UT FLAP SLA 10(1) Mill Creek Canyon Road
ID: 6982AF24B000015Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL HIGHWAY ADMINISTRATION6982AF CENTRAL FEDERAL LANDS DIVISILAKEWOOD, CO, 80228, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)
Timeline
    Description

    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the reconstruction and widening of Mill Creek Canyon Road in Salt Lake County, Utah, under project number UT FLAP SLA 10(1). The project aims to enhance safety and access to recreational sites within the Uinta-Wasatch-Cache National Forest, involving significant construction activities such as road widening, drainage improvements, and the installation of parking area facilities. This initiative is crucial for improving infrastructure while protecting local water and wildlife resources, with an estimated project cost ranging from $20 million to $30 million. Interested contractors must submit their bids by November 5, 2024, and can direct inquiries to Kelly Palmer at cflacquisitions@dot.gov or Leslie Karsten at CflContracts@dot.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines the specifications and plans for the Mill Creek Canyon Road reconstruction project in Salt Lake County, Utah, under the federal program UT FLAP SLA 10(1). This project focuses on various construction activities, including road and parking lot reconstruction, installation of new pullouts and roadside parking areas, retaining wall construction, rehabilitation of bridge railings, and drainage improvements over a total length of 4.56 miles. Detailed plans and quantities for each phase of the project are provided, including grading, drainage, paving, and erosion control measures. Key construction details and typical cross-sections are presented to ensure compliance with federal guidelines and standards. The document serves as a comprehensive guide for contractors and stakeholders involved in the project, ensuring clarity on requirements and contributing to safe and efficient completion of the road improvement works. The focus on drainage, traffic control, and environmental considerations reflects the project's commitment to infrastructure enhancement and sustainability.
    The document outlines the specifications for the Mill Creek Canyon Road project (UT FLAP SLA 10(1)), detailing the construction and grading plans necessary for road improvements. It includes measurements, construction limits, and pavement width transitions, ensuring adherence to federal and state regulations. The project addresses earthworks, erosion control, and drainage solutions, incorporating rock armored slopes and catch basins to manage water flow effectively. Key details encompass specific coordinates, construction notes for boulder resetting, and grading specifications with steepness percentages critical for road safety. Additionally, the document advises on vegetation management to preserve significant trees while ensuring road accessibility and environmental compliance. The project's systematic approach illustrates a commitment to enhancing infrastructure while mitigating potential environmental impacts, aligning with governmental objectives of improving local transportation networks. Overall, it serves as a comprehensive guide for contractors involved in the construction phase, ensuring that all aspects of the project are well-coordinated and executed.
    The document outlines the state project UT FLAP SLA 10(1) concerning improvements to Mill Creek Canyon Road, focusing on the construction and renovation of related parking areas. Key aspects include detailed site plans indicating construction limits, specifications for concrete elements like curbs and gutters, accessibility features, and removal instructions for existing structures such as boulders and toilets. The document signifies adherence to federal standards, particularly for accessible parking, ensuring a 2% grade in all directions. Various tables list precise geographical coordinates for layout points critical for project execution, supporting an organized construction approach. This initiative highlights the collaboration between federal and state agencies in enhancing recreational infrastructure in line with environmental considerations and community use.
    The Mill Creek Canyon Road project in Utah, UT FLAP SLA 10(1), involves extensive environmental stabilization and infrastructure improvements, including repair methods such as Class 1 riprap, rolled erosion control products, and check dam installation to prevent soil erosion. Key tasks include repairing rills or gullies, maintaining compact soil, and implementing a dewatering plan to manage site conditions effectively. The design details specify proper installation methods to ensure the effectiveness of erosion controls, including the dimensions, materials needed, and spacing for check dams, tailored to specific slope grades. Additionally, the project outlines the specifications and quantities of various materials, including protective aprons at culvert outlets, as well as a comprehensive schedule outlining the installation of soil nail walls and rockery walls for site stabilization. By utilizing precise measurements and requirements, this plan aims to enhance the roadway's durability and maintain environmental integrity during construction. The document reflects adherence to federal guidelines by the U.S. Department of Transportation's Federal Highway Administration, emphasizing compliance, safety, and ecological responsibility in infrastructure development.
    The Mill Creek Canyon Road Project, part of the Central Federal Lands Highway Division under the U.S. Department of Transportation, involves extensive construction aimed at improving road infrastructure in Salt Lake County, Utah. Key components include the installation of reinforced concrete box culverts and associated structures such as headwalls and wingwalls, in compliance with AASHTO standards and federal specifications. The project emphasizes the use of specific materials, including concrete with varying compressive strengths, and requires meticulous planning for drainage and soil stability, utilizing findings from a geotechnical report. Cost estimates, material specifications, and construction protocols are defined throughout the documentation, highlighting the importance of safety measures and structural integrity in the design of the culverts and associated elements. Additionally, the project incorporates environmental considerations, such as stream simulation materials, and requires careful coordination with preservation efforts for historic components. This initiative illustrates a commitment to enhancing transportation safety and efficiency while adhering to federal guidelines and ensuring environmental protection.
    The document titled "Paint" pertains to a government Request for Proposals (RFP), focusing on the procurement of paint supplies and services for various federal, state, and local projects. The primary objective is to solicit bids from vendors capable of providing a range of painting products and services, ensuring adherence to regulations concerning safety, quality, and environmental standards. Key points include specific requirements for types of paint, application techniques, and commitment to using low-VOC or eco-friendly solutions. Additionally, the document outlines delivery timelines, pricing structures, and the necessary qualifications and certifications vendors must possess. The process will involve a competitive evaluation of submitted proposals based on merit, anticipated outcomes, and cost-effectiveness. This RFP is part of broader efforts to maintain government facilities while striving for sustainability and compliance with current environmental policies, reflecting the government’s focus on efficient resource management.
    The document outlines utility trench details for the Mill Creek Canyon Road project in Utah, part of federal transportation initiatives. It specifies trench dimensions, conduit types, and installation requirements for both telecommunications and power systems. Key points include the necessity of a minimum conduit separation of 12 inches from other utilities, adequate bedding and backfill material, and the requirement for contractor-furnished designs for electrical installations. The document also emphasizes the importance of properly installing pull boxes, maintaining specific guidelines for depth and access, and ensuring the use of waterproof materials to prevent moisture and rodent intrusion. The purpose of these specifications is to ensure efficient installation while adhering to safety and regulatory standards for infrastructure projects, reflecting the government's commitment to maintaining operational integrity and service reliability in public utility systems. These details are critical for contractors participating in federal and state RFP processes, ensuring they can meet required project specifications.
    The document appears to be part of a collection of federal and state proposals for funding and projects, likely related to public services. It outlines the process of seeking support through RFPs (Requests for Proposals) and federal grants for local initiatives aimed at addressing community needs. Key components include eligibility criteria for applicants, the required documentation, timelines for submission, and evaluation metrics that determine funding allocation. Compared to previous iterations, updates may reflect changes in federal priorities or community-focused programs. It emphasizes collaboration among regional stakeholders and aligns with governmental efforts to enhance local capacity through financial support. The overall goal is to foster improved service delivery through strategic investments in local projects while ensuring compliance with federal guidelines and standards. The summary encapsulates critical details necessary for potential applicants seeking federal or state funding opportunities to support their initiatives.
    The Invitation for Bid (IFB) document outlines the solicitation process for the Mill Creek Canyon Road project, located in the Uinta-Wasatch-Cache National Forest, Utah, under federal highway jurisdiction. This project encompasses approximately 4.56 miles of road reconstruction, including improvements to parking lots, pullouts, retaining walls, bridge railing rehabilitation, and drainage enhancements. The project is funded and overseen by the U.S. Department of Transportation's Federal Highway Administration's Central Federal Lands Highway Division. Bids must be submitted in hard copy by November 5, 2024, with detailed requirements for documentation, bid security, and compliance with federal construction wage rate standards. Notable elements include a pre-bid meeting on October 8, 2024, which, while recommended, is not mandatory for bidders. The contract stipulates provisions for small business participation and requires adherence to federal regulations regarding materials and subcontracting plans, emphasizing the use of small, disadvantaged, and veteran-owned businesses. The price range for the project is estimated between $20 million and $30 million, reflecting the scale and scope of the planned improvements and ongoing commitments to safety and environmental standards throughout the construction phase.
    The Federal Highway Administration has announced a presolicitation contract opportunity for the reconstruction and widening of Mill Creek Canyon Road in Salt Lake County, Utah. This project aims to improve safety and access to recreational areas within the Uinta-Wasatch-Cache National Forest while protecting local water and wildlife resources. The scope involves various construction activities, including road widening, drainage improvements, parking area enhancements, and infrastructure for future utilities. The project is expected to begin advertising in September 2024, with an anticipated contract award in October 2024 and completion by October 2026. A non-mandatory pre-bid site visit is scheduled for October 8, 2024, to provide interested vendors with further project insights. The estimated project cost ranges from $20 million to $30 million and is part of a full and open competition process. Interested parties are encouraged to contact designated representatives for more information.
    The document outlines the amendment A001 to solicitation number 6982AF24B000015 for a roadway construction project, specifically addressing modifications to the original bid documents for the Mill Creek Canyon Road project (UT FLAP SLA 10(1)). Key changes include extended deadlines for submitting offers and detailed updates to various project plans, including revisions to pay item quantities and descriptions related to construction and environmental control measures. The amendment specifies changes in material sourcing, traffic accommodation during construction, and restoration efforts for construction areas. Contractors must acknowledge receipt of this amendment by the specified deadline to avoid rejection of their bids. The document emphasizes compliance with federal regulations, quality standards, and contractor responsibilities concerning material sourcing, environmental impact, and public access during the project. These modifications reflect the government's commitment to proper administration of federal projects while ensuring transparency and adherence to regulatory requirements.
    This document outlines Amendment A002 to the solicitation for the Mill Creek Canyon Road project (UT FLAP SLA 10(1)) administered by the Federal Highway Administration. It specifies that offers must acknowledge receipt of this amendment by a defined deadline to avoid rejection. The amendment modifies several project documents, including the Invitation for Bids (IFB) and plan sheets, replacing specific pages and adding new ones. It emphasizes adherence to various Federal Acquisition Regulation (FAR) provisions regarding contractor compliance, bid guarantees, and performance expectations, particularly in the context of construction wage rates, equal opportunity employment, and public transparency regarding greenhouse gas emissions. The document also includes notices for participation requirements, specifying the need for a contractor performance evaluation via the Contractor Performance Assessment Reporting System (CPARS). Key provisions discuss compliance with environmental standards and labor laws, detailing contractor responsibilities for various aspects of project execution. Overall, the amendment ensures clarity in contractual obligations, compliance requirements, and project execution standards within the context of federal construction contracting processes.
    The Horizontal Alignment Review Report details the alignment specifications for the project "2D Design SurvFt," particularly focusing on Alignment BL94. The report provides an extensive breakdown of the horizontal alignment components, with all measurements recorded in feet, detailing the linear and circular elements of the alignment. This includes critical data points such as station locations, northing, easting, tangential directions, lengths, radii, curvature, and various directional orientations essential for construction and engineering assessments. The report is structured sequentially, with each alignment segment marked and analyzed for angles, lengths, and directional changes. This document serves as a vital reference for project stakeholders, ensuring adherence to engineering standards and protocols in response to government RFPs and funding requirements. Its meticulous detail underscores the importance of precise alignment calculations in infrastructure projects, ultimately contributing to the project's safety, functionality, and regulatory compliance.
    The Horizontal Alignment Review Report presents detailed data on the horizontal alignments of a specific project named "2D Design SurvFt." It meticulously outlines the alignment named BL94, detailing a series of linear and circular elements with their respective coordinates, radii, and tangential directions, primarily expressed in feet. The document provides comprehensive specifications for various elements along the alignment, including lengths, degrees of curvature, and various radial and tangential directions crucial for transportation infrastructure planning. The report emphasizes precise measurements and mathematical calculations to ensure proper implementation of engineering standards. This review is significant in the context of government RFPs and grants, as adherence to such detailed specifications is critical for compliance, accuracy in construction, and successful project funding. By documenting these specifications, the report supports transparency and ensures that relevant stakeholders can effectively follow and evaluate the project's progress, aligning with regulatory requirements and best practices in civil engineering and public works.
    The Horizontal Alignment Review Report, created on August 28, 2024, details the specifications for the alignment of a project titled "2D Design SurvFt." The report includes extensive measurements and parameters for various linear and circular elements constituting the alignment named "Rev2_WGtoEF." Each segment is systematically outlined with critical data: Northing, Easting, tangential directions, lengths, radius, delta angles, and curvature measures. The overall document serves to assess and document the geometric properties of a roadway or infrastructure project, ensuring compliance with engineering standards for horizontal alignments. The meticulous data presented underscores important design considerations crucial for road construction and maintenance, reflecting the diligence required in federal or local government projects. This report is essential for evaluating the alignment's impact on safety, accessibility, and operational efficiency, thereby aligning with the objectives outlined in government RFPs and grants focused on infrastructural development and enhancement.
    The Horizontal Alignment Review Report, created on August 28, 2024, evaluates the design for the 2D Design SurvFt project, focusing on the horizontal alignment named WG BL. The report includes detailed measurements and parameters for various linear and circular elements within the alignment, specifying coordinates, tangents, and radii. Key findings highlight multiple linear sections and circular curves, providing their respective lengths, directions, and curvature details, crucial for roadway construction and engineering. For instance, the report details circular elements with radii of 400 feet and 24 feet, as well as unique tangential directions critical for navigation and safety. This comprehensive analysis ensures adherence to design standards for safe transportation infrastructure. The document underscores the importance of thorough alignment reviews in federal, state, and local procurement processes, reflecting the government's commitment to infrastructure integrity. Ultimately, the report serves as a critical reference to align engineering practices with regulatory requirements, facilitating informed decision-making in transportation projects.
    The Horizontal Alignment Review Report details the design and spatial parameters of the "WG BL" alignment for the project "2D Design SurvFt," created on August 28, 2024. The report outlines various linear and circular elements of the alignment, providing extensive data including coordinates, tangential directions, lengths, and radii for each segment. Notably, it describes the transition points, curves, and tangential properties essential for understanding horizontal alignment in engineering contexts. The document serves as a technical assessment necessary for planning and executing aligned road or pathway projects, ensuring adherence to design standards and measurements. This information is vital for state and local government agencies aiming to comply with regulations in infrastructure development, particularly in response to RFPs for public works projects. A significant focus lies in ensuring safety, efficiency, and structural integrity throughout the planning and implementation phases.
    The provided document outlines survey data related to the Mill Creek Canyon Road project, detailing point coordinates (Northing, Easting, and Elevation) for various stations and features. The report includes a series of points marked with identifiers (e.g., W01, P001, C014) and their corresponding spatial measurements, primarily measured in feet. Notably, a baseline alignment (BL94) is established as of August 28, 2024. The file serves as a layout reference, essential for civil engineering and geological assessments, aiding in planning, construction, and environmental analysis. The meticulous recording of point locations underlines the document's role in facilitating compliance with federal and state regulations necessary for infrastructure projects. Data accuracy is critical, as it aligns with standards expected in government RFPs and grants focused on public works and local development initiatives.
    The document presents a detailed layout of points related to a civil engineering project focused on Mill Creek Canyon Road, including geospatial data pertaining to various survey points referenced by station and offset values. The report—which was last revised on August 28, 2024—contains information on Northing, Easting, and Elevation measurements, all recorded in feet. The coordinates pertain to both existing features and proposed points for construction, with a mix of designations including "W" for water-related features and "C" for construction-related points. The comprehensive data aims to guide the execution of construction activities in alignment with specified project requirements and local regulatory standards. These measurements and detailed point locations are critical for accurate project planning, ensuring efficient implementation and compliance with engineering and safety protocols throughout the construction process. The overall purpose is to support ongoing construction and infrastructure development efforts through accurate geospatial documentation.
    The government file provides detailed surveying data for the Mill Creek Canyon Road project, dated August 28, 2024. It contains measurements of various points, including station offsets, northing, easting, and elevation details, facilitating the planning and development phase of the project. Specific design points labeled P01 to P22 and W01 to W10 indicate key survey locations along the proposed alignment, essential for project accuracy in layout design. The report confirms that all units of measurement are in feet and emphasizes the meticulous nature of infrastructure planning required for such projects. This structured data assists in meeting the technical specifications outlined in federal and local RFPs and grants, ensuring compliance and precision in construction tasks. The document serves as a critical resource for engineers and project managers, laying the foundational groundwork for effective road development and alignment adjustments in this region.
    The document provides detailed spatial data regarding the Baseline Alignment for the Mill Creek Canyon Road project, specifically focusing on layout points and their respective coordinates. It records Northing, Easting, and Elevation measurements for various stations along the alignment, formatted in feet. The report, generated on August 28, 2024, consists of multiple interrelated data points labeled from C01 to C32, detailing their respective positions and offsets from a baseline reference. The measurements aim to assist in infrastructure planning within the project's framework, potentially informing future federal or state RFPs and grants. The well-structured data indicates the project's development phase, aiming for precision in engineering and architectural planning for road improvements. This aligns with governmental objectives of ensuring accurate planning and resource allocation in public works projects.
    The document presents precise geospatial data for the Mill Creek Canyon Road project, detailing station offsets, northing, easting, and elevation points as per a two-dimensional design survey. It includes a list of coordinates marked as C01 through C24, with corresponding measurements for each point. All values, reported in feet, indicate the project's baseline alignment and the necessary layout points for design purposes. The report was created on August 28, 2024, suggesting its recent application in the context of the ongoing project. This structured data serves essential functions in government RFPs, alongside federal and state grant applications, facilitating the planning and execution of civil engineering projects. The detailed measurements indicate the project's scope and compliance with federal standards, thereby aiding in resource allocation and project management. Overall, the data is crucial for engineers and planners involved in the Mill Creek Canyon Road project, emphasizing accuracy in project specifications and alignment.
    This document presents spatial data related to a construction or infrastructure project, specifically detailing the alignment and layout points for a sidewalk. It includes a table of coordinates representing various points, including their station offsets and elevations. The project report, created on August 28, 2024, lists measurement data for several points identified as "P" for points, "C" for curves, and "W" for waterways, all in feet unless otherwise noted. The data is organized in a structured manner, indicating baseline alignment for the sidewalk, captured using a 2D design format. The file is aimed at guiding construction processes by providing geographical references critical for planning and execution. This conforming to state and federal requirements, reflects the commitment to precise data handling in public infrastructure projects, supporting the government's objective of maintaining a high standard of urban planning and development.
    The document outlines the alignment data for the Mill Creek Canyon Road project, detailing various survey points with specific northing, easting, and elevation measurements. Each point is identified by a unique designation (e.g., P001, P002) along with corresponding coordinate details indicating their position in feet. The report highlights baseline alignment as "WG BL," with a report creation date of August 28, 2024. The primary goal of this document appears to serve as a comprehensive reference for contractors and project managers regarding the geographical framework of the road's construction. The systematic organization of points allows for accurate mapping and planning. Additionally, the data supports the federal and local government’s objectives in infrastructure development by facilitating project alignment, ensuring adherence to safety standards, and aiding in compliance with environmental regulations. Overall, the document encapsulates the essential surveying information needed for effective execution and oversight of the Mill Creek Canyon Road project.
    The document presents a detailed report on survey data related to the "2D Design SurvFt" project, focused on an alignment identified as BL94. It includes various station offsets in both northing and easting coordinates, crucial for alignment and potential clearing needs. The report provides a comprehensive table that lists offsets and coordinates for multiple stations, with measurements in feet. These data points are vital for mapping and planning purposes in construction or land development projects. The purpose of the report seems aligned with governmental objectives, likely serving as a preliminary assessment for future RFPs or grant applications for infrastructure improvements. The accuracy of this survey data will support further planning and execution of projects aimed at public safety, compliance with regulatory standards, and efficient land use. In essence, this document serves as a foundational analysis for stakeholders, guiding decision-making processes for subsequent local or federal projects based on the mapped coordinates and offsets, ensuring that any future development aligns with regulatory and civil engineering needs.
    The document presents a comprehensive report detailing survey data related to Baseline and Offset alignments for a proposed clearing project (BL94). It captures an extensive array of station points with corresponding Northing and Easting measurements, including offsets for both the left and right sides of the alignment. The data is presented in a structured format, with locations spanning various station numbers from 10000 to 25875. The report emphasizes the importance of accurate positioning in maintaining compliance with project specifications and safety requirements. All measurements are in feet, and the report was created on August 28, 2024, reflecting the ongoing efforts in preparation for the construction phase. This technical documentation supports the objectives outlined in government RFPs and grants, emphasizing environmental management and construction compliance within the project scope.
    The document presents a detailed report on a project titled "2D Design SurvFt," focusing on a clearing report related to a construction alignment in an area designated as Rev2_WGtoEF. It includes extensive data on station offsets, northing, and easting coordinates collected on August 28, 2024. The project aims to analyze the baseline and offset alignments for proposed clearings, detailing specific point names, their corresponding station values, and geographic coordinates. Notably, the measurements reflect various offsets associated with both proposed clearing left and right of the alignment, indicating an emphasis on the spatial arrangement necessary for site preparation. This meticulous cataloging of spatial data serves as a critical element for government requests for proposals (RFPs), grants, and related projects as it informs stakeholders of precise site conditions and planning requirements. The thorough nature of the report underscores the importance of accurate surveying in ensuring compliance with governmental regulations and facilitating effective project planning for infrastructure projects.
    The document is a comprehensive report detailing the data from a clearing project as part of a government Request for Proposals (RFP). It provides significant measurements and coordinates relevant to baseline and offset alignments. The report includes station data ranging from 975 to 8525, focusing on offset alignments for both left and right segments of a specific project, along with their respective Northing and Easting coordinates. The purpose of this detailed report is to assist in the planning and execution phase of the project while ensuring compliance with regulations. Data entries denote positional references essential for project analysis and include clearance measurements that indicate the extent of required clearing activities. By systematically detailing the various stations and corresponding offsets, the report underscores the engineering and logistical considerations vital for effective land management and project execution. This structured information supports state and local grant applications while facilitating easier navigation through the federal RFP processes.
    The document presents a clearing report for a project titled "2D Design SurvFt," created on August 28, 2024. It includes data on alignments at specific stations, detailing both offset alignments for proposed clearing to the left and right of a baseline alignment labeled "WG BL." The report provides precise measurements in feet for various points, including offset, Northing, and Easting coordinates for each station from 275 to 1000 feet, documenting variances in alignment offset. Significant variations are noted in the offsets for both sides of the baseline alignment, indicating potential considerations for land management or construction activities linked to federal or state RFPs. This report outlines essential technical information crucial for evaluating conditions and planning actions related to land clearing and engineering projects, adhering to planning guidelines typical in federal and state project proposals. The structured data allows authorities and stakeholders to gauge the extent of proposed land alterations and identify the implications for environmental and infrastructural planning. This report is critical for compliance assessments and funding applications related to land improvement projects.
    The report outlines the station offset, northing, and easting details for a clearing project aligned with the WG BL Baseline. It documents precise spatial coordinates (northing and easting) for various station points, detailing offsets measured primarily in feet. The data covers a range of stations from 275 to 1000 with corresponding offset values indicating deviations from the baseline alignment. The report was generated on August 28, 2024, highlighting crucial geographical references essential for project execution, development, or assessment. This document serves a fundamental purpose within the context of federal and state project proposals (RFPs) by providing detailed geometric and positional information necessary for logistics, land-use planning, or compliance with surveying standards. The methodical structuring of the report facilitates understanding of positional deviations vital for infrastructure development or environmental assessments, ensuring adherence to regulatory requirements in any ensuing project work. Overall, the document emphasizes accuracy and precision in data essential for strategic planning and execution in accordance with governmental directives.
    The document presents a detailed cross-section gradebook report for a pavement project, focusing on various layers of pavement, their elevations, offsets, northing and easting coordinates, existing ground levels, and slope changes. It analyzes the Pavt_ETW_Layer1_L and Pavt_EOP_Layer1_L features with precise numeric data, including multiple stations along the alignment, each providing specific measurements that reflect the construction plan's specifications. Key points include consistent tracking of pavement elevation changes, offsets from centerline, and slope adjustments at various stations, crucial for ensuring adherence to engineering standards and maintenance practices. This structured approach aids in evaluating terrain, determining material requirements, and establishing safety protocols across the project site. The report underscores the systematic collection of geographic data necessary for the accurate execution of the road infrastructure project and highlights the attention given to maintaining compliance with federal and local regulations as part of the RFP process. Understanding such detailed documentation is vital for stakeholders, including engineers, contractors, and government agencies involved in project oversight and funding decisions.
    The document outlines a Cross Section Gradebook that records detailed measurements, including elevations, slopes, offsets, and existing ground data for road or pavement constructions in the specified coordinates. It lists features such as Pavt_EOP_Layer1_L, along with relevant Northing and Easting values organized in a structured format by station numbers. The report includes elevation data with corresponding slopes, showcasing varied ground conditions. It was created on August 28, 2024, emphasizing precise construction parameters essential for compliance with federal and local engineering standards. This document serves as a crucial technical resource for monitoring and managing road infrastructure projects, facilitating grant applications or proposals aligned with government RFPs for engineering and construction services. The adherence to specified measurements is vital for ensuring design accuracy, construction quality, and safety compliance in public works projects. Overall, it is a meticulous record integral to project development within the context of government-funded initiatives.
    The document presents a detailed cross-sectional gradebook containing comprehensive data on a roadway construction project, with specific emphasis on Pavement End-Of-Path (Pavt_EOP_Layer1_L) attributes at various stations. It outlines critical parameters such as offsets, elevations, and slopes associated with differing Northing and Easting coordinates, reflecting the terrain's characteristics and required construction metrics. The report systematically documents numerous data points, each indicating the existing ground levels, elevations of specified features, and adjacent slopes over multiple stations. The data generated on August 28, 2024, showcases the meticulous attention required in roadway design, particularly when considering differing slopes and elevation adjustments necessary for construction compliance and safety. Such reports are typically integral to federal and state-funded infrastructure projects, notably when preparing RFPs or federal grants, as they provide the foundational data required for informed decision-making and effective project planning. The thorough collection and presentation of this data underscore the importance of precise grading and structural planning in civil engineering, which ultimately supports the successful execution of government construction initiatives.
    The document presents a detailed cross-section gradebook that outlines pavement layer data, specifically focusing on the Pavt_EOP_Layer1_L and Pavt_ETW_Layer1_L features. It includes critical measurements such as elevation, offsets, and coordinates (Northing, Easting) at various stations throughout the site. The data covers existing ground elevations, slopes, and offsets needed for proper construction and assessment in a potential infrastructure project. The report serves as a technical guide for engineers and planners by providing precise geographical and structural references essential for roadway or civil engineering projects. It emphasizes the need for detailed evaluation of elevation changes and slopes to ensure optimal engineering practices and compliance with relevant regulations. By systematically cataloging this data, the document aids in assessing site conditions that will influence design decisions, construction methodologies, and cost estimates associated with federal or state RFPs for infrastructure development. The scientific accuracy of the measurements suggests a commitment to engineering standards and quality in project planning.
    The document details extensive topographical data regarding various features from a construction or excavation project. It presents elevation measurements, existing ground levels, offsets, and slopes for several identified features, such as ditches, slopes, and pavement layers. Each feature is meticulously recorded with corresponding northing and easting coordinates, and the slopes indicate angular gradients for excavation or construction purposes. The information is structured in a tabular format, transitioning through multiple sections such as Slope_Stake_Cut and Ditch_Bot, demonstrating a comprehensive survey methodology. This data serves multiple purposes including site assessments, ensuring compliance with grading regulations, and facilitating precise construction planning. Ultimately, this document is integral to government RFPs and local grants as it informs stakeholders about environmental considerations and technical specifications necessary for project implementation, ensuring that engineering efforts adhere to regulatory standards for safe infrastructure development.
    The document presents a cross-section gradebook report detailing Northing and Easting coordinates for various layers in pavement infrastructure, along with their elevations and slopes. Key features include Pavt_EOP_Layer1_L, Pavt_ETW_Layer1_L, and Pavt_CL_Layer1, each defined by specific offsets, existing ground measurements, and slope values. Data entries cover a spectrum of station points, providing precise geographical and structural information necessary for road and pavement assessments. The formatting includes systematic elevation readings and slope values, critical for understanding ground contours and drainage planning. The report emphasizes engineering aspects vital for ensuring compliance with construction standards and effective project execution. Overall, its purpose aligns with government infrastructure improvement initiatives, supporting requirements for RFPs and grants pertinent to state and local projects.
    The document titled "Cross Section Gradebook with Northing" provides comprehensive data regarding the elevation, slope, and coordinates of specific construction features along a designated alignment. It primarily focuses on "Pavt_EOP_Layer1_L," detailing various stations with corresponding northing, easting, ground elevation, offsets, and slopes. Each entry presents a systematic approach to recording grades and related geometrical data vital for construction and engineering projects, typically associated with federal and state infrastructure development. The report includes multiple data points, illustrating changes in slope and elevation at specified intervals, with elevations varying from 6109.854 to over 6255.622 feet. The detailed coordinates (northing and easting) support precise location identification essential for construction planning and execution. The report is structured to facilitate project management and regulatory compliance, emphasizing the importance of accurate topographical assessment in infrastructure projects. This analysis aligns with the context of government requests for proposals (RFPs) and grants for construction projects, underscoring the significance of thorough documentation in project development, safety assurance, and regulatory compliance. The systematic presentation of data aids stakeholders in making informed decisions regarding engineering and construction practices.
    The document outlines a comprehensive cross-section gradebook, detailing the elevation, northing, easting, existing ground, and slope information for pavement and edge-of-pavement features at various station intervals. The data included is systematically organized, providing precise measurements that aid in evaluating roadway characteristics. The report indicates specific coordinates relevant to civil engineering projects, which could facilitate infrastructure planning, maintenance assessments, or construction activities. Each entry generally comprises the structural layer, offset from the centerline, and a recorded slope, indicating ground inclines or declines. This detailed topographical data is essential for understanding site conditions, informing project development and ensuring compliance with engineering standards. The meticulous recording of elevation changes and geographical positioning highlights the document's role in contributing to effective government RFPs and grants focused on infrastructure improvement and urban development projects.
    The document presents a detailed cross-section gradebook report for a construction project in the Lower Canyon area, focusing on various pavement layers including Pavt_EOP_Layer1_L and Pavt_ETW_Layer1_L. It includes specific metrics such as elevation, northing, easting, existing ground levels, slope, and offset measurements taken at multiple stations along the project alignment. The report indicates consistent elevations and slopes across sections, critical for ensuring structural integrity and drainage efficiency. Measurements show slight variations in offsets and elevations, crucial for the design and construction phases. The report serves as a technical resource in compliance with federal and state guidelines for civil engineering projects, ensuring adherence to safety and structural specifications essential in the context of government-funded construction initiatives.
    The document outlines the design specifications for various cross-sections along Mill Creek Canyon Road as part of the UT FLAP SLA 10(1) project, a federal initiative managed by the Federal Highway Administration (FHWA) for maintaining and improving roadway infrastructure. It includes detailed cross-sectional data from multiple locations, including Elbow Fork to Big Water and Winter Gate Road, highlighting design grades, subgrades, and original ground levels across several stations (e.g., 2+66.60, 3+00.00). Each section provides elevations, slope ratios, and grading details, which are critical for engineering and construction purposes. The objective is to ensure proper drainage and structural integrity of the roadway, adhering to federal regulations and standards. This documentation is essential for state and local agencies to follow when evaluating bids for further enhancements and complying with grant requirements for transportation infrastructure improvement. The strategic outline promotes safety and maintains environmental considerations in the planning and execution of the roadway project.
    The Final Hydraulics Report for Mill Creek Canyon Road, prepared by HDR for the Federal Highway Administration, outlines hydrologic and hydraulic analyses essential for roadway and drainage improvements. The project encompasses 4.5 miles from the Winter Gate to the Big Water Trailhead in Salt Lake County, Utah, aiming to enhance safety, access to recreation, and protection of water and wildlife resources. The report details the project’s design criteria, data collection, site investigations, permitting needs, and environmental assessments, including impacts on wetlands and aquatic organism passage. Key components include hydrology evaluations for both minor and major drainage basins, the design of channel structures like the replacement of the White Bridge and construction of culverts at Elbow Fork. The report emphasizes stormwater management strategies, detailing proposed drainage improvements, which aim to mitigate erosion and improve water quality through best management practices. Additionally, the hydraulic performance of proposed structures was modeled to ensure compliance with FEMA regulations, including no significant rise in water surface elevation in floodplain areas. Overall, the document serves as a comprehensive blueprint for infrastructural improvements while adhering to safety and environmental standards.
    The "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects" (FP-14) serves as a binding framework for constructing roads and bridges directly managed by the Federal Highway Administration. Issued in 2014, the document incorporates both U.S. Customary and Metric units and specifies the relationship between contractors and the government, referencing the Federal Acquisition Regulation (FAR) and Transportation Acquisition Regulation (TAR) for compliance. It outlines detailed processes for bidding, contract execution, and management of construction work. The document is divided into various sections, including general requirements, project requirements, earthwork, asphalt pavements, bridge construction, and material specifications, each denoting specific roles, responsibilities, and protocols. Notably, it emphasizes the importance of work quality, safety standards, and the achievement of project milestones. Adherence to these specifications ensures that federal projects maintain consistent quality and meet regulatory standards, ultimately supporting infrastructure development within the framework of federal and state RFPs and grants. This comprehensive guide is essential for contractors engaged in highway projects funded through federal sources.
    The document provides a detailed grading summary related to roadway excavation and embankment for various locations such as Mill Creek Canyon Road and the Big Water Trailhead Parking Area. It outlines quantities in bank cubic yards (BCY) and compacted cubic yards (CCY), noting the relationships between total excavation available for fills, waste, and necessary backfill materials. The report specifies that the quantities reflect prismodial volumes and emphasizes the importance of conserving topsoil during excavation. It indicates that while total excavations have been calculated using a shrink/swell factor (assumed at 0.9), the contractor must determine actual factors and is responsible for ensuring compliance with specifications. The summary affirms that payment will be based on actual quantities of work performed, and the described excavation includes the removal of existing asphalt, which can be repurposed. Overall, this document serves as a guideline for contractors regarding excavation and embankment requirements for upcoming road projects within governmental RFP processes, ensuring adherence to specified guidelines and effective resource management.
    The Pavement Report outlines the geotechnical exploration and recommendations for the Upper Mill Creek Canyon Road Improvements project in Salt Lake County, Utah. Conducted by Terracon Consultants, this report details findings related to subsurface soil conditions, earthwork, and pavement section thickness over a 4.5-mile stretch of roadway. The report identifies existing asphalt pavement conditions, assesses potential frost susceptibility of the subgrade, and provides guidelines for earthwork preparation, grading, and material compaction. Key findings indicate varying subgrade compositions like silty sand and gravel, with some areas exhibiting fill materials. A pavement condition assessment revealed some sections are in good condition, while others show significant distress, necessitating structural repairs. Recommendations include maintaining effective drainage during construction to mitigate instability, as well as optimal pavement section thicknesses for expected traffic loading. This report serves as a critical resource for the project by ensuring compliance with federal standards and providing a framework for efficient reconstruction efforts, thus enhancing safety and access to national forest lands while preserving the natural environment.
    The solicitation #6982AF24B000015 outlines a pre-bid notice for the Mill Creek Canyon Road project, characterized by full and open competition with a HUBZone price preference. Bids must be submitted by November 5, 2024, with technical inquiries due by October 24, 2024. The contractor's responsibilities include kiosk installation for the Forest Service and adherence to various environmental guidelines, such as restoration of riparian areas and precautions regarding sensitive plant species. Important construction restrictions include no work between May 1 and July 15 to protect fish habitats, and ensuring winter recreation access from December 15 to March 15. The contractor will also manage the demolition of existing facilities, such as vault toilets, and is advised to conserve and utilize topsoil correctly. The completion deadline for the project is set for October 29, 2026, with significant penalties for delays. Overall, the document emphasizes compliance with detailed regulatory requirements and permits, aiming to enhance the area's infrastructure while protecting the natural environment.
    The document outlines the details for a pre-bid site visit related to the federal project 6982AF24B000015 UT FLAP SLA 10(1) Mill Creek Canyon Road, scheduled for October 8, 2024, at 9:00 am. It lists participating companies and their representative attendees, providing names and email addresses for various construction and evaluation firms. Key firms involved include Guardian C.M., QC Testing, Ralph L. Wadsworth, and Granite Construction, among others. The document is structured primarily as a contact list for companies planning to submit bids. The purpose of the pre-bid visit is to allow prospective contractors the opportunity to assess project specifications and conditions on-site, which is crucial for informed bidding in response to federal and state/local funding opportunities. This process aligns with standard practices in the context of government RFPs and grant procedures, ensuring transparency and competition among bidders while facilitating project planning.
    The document outlines a series of questions and answers related to the Mill Creek Canyon Road project (UT FLAP SLA 10(1)), addressing contractor inquiries about excavation, material usage, and project requirements. Key topics include the incompleteness of digital files concerning ground grades, the contractor's responsibilities for vault toilet removal, and specifications for using asphalt millings as aggregate base. The document clarifies that vault toilets will not be salvaged, emphasizes specific conduit installation requirements, and discusses the conditions regarding culvert load ratings. It further details the management of temporary roadway surfaces, embankment types, and waste material disposal at designated staging areas. Specific amendments and plan sheets are referenced for additional guidance on these matters. Overall, this FAQ aims to ensure clarity in contractor expectations and project compliance, streamlining the pre-bid process for potential bidders.
    The document contains a compilation of questions and answers related to the Mill Creek Canyon Road project, as part of a federal Request for Proposal (RFP). Key topics addressed include construction processes, material specifications, contractor responsibilities, and compliance with federal and state regulations. Significant queries relate to excavation challenges, the status of vault toilets, use of asphalt millings, and contractor equipment requirements. The federal government clarifies various aspects, including the non-mandatory nature of the pre-bid site visit, the prohibition of asphalt millings for aggregate use, and the contractor's obligation to perform specific tasks such as washing all construction equipment. It also provides terms regarding conduit installation and temporary road surface requirements, ensuring contractors understand their limitations and responsibilities throughout the project. The responses illustrate the complexity of the construction guidelines and underscore the government's emphasis on compliance with safety and environmental standards during the execution of the project. The document concludes with the updated bid date, emphasizing the importance of adhering to outlined procedures and timelines. Overall, it serves as an essential reference for potential bidders seeking to ensure their proposals align with project requirements.
    The document pertains to the Mill Creek Canyon Road project (RFP 6982AF24B000015) in Utah, specifically addressing inquiries related to earthwork and excavation takeoffs. A question was submitted on October 3, 2024, regarding incomplete XML files for both the Existing Ground (EG) and Finished Grade surfaces, hindering the ability to extract necessary data for project planning. The response indicates that updated electronic design files and physical data were posted on October 8, 2024, potentially resolving the data import issues. This exchange illustrates the ongoing communication between contractors and project managers to clarify technical difficulties associated with project documentation. Ensuring accurate and complete data is essential for effective project execution and compliance with RFP specifications.
    The document outlines a comprehensive list of items, materials, and services for a government-funded construction project, detailing specifications including types, estimated quantities, and pay item descriptions. The focus is on various construction and engineering tasks such as mobilization, grading, drainage, erosion control, and removal of existing structures. Each line item includes specific unit measurements (e.g., cubic yards, square yards, each) and estimated quantities necessary for project completion. The amendments indicate a detailed review of estimates and modifications necessary before the project initiation. The purpose of this document aligns with Requests for Proposals (RFPs) or federal grants related to public works, emphasizing precision in planning and budgeting for local or state government projects. This serves to ensure compliance with regulations while optimizing resource allocation for public infrastructure development. The structured format allows for a clear understanding of the project's needs and relevant financial estimates, facilitating accurate bidding and execution by contractors. Overall, the document exemplifies the systematic approach required in governmental contracting processes.
    The Superelevation Data Report details the superelevation measurements along the ALI_MAIN_WINTER_GATE_TO_ELBOW_FORK and ALI_MAIN_ELBOW_FORK_TO_BIGWATER roadways. It features lane-specific cross slope information, specifying different types: Normal Crown, Full Super, Reverse Crown, and Level Crown. Each station's measurements include elevation points, the cross slope in feet, and the type of point recorded at designated intervals, ranging from 999.99 to 25845.95. The document is structured hierarchically, organized by segments and lanes, presenting measurements in a tabular format. It encompasses various transitions and maintaining criteria essential for safe roadway design, underscoring the importance of correct superelevation to manage vehicle dynamics and enhance road safety. By documenting these details, the report facilitates engineering decisions for maintenance and improvements, contributing to overall infrastructure management. This report forms part of essential guidelines for federal and state road safety and maintenance projects, thereby aligning with broader government objectives related to transportation infrastructure and public safety. The accuracy and systematic presentation of data are crucial for future analysis, compliance monitoring, and funding applications under potential federal grants or RFPs.
    The document outlines the specifications and identification points for a construction project related to Mill Creek Canyon Road. It includes a detailed listing of various construction elements such as Slope Stake Cuts, Ditches, Pavement layers, and Curb specifications, emphasizing that the points apply to both sides of the roadway. Notably, it discusses the implementation of roadside soil nail walls and rock armored slopes, ensuring that construction is conducted according to the provided plans. Specific report points for staking and subgrade are also mentioned, indicating the critical nature of accurate measurements and assessments. The overall objective of this document is to provide a structured approach to the layout and construction processes necessary for road improvement projects under federal and state guidelines, ensuring compliance with the identified specifications and safety measures by detailing necessary construction components and processes. The document serves as a foundational resource for contractors and engineers engaged in the project, highlighting the importance of following precise plans and accumulation of designated reports for effective project execution.
    The Final Geotechnical Engineering Report for the Upper Mill Creek Canyon Road Improvements outlines the subsurface conditions and recommendations for reconstructing and widening approximately 4.5 miles of roadway in Salt Lake County, Utah. The project aims to enhance safety and preserve natural resources and involves replacing the White Bridge and constructing retaining walls and culverts. Key findings reveal variable soil conditions, primarily consisting of sand, gravel, and cobbles, with encountered bedrock depths ranging from 5 to 25 feet. Recommendations for earthwork include utilizing specialized equipment due to unpredictable geological conditions and managing groundwater through dewatering strategies. Design parameters for structures such as box culverts and retaining walls have been established, emphasizing necessary foundation fill and anticipated settlement. The report also addresses concerns surrounding geologic hazards, including potential landslides and seismic activity. It emphasizes the importance of site monitoring and appropriate drainage measures during construction to ensure stability and compliance with federal specifications. Overall, the report provides critical geotechnical insights essential for the safe and effective planning and execution of the road improvement project, while adhering to regulatory standards and promoting environmental stewardship.
    Terracon Consultants Inc. submitted a pavement report addendum to Mr. Jon Pederson of DJ&A, P.C. regarding the Upper Mill Creek Canyon Road Improvements project in Salt Lake County, Utah. This addendum addresses design changes for the pavement section in the Thousand Springs area, which presents risks due to unstable subgrade conditions and proximity to water levels. Initial pavement recommendations included a design section of asphalt over crushed aggregate; however, concerns arose about possible destabilization during construction. The design team and Central Federal Lands (CFL) considered various alternatives, ultimately agreeing on a 4-inch overlay using a fiberglass grid, incorporating localized repairs for unstable subgrade areas. Recommended actions include removing existing asphalt, placing a properly compacted crushed aggregate base, and proofrolling the subgrade to identify any weak spots. Additional measures such as fabric and geogrid installation below the base course are suggested to offer extra support. The report identifies specific areas for required soft spot repairs based on site observations and underlines the need for careful execution to maintain roadway integrity. This document serves to ensure quality and safety for the pavement project, aligned with federal and state standards for road construction.
    The document relates to a procurement request from the United States Department of Agriculture, Forest Service (USDA-FS) for a specific type of vault toilet to maintain uniformity across installations in the Uinta-Wasatch-Cache National Forest. The requested item, a double occupancy vault toilet (Item 64603-1000), has previously been used by the USDA-FS, emphasizing consistency and ease of maintenance. The justification for opting for a sole source procurement is rooted in the USDA-FS's specific requirements, implicating that no market research was conducted to identify alternative options. Efforts to solicit offers from potential suppliers are documented, and a plan for addressing any competitive barriers has been stated as non-essential in this context. Pricing will be scrutinized to confirm that costs remain fair and reasonable. No other interested parties have emerged, further supporting the rationale for limiting to sole-source products. This document highlights the USDA-FS’s commitment to standardizing its facilities while ensuring cost-effectiveness and operational efficiency in its procurement process.
    The Vertical Alignment Review Report, created on August 28, 2024, assesses the alignment of a proposed project named "2D Design SurvFt." It outlines technical data regarding both horizontal and vertical alignments, detailing various elements including linear segments and symmetrical parabolas. Key measurements feature start and end stations, elevation changes, tangent grades, lengths, and curvature parameters such as radius and middle ordinate values. Overall, the report meticulously documents the elevation changes throughout the alignment, providing critical data necessary for engineering considerations in infrastructure development. This information is significant for compliance with government standards associated with federal RFPs and grants, as it ensures that the proposed designs meet safety, functionality, and regulatory requirements for local and state improvements.
    The Vertical Alignment Review Report, created on August 28, 2024, evaluates the vertical and horizontal alignment of the project designated as "2D Design SurvFt." The report details various sections of the alignment, providing crucial parameters such as station numbers, elevations, tangent grades, and lengths related to linear and symmetrical parabolic elements. Specifically, it addresses key alignment segments, including entrance and exit grades, rates of change, and middle ordinates, presenting an extensive quantitative analysis of the alignment. This document serves a critical role in assessing the engineering specifications and safety compliance for road construction or maintenance projects under government oversight. The intricateness of the data suggests adherence to federal and local standards, ensuring that the alignment conforms to necessary engineering and safety guidelines. As such, this report would likely inform RFPs and grant applications for infrastructure projects, underpinning the importance of precise engineering assessments in the formative stages of public works initiatives.
    The Vertical Alignment Review Report, created on August 28, 2024, outlines the geometric specifications and alignment details for the 2D Design SurvFt project. The report provides comprehensive data on both horizontal and vertical alignment elements, including tangential grades, lengths, elevations, and parabolic elements. Specific numerical values indicate changes in grade, length of tangents, and middle ordinates at various station points throughout the alignment. The analysis follows a structured format with detailed measurements to ensure precision in engineering and design considerations. The purpose of the report is to facilitate technical review, ensuring compliance with alignment standards within federal and state infrastructure projects, thus supporting project approvals related to government Requests for Proposals (RFPs) and grants.
    Lifecycle
    Title
    Type
    Similar Opportunities
    UT FTNP DINO 10(3) 100(2) Green River Road and Quarry Access Road
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the UT FTNP DINO 10(3) 100(2) project, which involves the rehabilitation of Green River Road and Quarry Access Road within Dinosaur National Monument, located in Colorado and Utah. The project aims to address deteriorating road conditions by rehabilitating approximately 2.35 miles of roadway, multiple pullouts, and two parking lots, along with pavement preservation work on an additional 50.4 miles of roads, including various infrastructure improvements such as curb and guardrails. This initiative is critical for maintaining safe access to the national monument and enhancing the overall infrastructure, with an estimated cost range between $10 million and $20 million. Interested bidders must submit their proposals by the specified deadline and can contact Stephanie Navarro or Ryan Phillips at CFLContracts@dot.gov for further information.
    Cutthroat Road Reroute and Culvert Install
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is preparing to solicit bids for the Cutthroat Road reroute and culvert installation project within the Uinta-Wasatch-Cache National Forest in Utah. This project entails the construction of approximately 2,216 feet of a new 14-foot wide roadway and the installation of two culverts, including an aquatic organism passage structure, to enhance local infrastructure. The estimated construction budget for this project ranges between $100,000 and $250,000, and a presolicitation site visit is scheduled for November 6, 2024, to allow potential contractors to assess the site conditions prior to the formal solicitation, which is anticipated to occur during winter shutdowns. Interested vendors should confirm their participation with Project Engineer Michael Bender via email, and note that costs incurred for attending the site visit will not be reimbursed.
    OR FLAP UMATILL 582(1), Mill Creek Road
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the construction project titled OR FLAP UMATILL 582(1), Mill Creek Road, located in Umatilla County, Oregon. This project involves the replacement of nine deteriorating retaining walls and upgrading the road surface to enhance access to the Umatilla National Forest, with a focus on compliance with federal infrastructure standards and seismic design protocols. The Invitation for Bids (IFB) emphasizes full and open competition, particularly encouraging participation from HUBZone Small Businesses, and includes detailed specifications and requirements for bid submission. Interested contractors can reach out to the Contracts G. Office at WFL.contracts@dot.gov or call 360-619-7520 for further information, with the bid submission deadline outlined in the IFB documents.
    ID FLAP BONNER 841(1), Trestle Creek Road, MP 100 to 103.7
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the reconstruction and paving of Trestle Creek Road in Bonner County, Idaho, under project ID FLAP BONNER 841(1). The project aims to enhance a 3.75-mile stretch of roadway by implementing improvements such as riprap placement, roadway aggregates, asphalt concrete pavement, and drainage enhancements, ultimately facilitating year-round access to the Kaniksu National Forest. This initiative is part of the government's commitment to infrastructure improvement and environmental stewardship, with an estimated contract value between $5 million and $10 million. Interested vendors should note that the solicitation is set to be released in Spring 2025, with a completion target of Fall 2025, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    Pineview Reservoir Recreation Complex Reconstruction – Port Boat Ramp Ogden Ranger District, Uinta Wasatch, Cache National Forest, Weber, Utah
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking contractors for the reconstruction of the Pineview Reservoir Recreation Complex, focusing on the Port Boat Ramp in the Ogden Ranger District of the Uinta Wasatch-Cache National Forest, Weber, Utah. The project entails comprehensive reconstruction efforts, including the removal of existing structures, road improvements, storm drainage enhancements, and the construction of new facilities such as comfort stations, a dump station, and a parking area. This initiative is vital for enhancing recreational access and facilities while ensuring compliance with environmental regulations and federal guidelines. Interested parties should note that a pre-solicitation site visit is scheduled for November 15, 2024, at 10:00 AM MST, and the project is estimated to exceed $10 million, with a completion timeline of 180 days starting in May 2024. For further inquiries, contact Holly Hlavac at holly.hlavac@usda.gov or Lucas Dahlman at Lucas.Dahlman@usda.gov.
    UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The United States Department of Agriculture's Forest Service is seeking qualified contractors for the Road and Bridge Construction Services Multiple Award Task Order Contract (MATOC) in the Intermountain Region 4, specifically focused on road and bridge construction and related services. The procurement includes a range of activities such as the repair and construction of various types of roads, bridges, culverts, and aquatic passages, with a total small business set-aside and a minimum of ten contracts anticipated to be awarded. This initiative is crucial for maintaining and enhancing infrastructure within national forests, ensuring both public accessibility and environmental stewardship. Interested vendors are encouraged to participate in scheduled site visits from October 9 to October 17, 2024, to familiarize themselves with the project locations, and must direct inquiries to Paul Larsen at paul.larsen@usda.gov. The full solicitation is expected to be available in fall 2024, with task orders ranging from $2,000 to $3,000,000 and a shared ceiling limit of $50,000,000 for all orders.
    CA FTNP SEKI 13(2) Mineral King Road
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the rehabilitation of Mineral King Road, a critical infrastructure project located within Sequoia and Kings Canyon National Park in California. The project encompasses approximately 12.09 miles of roadway and includes tasks such as asphalt paving, drainage improvements, and the construction of retaining walls, with an estimated cost range of $25 million to $35 million. This initiative is vital for enhancing visitor access and ensuring the safety and sustainability of the park's infrastructure, particularly in an environmentally sensitive area. Interested contractors must submit their bids by 2:00 p.m. local time on November 6, 2024, and are encouraged to attend a pre-bid meeting on October 8, 2024, for further project insights. For inquiries, contact Jorey Deml or Ryan Phillips at cflacquisitions@dot.gov.
    Z--Hyrum Dam Spillway Replacement
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the U.S. Department of the Interior, is soliciting bids for the Hyrum Dam Spillway Replacement project, located approximately 9 miles southwest of Logan, Utah. The project entails the construction of a new reinforced concrete spillway, removal of the existing spillway, and various associated infrastructure improvements, including drainage systems, mechanical features, and roadway realignment. This initiative is crucial for enhancing dam safety and infrastructure resilience, with a performance period spanning from March 2025 to January 2029 and an estimated contract value between $100 million and $200 million. Interested contractors must submit sealed bids by November 8, 2024, and can direct inquiries to Lynette Rock at LRock@usbr.gov or call 385-228-8535.
    UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The United States Forest Service, under the Department of Agriculture, is seeking qualified contractors for Road and Bridge Construction Services in the Intermountain Region 4. This procurement is part of a Total Small Business Set-Aside initiative, focusing on highway, street, and bridge construction, with the relevant NAICS code being 237310. The services are crucial for maintaining and improving infrastructure within national forests, ensuring safe access for both the public and forest management activities. Interested parties are encouraged to attend informational meetings scheduled in various locations, including South Jordan, UT, and Boise, ID, with additional details available through provided links. For further inquiries, contact Paul Larsen at paul.larsen@usda.gov.
    Joes Valley Camp Ground Restoration
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking vendors for the Joes Valley Campground Restoration project in Emery County, Utah. This opportunity involves a site visit scheduled for November 13, 2021, allowing prospective contractors to assess the project area prior to the anticipated solicitation for campground upgrades and chip seal paving, which is expected to be issued in April or May 2025. The project aims to enhance recreational facilities, including the installation of picnic tables, fire rings, and improvements to accessibility, with an estimated construction cost between $500,000 and $800,000. Interested parties should contact Casey Miller at casey.miller@usda.gov for further information and are encouraged to familiarize themselves with the site conditions that may affect contract performance.