Teton Canyon Bridge Replacement Construction at Caribou-Targhee National Forest, Idaho
ID: 1240LT24R0072Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICECaribou-Targhee National ForestIDAHO FALLS, ID, 83401, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of Agriculture's Forest Service is seeking qualified contractors for the Teton Canyon Bridge Replacement Construction project located in the Caribou-Targhee National Forest, Idaho. The procurement involves the replacement of two pedestrian bridges, specifically the Sheep Bridge and the Treasure Lake Bridge, aimed at enhancing recreational access and safety for trail users. This initiative reflects the government's commitment to improving infrastructure within national forests, ensuring both public accessibility and environmental integrity. Proposals are due by October 7, 2024, at 11:59 p.m. Central Time, and interested parties should contact Mary Harding at mary.harding@usda.gov for further details.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines a federal solicitation for the construction of a new bridge over Teton Creek on the Sheep Bridge Trail within the Caribou-Targhee National Forest in Idaho. The solicitation, identified as solicitation number 1240LT24R0072, specifies that the project is set aside for small businesses and follows a Lowest Price Technically Acceptable (LPTA) proposal evaluation process. The project includes removing the existing bridge and constructing a new one, along with site preparation and bank contouring. Additionally, there are options for a prefabricated steel pedestrian bridge. Proposals are due by September 24, 2024, emphasizing the need for potential bidders to understand the project's technical requirements through site visits. Contractors will need to submit performance and payment bonds within ten days of receiving a Notice to Proceed. The entire project execution is expected to commence by September 30, 2024, and complete by November 30, 2025, with potential penalties for delays. The document includes multiple legal clauses regarding insurance, bonding, labor standards, and Buy American requirements, ensuring compliance with federal regulations. Overall, it represents a significant infrastructure investment aimed at enhancing local transportation networks while supporting small businesses.
    The document is an amendment/modification to a solicitation issued by the USDA Forest Service for the Teton Canyon Bridge Replacement Construction project in Idaho under the Great American Outdoors Act (GAOA). The amendment, numbered 0001 and effective from September 13, 2024, serves to amend solicitation number 1240LT24R0072 dated September 12, 2024, and extends the deadline for offers. Contractors must acknowledge the receipt of this amendment through various means to ensure that their proposals are considered. The document specifies that all terms and conditions remain unchanged except where modified in this amendment, emphasizing the continuity of the contractual obligations. Overall, the purpose of this file is to inform potential contractors of the modifications to the previous solicitation, ensuring compliance with federal regulations while facilitating an efficient bidding process for the bridge construction project. The detailed structure follows the federal acquisition guidelines, highlighting the importance of timely communication and acknowledgment in the procurement process.
    The document outlines the amendments to Request for Proposals (RFP) 1240LT24R0072, focusing on a construction project managed by the federal government. Key changes include the introduction of several attachments detailing plans, specifications, and project photos essential for contractors. The instructions for offerors have been updated, emphasizing a revised technical approach that requires a comprehensive construction schedule and logistics plan. This includes a set start date for evaluation purposes. Additionally, the amendments add a new evaluation factor, Factor 3 – Key Personnel & Major Subcontractor(s). Offerors must submit detailed resumes for key personnel who will directly manage the project, as well as information about major subcontractors and their roles. The evaluation criteria have been adjusted to assess the qualifications and experience of these personnel and subcontractors in ensuring project quality and competency. The original Factor 3 focused on pricing has been renumbered to Factor 4. This document serves to clarify expectations and improve the selection process for contractors, ensuring the project’s successful execution in accordance with governmental standards and specifications.
    This document is an amendment to solicitation number 1240LT24R0072, issued by the USDA Forest Service, pertaining to the Teton Canyon Bridge Replacement construction within the Caribou-Targhee National Forest in Idaho. The amendment, effective September 18, 2024, extends the deadline for receipt of offers. Contractors must acknowledge receipt of the amendment to avoid rejection of their offers, which can be done through various means outlined in the document. The amendment signifies administrative modifications related to the contract, while the substantive terms and conditions remain unchanged. It ensures compliance with government procurement regulations while facilitating necessary changes for the project. The objective is to manage the bureaucratic aspects of the solicitation process effectively while supporting the continuation of the infrastructure improvement initiative. Overall, the amendment serves to streamline response protocols for potential contractors while reiterating the project's significance and compliance measures.
    The document outlines amendments to RFP 1240LT24R0072 concerning the Treasure Lake Bridge project, incorporating new specifications and addressing offeror queries. Key modifications include the addition of Attachment 8, which contains detailed drawings and specifications for the Treasure Lake Bridge. A comprehensive list of attachments is provided, detailing data such as plans, statements of work, project specifications, and supporting documents. Responses to offeror questions clarify logistics for site visits, the availability of drawings for the Treasure Bridge, design similarities with the Sheep Bridge, and confirm the requirement for installation pricing for the Treasure Bridge. The proposal submission deadline has been updated to October 7, 2024, at 11:59 p.m. Central Time. This amendment aims to provide clarity, ensure compliance, and facilitate the proposal process for potential bidders while reinforcing the government's transparency in communication and requirements within the context of federal procurement processes.
    The U.S. Department of Agriculture's Forest Service, specifically the Teton Basin Ranger District of the Caribou-Targhee National Forest, is announcing a bridge replacement project for bridge number 6130-0.2, located near the Sheep Bridge Trail. The project's geographical coordinates are 43.757743° latitude and -110.989864° longitude. The document includes signatures from Chad Porter and Melvin Bolling, indicating official approval and acknowledgment of the project's details, dated May 23 and May 24, 2023, respectively. This project highlights the Forest Service’s commitment to infrastructure improvements within national forests, ensuring accessibility and safety for various users of the recreation area. It reflects the federal initiative to maintain and upgrade essential structures that support both public access and environmental integrity.
    The USDA's Statement of Work (SOW) outlines a project for the construction of two pedestrian bridges in the Caribou-Targhee National Forest near Driggs, Idaho. Bridge 1, known as Sheep Bridge, will replace an existing structure to improve recreational access, while Bridge 2 will be installed to separate pedestrian traffic from vehicles for safety reasons. The contractors are required to design, fabricate, and install both bridges in accordance with AASHTO LRFD design specifications. Key tasks for Bridge 1 include removing the old bridge, creating geocell foundations, and constructing the new prefabricated steel bridge. For Bridge 2, the process involves similar preparatory steps with the addition of precast concrete sills. The timeline for project completion aims for the end of the 2024 field season, considering environmental conditions and specific work windows. Contractors will need to appoint a key individual with bridge design and installation expertise for effective communication with the Forest Service throughout the project. Overall, this SOW reflects the government's initiative to enhance infrastructure while ensuring public safety and access within national forest areas.
    The Forest Service Supplemental Specifications for the Teton Canyon Trail Bridge Replacements document outlines the requirements and procedures for the construction project. The specifications include a detailed breakdown of terms, definitions, and various sections relevant to contract execution, scope of work, quality control, and material handling. Key components focus on the contractor's responsibilities—using designated roads, controlling materials to be weed-free, and adhering to public traffic management guidelines enforced by the Manual on Uniform Traffic Control Devices (MUTCD). It emphasizes the importance of compliance with legal and environmental regulations throughout the project's duration, particularly in regards to erosion control, stormwater management, and weed prevention. Key sections have been deleted or modified to streamline processes and clarify responsibilities, stressing contractor qualifications and control measures. Additionally, specific measurement and payment procedures are outlined for proper compensation based on work performed. This document serves as a framework to ensure that construction activities maintain safety standards and environmental protection while fulfilling government regulations, thereby supporting the successful completion of bridge replacements in Teton Canyon.
    The document outlines wage determinations for highway construction projects in Idaho under the Davis-Bacon Act, highlighting minimum wage requirements based on current executive orders. It specifies that contracts awarded on or after January 30, 2022, require payment of at least $17.20 per hour to workers, while contracts awarded between January 1, 2015, and January 29, 2022, stipulate a minimum of $12.90 per hour. The wage determinations include detailed classifications of workers, their respective wage rates, and fringe benefits for various roles such as laborers, operators, and electricians. It also discusses the need for contractors to submit conformance requests for any unlisted job classifications necessary for the completion of the contract work. Additionally, the document details workers' rights under Executive Orders related to paid sick leave. The appeal process for wage determination disputes is highlighted, emphasizing the structured administrative steps for any interested parties. This file serves as essential guidance for contractors and subcontractors involved in federal highway construction projects, ensuring compliance with labor standards and worker protections.
    The document provides an overview of the Treasure Lake Bridge construction site, detailing its layout and access points. It includes descriptions and images taken from various locations around the bridge, showing abutments 1 and 2 from different angles. The primary access for construction will be on the south bank, with equipment expected to limit stream crossings to minimize impact. A mini excavator may access one of the abutments from the north side. The area downstream of abutment 2 is noted for its proximity to an existing road, which will be utilized as an access route, prepared by Forest Service personnel. This information is essential for ongoing planning and execution of the bridge construction project under federal guidelines.
    The document outlines a project for the replacement and enhancement of the Sheep Bridge over a creek. The existing bridge, with a span of approximately 50 feet, will be replaced with a prefabricated steel underhung truss bridge spanning 80 feet to increase water flow capacity and reduce the capture of woody debris. The new design involves reshaping streambanks to align with natural floodplain dimensions, removing existing earthen fill material, crib logs, and gabion wires from both sides of the creek, as well as concrete and rebar from the north side. Elevation adjustments will be made to approach trails to match existing trail elevations, with a maximum grade of 12%. Proper installation of a rock underdrain at the second approach will also be included. The project's intent is to restore the area’s natural hydrology and improve structural integrity, demonstrating compliance with environmental regulations while considering local ecological impacts within the context of federal and state grants or contracts for infrastructure improvements.
    This document outlines the wage determination for construction projects in Idaho, specifically related to highway construction across several counties. It references the Davis-Bacon Act, which mandates that contractors pay minimum wage rates, as specified in Executive Orders 14026 and 13658, based on the contract's initiation date. For contracts starting or renewed after January 30, 2022, the minimum wage is set at $17.20 per hour, while contracts from January 1, 2015, to January 29, 2022, require a minimum of $12.90 per hour. Detailed wage rates for various labor classifications, such as cement masons, electricians, and truck drivers, are provided along with fringe benefits. The document also explains how to appeal wage determinations and the process for submitting conformance requests for unlisted classifications. It highlights the importance of following labor standards under the listed Executive Orders and ensuring worker protections, like paid sick leave as per Executive Order 13706. This wage determination serves a critical role in ensuring compliance with federal labor laws for contractors involved in state and federal construction projects, facilitating fair compensation and working conditions.
    The government file outlines the development of the Treasure Lake Trail Bridge project within the Caribou-Targhee National Forest, specifically in the Teton Basin District. The primary goal of the project is to construct a prefabricated steel underhung truss bridge to improve access and safety for trail users. The specifications detail the materials, construction methods, and engineering standards that must be adhered to, including compliance with federal highway specifications (FP-14) and the AASHTO standards for pedestrian bridges. Key project components include the design of a 90-foot bridge, installation of precast concrete grade beams, and various structural materials like weathering steel and treated timber. The document also emphasizes environmental considerations, including erosion control and minimal disturbance to surrounding ecosystems during construction. Additionally, it provides guidance for submitting designs for review, with expectations for detailed shop drawings and calculations from registered professional engineers. The project reflects government investment in infrastructure and recreational access, aligning with broader goals of maintaining national forest trails and enhancing public use of natural areas.
    Similar Opportunities
    White Mountain National Forest, Rob Brook Road Bridge Replacement, FR 35, MP. 0.1
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the USDA Forest Service, is soliciting bids for the replacement of the Rob Brook Road Bridge located in the White Mountain National Forest, Albany, New Hampshire. The project involves demolishing an existing 28-foot timber bridge and constructing a new 44-foot steel girder bridge, with a completion deadline set for October 31, 2025. This infrastructure improvement is crucial for maintaining safe transportation routes within national forests and reflects the government's commitment to environmental stewardship. Interested contractors must register in the System for Award Management (SAM) and submit their bids by September 10, 2024, with the anticipated contract value ranging between $500,000 and $1,000,000. For further inquiries, potential offerors can contact Brad Higley at bradley.higley@usda.gov.
    ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
    Active
    Transportation, Department Of
    The Department of Transportation's Federal Highway Administration seeks contractors for the Crown Point Trail project in Idaho, involving extensive trail construction and repairs. This small business set-aside project, valued between $700,000 and $2 million, requires expertise in highway construction and will be awarded through a sealed bid process. The upcoming procurement, anticipated in early 2025, aims to enhance a 2.7-mile trail stretch with resurfacing, slope repairs, and new construction, accessible for physical inspection now before snow sets in.
    Crazy Woman Creek Corridor Updates - Forest Service Rd. 33 Repairs
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service under the Bighorn National Forest, is soliciting proposals for the Crazy Woman Creek Corridor Updates, which include critical repairs to Forest Service Road 33 in Wyoming. The primary objective of this project is to replace a bridge at milepost 1.70 on Crazy Woman Road, with additional optional work involving the rehabilitation of other bridges, road improvements, and culvert replacements at specified mileposts. This initiative is vital for enhancing transportation infrastructure within the national forest, ensuring safety and accessibility while adhering to federal environmental standards. Interested contractors must submit sealed bids by October 3, 2024, with a performance period set from January 1, 2025, to July 1, 2026. For further inquiries, potential bidders can contact Mark Reed at mark.reed@usda.gov.
    UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
    Active
    Agriculture, Department Of
    The United States Forest Service, under the Department of Agriculture, is seeking qualified contractors for Road and Bridge Construction Services in the Intermountain Region 4. This procurement is part of a Total Small Business Set-Aside initiative, focusing on highway, street, and bridge construction, with the relevant NAICS code being 237310. The services are crucial for maintaining and improving infrastructure within national forests, ensuring safe access for both the public and forest management activities. Interested parties are encouraged to attend informational meetings scheduled in various locations, including South Jordan, UT, and Boise, ID, with additional details available through provided links. For further inquiries, contact Paul Larsen at paul.larsen@usda.gov.
    CARIBOU-TARGHEE NATIONAL FOREST - Stoddard Creek Campground Gravel
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is soliciting proposals for the delivery of 1,000 yards of ¾ Road Base gravel to the Stoddard Creek Campground located in the Caribou-Targhee National Forest, Dubois Ranger District, Idaho. The project requires that bidders provide proof of specifications for the gravel to ensure compliance with project requirements, and it explicitly states that belly dump or side dump trailers cannot be used for the delivery. This procurement is part of broader federal initiatives aimed at enhancing recreational spaces and improving visitor amenities within public lands, thereby promoting outdoor activities and tourism. Interested contractors should contact Robyn Akins at Robyn.Akins@usda.gov or Curtis Neppl at curtis.neppl@usda.gov for further details, as this opportunity is set aside for small businesses under the SBA guidelines.
    ID FLAP IDAHO NF17(1), Mt. Idaho Grade Road Rehabilitation
    Active
    Transportation, Department Of
    The U.S. Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for the rehabilitation of the Mt. Idaho Grade Road under project ID FLAP IDAHO NF17(1) located in Grangeville, Idaho. The project encompasses approximately 6 miles of roadway improvements, addressing critical issues such as roadway subgrade instability and inadequate drainage, which have led to surface deterioration. This initiative is vital for enhancing access to local national forests and recreational areas, ensuring compliance with federal construction standards while promoting safety and efficiency in transportation infrastructure. Interested contractors must submit their bids by October 8, 2024, following the guidelines outlined in the solicitation documents, and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    Phase 1 4FL Forest Housing Deferred Maintenance
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, Forest Service is soliciting bids for the Phase 1 4FL Forest Housing Deferred Maintenance project located in McCall, Idaho, specifically within the Payette National Forest. This project involves critical construction activities, including the installation of new utilities, demolition of existing structures, and the construction of a new laundry facility, all aimed at improving housing infrastructure for government employees. The contract is set aside for small businesses, with a total estimated value between $250,000 and $500,000, and the performance period is scheduled from September 30, 2024, to October 30, 2025. Interested contractors must submit their proposals by September 23, 2024, at 5:00 PM EST, and can direct inquiries to Brenda Simmons at brenda.simmons@usda.gov.
    Project WV ERFO FS MNGAH921 2018-1(1) - Monongahela National Forest
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration's Eastern Federal Lands Highway Division, is seeking qualified small businesses for a construction project in the Monongahela National Forest, West Virginia. The project involves trail and road repairs, culvert replacements, and bridge reconstructions across 29 repair sites, necessitated by damage from significant storms, with an estimated total cost between $12 million and $15 million. This initiative aims to enhance infrastructure resilience and promote small business participation in federal contracting opportunities. Interested prime contractors must submit their qualifications by September 25, 2024, to Mr. Michael Sun at EFLHD.Contracts@dot.gov, adhering to specific formatting guidelines for their submissions.
    Purchase and delivery of 15 picnic tables, 15 fire rings, and 15 utility tables to the St. Anthony Work Center.
    Active
    Agriculture, Department Of
    The USDA Forest Service is seeking proposals for the purchase and delivery of 15 picnic tables, 15 fire rings, and 15 utility tables to the St. Anthony Work Center in Idaho. The procurement aims to enhance recreational facilities in the Caribou-Targhee National Forest, with specific requirements for the products, including ADA compliance, snow load ratings, and durable materials. This initiative underscores the importance of accessible outdoor amenities for public enjoyment and aligns with federal guidelines. Interested contractors must submit their proposals by September 19, 2024, and can contact Morgan Sharp at morgan.sharp@usda.gov for further information.
    WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the replacement of the North Fork Crazy Woman Creek Bridge in Johnson County, Wyoming, under the contract number 6982AF24B000023. The project involves replacing an existing bridge structure on Crazy Woman Canyon Road/Route 33, including roadway approach reconstruction and installation of object markers, with a focus on compliance with federal construction standards and environmental regulations. This initiative is part of a broader effort to enhance federal transportation infrastructure, categorized as a total small business set-aside under NAICS 237310, with bids due by October 1, 2024, and a projected completion date of September 26, 2025. Interested contractors can direct inquiries to Denise Martinez or Leslie Karsten at CFLAcquisitions@dot.gov.