TX FW TECH MULTI (1), Various Routes & Parking
ID: 6982AF24B000012Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL HIGHWAY ADMINISTRATION6982AF CENTRAL FEDERAL LANDS DIVISILAKEWOOD, CO, 80228, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)
Timeline
    Description

    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the reconstruction and maintenance of various routes and parking areas within the Texas Chenier Plain Wildlife Refuge Complex, specifically in Wallisville, Texas. The project encompasses approximately 16.4 miles of existing roadways, requiring improvements such as asphalt reconstruction, chip seal maintenance, and enhanced surface drainage to restore infrastructure damaged by Hurricane Harvey in 2017. This initiative is crucial for maintaining coastal migratory bird habitats and ensuring safe access within the wildlife refuge. The estimated project cost ranges from $5 million to $10 million, with a pre-bid meeting scheduled for August 28, 2024, and bids due by September 25, 2024. Interested contractors can contact Doug Whitcomb or Ryan Phillips at cflacquisitions@dot.gov for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    This document outlines the amendment and modification of a solicitation related to multiple construction projects managed by the Federal Highway Administration. It provides specific instructions for contractors on how to acknowledge receipt of amendments, including deadlines and acceptable communication methods. The text includes terms, definitions, and formatting changes relevant to contract engagements, emphasizing the need for precision in materials, measurement, and reporting processes. Key definitions are updated, including the introduction of an Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), which will be utilized for daily construction records. It specifies the contractor's responsibilities for sourcing water, storing construction materials according to safety and environmental standards, and maintaining organized staging areas. The document also outlines safety protocols and the need for contractors to submit site maps prior to commencing construction. Ultimately, the document serves as a comprehensive guide for contractors involved in federal highway projects, ensuring adherence to updated specifications and compliance with relevant regulations while promoting efficient project execution.
    The document outlines amendments to a project managed by HDR Engineering, Inc., specifically regarding the design modifications to Route 010 Parking Area and associated infrastructure. Notable amendments include the relocation of Parking Area 2, increases in concrete pavement and roadway aggregate quantities, and the addition of a sign system and accessibility symbols. Other changes highlight the update of construction lines, fill material callouts, and parking area striping. The revisions were made to improve site functionality and compliance with accessibility standards, with specific measurements and details provided for proposed installations such as signs and parking dimensions. These modifications reflect the firm’s commitment to enhancing public infrastructure while adhering to regulatory requirements. The document serves as a formal record of changes to ensure all stakeholders are apprised of the project’s progression and adjustments as necessary.
    The Bid Opening Summary details the bids received for a project titled "Various Routes & Parking," under project number TX FW TECH MULTI (1), with a bid opening date of September 25, 2024, in Lakewood, CO. The Bid Opening Officer is Ryan Phillips. Four contractors submitted proposals, with Central Southern Construction Corp. bidding $10,466,175.00, C-A Native Constructors, Inc. offering $8,275,169.29, and McKenzie Construction and Site Development, LLC submitting $7,807,557.00. Notably, Construction Solutions Group, LLC did not provide any bids. The Engineer's estimate for the project was significantly lower at $5,875,500.00. All bids are subject to verification. This document serves as a key part of the procurement process, ensuring transparency and accountability in government contracting for public works projects. It illustrates the competitive nature of federal and local RFPs, emphasizing the need for careful evaluation of submissions against estimated costs.
    The U.S. Department of Transportation is inviting bids for road rehabilitation and related improvements at the Anahuac and McFaddin National Wildlife Refuges in Texas, with the solicitation number 6982AF24B000012. The project involves approximately 16.4 miles of existing roadways and includes various enhancements such as crack sealing and drainage improvements. The solicitation is open to all bidders and includes specific requirements like submitting bids in hard copy, registering with the System for Award Management (SAM), and adhering to federal construction standards. Bidders are required to provide extensive documentation, including bid guarantees, a HUBZone preference notice (if applicable), and compliance with the Buy American Act. The Government will evaluate the bids based on price and responsiveness, with a focus on small business participation as outlined in various federal guidelines. A non-mandatory pre-bid meeting will be held to orient contractors with the project site. The estimated cost for the project is between $5 million and $10 million, emphasizing the government's commitment to restoring coastal migratory bird habitats following Hurricane Harvey's damage in 2017.
    The document addresses inquiries related to the TX FW TECH MULTI(1) Various Routes & Parking project as part of a federal Request for Proposals (RFP). It includes questions from bidders regarding responsibilities, technical specifications, and contract terms. Key points covered include: the requirement for contractors to furnish office trailers, implications of project end dates upon award options, handling delays without work allowed in April, and acceptable materials like box culverts in place of specified RCPs. Additionally, qualifications for site personnel are clarified, time extensions for performance due to lead time issues may be considered, and the availability of soil boring reports was questioned. Importantly, it notes that no time extensions for reviewing new plans are currently being granted. This document serves as a crucial clarification tool for potential bidders, ensuring they are informed of contractual obligations and project expectations as they prepare their proposals.
    The document provides a series of questions and answers related to a government Request for Proposal (RFP) for the Texas FW Tech Multi(1) project involving various routes and parking. Key points include clarifications on responsibilities regarding a government-furnished office trailer, implications for project timelines under different award options, and considerations for material substitutions such as box culverts in place of traditional RCPs. The document addresses workforce qualifications, the unavailability of soil boring reports, and guidelines for asphalt and concrete mixes. It also specifies that no time extensions will be provided for proposal submissions, despite market delays. Notably, an error regarding an extension on the bid date was corrected, affirming that the deadline remains unchanged. This Q&A format aims to foster transparency and clarify essential details for potential contractors, ensuring they have the necessary information to proceed with the bidding process effectively.
    The document outlines an amendment to a solicitation issued by the Federal Highway Administration, specifically related to the project titled "Various Routes & Parking" under contract ID 6982AF24B000012. It details procedures for acknowledging the amendment, emphasizing that failure to do so by the specified deadline may lead to the rejection of bids. The amendment includes instructions for submitting changes to offers and clarifies that contractors are not required to return signed copies of the amendment. Key modifications include an extended deadline for bids, the removal and replacement of Bid Schedule A and specific plan sheets, along with an updated pay item description for construction-related tasks. The document concludes with a summary of bid schedules, quantities, and descriptions of various construction and maintenance activities necessary for the project. This reflects the government's ongoing commitment to infrastructure development while ensuring participants adhere to required standards and deadlines.
    The memo outlines the hydrologic and hydraulic design analyses for various roadway improvements at the Anahuac and McFaddin National Wildlife Refuges in Texas. The project primarily focuses on Routes 010, 011, 012, and others, with current funding only for Schedule A and Option X, while certain segments are shelved. Key activities include reconstructing the Visitor Center parking lot to improve drainage and resurfacing roads to enhance resilience to flooding. Despite the coastal area's susceptibility to floods and hurricanes, the project aims to maintain existing drainage patterns, mitigating localized ponding without adversely impacting floodplain conditions. The drainage elements involve minimal modifications, with a detailed hydrologic analysis at the Visitor Center. The project is categorized as a Tier 1 initiative, affecting less than one acre of land, thereby complying with Texas environmental regulations. The memo confirms adherence to relevant FEMA flood standards and emphasizes a commitment to minimizing impacts on adjacent wetlands. The overall bid for the project is set for July 2024, underlining the government's initiative to maintain and enhance wildlife refuge infrastructure effectively.
    The Pavement Design Report for the Anahuac National Wildlife Refuge, prepared by Shannon & Wilson, Inc., assesses subsurface conditions and offers pavement design recommendations for road improvements in Chambers County, Texas. The report outlines the project's context, detailing existing roadways and their current conditions, including assessments of distresses based on the U.S. Fish and Wildlife Service (FWS) rating system. A geotechnical investigation involved drilling ten borings to analyze subgrade conditions and conducting laboratory tests on collected samples. The findings indicate varying soil types, potential swelling due to expansive clays, and corrosion risks to substructure elements. The report presents several recommended pavement section alternatives based on the anticipated low traffic volumes and asserts that subgrade treatment may be necessary due to soil characteristics. It emphasizes the importance of adhering to federal and state specifications during construction and suggests mitigation measures to handle expansive soil and water drainage considerations. Overall, the report serves as a crucial guide for achieving sustainable road improvements while ensuring compliance with federal guidelines.
    The document pertains to a federal Request for Proposals (RFP) issued to HDR Engineering, Inc., a registered firm in Texas. Philip R. Hahn is the point of contact for this proposal, emphasizing the firm's status and registration. The repetitive entries suggest a series of acknowledgments or confirmations related to the firm's qualifications and their ongoing compliance with federal and state regulations. Key focal areas include engineering and related services such as surveying, procurement, maintenance, and facility management, which are crucial for upholding quality standards and meeting project goals. The document serves as a formal record outlining HDR Engineering, Inc.’s qualifications while showcasing the federal government's operational procedures in engaging with contracted firms for infrastructural and engineering projects. Overall, the document underscores the importance of adherence to regulatory standards and the critical role of proper documentation in governmental processes.
    This document pertains to an RFP under Philip R. Hahn of HDR Engineering, Inc., a Texas-registered firm, dated July 30, 2024. The purpose of the RFP is to solicit proposals for engineering services that align with federal and state guidelines. It details various aspects such as surveying, environmental assessments, and remediation tasks that are to be completed by qualified contractors. An emphasis is placed on regulatory compliance, safety protocols, and the capacity to work effectively within existing frameworks. HDR Engineering, Inc. is expected to demonstrate expertise in handling civil infrastructure and environmental engineering challenges, ensuring that all work adheres to stipulated guidelines. The document outlines requirements for proposal submissions, including qualifications, scope of work, and project timelines to ensure a comprehensive evaluation process. Overall, the RFP emphasizes the significance of adhering to local, state, and federal standards in engineering projects, highlighting HDR Engineering, Inc.'s role in facilitating these critical services within the prescribed legal and environmental frameworks. The objective is to achieve effective project delivery while safeguarding public safety and environmental integrity.
    Lifecycle
    Similar Opportunities
    Vicksburg National Military Park
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for construction work at the Vicksburg National Military Park in Mississippi, under Solicitation Number 693C73-25-B-000002. The project involves essential slide repairs on Grant Avenue and Union Avenue, including tasks such as roadway excavation, embankment construction, and installation of engineered structures to stabilize the affected areas. This initiative is crucial for maintaining the park's infrastructure and ensuring visitor safety, with an estimated project cost ranging from $5 million to $10 million. Interested contractors should prepare to submit their bids electronically by the specified deadline, with bid documents expected to be available around October 23, 2024. For further inquiries, contact Emily McCleary or C. Shawn Long at EFLHD.Contracts@dot.gov.
    MS NP NATR 3N18 3H27 ETC - Geotechnical, Pavement Rehabilitation, and Structural Repairs
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Geotechnical, Pavement Rehabilitation, and Structural Repairs project (MS NP NATR 3N18 3H27 ETC) in Mississippi. This project, which spans between mileposts 121 and 204, involves extensive repairs including addressing slide areas, bridge joints, delaminated concrete decks, and pavement rehabilitation, with an estimated budget of $40 million to $50 million. The work is critical for maintaining the integrity and safety of highway infrastructure in the region. Bid documents will be available starting November 4, 2024, and interested contractors must register on the SAM website to access them. For inquiries, contact Rubrena Johnson or Shirley A. Anderson at eflhd.contracts@dot.gov, and ensure compliance with federal registration and subcontracting requirements.
    CA FTNP SEKI 13(2) Mineral King Road
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the rehabilitation of Mineral King Road, a critical infrastructure project located within Sequoia and Kings Canyon National Park in California. The project encompasses approximately 12.09 miles of roadway and includes tasks such as asphalt paving, drainage improvements, and the construction of retaining walls, with an estimated cost range of $25 million to $35 million. This initiative is vital for enhancing visitor access and ensuring the safety and sustainability of the park's infrastructure, particularly in an environmentally sensitive area. Interested contractors must submit their bids by 2:00 p.m. local time on November 6, 2024, and are encouraged to attend a pre-bid meeting on October 8, 2024, for further project insights. For inquiries, contact Jorey Deml or Ryan Phillips at cflacquisitions@dot.gov.
    ND FTFW WHHI 10(5) WHITE HORSE HILL NGP AUTO TOUR ROUTE
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the improvement of the Auto Tour Route at the White Horse Hill National Game Preserve in North Dakota. The project aims to enhance visitor access, safety, and overall experience by rehabilitating approximately 1.5 miles of roadway, which includes crack filling, asphalt patching, chip sealing, and pavement marking. This initiative is crucial for maintaining the infrastructure of the preserve, ensuring compliance with federal specifications, and promoting environmental considerations. Interested bidders must submit proposals by December 5, 2024, with an estimated project cost ranging between $700,000 and $2,000,000. For further inquiries, contact Jorey Deml at CFLAcquisitions@dot.gov.
    WY NPS GRTE 2020(1), Moose Wilson Road Phase 2
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Moose Wilson Road Phase 2 project located in Grand Teton National Park, Wyoming. This project involves the reconstruction and realignment of approximately 1.386 miles of roadway, including the installation of Aquatic Organism Passage culverts and the development of new parking areas, aimed at enhancing access and safety within the park's sensitive ecological environment. The procurement is critical for improving infrastructure while adhering to federal standards and environmental regulations, ensuring the preservation of natural resources during construction. Interested contractors must submit written bids by the specified deadline, and for further inquiries, they can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520.
    NM NP MULTI PMS(1), Pavement Preservation New Mexico
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is issuing a Request for Proposals (RFP) for the NM NP MULTI PMS(1) Pavement Preservation Project in New Mexico. This project aims to enhance and preserve roadways and parking areas across multiple national park sites, including Carlsbad Caverns National Park and White Sands National Park, through various techniques such as crack sealing, patching, chip sealing, and micro-surfacing over a total length of 33.49 miles. The initiative underscores the federal government's commitment to maintaining infrastructure in protected areas while ensuring compliance with construction standards and enhancing visitor experiences. Interested vendors should contact the Contracts G. Office at contracts@mail.wfl.fhwa.dot.gov or call 360-619-7520, with an estimated project cost between $5 million and $10 million and a tentative completion date set for Winter 2025.
    OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 and WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the OR FS ERFO 2020(1)-14(1) and WA ERFO FS UMATL614 2020-1(1) projects, which involve extensive repairs in the Walla Walla South and North Umatilla areas. The scope of work includes excavation, grading, aggregate surfacing, drainage improvements, and stream bank stabilization, aimed at enhancing the resilience and safety of critical infrastructure in the Umatilla National Forest. With an estimated project cost between $5 and $10 million and a tentative completion date set for spring/summer 2027, interested bidders are encouraged to prepare for the solicitation process, which will be formally announced in early 2024. For further inquiries, potential contractors can contact the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    UT FLAP SLA 10(1) Mill Creek Canyon Road
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the reconstruction and widening of Mill Creek Canyon Road in Salt Lake County, Utah, under project number UT FLAP SLA 10(1). The project aims to enhance safety and access to recreational sites within the Uinta-Wasatch-Cache National Forest, involving significant construction activities such as road widening, drainage improvements, and the installation of parking area facilities. This initiative is crucial for improving infrastructure while protecting local water and wildlife resources, with an estimated project cost ranging from $20 million to $30 million. Interested contractors must submit their bids by November 5, 2024, and can direct inquiries to Kelly Palmer at cflacquisitions@dot.gov or Leslie Karsten at CflContracts@dot.gov.
    Gulf Intracoastal Waterway, Texas, Placement Area No. 118-A Improvements, Dike Repair and Shoreline Erosion Protection in Calhoun County, Texas. (Previously W912HY23B0004)
    Active
    Dept Of Defense
    Presolicitation DEPT OF DEFENSE is seeking a contract for the Gulf Intracoastal Waterway, Texas, Placement Area No. 118-A Improvements, Dike Repair and Shoreline Erosion Protection in Calhoun County, Texas. This project involves the repair and protection of dikes and shoreline erosion in Calhoun County, Texas. The contract requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) prior to responding to the solicitation. The project includes the construction of various structures such as drop outlet structure, access dike, containment dike, training dike, revetment, and breakwater. The completion time for the project is 274 calendar days. The contract will be a firm-fixed price contract with a magnitude between $5,000,000.00 and $10,000,000.00. The solicitation will be issued on or about 10 October 2023, with a response date of 9 November 2023. Contractors must be registered with the Systems for Award Management (SAM) to be eligible for the contract. For more information, contact Ms. Lucille Smith at (409) 766-3845 or Lucille.r.smith@usace.army.mil.
    NM NP MULTI PMS(1), Pavement Preservation New Mexico
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the NM NP MULTI PMS(1) Pavement Preservation project in New Mexico, which involves maintenance work across various national parks and monuments. The project includes tasks such as crack sealing, patching, chip seal application, micro surface treatments, and pavement marking over a total length of 33.49 miles, with an estimated completion date in Winter 2025. This initiative is crucial for maintaining infrastructure and ensuring the safety of public roadways while preserving national heritage sites. Interested vendors can contact the Contracts G. Office at contracts@mail.wfl.fhwa.dot.gov or by phone at 360-619-7520, with the estimated project cost ranging between $5 million and $10 million and anticipated solicitation in Fall 2025.