularly significant as it is set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) companies, reflecting the government's commitment to supporting veteran entrepreneurs. Interested parties should submit their quotes by November 15, 2024, at 3:00 p.m. Central Time, and may direct inquiries to Contract Specialist Dustin Biermann at Dustin.Biermann@va.gov.
    Z1DA--Provide Variable Air Volume Boxes for Operating Room, Oncology, and Eye Clinic 540-22-115 (VA-24-00075614)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the installation of Variable Air Volume (VAV) boxes at the Louis A. Johnson VA Medical Center in Clarksburg, WV, under Project No. 540-22-115. The project aims to enhance the HVAC systems specifically for the operating room, oncology, and eye clinic areas, requiring the installation of ten VAV boxes along with associated ductwork, piping, and controls. This initiative is critical for improving air quality and ventilation in medical facilities, thereby enhancing patient care environments. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses, must submit their bids by December 5, 2024, with an estimated project cost between $100,000 and $250,000. For further inquiries, contact Contract Specialist Aaron Z Morrison at Aaron.Morrison@va.gov.
    Z1DA--556-23-104 Chilled Water Piping From Bldg.188 to Bldg.3
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the construction of an expansion line of chilled water piping at the Captain James A. Lovell FHCC in North Chicago, Illinois. The project, identified as 556-23-104, involves extending chilled water supply and return lines from Building 188 to several other buildings, adhering to specified designs and regulatory guidelines. This procurement is crucial for maintaining efficient climate control within the facility, which serves veterans' healthcare needs. The project budget is estimated between $1,000,000 and $2,000,000, with a completion timeframe of 330 calendar days following the issuance of the Notice to Proceed. This solicitation is set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms, and interested bidders must be verified SDVOSB entities under the applicable NAICS code 238220. The formal solicitation is expected to be posted on or about October 25, 2024, with a bid opening scheduled for November 26, 2024. For further inquiries, interested parties may contact Contract Specialist Rebecca Picchi at rebecca.picchi@va.gov or by phone at 414-384-2000 x42026.
    C1DA--652-24-105 Upgrade Air Handling Systems & Distribution (VA-25-00009506)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified architect-engineering (A/E) firms to upgrade air handling systems and distribution at the Central Virginia VA Health Care System in Richmond, Virginia. The project involves designing and replacing components for air handlers, controls, variable air volume units, and ductwork in critical areas, ensuring compliance with VA guidelines and national codes. This initiative is crucial for enhancing HVAC efficiency in healthcare environments, particularly in sensitive areas such as surgical intensive care and operating rooms. Interested service-disabled veteran-owned small businesses (SDVOSBs) must submit their SF-330 forms by 3:00 PM EDT on December 6, 2024, with an estimated construction budget between $1 million and $5 million. For further inquiries, contact Contract Specialist Donteana Gibbs at Donteana.Gibbs@va.gov or 757-251-4109.
    Z2DA--Upgrade/Repair CLC HVAC System Project# 671-22-198
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is preparing to solicit bids for the upgrade and repair of the HVAC system at the Community Living Center (CLC) of the Audie L. Murphy Memorial Hospital in San Antonio, Texas, under Project 671-22-198. This minor construction project will involve comprehensive work, including general construction, mechanical upgrades, fire protection, electrical modifications, and repairs to the HVAC, steam, chill water, and hot water systems within the facility. The project is significant for enhancing the living conditions of veterans and ensuring compliance with local and VA building codes. The solicitation is expected to be released around November 11, 2024, with a project magnitude estimated between $1,000,000 and $5,000,000, and is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Interested contractors can reach out to Contract Specialist Andres Garcia at andres.garcia1@va.gov for further details.
    Z1DA--595-25-102 Replace Multi-Stack Bldg 37 DB Lebanon VA Medical Center
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the replacement of multi-stack heat pumps in Building 37 at the Lebanon VA Medical Center. This Design/Build project requires contractors to provide all necessary labor, materials, and design services, with a completion timeline of 280 days post-Notice to Proceed, while adhering to strict safety and operational protocols to minimize disruption to hospital activities. The project is particularly significant as it aims to enhance the facility's HVAC systems, ensuring compliance with federal standards and improving patient care environments. Proposals for the first phase are due by December 6, 2024, with a site visit conducted on November 6, 2024; interested parties can contact Contract Specialist Amanda M. Murphy at amanda.murphy5@va.gov for further details.